Dillard’sEnergy Management
Jeff BowenDillard’s Stores Services, Inc.
Little Rock, AR
EMS
• What it is –– ASI Controls – Direct Digital Controls– Web enabled
• What we use it for –– On/Off , Control temperature, control schedules,
On/Off, troubleshooting• How many do we have –
What the System Does• Manages, monitors and controls energy usage• We configure and monitor our networked facilities through our web
browser• We receive alarms and event notifications on email, mobile phone,
or via text message• We update lighting and/or climate control schedules at a facility, set
of facilities, or the entire network, with one command• We can integrate different devices from different manufacturers
using ASI’s WebLink• We analyze and graph trend data online or export it to Excel for
additional processing
ASI Controller
ASI Rooftop Unit Controller
How Many do we Have?
• 342 Stores (buildings) monitored– 292 are on a Wide Area Network (WAN)– 50 are on older dial-up technology
• 6 Distribution Centers monitored (WAN)• 2 Data Centers monitored (WAN)• 1 Corporate Office (WAN)• 351 Total Systems Monitored
Roof Top Systems Monitoring
• Roof Top HVAC Units –– Space Temperatures (alarm for high and low)– Unit Amperage– Supply Air Temperature– Return Air Temperature– Monitor the difference between supply air temperature
and return air temperature (alarm for high differences)– Approximately 15 points monitored on each RTU– 225 – 400 points monitored per store for HVAC alone– 78,125 points monitored daily (using averages)
Chiller Systems Monitoring
• Chiller Systems –– Supply Air Temperature/Space Temperature (air handler)– Amperage (chiller and air handlers)– Chiller Alarms – Chilled Water Temperatures– Condenser Water Temperatures– Cooling Tower Fan Status– Approximately 1,875 points monitored daily on chillers
Lighting Controls
• Lighting Controls are time based– Separated into 4 quadrants per store, per floor– Separated into –
• Work Lights – on 3 hours prior to store opening• Sales Lights – on 15 minutes prior to store opening• Feature Lights – on 8 minutes prior to store opening
• Manual Overrides upon request– Executive visits– Store Maintenance– Comfort Issues– Temporary Schedule Changes (sales, etc.)
Main Control Panel
• What else we monitor –– Emergency Generator Status and Alarm Condition– Escalator Run Status– Lighting Panel Overrides– Main Panel Override– Building Power – Voltage, kW, kWh, power factor– Photocells– Outside Air Temperature– Interior Humidity– Building Security System– Monitors Communication to HVAC systems
EMS – RTU Detail Screen
5:45 AM11:45 AM 5:45 PM 11:45 PM 5:45 AM11:45 AM 5:45 PM 11:45 PM 5:45 AM11:45 AM 5:45 PM3/30/13 3/31/13 4/1/13
0
50
100
150
200
250
300
350
400
kW Demand - Store 226 Altamonte Springs, FLEaster Holiday
Total
The Power of Off!
Morning Start Up Sequence - Before
5:30 AM 3:15 PM 1:00 AM 10:45 AM 8:30 PM 6:15 AM 4:00 PM 1:45 AM 11:30 AM 9:15 PM 7:00 AM 4:45 PM0
200
400
600
800
1000
1200
1400
Domain - Austin, TX - kW DemandJune 8 - 12, 2013
734 - kW Demand
kW D
eman
d
5:30 AM
6:00 AM
6:30 AM
7:00 AM
7:30 AM
8:00 AM
8:30 AM
9:00 AM
9:30 AM
10:00 AM
10:30 AM
11:00 AM
11:30 AM
12:00 PM
12:30 PM
1:00 PM
1:30 PM
2:00 PM
2:30 PM
3:00 PM
3:30 PM
4:00 PM
4:30 PM
5:00 PM
5:30 PM
6:00 PM
6:30 PM
7:00 PM
7:30 PM
8:00 PM
8:30 PM
9:00 PM
9:30 PM
10:00 PM
10:30 PM
11:00 PM
0
200
400
600
800
1000
1200
1400
kW Demand - Before Morning SequenceFriday June 12th
Total
Morning Start Up Sequence After
5:30 AM 2:30 PM 11:30 PM 8:30 AM 5:30 PM 2:30 AM11:30 AM 8:30 PM 5:30 AM 2:30 PM 11:30 PM 8:30 AM 5:30 PM0
200
400
600
800
1000
1200
Domain - Austin, TX - kW DemandJuly 10 - 14, 2013
kW Demand
kW D
eman
d
5:30 AM
6:00 AM
6:30 AM
7:00 AM
7:30 AM
8:00 AM
8:30 AM
9:00 AM
9:30 AM
10:00 AM
10:30 AM
11:00 AM
11:30 AM
12:00 PM
12:30 PM
1:00 PM
1:30 PM
2:00 PM
2:30 PM
3:00 PM
3:30 PM
4:00 PM
4:30 PM
5:00 PM
5:30 PM
6:00 PM
6:30 PM
7:00 PM
7:30 PM
8:00 PM
8:30 PM
9:00 PM
9:30 PM
10:00 PM
10:30 PM
11:00 PM
0
200
400
600
800
1000
1200
kW Demand - After Morning SequenceFriday July 14th
Total
Comparing Before and After
5:30 AM
6:15 AM
7:00 AM
7:45 AM
8:30 AM
9:15 AM
10:00 AM
10:45 AM
11:30 AM
12:15 PM
1:00 PM
1:45 PM
2:30 PM
3:15 PM
4:00 PM
4:45 PM
5:30 PM
6:15 PM
7:00 PM
7:45 PM
8:30 PM
9:15 PM
10:00 PM
10:45 PM0
200
400
600
800
1000
1200
1400
Domain - Austin, TX - ComparisonFriday June 14 vs. Friday July 12
2012 kW Demand 2013 kW Demand
kW D
eman
d
Questions?