1. Name of work:- Resectioning of Dhunni minor RD 0+000 to ...

81
S.# Description Quantity Unit Rate quoted by contractor in figures Rate quoted by contractor in words 1 Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, slush, daldal, and underwater) including its disposal and preparation of working pad for operation of Machinery. (Rate includes 100 ft lead). Qty as per Sheet Attached. 72238 % 0 Cft 2 Earth work excavation in irrigation channel, drains etc to designed section, grades and profiles excavated material disposed off and dressed with in 50 ft. (15 m) lead:- ordinary 73833 % 0 Cft Contractor 1. Name of work:- Resectioning of Dhunni minor RD 0+000 to 40+218 tail. BOQ Executive Engineer, Gujrat Division UJC Gujrat

Transcript of 1. Name of work:- Resectioning of Dhunni minor RD 0+000 to ...

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead). Qty as per Sheet Attached.

72238 % 0 Cft

2

Earth work excavation in irrigation channel, drains etc to designed

section, grades and profiles excavated material disposed off and dressed

with in 50 ft. (15 m) lead:- ordinary

73833 % 0 Cft

Contractor

1. Name of work:- Resectioning of Dhunni minor RD 0+000 to 40+218 tail.

BOQ

Executive Engineer,

Gujrat Division UJC

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead). Qty as per Sheet Attached.

243680 %o Cft

Contractor

BOQ

2. Name of work:- Resectioning of Phalia disty RD 189+000 to 231+500 tail.

Executive Engineer,

Gujrat Division UJC

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead). Qty as per Sheet Attached.

242670 %0 Cft

Contractor

3. Name of work:- Resectioning of Qadirabad minor RD 0+000 to 50+050 tail.

BOQ

Executive Engineer,

Gujrat Division UJC

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead).Qty as per Sheet Attached.

221893 %0 Cft

Contractor

4. Name of work:- Resectioning of Humber minor RD 0+000 to 18+850 tail.

BOQ

Executive Engineer,

Gujrat Division UJC

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead).

410204 %0 Cft

2 Berm Cutting single through of kassi , thaora or shawal (without dressing)17355 %0 Cft

Contractor

BOQ

5. Name of work:- Resectioning of Bhallowal disty RD 60+000 to 132+090 tail.

Gujrat Division UJC

Executive Engineer,

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1Pacca brick work other than building upto 10ft. (3 m) height. cement, sand

mortar:- Ratio 1:4 381.78 % Cft

2

Cement concrete plain including placing, compacting, finishing and curing

complete (including screening and washing of stone aggregate): Ratio 1: 2: 4 49.69 %Cft

3 Borrowpit excavation dressed dressed lead upto 100 ft (30 metre). 1224.00 %0 Cft

4Dismantling Brick work in lime or cement marter

19.69 % Cft

Contractor Executive Engineer,

Gujrat Division UJC

Gujrat

6. Name of work:- Restoration of side protection wall at RD 7-8 /L&R

of Pahrianwali Minor near Grave Yard.

BOQ

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Excavation in foundation of building, bridges and other structures, including

dagbelling, dressing, refilling around structure with excavated earth, watering and

ramming lead upto one chain (30 m) and lift upto 5 ft. (1.5 m) in ordinary soil.

C-3, I-21 (b)

570.00 % 0Cft

2Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 50 mm) gauge, in

foundation and plinth:- Ratio 1: 4: 8 570.00 % Cft

3Pacca brick work in foundation and plinth in Cement, sand mortar:- Ratio 1:4

342.00 % Cft

4Pacca brick work other than building upto 10ft. (3 m) height. cement, sand

mortar:- Ratio 1:4 1634.73 % Cft

5

Cement concrete plain including placing, compacting, finishing and curing

complete (including screening and washing of stone aggregate): Ratio 1: 2: 4 96.75 % Cft

6 Borrowpit excavation dressed dressed lead upto 100 ft (30 metre). 4072.65 %0 Cft

7 Dismantling Brick work in lime or cement marter 21.3675 % Cft

7. Name of work:- Restoration of side protection wall at RD 6-7/L&R

of Pahrianwali Minor near Grave Yard.

BOQ

Contractor Executive Engineer,

Gujrat Division UJC

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1 Dismantling brick work in lime or cement mortar. 402 % Cft

2Pacca brick work other than building upto 10 ft. (3 m) height. in

cement, sand mortar:-Ratio 1:3.126 % Cft

3

Reinforced cement concrete in roof slab, beams,columns lintels,

girders and other structural members laid in situ or precast laid in

position, or prestressed members cast in situ, complete in all

respects:- Type C (nominal mix 1: 2: 4).

209 1 Cft

4

Fabrication of mild steel reinforcement bar cage for cement

concrete, including cutting, bending, laying in position,making

joints and fastening, including cost of binding wire and labour

charges for binding of steel reinforcement (also includes removal

of rust from the bars) :- deformed bars (Grade-40).

661 % Kg

Contractor

1. Name of work:- Repairing Cart Bridge at RD 210-211 / R of Phalia disty.

BOQ

Executive Engineer,

Gujrat Division UJC

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead). Qty as per Sheet Attached.

244175 %o Cft

Contractor

Gujrat

2. Name of work:- Repairing & Strengthening banks of Phalia disty RD 168+000 to 231+500 tail in

Bhikho section.

BOQ

Executive Engineer,

Gujrat Division UJC

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Excavation in foundation of building, bridges and other

structures, including dagbelling, dressing, refilling around

structure with excavated earth, watering and ramming lead

upto one chain (30 m) and lift upto 5 ft. (1.5 m) in ordinary soil.

2205 %o Cft

2Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 50

mm) gauge, in foundation and plinth:- Ratio 1: 4: 8315 % Cft

3Pacca brick work other than building upto 10 ft. (3 m) height.

cement, sand mortar:-Ratio 1:4.880 % Cft

4

Borrowpit excavation dressed & transporation of earth all types

when the total distance including the lead covered in the item of

work is more than 1000 ft. (300 m ) dressed lead upto 1000 ft. Qty

as per sheet attached.

7800 %o Cft

Contractor Executive Engineer,

Gujrat Division UJC

Gujrat

3. Name of work:- Providing side protection wall at RD 185-186 / L of Phalia disty.

BOQ

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Excavation in foundation of building, bridges and other

structures, including dagbelling, dressing, refilling around

structure with excavated earth, watering and ramming lead

upto one chain (30 m) and lift upto 5 ft. (1.5 m) in ordinary soil.

4410 %o Cft

2Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 50

mm) gauge, in foundation and plinth:- Ratio 1: 4: 8630 % Cft

3Pacca brick work other than building upto 10 ft. (3 m) height.

cement, sand mortar:-Ratio 1:4.1760 % Cft

Contractor Executive Engineer,

Gujrat Division UJC

Gujrat

4. Name of work:- Providing side protection wall at RD 184-185 / R of Phalia disty.

BOQ

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Excavation in foundation of building, bridges and other

structures, including dagbelling, dressing, refilling around

structure with excavated earth, watering and ramming lead

upto one chain (30 m) and lift upto 5 ft. (1.5 m) in ordinary soil.

4961 %o Cft

2Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 50

mm) gauge, in foundation and plinth:- Ratio 1: 4: 8709 % Cft

3Pacca brick work other than building upto 10 ft. (3 m) height.

cement, sand mortar:-Ratio 1:4.1980 % Cft

Contractor Executive Engineer,

Gujrat Division UJC

Gujrat

5. Name of work:- Providing protection wall at RD 230-231 / R of Phalia disty.

BOQ

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Excavation in foundation of building, bridges and other

structures, including dagbelling, dressing, refilling around

structure with excavated earth, water ramming lead

upto 1 chain. In ordinary soil.

1200 %o Cft

2Cement concrete brick or stone ballast 1.5" to 2" gauge in

foundation in 1: 4: 8.400 % Cft

3Pacca brick work in foundation and plinth in cement sand mortar

in 1:3.480 % Cft

4Pacca brick work other than building in cement sand mortar in 1:3

up to 10' height.1036 % Cft

5Cement concrete plain including placing, compacting, finishing and

curing complete in Ratio 1: 2: 4.60 % Cft

6Borrowpit excavation dressed lead upto 100 ft (30 metre).

Ordinary soil (dressed).23230 %o Cft

7 Cement pointing struck joints, on walls, upto 20' (6.00 m) ratio 1:2. 1200 % Cft

Contractor

6. Name of work:- Providing side protection wall at RD 84-85 upstream and downstream village Road

Bridge of 14-R disty.

BOQ

Executive Engineer,

Gujrat Division UJC

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead).

27284 %0 Cft

2 Uprooting Sarkansa growth lead upto 100 feet. 28280 % Sft

Contractor

7. Name of work:- Resectioning of Kot Fateh Din Sub Minor RD 0+000 to 21+500 tail.

Gujrat

BOQ

Executive Engineer,

Gujrat Division UJC

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead).

245300 %o Cft

Contractor

8. Name of work:- Berm cutting and desilting of Bhallowal disty RD 14+000 to 26+000.

BOQ

Executive Engineer,

Gujrat Division UJC

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead).

226115 %o Cft

Contractor Executive Engineer,

Gujrat Division UJC

Gujrat

9. Name of work:- Resectioning of Bhallowal disty RD 38+000 to 52+000 in Bhacher section.

BOQ

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead).

244700 %o Cft

Contractor

Gujrat Division UJC

Gujrat

Executive Engineer,

10. Name of work:- Berm cutting and desilting of Bhallowal disty RD 26+000 to38+000.

BOQ

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead).

232910 %o Cft

Contractor

11. Name of work:- Resectioning of Bhallowal disty RD 0+000 to 14+000 in Bhacher section.

BOQ

Executive Engineer,

Gujrat Division UJC

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1 Jungle clearance and removing within 100 ft. (30 m) thick. 34000 %o Sft2 Regular excavation dressed. 23080 %o Cft3 Rehandling of earthwork lead upto 50 feet. 17310 %o Cft

4Borrowpit excavation undressed lead upto 100 ft (30 metre) in ordinary

soil5770 %o Cft

Contractor

Gujrat Division UJC

Gujrat

12. Name of work:- Detecting & filling porcupine holes on Gujrat Branch between RD 96+000 to

BOQ

Executive Engineer,

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Excavation in foundation of building, bridges and other

structures, including dagbelling, dressing, refilling around

structure with excavated earth, water ramming lead

upto 1 chain. In ordinary soil.

787.5 %o Cft

2Cement concrete brick or stone ballast 1.5" to 2" gauge in

foundation in 1: 4: 8.262.5 % Cft

3Pacca brick work in foundation and plinth in cement sand mortar

in 1:3.315 % Cft

4Pacca brick work other than building in cement sand mortar in 1:3

up to 10' height.798 % Cft

5Cement concrete plain including placing, compacting, finishing and

curing complete in Ratio 1: 2: 4.39 % Cft

6 Borrowpit excavation lead upto 100 ft dressed. 26601 %o Cft

7Cement pointing struck joints, on walls, upto 20' (6.00 m) height ratio

1:2.840 % Sft

BOQ

13. Name of work:- Repairing fall and extension of D/S protection wall at RD 87+809 of 15-R disty.

Contractor

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Excavation in foundation of building, bridges and other

structures, including dagbelling, dressing, refilling around

structure with excavated earth, water ramming lead

upto 1 chain. In ordinary soil.

937.5 %o Cft

2Cement concrete brick or stone ballast 1.5" to 2" gauge in

foundation in 1: 4: 8.312.5 % Cft

3Pacca brick work in foundation and plinth in cement sand mortar

in 1:3.375 % Cft

4Pacca brick work other than building in cement sand mortar in 1:3

up to 10' height.950 % Cft

5Cement concrete plain including placing, compacting, finishing and

curing complete in Ratio 1: 2: 4.47 % Cft

6 Borrowpit excavation lead upto 100 ft dressed. 10072 %o Cft

Gujrat Division UJC

Gujrat

14. Name of work:- Providing protection wall U/S Fall at RD 122+820 of 15-R disty.

BOQ

Executive Engineer,

7Cement pointing struck joints, on walls, upto 20' (6.00 m) height ratio

1:2.1000 % Sft

Contractor

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead).

12999 %0 Cft

2 Uprooting Sarkansa growth and disposal within 100 feet. 8400 % Sft3 Removing weed growth from Channels by using Chemical. 453500 % Sft

Contractor

Executive Engineer,

Gujrat Division UJC

Gujrat

15. Name of work:- Resectioning of Suleman Minor RD 0+000 to 38+900 tail.

BOQ

Executive Engineer,

Gujrat Division UJC

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1 Removing weed growth from Channels by using Chemical. 74328 % Sft

Contractor

16. Name of work:- Resectioning of Dala Minor RD 0+000 to 7+911 tail.

BOQ

Executive Engineer,

Gujrat Division UJC

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Cement concrete plain including placing, compacting, finishing and

curing complete (including screaning & washing of stone

aggregate 1: 2: 4).

635.832 % Cft

2 Carriage of small consignment upto lead 8 KM. 291 Each3 Placing boundary pillers in position including digging pits. 291 Each

4Painting distance marks for white ground and black lettering on both

faces.291 Each

Contractor

17. Name of work:- Providing & Fixing Distance Marks on Channels in Chuknawali Section.

BOQ

Executive Engineer,

Gujrat Division UJC

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1Earthwork for outlets, excavation refilling, ramming and pudding

channels, discharge 101 to 200 cusecs.29 1 Job

2Earthwork for outlets, excavation refilling, ramming and pudding

channels, discharge upto 50 cusecs.7 1Job

3 Dismantling outlets A.P.M. or O.F. "H" upto 2.0 ft. (600 mm) 36/2. 18 1 No.

4Extra labour in fixing A.P.M. and O.F. outlet blocks, channel depth of 2.0'.

(600 mm).36 1 No.

5Water allowance for constructing outlets or culverts, whencanal water is

not flowing. (36/2)18 1 No.

6Pacca brick work other than building upto 10ft. (3m) height cement,

sand mortar Ratio 1:3 gullet portion. 400.51 % Cft

18. Name of work:- Repairing Defective / Tempered outlets in Chuknawali Section.

BOQ

7

Fabrication of heavy steel work, with angle, tees, flat iron and

sheet iron for making trusses, girders tanks, etc. including cutting,

drilling, revitting, handling, assembling and fixing, but excluding

erection in position.

745.96 % Kg

Contractor

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Excavation in foundation of building, bridges and other

structures, including dagbelling, dressing, refilling around

structure with excavated earth, water ramming lead

upto 1 chain. In ordinary soil.

893.9 % 0Cft

2Cement concrete brick or stone ballast 1.5" to 2" gauge in

foundation in 1: 4: 8.443.5 % Cft

3Pacca brick work other than building in cemen sand mortar 1:3 up to

10' height.1074 % Cft

4 Dry Brick pitching. 75 % Cft

BOQ

19. Name of work:- Repairing fall at RD 41000 of 15-R disty.

Executive Engineer,

Gujrat Division UJC

Gujrat

5Cement concrete plain including placing, compacting, finishing and

curing complete in 1:2:4.189 % Cft

6 Borrowpit excavation undressed lead upto 100 ft in ordinary soil 36206 % 0Cft

7 Cement pointing struck joints, on walls, upto 20' (6.00 m) height 186 % Sft8 Supply and Dumping Brick bats. 113.4 % Cft

9 Formation, dressing and preparing sub - grade on slop. 99 % Sft

Contractor

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead).

211725 %0 Cft

2 Uprooting Sarkansa growth and disposal within 100 feet. 64610 % Cft

20. Name of work:- Resectioning of 15-R disty RD 87+000 to 173+360 tail.

BOQ

Gujrat Division UJC

Executive Engineer,

Gujrat

Contractor

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1Borrowpit excavation dressed lead upto 100 ft (30 metre) in ordinary soil

101540 %0 Cft

2 Uprooting Sarkansa growth and disposal within 100 feet. 48790 % Sft

21. Name of work:- Repairing and Strengthening of banks of 15-R disty RD 87+000 to 173+360 tail (RD

149 to 160)

BOQ

Executive Engineer,

Gujrat Division UJC

Gujrat

Contractor

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1 Uprooting Sarkansa growth and disposal within 100 feet. 111760 % Sft2 Removing weed growth from Channels by using Chemical. 424140 % Sft

Contractor

22. Name of work:- Resectioning of Chak Jano Minor RD 0+000 to 27+960 tail.

BOQ

Executive Engineer,

Executive Engineer,

Gujrat Division UJC

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead).

120647 %o Cft

23. Name of work:- Resectioning of 13-R disty RD 0+000 to 42+640 tail.

BOQ

Gujrat Division UJC

Gujrat

Contractor

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

Executive Engineer,

Gujrat Division UJC

Gujrat

24. Name of work:- Resectioning of 11-R disty RD 0+000 to 41+150 tail.

BOQ

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead).

150081 %o Cft

Contractor

Gujrat

Executive Engineer,

Gujrat Division UJC

25. Name of work:- Resectioning of 14-R disty RD 0+000 to 43+000 in Chuknawali Section.

BOQ

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead).

226880 %o Cft

Contractor Executive Engineer,

Gujrat Division UJC

Gujrat

26. Name of work:- Resectioning of 14-R disty RD 44+000 to 87+000

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead).

152125 %o Cft

Contractor

BOQ

Executive Engineer,

Gujrat Division UJC

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead).

72500 %o Cft

Contractor

Gujrat Division UJC

Gujrat

27. Name of work:- Resectioning of Pahrianwali Minor RD 0+000 to 59+800 tail.

BOQ

Executive Engineer,

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead).

51239.50 %o Cft

Contractor

28. Name of work:- Resectioning of Basi Minor RD 0+00 to 27+300.

BOQ

Executive Engineer,

Gujrat Division UJC

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1Borrowpit excavation dressed lead upto 100 ft (30 metre) in ordinary soil

75697.65 %0 Cft

Contractor

29. Name of work:- Repairing and Strengthening banks of Pharianwali Minor RD 10+000 to 23+000 &

RD 47-48.

BOQ

Executive Engineer,

Gujrat Division UJC

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1Borrowpit excavation dressed lead upto 100 ft (30 metre) in ordinary soil

102535.50 %0 Cft

Contractor

30. Name of work:- Repairing and Strengthening of banks of 14-R disty RD 0+00 to 87+000.

BOQ

Executive Engineer,

Gujrat Division UJC

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead).

226184 %o Cft

Contractor

31. Name of work:- Resectioning of 15-R disty RD 0+00 to 87+000 in Chuknawali Section (RD 36+000

to 57+000).

BOQ

Executive Engineer,

Gujrat Division UJC

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead).

214712 %o Cft

Contractor

Gujrat Division UJC

Gujrat

32. Name of work:- Resectioning of 15-R disty RD 0+00 to 87+000 in Chuknawali Section (RD 0+000

to 35+013).

BOQ

Executive Engineer,

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1

Earth work in excavation of drains, irrigation channels through

Excavator/ drag lines in all kinds of soil and condition (Dry, wet,

slush, daldal, and underwater) including its disposal and

preparation of working pad for operation of Machinery. (Rate

includes 100 ft lead).

244708 %o Cft

Contractor

33. Name of work:- Desilting of Duggal Minor RD 0+000 - 33+005 Tail.

BOQ

Executive Engineer,

Gujrat Division UJC

Gujrat

S.# Description Quantity Unit

Rate

quoted by

contractor

in figures

Rate quoted by

contractor in words

1Earth work excavation in ashes,sandand soft soil or silt

clearance,undressed lead upto 50 ft (15 meter).,13090 %o Cft

Contractor

34. Name of work:- Desilting of Raika Minor RD 0+000 - 11+000 Tail.

BOQ

Executive Engineer,

Gujrat Division UJC

Gujrat