Regular Board Meeting Agenda January 10, 2019 - 5:00 P.M. 1. Call to Order - Pledge of Allegiance 2. Roll Call: 3. Agenda Review: 3.1 Motion for an Executive Session: To discuss personnel matters – District Manager’s performance review, pursuant to §24-6-404(4)(f), C.R.S. 4. Public Comment on Non-Agenda Items: 5. Consent Items: 5.1. Minutes of the December 13, 2018 Regular Board Meeting ....... Page 4 5.2. Tap List 636 ................................................................................. Page 9 5.3. December 2018 Disbursements Report ........................................ Page 10 5.4. December 2018 Financial Report................................................. Page 15 5.5. Designation of Public Posting Places................................... Page 21 6. Discussion Items: 6.1. Introduction of Randy Starr and Mike Westbrook, District General Counsel 6.2. Carter Lake Filter Plant ................................................................ Page 22 6.3. Public Hearing: Action Item: Motion to Approve Resolution No. 2019-1, Inclusion ................ Page 23 7. Staff Reports 7.1. District Manager’s Report ............................................................ Page 27 7.2. District Engineer’s Report ............................................................ Page 28 7.3. Water Resources Manager’s Report ............................................. Page 31 7.4. Operations Manager’s Report and Water Quality Update ........... Page 35 8. Director Reports: 9. Executive Session: To discuss personnel matters – District Manager’s performance review, pursuant to §24-6-404(4)(f), C.R.S. 10. Adjournment. Directors: Bill Szmyd, President Steven Brandenburg Larry Brandt Paul Bukowski Kathy Gallivan-Crist Ed Martens Emily McMurtrey District Manager: Michael T. Cook, PE 835 E Highway 56 Berthoud, CO 80513 P: 970-532-2096 F: 970-532-3734 www.LTWD.org 1

Transcript of Directors: District Manager: Bill Szmyd, President Michael ......Jan 10, 2019  · Director Brandt...

  • Regular Board Meeting Agenda January 10, 2019 - 5:00 P.M.

    1. Call to Order - Pledge of Allegiance

    2. Roll Call:

    3. Agenda Review:3.1 Motion for an Executive Session: To discuss personnel matters – District Manager’s performancereview, pursuant to §24-6-404(4)(f), C.R.S.

    4. Public Comment on Non-Agenda Items:

    5. Consent Items:5.1. Minutes of the December 13, 2018 Regular Board Meeting ....... Page 4 5.2. Tap List 636 ................................................................................. Page 9 5.3. December 2018 Disbursements Report ........................................ Page 10 5.4. December 2018 Financial Report ................................................. Page 15 5.5. Designation of Public Posting Places ................................... Page 21

    6. Discussion Items:6.1. Introduction of Randy Starr and Mike Westbrook, District General Counsel 6.2. Carter Lake Filter Plant ................................................................ Page 22 6.3. Public Hearing: Action Item:

    Motion to Approve Resolution No. 2019-1, Inclusion ................ Page 23

    7. Staff Reports7.1. District Manager’s Report ............................................................ Page 27 7.2. District Engineer’s Report ............................................................ Page 28 7.3. Water Resources Manager’s Report ............................................. Page 31 7.4. Operations Manager’s Report and Water Quality Update ........... Page 35

    8. Director Reports:

    9. Executive Session: To discuss personnel matters – District Manager’s performance review, pursuant to§24-6-404(4)(f), C.R.S.

    10. Adjournment.

    Directors: Bill Szmyd, President Steven Brandenburg Larry Brandt Paul Bukowski Kathy Gallivan-Crist Ed Martens Emily McMurtrey

    District Manager: Michael T. Cook, PE

    835 E Highway 56 Berthoud, CO 80513

    P: 970-532-2096 F: 970-532-3734 www.LTWD.org

    1

    http://www.ltwd.org/

  • Big Picture Future Capital Projects: Campion line replacement program. Alps Line replacement / upgrade. Additional CLFP storage tank. Additional Treatment Capacity. Raw water infrastructure needs.

    2018 strategic plan, priority summary:1. Second use water.2. Dry Creek expand/treatment/

    hydro/recreation...3. Mead / Longs Peak service area.4. Limited Water Resources5. Technology - Beacon Meters.6. Age/type of infrastructure.7. Heavy competition for water.8. Windy Gap water opportunities.9. Good financial Condition.10. Reliability of system.

    The next few on the list:1. Boom and bust planning.2. More Storage.3. Longer term Financial planning.4. Dependence on CBT (Colorado River)5. Appropriate Staffing levels.

    "Serving our customers with safe, reliable and good tasting water at a fair price"

    UPDATED 12/10/2018

    2

    mtcookRectangle

    mtcookRectangle

    mtcookLine

    mtcookLine

    mtcookRectangle

    mtcookPencil

    mtcookPencil

  • 3

  • Agenda Item Summary Little Thompson Water District

    Date: January 10, 2019

    Item #: 5.1

    Staff: Michael T. Cook, District Manager

    Subject: Approval of the minutes of the December 13, 2018 Regular Board Meeting

    Staff Recommendation: Staff recommends approval.

    4

  • MINUTES OF THE REGULAR MEETING OF THE BOARD OF DIRECTORS

    OF LITTLE THOMPSON WATER DISTRICT

    The Board of Directors of Little Thompson Water District (LTWD) met in regular session on Thursday, December 13, 2018 at the District office. Attendance was as follows:

    Board of Directors: Bill Szmyd, President Steven Brandenburg Larry Brandt Paul Bukowski Kathy Gallivan-Crist Ed Martens Emily McMurtrey

    Present Present Present Present Present Present Present

    Staff in Attendance: Mike Cook, District Manager Judy Dahl, Business Manager Amber Kauffman, District Engineer Nancy Koch, Water Resources Manager Ken Lambrecht, Operations Manager Angela Diekhoff, District Accountant Judy O’Malley, Recording Secretary

    Other Attendees: Julie Pasillas, Director of Community Resources of the Town of Firestone Dave Lindsay, Town Engineer of the Town of Firestone Gregg Ten Eyck, Sr. Project Manager of Leonard Rice Engineers

    CALL TO ORDER

    President Szmyd called the meeting to order at 5:02 p.m. followed by recitation of the Pledge of Allegiance.

    ROLL CALL

    Roll call was taken. All Directors were present.

    AGENDA REVIEW

    There were no changes to the agenda.

    PUBLIC COMMENTS ON NON-AGENDA ITEMS

    There were no public comments.

    CONSENT AGENDA

    President Szmyd requested to hear the 2018 Supplemental Budget Appropriation Resolution separately from the other Consent Agenda Items. President Szmyd requested a motion be made to approve all other Consent Agenda items. It was moved by Director Brandt, seconded by Director Bukowski, to approve the Consent Agenda including:

    • Minutes of the November 15, 2018 Regular Board Meeting,• Tap List 635,• November 2018 Disbursements in the amount $2,548,571.17:

    o Operating Account: $2,227,435.71: ACH Manual Check Numbers 1755 to 1792 – $2,174,771.09, Check Numbers 8950 to 8991 – $52,664.62,

    o Payroll Account: (Two Bi-weekly payroll periods in November) for $321,135.46: ACH Transmittal Vouchers – O-1524 to O-1526 – $159,119.42, Check Number 1920 - $2,955.20

    5

  • ACH Direct Deposit Numbers N-8348 to N-8444 – $159,060.84,• November 2018 Financial Report.

    Motion carried unanimously.

    2018 Supplemental Budget Appropriation Resolution: District Business Manager Dahl presented the 2018 Supplemental Budget Appropriation Resolution No. 2018-10 as follows:

    The 2018 Supplemental Budget was necessitated due to the District having spent more than anticipated in the Operating Budget because of additional repairs and maintenance. The Non-Operating Budget was increased because of additional costs in county road improvements, small line abandonments, and the addition of the Beacon Master Meter Upgrade Project.

    Business Manager Dahl also asked that the Board approve an increase in the operating revenue budget by $1,902,500.00 for mineral lease and water revenue and the non-operating revenue budget by $3,088,500.00 for additional revenue in the Poudre River Power Authority (PRPA) Windy Gap Water Rights, plant investment fees, other fees, and interest income.

    The supplemental revenue appropriation increases recommended by Business Manager Dahl are $4,991,000.00 for a total revenue budget of $20,308,408.00.

    The supplemental expenditure appropriation increases recommended by Business Manager Dahl are $672,000.00 for a total expense budget of $13,563,864.00.

    Following discussion, it was moved by Director Bukowski, seconded by Director Gallivan-Crist, to adopt Resolution 2018-10 Supplemental Budget and Appropriation as presented. Motion carried unanimously.

    DISCUSSION ITEMS

    Presentation About Proposed St. Vrain Area Water Authority: Representatives from The Town of Firestone, Julie Pasillas, Director of Community Resources; Dave Lindsay, Town Engineer; and Gregg Ten Eyck, Sr. Project Manager of Leonard Rice Engineers gave a presentation regarding the proposed St. Vrain Water Authority.

    The Board members decided further discussion with the Town of Firestone was in order.

    Carter Lake Filter Plant (CLFP): The following items were discussed:

    • In their Monthly Board Packet, the CLFP provides graphs showing the trans-membrane pressure andpermeability representing the effectiveness of the cleaning cycle for each cell. District Manager Cookreviewed the graphs and found a major improvement in the recovery of the cells due to the recentchanges in the cleaning process for the cells.

    • The CLFP has proposed a time line for future plant upgrades.• Four of the filters in the south plant are being rebuilt.

    President Szmyd suggested a joint sub-committee be formed for the purpose of long-range planning follow-up. It was noted that if the sub-committee were to consist of three or more CLFP Board members the meeting would need to be Noticed.

    Overview of the District Goals and Objectives for 2019: District Manager Cook presented a list of objectives for the District. The list consisted of goals the District is using to develop the budget and operational work plans. District Manager Cook requested the Board review

    6

  • the objectives and offer its input to accomplish the needs of the District. Following are the presented goals and objectives:

    • Planned and Budgeted Objectives: o External review of District compensation and benefits. o Office expansion. o Beacon meter technology installation and implementation. o Prepare to file for a change of use on native water rights. o National American Water Works Assoc (AWWA) conference and exhibition, June 2019 in

    Denver; arranging for all employees and Board members to attend the exhibition hall. o Distribution master plan update. o Loveland Intergovernmental Agreement (IGA). o Updated Brookfield agreement and pipeline project. o Tap file scanning and data management. o Rules and regulations updates.

    Schedule a work session with the Board for further review and guidance of current and future policies for the District:

    • Conservation. • Long range financial planning. • Future water. • The proposed Water Treatment Authority. • Review of drought protection plan in 2019.

    STAFF REPORTS District Manager’s Report: District Manager Cook reported on the following:

    • Purchase of Windy Gap Water Shares scheduled for closing in January 2019. • The employee Holiday Lunch was held December 12 at the Double Tree in Platteville. • No updates were available on the discussion with Colorado Parks and Wildlife (CPW) and Larimer

    County regarding recreation and/or wildlife use of the Dry Creek property. • The Board Holiday Dinner is scheduled for January 11 at Hale & Bradford Distillery. • An invitation will be extended to Randy Starr and Mike Westbrook, the District legal counsel, to attend

    a future Board meeting. • District Manager Cook participated in a tour of the Lower Colorado River water system.

    District Engineer’s Report: District Engineer Kauffman reported on the following:

    • Most capital projects are completed and the final punch lists are being worked through. • Projects are moving forward in the Mead area. • Colorado Department of Transportation (CDOT) Highway projects are moving forward. • The contractor for the Taft Avenue project and LTWD have been served with a complaint for non-

    payment. The District is working with its insurance company and attorney to go through the claim to ensure all parties are paid.

    • The feasibility of providing water for cash to developers was discussed. • Going forward the age of the water lines will be recorded during the GPS Project.

    Water Resources Manager’s Report: District Water Resources Manager Koch reported on the following:

    • The 2019 Water Year began on November 1, 2018. • The District received a 50% quota for both its fixed and variable Colorado-Big Thompson (C-BT)

    units. The District also received 200 acre-feet of Windy Gap water; its full order. • The Handy Ditch Company Board met with LTWD staff to share the results of a ditch wide analysis

    which defines the historic water use and losses in the ditch system.

    7

  • o This analysis can be used by the District as the basis for its change of use application to theWater Court.

    • The snowpack is currently at 130%, however that is only through November the bulk of the totalsnowpack for the water year will accrue in the next five months.

    Operations Manager’s Report and Water Quality Update: Operations Manager Lambrecht reported on the following:

    • Locate requests and leak repairs are declining, as is normal for this time of year.• Results of the monthly samples were within acceptable tolerances, the next Lead & Copper sampling

    period is January 1 – June 30, 2019.• One of the new master meters was defective and will be replaced under warranty.• The Modular Office Project site plan has been approved and the documents for the building permit are

    being prepared.• The Operations crew has been assisting with the repair of the slide gate at Dry Creek Reservoir.• Two additional concrete bins have been constructed for aggregate or material storage.

    DIRECTOR REPORTS

    Director Brandt advised of a rebate program being offered by the Northern Colorado Water Conservancy District (NCWCD) for facilities that show conservation measures.

    Director Bukowski questioned why a City of Loveland water customer was referred to LTWD for a Taste & Odor problem. He was advised there are a few Loveland customers being serviced on LTWD water lines, and LTWD customers are being serviced on Loveland water lines.

    Directors McMurtrey and Gallivan-Crist reported on the following: • Employee Performance Evaluation forms were reviewed and Directors McMurtrey and Gallivan-Crist

    suggested the addition of a section for employees to input the environment under their supervisor.• Director Gallivan-Crist noted Director McMurtrey performed the majority of the work.• It was discussed that the form Directors McMurtrey and Gallivan-Crist were referencing had been

    updated recently, as well as a change to the evaluation process.• President Szmyd suggested a session in January for all Board members to discuss the Employee

    Evaluation Form, and afterward the form should be sent to the District legal counsel for review.

    Business Manager Dahl advise the Board members they will receive two checks in December one for the November Board meeting and one for the December Board meeting.

    There being no further business, it was moved by Director McMurtrey, seconded by Director Gallivan-Crist, to adjourn the meeting at 8:02 p.m. Motion carried unanimously.

    Respectfully submitted,

    Michael T. Cook

    8

  • Agenda Item Summary Little Thompson Water District

    Date: January 10, 2019

    Item: 5.2

    Staff: Michael T. Cook, Holly Suess, Judy O’Malley

    Subject: Tap List Number 636

    Staff Recommendation: Staff recommends approval of Tap List number 636

    TAP LIST 636 ~ NEW AND AMENDED CONTRACTS

    Tap Commitments Balance Taps with Water Rights Satisfied /Water Dedications 110 Dormant Taps 7

    Total Other Tap Commitments 117

    TAP # NAME 5/8” URBAN

    5/8” STANDARD

    OTHER WATER RIGHTS

    CIL

    6780 WAC Land LLC X .7 AF 6781 William Scott Davis X .7 AF 8529 Lennar Homes X .35 AF 8530 Lennar Homes X .35 AF 8531 Lennar Homes X .35 AF 8532 Barefoot Residential LLC X .35 AF 8533 Barefoot Residential LLC X .35 AF 8534 Barefoot Residential LLC X .35 AF 8535 Barefoot Residential LLC X .35 AF 8536 Schmidt Family Trust X .7 AF

    DECEMBER 2018 TOTALS 7 3 4.55 AF YEAR-TO-DATE 2018 TOTALS 123 31 9 92.04 AF 9.1 AF

    TAPS BUDGETED 2018 100 40

    9

  • Agenda Item Summary Little Thompson Water District

    Date: January 10, 2019

    Item Number: 5.3

    Staff: Judy Dahl and Angela Diekhoff

    Subject:

    December 2018 Disbursements

    Request approval of the December 2018 Cash Disbursements in the amount of $887,611.92

    Operating Account: $635,950.19

    ACH Manual Check Numbers 1793 to 1842 – $418,366.49 Check Numbers 8992 to 9055– $217,583.70

    Payroll Account: $251,661.73 (Two bi-weekly payroll periods in December)

    ACH Transmittal Vouchers 1547 to 1561 – $121,371.12 Check 1921-1950 - $ 30,543.70 ACH Direct Deposit Numbers 8445-8518 – $99,746.91

    Staff Recommendation:

    Staff recommends approval.

    Discussion:

    All expenses are for normal operating cost, with the exception of $40,066 for Dry Creek Headgate, Capital Projects of $134,009, and Loan payment of $197,838 .

    10

  • Employee Related Expenses 251,661.73$ 2017 Signature Loan Payment 197,838.61$ Capital Projects - District on summary page 134,009.96$ Filter Plant Ops Expense 45,779.04$ Dry Creek Reservoir Expense 40,066.63$ System Repairs & Maintenance 37,408.72$ Telemetry Improvements 28,132.25$ Vehicle Expense 25,538.26$ Inventory 25,045.22$ Capital Projects - Joint on summary page 15,974.20$ Service Contracts 12,960.84$ Locate Expense 12,273.79$

    Credit Card Charges - Vehicle Exp $2019/Office $1942,/Computer Exp $1700/Conf,lodge & Training $550/Uniforms $527/Furn $4951

    11,689.86$

    Office Expense 10,531.89$ Bldg & Grnds Expense 10,380.92$ Communications Expense 4,514.32$ Operations - Utilities 4,034.75$ Engr/CAD/Prof Expenses 3,351.50$ Operations and Maintenance 3,150.18$ Insurance-Worker Compensation 2,469.00$ Cross Con/Backflow Program 1,800.00$ Fire Hyd Meter Deposits Refund 1,683.00$ Uniforms 1,497.70$ Generator Maintenance 1,446.79$ Water Quality Expense 1,237.50$ Education & Training 1,000.00$ Safety Expenses 635.14$ Firestone Surcharge Fee 548.35$ Customer Refunds 364.40$ Assessment Fees 300.00$ Purchased Water Expenses 287.37$

    Total 887,611.92$

    Little Thompson Water DistrictCash Disbursements Summary

    Check Issue Dates: 12/1/2018 - 12/31/2018

    11

  • Check No Date Payee Description Amount Operations

    1799 12/4/2018 Signature Public Funding 2017 Signature Loan Principal 197,838.61 1801 12/6/2018 Carter Lake Filter Plant Filter Plant Ops Expense 45,779.04 9018 12/7/2018 Gopher Excavation, Inc Small Line Abandonment 36,662.00 9051 12/28/2018 Gopher Excavation, Inc Cty Rd Improvements 33,366.50 9041 12/20/2018 Orback Construction Tap Relocations 26,358.75 1805 12/6/2018 Timber Line Electric & Control Telemetry Improvements 20,779.00 9032 12/20/2018 Inland Potable Services Dry Creek Reservoir Expense 20,000.00 1802 12/6/2018 Carter Lake Filter Plant Permanent Orthophosphate Sys 15,974.20 1796 12/3/2018 National Meter & Automation Beacon Meter Upgrade Project 15,805.60 9034 12/20/2018 J-U-B Engineers, Inc. West 1st St 15,068.91 9011 12/6/2018 L & M Underground, Inc. System Repairs & Maintenance 12,800.00 8993 12/6/2018 4Rivers Equipment Vehicle Expense 12,073.33 1793 12/3/2018 Adams Bank MasterCard A/R - Reimbursable Costs 11,689.86 1824 12/21/2018 AECOM USA, Inc Dry Creek Reservoir Expense 11,500.00 1826 12/21/2018 Stratus Information Systems (ITX) Service Contracts 10,853.25 1835 12/28/2018 National Meter & Automation Inventory 9,825.79 1807 12/6/2018 Dana Kepner Company, Inc. Locate Expense 8,927.44 1795 12/3/2018 Core & Main LP Inventory 8,120.71 1832 12/24/2018 Timber Line Electric & Control Telemetry Expense 7,353.25 1798 12/4/2018 Ferguson Waterworks #1116 Inventory 7,098.72 1822 12/19/2018 Wright Express Fleet Services Vehicle Expense 6,253.47 9005 12/6/2018 Gopher Excavation, Inc Dry Creek Reservoir Expense 6,079.53 9015 12/6/2018 VS Concrete Services Bldg & Grnds Expense 5,000.00 9019 12/7/2018 Gopher Excavation, Inc System Repairs & Maintenance 4,825.00 1823 12/21/2018 Southwest Direct, Inc Office Expense 4,789.77 1820 12/14/2018 Poudre Valley REA Operations - Utilities 3,681.52 9010 12/6/2018 J-U-B Engineers, Inc. West 1st St 3,600.00 9036 12/20/2018 L & M Underground, Inc. System Repairs & Maintenance 3,400.00 1837 12/28/2018 Carlson, Hammond & Paddock Engr/CAD/Prof Expenses 3,351.50 8992 12/6/2018 L & M Underground, Inc. System Repairs & Maintenance 3,000.00 9030 12/20/2018 Hoff Construction Bldg & Grnds Expense 2,812.50 9007 12/6/2018 Heavy Duty Truck Repair Vehicle Expense 2,655.26 9048 12/28/2018 Ag Equipment, Inc. System Repairs & Maintenance 2,630.00 9044 12/20/2018 Starr & Westbrook, PC Legal - General Counsel 2,565.00 1809 12/6/2018 PIONEER System Repairs & Maintenance 2,535.34 1821 12/18/2018 PINNACOL Insurance-Worker Compensation 2,469.00 1816 12/28/2018 Verizon Wireless Communications Expense 2,330.04 9043 12/20/2018 St. Vrain Companies, Inc. System Repairs & Maintenance 2,200.00 1797 12/4/2018 POLLARD WATER Locate Expense 2,073.25 1825 12/21/2018 Arvada Pump Company Dry Creek Reservoir Expense 2,021.56 1839 12/28/2018 Loveland Ready-Mix Concrete, Inc. Small Line Abandonment 1,917.70 1803 12/14/2018 Ad Promotional Items, LLC Office Expense 1,865.10 9021 12/20/2018 AJ's Backflow Testing LLC Cross Con/Backflow Program 1,800.00 9001 12/6/2018 EARTH SERVICES & ABATEMENT Fire Hyd Meter Deposits Refund 1,683.00 9029 12/20/2018 Heavy Duty Truck Repair Vehicle Expense 1,644.45 1808 12/6/2018 Loveland Ready-Mix Concrete, Inc. Bldg & Grnds Expense 1,543.28 9012 12/6/2018 Loveland Barricade, LLC System Repairs & Maintenance 1,467.25 9022 12/20/2018 Alpine Power Solutions Generator Maintenance 1,446.79 1811 12/6/2018 Frontier Business Products Service Contracts 1,327.59 1831 12/24/2018 AT&T Mobility Communications Expense 1,319.40 1806 12/6/2018 UNCC Locate Expense 1,273.10 1838 12/28/2018 PIONEER System Repairs & Maintenance 1,262.78 9014 12/6/2018 Poudre Valley Rural Elec Assoc System Repairs & Maintenance 1,198.40 1840 12/28/2018 Loveland Barricade, LLC System Repairs & Maintenance 1,099.75 9000 12/6/2018 Ditch Witch of the Rockies Vehicle Expense 1,080.51 9039 12/20/2018 Northern Co Water Cons Dist Education & Training 1,000.00 9027 12/20/2018 Cote's Vehicle Expense 911.23 1815 12/7/2018 Home Depot Credit Services PRV Routine Repairs 848.02 9023 12/20/2018 Badger Meter Service Contracts 780.00 9026 12/20/2018 Coffey Engineering & Surveying Cty Rd Improvements 777.50

    Little Thompson Water DistrictCash Disbursements Detail

    Check Issue Dates: 12/1/2018 - 12/31/2018

    12

  • Check No Date Payee Description Amount

    Little Thompson Water DistrictCash Disbursements Detail

    Check Issue Dates: 12/1/2018 - 12/31/2018

    9016 12/7/2018 BlueTarp Financial Operations and Maintenance 738.99 9006 12/6/2018 Grainger Operations and Maintenance 682.43 1813 12/7/2018 COMCAST Communications Expense 649.22 8998 12/6/2018 City of Longmont Water Quality Expense 630.00 9025 12/20/2018 City of Longmont Water Quality Expense 607.50 9020 12/7/2018 Sportsmans Warehouse Uniforms - Administration 596.89 1818 12/12/2018 Cintas Corporation #737 Bldg & Grnds Expense 575.80 9046 12/20/2018 Town of Firestone Firestone Surcharge Fee 548.35 1841 12/28/2018 Landmark Engineering Office Expansion 453.00 8996 12/6/2018 B-Town Automotive Vehicle Expense 446.30 9017 12/7/2018 Bomgaars Supply Uniforms 435.94 9054 12/28/2018 Municipal Treatment Equipment Operations and Maintenance 416.37 1836 12/28/2018 Frontier Business Products Office Expense 411.58 9028 12/20/2018 Front Range Raynor Bldg & Grnds Expense 401.00 1830 12/24/2018 Sam's Club Office Expense 370.24 1828 12/21/2018 Tractor Supply Credit Plan Operations and Maintenance 307.97 1834 12/28/2018 UMB Bank NA Office Expense 300.00 9040 12/20/2018 Northern Co Water Cons Dist Assessment Fees 300.00 9035 12/20/2018 KHLEIF, RICHARD & DANIELLE Customer Refunds 287.63 1817 12/11/2018 John Deere Financial Operations and Maintenance 286.94 1804 12/6/2018 Safety Services Safety Expenses 275.00 1810 12/6/2018 Napa Auto Parts Operations and Maintenance 269.70 9013 12/6/2018 Northern Safety Company Inc Safety Expenses 260.53 8997 12/6/2018 Canyon Crane and Welding Service Dry Creek Reservoir Expense 250.00 9042 12/20/2018 Rocky Mtn Quick Lube Vehicle Expense 249.79 1819 12/27/2018 United Power, Inc. Operations - Utilities 245.95 8994 12/6/2018 Berthoud Ace Hardware Dry Creek Reservoir Expense 234.92 1800 12/5/2018 CenturyLink Communications Expense 215.66 9050 12/28/2018 Fastenal Company Dry Creek Reservoir Expense 215.54 9038 12/20/2018 MFCP Inc. Operations and Maintenance 212.86 9033 12/20/2018 Jax Outdoor Gear Uniforms 199.97 1842 12/31/2018 City of Loveland Water & Power Purchased Water Expenses 147.89 8995 12/6/2018 Bowman Construction Supply System Repairs & Maintenance 142.18 1833 12/24/2018 City of Loveland Water & Power Purchased Water Expenses 116.49 9055 12/28/2018 PMM Advertising Elections, Hearings & Public 114.26 8999 12/6/2018 Davidson-Gebhardt Chevrolet Vehicle Expense 99.95 9008 12/6/2018 Jax Outdoor Gear Uniforms 99.95 9047 12/20/2018 Workwear Store Uniforms 89.98 1794 12/24/2018 City of Loveland Water & Power Purchased Water Expenses 76.29 9049 12/28/2018 Bomgaars Supply Uniforms 74.97 1812 12/7/2018 Cintas Corporation - First Aid Supplies Safety Expenses 64.61 9002 12/6/2018 GCR Tire Centers - TDS Longmont Vehicle Expense 64.00 9052 12/28/2018 High Country Proco Office Expense 60.60 9009 12/6/2018 Jiffy Lube #86 Vehicle Expense 59.97 9024 12/20/2018 BAREFOOT RESIDENTIAL LLC Customer Refunds 58.08 9045 12/20/2018 Town of Berthoud Bldg & Grnds Expense 48.34 1829 12/24/2018 UPS Office Expense 38.53 9053 12/28/2018 Mobile Lab Safety Expenses 35.00 1814 12/10/2018 XCEL Energy Operations - Utilities 30.99 1827 12/24/2018 Central Weld County Water District Purchased Water Expenses 22.99 9037 12/20/2018 LONGMONT PROPERTY GROUP LLC Customer Refunds 18.69 9031 12/20/2018 ID Edge Office Expense 16.81 9003 12/6/2018 Void Void - 9004 12/6/2018 Void Void -

    Total Operations 635,950.19

    Payroll

    1547 12/13/2018 CCOERA 401 401 Contributions Pay Period: 12/9/2018 9,346.47 1548 12/13/2018 CCOERA 457 457 Contributions Pay Period: 12/9/2018 5,154.19 1549 12/13/2018 CDOR CO Withholding Tax Pay Period: 12/9/2018 2,839.00 1550 12/13/2018 COLONIAL LIFE INSURANCE Voluntary Life Pay Period: 12/9/2018 253.29 1551 12/13/2018 EFTPS FICA/FWH Tax Deposit Pay Period: 12/9/2018 22,506.09

    13

  • Check No Date Payee Description Amount

    Little Thompson Water DistrictCash Disbursements Detail

    Check Issue Dates: 12/1/2018 - 12/31/2018

    1552 12/13/2018 FAMILY SUPPORT REGISTRY Child Support Pay Period 12/9/2018 364.75 1553 12/13/2018 TASC FSA FLEX DEPENDENT CARE Pay Period: 12/9/2018 315.37 1554 12/13/2018 TASC HSA HEALTH SAVINGS ACCOUNT Pay Period: 12/9/ 2,100.47 1555 12/27/2018 CCOERA 401 401 Contribution Pay Period: 12/23/2018 9,274.07 1556 12/27/2018 CCOERA 457 457 Contributions Pay Period: 12/23/2018 5,882.45 1557 12/27/2018 CDOR CO Withholding Tax Pay Period: 12/23/2018 2,882.00 1558 12/27/2018 CEBT Employee Insurance Pay Period: 12/23/2018 39,386.24 1559 12/27/2018 EFTPS FICA/FWH Tax Deposit Pay Period: 12/23/2018 18,286.14 1560 12/27/2018 FAMILY SUPPORT REGISTRY Child Support Pay Period: 12/23/2018 364.75 1561 12/27/2018 TASC FSA FLEX DEPENDENT CARE Pay Period: 12/23/20 315.37 1562 12/27/2018 TASC HSA HEALTH SAVINGS ACCOUNT Pay Period: 12/23 2,100.47 1921 12/12/2018 Cordova, Alan Bonus 2018 1,015.85 1922 12/12/2018 Duross, Sacha L Bonus 2018 1,015.85 1923 12/12/2018 Hopkins, Tom L Bonus 2018 1,015.85 1924 12/12/2018 Lambrecht, Ken D Bonus 2018 1,015.85 1925 12/12/2018 Nygren, Troy L Bonus 2018 1,015.85 1926 12/12/2018 Rowell, Scott E Bonus 2018 1,015.85 1927 12/12/2018 Schaeffer, Stephen E Bonus 2018 1,015.85 1928 12/12/2018 Shumpert, David E Bonus 2018 1,015.85 1929 12/12/2018 Epperly, Ryan L Bonus 2018 1,015.85 1930 12/12/2018 Hoff, Amanda V Bonus 2018 1,015.85 1931 12/12/2018 Clay, Kinsey T Bonus 2018 1,015.85 1932 12/12/2018 Dunn, Roberta A Bonus 2018 1,015.85 1933 12/12/2018 Lemming, Ryan L Bonus 2018 1,015.85 1934 12/12/2018 Payfer, Travis Bonus 2018 1,015.85 1935 12/12/2018 Varn, Christopher J Bonus 2018 1,015.85 1936 12/12/2018 Berthold, Jared A Bonus 2018 1,015.85 1937 12/12/2018 Behrens, Kristopher Bonus 2018 1,015.85 1938 12/12/2018 Blair, Kathleen G Bonus 2018 1,015.85 1939 12/12/2018 Dahl, Judy G Bonus 2018 1,015.85 1940 12/12/2018 Suess, Holly E Bonus 2018 1,015.85 1941 12/12/2018 Diekhoff, Angela D Bonus 2018 1,015.85 1942 12/12/2018 O'Malley, Judy B Bonus 2018 1,015.85 1943 12/12/2018 Holderfield, Sarah M Bonus 2018 1,015.85 1944 12/12/2018 Harbitz, Mary E Bonus 2018 1,015.85 1945 12/12/2018 Suits, Garey T Bonus 2018 1,015.85 1946 12/12/2018 Cook, Michael T Bonus 2018 1,084.05 1947 12/12/2018 Cooper, Todd E Bonus 2018 1,015.85 1948 12/12/2018 Robinson, Joseph E Bonus 2018 1,015.85 1949 12/12/2018 Koch, Nancy A Bonus 2018 1,015.85 1950 12/12/2018 Kauffman, Amber L Bonus 2018 1,015.85

    8445-8474 12/13/2018 Direct Deposit Pay Period Ending 12/9/2018 51,529.62 8475 12/13/2018 Gallivan, Kathleen M November Board Meeting 109.24 8476 12/13/2018 Bukowski, Paul H November Board Meeting 98.12 8477 12/13/2018 Szmyd, William R November Board Meeting 103.03 8478 12/13/2018 Martens, Edward M November Board Meeting 104.34 8479 12/13/2018 Brandt, Larry R November Board Meeting 108.04 8480 12/13/2018 Brandenburg, Steven T November Board Meeting 100.41 8481 12/13/2018 McMurtrey, Emily J November Board Meeting 101.72

    8482-8511 12/27/2018 Direct Deposit Pay Period Ending 12/23/2018 46,767.49 8512 12/27/2018 Gallivan, Kathleen M December Board Meeting 109.24 8513 12/27/2018 Bukowski, Paul H December Board Meeting 98.12 8514 12/27/2018 Szmyd, William R December Board Meeting 103.03 8515 12/27/2018 Martens, Edward M December Board Meeting 104.34 8516 12/27/2018 Brandt, Larry R December Board Meeting 108.04 8517 12/27/2018 Brandenburg, Steven T December Board Meeting 100.41 8518 12/27/2018 McMurtrey, Emily J December Board Meeting 101.72

    Total Payroll 251,661.73

    Total Disbursements 887,611.92

    14

  • Agenda Item Summary Little Thompson Water District

    Date: January 10, 2019

    Item Number: 5.4

    Staff: Judy Dahl

    Subject: Discussion of the December Financial Reports.

    Staff Recommendation: Staff recommends acceptance of the December Financial Reports.

    Discussion:

    OPERATING FUND:

    Operating Revenue – We have collected $10,196,741 which is $627,442 less than budgeted. We received $1,100,000 for Mineral Lease Revenue and $565,000 in Bulk Water Revenue.

    Operating Costs – We have spent $8,989,141 which is $5,798 less than budgeted.

    Operating Gain (Loss) – We have an operating gain of $1,207,600 which is $621,644 less than budgeted.

    NON-OPERATING FUND:

    Non-Operating Revenue – We have collected $9,560,977 which is $76,752 more than budgeted.

    Capital Costs – District – We have spent $3,355,300 which is $919,625 less than budgeted.

    Detail of the year to date District Capital Project Expenses:

    Capital Project Expense Actual YTD

    Annual Budget

    Service Connection Expense $105,243 $169,675 County Road Improvements $175,819 $150,000 Small Line Abandonment $394,714 $125,000 Arkin’s Tank $0 $85,000 Telemetry Improvements $20,780 $50,000 Taft & County Rd 17 $631,663 $700,000 24-Inch Water Line Replacement $8,582 $0 Burdic Vault Abandonment $3,866 $0 West First Street $252,975 $505,000 Greip Farm Ditch Rebuild $14,808 $12,000 Beason Meter Upgrade Project $234,303 $0 Vehicle Replacement Program $112,563 $98,500 Miscellaneous Equipment $45,775 $49,000 Operations Equipment $176,142 $195,000 Office Expansion $101,567 $310,000 Water Rights – CBT $534,50 $1,058,750 Water Rights – Other $57,000 $0 Water Rights – Windy Gap $485,000 $485,000 Total Capital Projects – District $3,355,300 $3,767,925

    15

  • Agenda Item Summary 5.4 2

    Capital Expenses - Joint: We have spent $154,622437 which is $139,378 less than budgeted.

    Detail of the year-to-date Joint Capital Project Expenses:

    Non-Operating Gain (Loss) – We have a net non-operating gain of $6,034,198 which is $1,118,898 more than budgeted.

    CHANGE IN WORKING CAPITAL:

    Year-To-Date Change in Working Capital

    Actual Budget Actual Above

    (Below) Budget

    Operating Gain (Loss) $1,207,600 $1,829,244 ($621,644)

    Non-Operating Fund Gain (Loss) $6,051,055 $4,915,300 $1,135,755

    Total Gain (Loss) $7,258,655 $6,744,544 $514,111

    Capital Project Expense Actual YTD

    Annual Budget

    CLFP Non-Budgeted Capital $2,944 $0 CLFP Pre-Treatment Study $26,000 CLFP Membrane Replacement $1,436 CLFP Drying 1 Relocation $52,776 $63,440 CLFP Splitter Box Rehabilitation $28,080 CLFP Blower Air Piping $26,520 CLFP Permanent Orthophosphate System $88,421 $52,244 CLFP North Plant Wall & HVAC $5,679 $90,137 Easement for future Tanks $7,579 Vehicles & Equipment – Joint $3,366 $0 Total CLFP Capital Project Expense $154,622 $294,000

    16

  • $2,000,000

    $2,500,000

    $3,000,000

    $3,500,000

    $4,000,000

    $4,500,000

    $5,000,000

    $5,500,000

    $6,000,000

    $6,500,000

    $7,000,000

    $7,500,000

    $8,000,000

    $8,500,000

    $9,000,000

    $9,500,000

    $10,000,000

    $10,500,000

    $11,000,000

    $11,500,000

    $12,000,000

    $12,500,000

    $13,000,000

    $13,500,000

    $14,000,000

    $14,500,000

    $15,000,000

    $15,500,000

    $16,000,000

    $16,500,000

    $17,000,000

    $17,500,000

    $18,000,000

    LITTLE THOMPSON WATER DISTRICT2018 WORKING CAPITAL GRAPHICAL COMPARISON

    17

  • -

    1,000,000

    2,000,000

    3,000,000

    4,000,000

    5,000,000

    6,000,000

    7,000,000

    8,000,000

    9,000,000

    10,000,000

    11,000,000

    12,000,000

    2018 OPERATING REVENUE & EXPENSE CUMULATIVE

    BUDGETED REVENUE BUDGETED EXPENSE ACTUAL REVENUE ACTUAL EXPENSE

    -

    1,000,000

    2,000,000

    3,000,000

    4,000,000

    5,000,000

    6,000,000

    7,000,000

    8,000,000

    9,000,000

    10,000,000

    11,000,000

    2018 NON OPERATING REVENUE & EXPENSE CUMULATIVE

    BUDGETED REVENUE BUDGETED EXPENSE ACTUAL REVENUE ACTUAL EXPENSE

    18

  • Current Current Month 2018 2018 YTD 2018Month Month Comp YTD YTD Comp AdoptedActual Budget Bud/Act Actual Budget Bud/Act Budget

    OPERATING REVENUEWater Revenue - Base Fee 224,906 220,500 4,406 2,675,481 2,640,000 35,481 2,640,000 Water Revenue - Tier I 68,949 80,000 (11,051) 1,089,367 1,114,000 (24,633) 1,114,000 Water Revenue - Tier II 35,060 303,000 (267,940) 1,728,266 2,113,000 (384,734) 2,113,000 Water Revenue - Tier III 14,606 120,500 (105,894) 1,058,014 1,243,500 (185,486) 1,243,500 Water Revenue - Tier IV 60,475 83,500 (23,025) 1,511,970 1,614,000 (102,030) 1,614,000 Wholesale Water Revenue 20,788 145,550 (124,762) 352,275 342,220 10,055 342,220 Water Rental Revenue - - - 12,123 20,000 (7,877) 20,000 Bulk Water Revenue 4,059 332,500 (328,441) 569,471 550,000 19,471 550,000 Other Revenue 3,170 1,103,300 (1,100,130) 1,154,660 1,142,150 12,510 1,142,150 Windy Gap Firming Passthrough - - - - - - 45,313 Total Operating Revenue 432,013 2,388,850 (1,956,837) 10,196,741 10,824,183 (627,442) 10,824,183

    OPERATING EXPENSESWater Treatment 34,773 47,393 (12,620) 1,057,937 1,032,367 25,570 1,032,367 Distribution System 128,223 246,940 (118,717) 1,090,853 975,680 115,173 975,680 General & Admin 57,213 41,950 15,263 631,271 692,263 (60,992) 692,263 Engineering 18,314 12,650 5,664 113,176 225,355 (112,179) 225,355 Assessments 735 300 435 761,964 747,304 14,660 747,304 Joint Operations 29,209 1,335 27,874 46,687 31,420 15,267 31,420 Employee costs 271,368 250,460 20,908 2,767,126 2,732,216 34,910 2,732,216 Debt Service (1,000) 38,206 (39,206) 2,520,127 2,558,334 (38,207) 2,558,334 Total Operating Expenses 538,836 639,234 (87,779) 8,989,141 8,994,939 (5,798) 8,994,939

    Operating Gain(Loss) (106,823) 1,749,616 (1,869,059) 1,207,600 1,829,244 (621,644) 1,829,244

    NON OPERATING REVENUETap Fees - Current Year 82,000 460,000 (378,000) 1,684,500 1,505,000 179,500 1,505,000 Cash In Lieu Water Rights 38,500 77,000 (38,500) 822,000 1,058,750 (236,750) 1,058,750 Tap Installation Revenue 4,500 8,000 (3,500) 154,675 169,675 (15,000) 169,675 Water Right Revenue - - - - - - Interest Income 30,186 116,000 (85,814) 189,357 160,000 29,357 160,000 Gain(Loss) Sales of Assets - - - 7,039 - 7,039 - Contrib Water Court Fees - - - - - - - Other Fees 3,601 84,100 (80,500) 262,649 166,800 95,849 165,800 PRPA Windy Gap Water Shares - 2,529,000 (2,529,000) 5,938,900 5,939,000 (100) 5,939,000 Windy Gap Firming Project - - - 485,000 485,000 - 485,000 Total Non Operating Revenue 158,787 3,274,100 (3,115,313) 9,544,120 9,484,225 59,895 9,484,225

    NON OPERATING EXPENSESCapital Projects - District 168,547 527,500 (358,953) 1,842,755 2,078,675 (235,920) 2,078,675 Vehicles and Equipment 63,848 - 63,848 436,045 652,500 (216,455) 652,500 Water Rights Purchase - 77,000 (77,000) 591,500 1,058,750 (467,250) 1,058,750 Windy Gap Firming Project - - - 485,000 485,000 - 485,000

    Total Capital District 232,395 604,500 (372,105) 3,355,300 4,274,925 (919,625) 4,274,925

    Capital Projects - Joint 185 - 185 154,622 294,000 (139,378) 294,000

    Total Non Operating Expenses 232,580 604,500 (371,920) 3,509,922 4,568,925 (1,059,003) 4,568,925

    Non Operating Gain(Loss) (73,794) 2,669,600 (2,743,394) 6,034,198 4,915,300 1,118,898 4,915,300

    Net Gain(Loss) (180,617) 4,419,216 (4,612,452) 7,241,798 6,744,544 497,254 6,744,544

    LITTLE THOMPSON WATER DISTRICTINCOME AND EXPENSE SUMMARY

    FOR MONTH ENDING December 31, 2018

    1/8/2019 12:10 PM J:\csldata\Xcel\2018 Financial Statements Page 4 19

  • Prior YTD ActualMonth 2018 2017

    CURRENT ASSETSBoard Designated Reserves 12,833,598$ 12,569,436$ 5,072,455$ Legally Restricted Reserves 1,161,964$ 1,161,964$ 1,382,445$ Cash In Lieu of Water Rights 1,472,194$ 1,510,694$ 1,280,194$

    Total Cash & Cash Equivalents 15,467,755$ 15,242,094$ 7,735,093$

    ACCOUNTS RECEIVABLEA/R - Water Revenue 607,307$ 541,644$ 584,258$ A/R - Miscellaneous 26,198$ 39,526$ 23,545$ Tap Receivable -$ -$ 37,500$ Reimbursable Expenses 15,000$ 1,667$ 27,742$

    Total Accounts Receivable 648,505$ 582,837$ 673,045$

    OTHER ASSETSInventory 241,362$ 229,918$ 229,938$ Prepaid Expenses 18,330$ 22,905$ 18,330$ Debt Issuance Costs (18,572)$ (18,572)$ (18,572)$

    Total Other Assets 241,120$ 234,251$ 229,696$

    CAPITAL ASSETSCLFP Plant Investment 3,611,985$ 3,611,985$ 3,731,906$ CLFP Equity Joint Venture 7,432,221$ 7,432,221$ 7,432,221$ Dry Creek Reservoir 6,508,922$ 6,508,922$ 6,508,922$ Distribution System 64,325,026$ 64,325,026$ 62,507,391$ Easement Rights 454,124$ 454,124$ 454,124$ District Land 1,052,341$ 1,052,341$ 1,052,341$ District Property 9,446,994$ 9,446,994$ 9,435,580$ Auto/Office/Ops Equipment 1,839,871$ 1,839,871$ 1,839,871$ Construction in Progress 1,829,049$ Accumulated Depreciation (28,410,242)$ (28,410,242)$ (28,410,243)$ Water Rights 64,248,631$ 64,248,631$ 64,248,631$

    Total Capital Assets 130,509,874$ 130,509,874$ 130,629,794$

    TOTAL ASSETS 146,867,255$ 146,569,055$ 139,267,629$

    CURRENT LIABILITIESAccounts Payable 747,457$ 609,430$ 450,340$ P/R, Taxes, Benefits Payable 266,126$ 286,570$ 266,110$ Bond/Loan Interest Payable 26,284$ 26,284$ 26,284$ Current Portion Long Term Debt 2,204,799$ 2,204,799$ -$

    Total Current Liabilities 3,244,666$ 3,127,083$ 742,734$

    LONG TERM LIABILITIESBond/Loan Principal 11,157,143$ 11,157,143$ 13,361,942$ Bond Deferred Loss (Premium/Discount) (185,564)$ (185,564)$ (185,564)$

    Total Long Term Liabilities 10,971,579$ 10,971,579$ 13,176,378$

    TOTAL LIABILITIES 14,216,244$ 14,098,662$ 13,919,112$

    NET ASSETSNet Assets 125,228,596$ 125,228,596$ 117,855,513$ Net Gain(Loss) 7,422,415$ 7,241,798$ 7,493,004$

    Total Net Assets 132,651,011$ 132,470,394$ 125,348,517$

    TOTAL LIABILITIES & NET ASSETS 146,867,255$ 146,569,056$ 139,267,629$

    LITTLE THOMPSON WATER DISTRICTBALANCE SHEET

    December 31, 2018

    1/8/2019 12:10 PM J:\csldata\Xcel\2018 Financial Statements Page 220

  • Agenda Item Summary Little Thompson Water District

    Date: January 10, 2019

    Item Number: 5.5

    Staff: Michael T. Cook

    Subject: (1) Designation of the District’s Public Posting Places(2) Designation of "official" Posting Place for 24-hour (agenda) Notice of District Meetings

    Staff Recommendation: Staff recommends adoption of the Public Posting Places as listed below and adoption of the "official" Posting Place for 24-hour (agenda) Notice of District Meeting as listed below.

    Discussion: The Colorado Revised Statutes require the Public Place or Places for posting our meeting notices and the "official" Posting Place for 24-hour (agenda) Notice of District Meetings be designated annually at the first regular meeting of each calendar year.

    (1) There are no recommended changes to our posting places, which are as follows:

    • County Court Houses of Larimer, Weld and Boulder Counties,• District Office at 835 East Highway 56, Berthoud, Colorado,• Town Hall in Johnstown, Colorado, and• Town Hall in Mead, Colorado.

    (2) The Little Thompson Water District office is the "official" Posting Place for the 24-hour (agenda)

    21

    slebsackTypewritten Text

    slebsackTypewritten Text

    slebsackTypewritten Text

    slebsackTypewritten Text

    slebsackTypewritten Text

    slebsackTypewritten Text(2) Little Thompson Water District is the Posting Place for the 24-hour (agenda) Notice of District Meetings.

    slebsackTypewritten Text

  • Agenda Item Summary Little Thompson Water District

    Date: January10, 2019 Item: 6.2Staff: Michael T. Cook, District Manager

    Subject: Carter Lake Filter Plant (CLFP)

    Managers meeting: Meet with Rick on December 19th at the CLFP to talk about the impact of LTWD hiring a CLFP employee.

    CLFP Board packet review: .

    22

  • Agenda Item Summary Little Thompson Water District

    Date: January 10, 2019

    Item: 6.3

    Staff: Judy O’Malley

    Subject:

    LTWD Inclusion – Resolution 2019-1: • Centennial Berthoud Developers, LLC: Parcels 9418407001, 9418407002, 9419109003,

    9418406001, 9418406002, 9418406003

    Staff Recommendation:

    Consent agenda approval of Resolution 2019-1, authorizing the Board President and Secretary to complete the documents required to include the properties as listed above in the Little Thompson Water District.

    Discussion:

    The inclusion for the properties listed above are being done to comply with District Rules and Regulations. See the attached location map.

    23

  • LITTLE THOMPSON WATER DISTRICT 835 E. HIGHWAY 56

    Berthoud, Colorado 80513 970-532-2096

    RESOLUTION 2019-1

    A RESOLUTION TO GRANT PETITIONS FOR PROPERTY INCLUSION INTO THE LITTLE THOMPSON WATER DISTRICT

    "RESOLVED that LITTLE THOMPSON WATER DISTRICT grant the Petitions for Inclusion of Land in the District by the following property owner(s) of the property described as follows:

    Property Owner: MCDONALD DEVELOPMENT Parcel Number: 9418407001 Property Address: CARVIN PLACE, BERTHOUD, CO Legal Description: COMMON AREA LOT A, CENTENNIAL FARM CONSERVATION

    DEVELOPMENT FILE #03-S2207 (20070029937) Parcel Number: 9418407002 Property Address: PIERRE RIDGE DRIVE, BERTHOUD, CO Legal Description: COMMON AREA LOT B, CENTENNIAL FARM CONSERVATION

    DEVELOPMENT FILE #03-S2207 (20070029937) Parcel Number: 9419109003 Property Address: BERTHOUD, CO Legal Description: COMMON AREA LOT C, CENTENNIAL FARM CONSERVATION

    DEVELOPMENT FILE #03-S2207 (20070029937) Parcel Number: 9418406001 Property Address: BERTHOUD, CO Legal Description: OUTLOT A, CENTENNIAL FARM CONSERVATION DEVELOPMENT

    FILE #03-S2207 (20070029937) Parcel Number: 9418406002 Property Address: TWIN POD PLACE, BERTHOUD, CO Legal Description: OUTLOT B, CENTENNIAL FARM CONSERVATION DEVELOPMENT

    FILE #03-S2207 (20070029937) Parcel Number: 9418406003 Property Address: BERTHOUD, CO Legal Description: OUTLOT C, CENTENNIAL FARM CONSERVATION DEVELOPMENT

    FILE #03-S2207 (20070029937)

    for the inclusion of their property in said District. It is resolved that the President and Secretary of the District do any and all things necessary to include such property in the District."

    "I hereby certify that the above Resolution was duly and regularly adopted by the Little Thompson Water District at a meeting of the Board of Directors held on January 10, 2019."

    24

  • _______________________________ President

    Attest:_______________________________

    Secretary [SEAL]

    25

  • N COUNTY ROAD 23ENC

    OUNT

    YROA

    D23

    W COUNTY ROAD 8E

    MALIBU DR

    W COUNTY ROAD 8

    CARV

    IN PL

    SHELBY DR

    PIERR

    ERIDG

    E DR

    SALTOPS DR

    NATION

    S

    WAYTWIN PODPL

    HerthaReservoir

    Dry CreekReservoirStream

    Sweck Lateral

    Sweck Lateral

    Dry Creek

    5LTWD INCLUSIONS:CENTENNIAL FARM

    COMMON AREA, LOT APARCEL: 9418407001

    COMMON AREA, LOT BPARCEL: 9418407002

    COMMON AREA, LOT CPARCEL: 9419109003OUTLOT CPARCEL: 9418406003

    OUTLOT BPARCEL: 9418406002OUTLOT APARCEL: 9418406001

    26

  • To: From: Date: Re:

    Board of Directors Michael T. Cook January 10, 20197.1 District Manager’s Report

    Purchase of Windy Gap Water Shares: Approval of the transfer of two units of Windy Gap water from Poudre River Power Authority (PRPA) to LTWD on the agenda for the January 10th, 2019 Northern Water Board Meeting, the recommendation is for approval. Based on an approval of the transfer at that meeting we have asked our partner developers to bring the funds of $5,000,000.00 to us on the 16th of January for a closing with PRPA (a transfer of funds) scheduled for January 18, 2019.

    Dry Creek Discussions with Colorado Parks and Wildlife (CPW) and Larimer County: No updates at this time, we are waiting on proposals from CPW and Larimer County.

    Berthoud Area Water and Property: I have worked to connect a retiring landowner/farmer with a developer needing water for a "ready to go" project. The deal would include 81 units of CBT, 11.75 shares of Handy Ditch, and 2 parcels of land totaling over 38 acres. I am working to also make sure that the land is cared for in an appropriate manner after the water is used elsewhere.

    St. Vrain Water Authority Formation:I have sent the first draft of the St, Vrain Water Authority Formation documents to Mike Westbrook for a review. We are also scheduling a meeting with Firestone to continue talking about the process of formation and our potential involvement.

    27

  • MEMORANDUM From: Amber Kauffman, P.E., District Engineer

    Date January 7, 2019

    Re: JANUARY BOARD MEETING ENGINEERING REPORT

    Request for service activity for December 2018: COMMITMENTS: 11 2018 TOTAL: 1,484

    2018 CAPITAL CONSTRUCTION PROJECTS NOTES: ESTIMATED BUDGET:

    TAFT AVENUE / COLONY RIDGE LOOP Construction complete - working to close out with bonding company $ 700,000

    WCR 32 – SMALL LINE ABANDONMENT Construction complete – Final payment made $ 201,187.50

    ARKINS TANK LINING Out for Bid – To be completed in 2019 $ 85,000

    WEST 1ST STREET Design underway for waterline in 1st Colt Dr to CR 23H and Alpine Laurel

    Drive to George Rist Ditch

    $ 505,000

    TELEMETRY IMPROVEMENTS $ 50,000

    BUILDING EXPANSION Site plan approved. $ 310,000

    COUNTY ROAD PROJECTS $ 100,000

    Boyd Avenue – Work complete, final payment made $ 117,012.50

    LCR 2 at Little Thompson River – complete $ 32,000

    West 1st Street (Rossum Dr to CR 21) at final punchlist $ 221,000

    GREIP FARM DITCH REBUILD Ditch construction complete $ 12,000

    2019 CAPITAL CONSTRUCTION PROJECTS NOTES: ESTIMATED BUDGET:

    TAFT AVENUE Construction of northern portion of project $ 170,000

    ARKINS TANK LINING Out for Bid $ 95,000

    WEST 1ST STREET Design underway $ 641,000

    CAMPION WATER LINE DESIGN Transmission replacement design $ 110,000

    WCR 54/WCR 17 IMPROVEMENTS Driven by Weld County Public Works $ 200,000

    WCR 34/WCR 13 IMPROVEMENTS Driven by Weld County Public Works $ 400,000

    DRY CREEK FEASIBILITY Treatment/pretreatment at CLFP $ 85,000

    BEACON METER UPGRADE PROJECT Replace residential meters in District with Beacon meter technology $ 3,050,000

    BUILDING EXPANSION Waiting on electrical engineer changes to submit building permit $ 150,000

    COUNTY ROAD PROJECTS $ 150,000

    SMALL LINE IMPROVEMENT PROJECTS $ 72,000

    Some other ongoing District and developer projects: Barefoot Lakes : Filing 1 and 2, approved

    Filing 3: Construction approved in Phase 1, Phase 2 construction is progressing Inlet Structure: Construction complete, awaiting punch list completion.

    Horizon Hills: Waiting on 16-inch transmission line plans (242 lots), Owner has agreement with District to purchase water this week. Martin Marietta Facility: Approved, waiting for opening Warberg Farms: Construction complete, paperwork required. Bebo Property: Construction complete, needs to submit paperwork Sorrento: Approved for construction (465 lots) Red Barn: Awaiting resubmittal (457 lots) Highlands: Preliminary Plat submitted (220 lots) Mead Place: Awaiting resubmittal (313 lots plus multifamily), developer is under contract to purchase water this week. Mead Village: Project sold, project to be redesigned per builder

    28

  • Other information: We are still working with CDOT’s contractor for improvements at I-25 and SH 402. CDOT is changing their frontage road alignment on the east side which is delaying our waterline design by their engineer team.

    LTWD is meeting with CDOT representatives and CWCWD for the improvements along I-25 from WCR 32 to SH 402. The interchange at SH 56 will require our jointly owned 42-inch waterline to be relocated for 3,600 feet.

    We are also working with Brookfield and CDOT to produce an alignment of a new 24-inch waterline for design and construction in the next three years to ensure clearance of the I-25 expansion from WCR 32 to SH 402.

    GIS progress: It should be noted that we have started adding the installation year to our database of our pipelines. Of the 610+ miles of line we have, 268 miles

    of the pipe have the installation date added!

    Shots on Main equates to lines GPS’d during initial construction or during a repair/pothole.

    Progress as of January 7, 2019

    29

  • For Comparison: data from January 2018 Board meeting

    30

  • To: Board of Directors From: Nancy Koch, Water Resources Manager Date: January 3, 2019 RE: JANUARY WATER RESOURCES MANAGER’S REPORT

    Directors: Bill Szmyd, President

    Steve Brandenburg

    Larry Brandt

    Paul Bukowski

    Kathy Gallivan-Crist

    Ed Martens

    Emily McMurtrey

    District Manager: Michael T. Cook, P.E.

    835 E. Hwy 56

    Berthoud, CO 80513

    Phone: 970-532-2096

    Fax: 970-532-3734

    www.LTWD.org

    31

  • Water Rights Outreach

    The Handy Ditch Company provided the District the Executive Summary of its Ditchwide Study that evaluates the historic yield of Handy shares, among other issues. The summary document presents the assumptions and conclusions of the study. The data used in the study are in a separate report that has not been provided by the ditch at this time. Staff and the District’s consultants are reviewing the Executive Summary.

    District staff and consultants are evaluating the potential yield of the Hayseed water right, the number one water right on the St. Vrain Creek. The research is primarily focused on the benefit to Brookfield as it owns a portion of the Hayseed water right, but the District can use the research to assess the validity of claims to the Hayseed right by other developers.

    32

  • Drought Levels Have Slighly Improved Since October

    33

  • Snowpack in the Colrado Basin NearAverage

    34

  • MEMORANDUM

    To: Board of Directors From: Ken Lambrecht, Operations Manager Date: January 4, 2019 Re: Operations and Water Quality Report

    Locate Requests:

    Leak Repairs:

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    2018

    2017

    2016

    7 Yr Ave

    02468

    1012141618

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    2018

    2017

    2016

    7 Yr Ave

    35

  • Water Quality Report

    Monthly Water Quality Samples All monthly samples were within acceptable tolerances.

    • Total Coliforms: Absent• Escherichia Coli: Absent• Residual Chlorine: 0.2 < Cl2 < 3.0• pH: 7.0 < pH < 9.5

    DBP2

    Next Sampling Period: February 2019

    Lead & Copper

    Next Sampling Period: January 1 – June 30, 2019

    Customer Taste and Odor Work Orders:

    Created Date

    Service Order Number Service Address City Description

    12/10/2018 11133 7977 BISON BLUFF ST LOVELAND Cloudy Dirty Customer Comment: Water in tub appeared grey with some black flakes. After running faucet for a few minutes, the water cleared up. Customer will try and capture sample and will call back if they see the grey water again.

    Completed Comment: Customer has not called back with any issues and has not been able to collect a sample of the dirty water. 12/17/2018 11170 20607 NORTHMOOR DR JOHNSTOWN Cloudy Dirty Customer Comment: Customer brought in sample of humidifier filter. Fairly new humidifier fed from hot water heater and filter becomes dirty faster than normal. Plumber questioned water quality. Customer Service representative spoke with him and water goes through copper tubing near unit. Please contact customer with findings and any guidance.

    Completed Comment: Called and spoke with customer, filter hasn't been changed since January. The humidifier filter can capture dirt just like the other filter on furnace.

    36

  • Projects

    Modular Office Project:

    The new electrical plans should be completed on January 11th. We’ll be submitting our building permit to the County once the plan set is complete.

    Master Meter Upgrade Project

    The project is complete. We are continuing to read the master meters manually to verifying the reads to ensure accuracy.

    Beacon Meter Upgrade Project

    LTWD staff have been coordinating with our material supplier and an experienced installation contractor to create our Request for Proposal. There are still some unresolved questions and concerns. I have concerns that the new BEACON meters may not work in all parts of the District. The manufacturer is developing a newer model that should take care of the poor cellular coverage areas. Initial tests are promising, but the newer model is not available for delivery (yet). Hopefully later this quarter. I will want to field test these meters before we begin the mass change out of all the meters. We also have a fallback plan to revert back to a drive-by system for our most remote areas.

    Orion CE Orion LTE Orion ME Drive by Cellular Drive by Currently Using Currently Testing Fallback Plan

    Photo not available for the LTE(M).

    All 3 systems (LTE, LTE(M) and Orion ME) will publish the data into the EyeOnWater application that will be available to our customers. The downside is that data for the drive by (Orion ME) will only be updated on a monthly basis. I believe that we will only have a few hundred customer that will be on the Orion ME.

    The material supplier is agreeing to replace any LTE endpoints that are unable to connect with an LTE(M) at their expense, and replace again with a Orion ME at their expense if the LTE(M) is unable to connect. The District should be able to limit our labor and material cost for the change outs. We’ll just have the challenge of keeping all the records up to date during every billing cycle.

    37

  • Valve Exercising Program

    This week we took delivery of our valve exerciser. One of our experienced Crew Leaders is developing our exercise program. Our goal is the exercise, assess the condition and/or repair every valve in the District over the next 5 years. There are approximately 8,400 valves in the distribution system. The data collected will be entered into our GIS database.

    38

    AGENDA5.1 MINUTES OF THE DECEMBER 13 2018 REGULAR BOARD MEETING5.2 TAP LIST 6365.3 DECEMBER DISBURSEMENTS REPORT5.4 DECEMBER 2018 FINANCIAL REPORT5.5 DESIGNATION OF PUBLIC POSTING PLACES6.2 CARTER LAKE FILTER PLANT6.3 PUBLIC HEARING ACTION ITEM MOTION TO APPROVE RESOLUTION NO 2019-1 INCLUSION7.1 DISTRICT MANAGER'S REPORT7.2 DISTRICT ENGINEER'S REPORT7.3 WATER RESOURCES MANAGER'S REPORT7.4 OPERATIONS MANAGER'S REPORT AND WATER QUALITY UPDATE