SSMA Steel Stud Manufacturers Association WWW.SSMA.COM Cold-Formed Steel Details

description

sdfsf

Transcript of {DF2BE643-0D0A-4FB5-983D-B9AD3110806F}

  • SSMA Steel Stud Manufacturers Association

    WWW.SSMA.COM

    Cold-Formed Steel Details

    Phil R Clark

  • Contents Cover Page. 1 Contents.. 2 Disclaimer 4 Window Details: Load Bearing, Back to Back Header, Single Jamb 5 Load Bearing, Back to Back Header, Boxed Jamb 6 Load Bearing, Back to Back Header, Back to Back Jamb 7 Load Bearing, Boxed Header, Single Jamb 8 Load Bearing, Boxed Header, Boxed Jamb 9 Load Bearing, Boxed Header, Back to Back Jamb 10 Load Bearing, Single Header with Strongback, Single Jamb.. 11 Load Bearing, Single Header with Strongback, Boxed Jamb.. 12 Load Bearing, Single Header with Strongback, Back to Back Jamb.. 13 Non-Load Bearing, Single Track Header, Single Jamb.14 Non-Load Bearing, Single Track Header, Boxed Jamb.15 Non-Load Bearing, Single Track Header, Back to Back Jamb.16 Door Details: Load Bearing, Back to Back Header, Single Jamb 17 Load Bearing, Back to Back Header, Boxed Jamb 18 Load Bearing, Back to Back Header, Back to Back Jamb 19 Load Bearing, Boxed Header, Single Jamb 20 Load Bearing, Boxed Header, Boxed Jamb 21 Load Bearing, Boxed Header, Back to Back Jamb 22 Load Bearing, Single Header with Strongback, Single Jamb.. 23 Load Bearing, Single Header with Strongback, Boxed Jamb.. 24 Load Bearing, Single Header with Strongback, Back to Back Jamb.. 25 Non-Load Bearing, Single Track Header, Single Jamb.26

    Phil R ClarkPage 2

  • Non-Load Bearing, Single Track Header, Boxed Jamb.27 Non-Load Bearing, Single Track Header, Back to Back Jamb.28 Deflection Track Assembly: Single Track with Cold-rolled Channel. 29 Double Deflection Track. 30 Bridging Single Flat Strap with Blocking. 31 Double Flat Strap with Blocking.32 Cold-rolled Channel with Angle Clip. 33 Full-height Curtain Wall Deflection Clip..34 Spandrel Curtain Wall Sticker to Beam 35 Diagonal Brace.36 Sticker with Vertical Drop and Diagonal Brace.. 37 Spandrel Framing at Pony Wall at Steel Post with Embed. 38 Bottom Track Anchorage Low Velocity Fastener.39 Wedge Anchor. 40 Backing Flat Strap Lightly Loaded 41 Clipped Track Heavily Loaded.. 42 Wall Framing at Corner Track Lap Connection. 43 Non-Load Bearing Interior Wall Framed Above Ceiling with Diagonal Kicker.. 44 Framed to Ceiling with Diagonal Kicker.. 45 Shearwall X-Bracing. 46 Typical Floor Framing47

    Phil R ClarkPage 3

  • DISCLAIMER The details contained in this document are intended as a general guide for using Steel Stud Manufacturers Association (SSMA) member products. These products should not be used in design or construction without an independent evaluation by a qualified engineer or architect to verify the suitability of a particular product for use in a specific application. The SSMA and its members assume no liability for failure resulting from the use or misapplication of the detail drawings contained herein.

    This document may not be reproduced or distributed in any form, electronic or otherwise, without the express written consent of SSMA. In no event will SSMA be liable for any damages, including loss of data or information of any kind, lost profits, cost of cover or any other special, incidental, consequential or indirect damages arising out of this agreement or the use or inability to use the details, however caused, and on any theory of liability. Warning: This electronic file is furnished without guarantee of compatibility with recipients hardware or software and may contain undetected viruses or other harmful material. It is recommended that the recipient check the electronic file prior to use. SSMA assumes no responsibility for damage to users property as a result of receiving and/or using the electronic file.

    Page 4

  • INFILL STUD

    SILL

    ANGLE

    HEADER TRACKS

    INFILL STUD

    JAMB

    ADDITIONAL ANCHORAGE @ JAMB

    BASE TRACK

    CRIPPLE STUD

    CRIPPLE STUDUse of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes. Back to back header reduces web-crippling reinforcement requirements. Using a wider flange and thicker jamb stud material reduces cost of installation compared to built-up jamb studs. Using a wider flange reduces possibility of installing a wall stud as a jamb stud.

    ADVANTAGES:1.

    2. 3.

    4.HEADER

    MEMBERS

    TYPICAL BASE ANCHORAGE

    Window - Load BearingBack to Back Header

    Single Jamb

    Page 5

  • CRIPPLE STUD

    CRIPPLE STUD

    JAMB

    SILL

    INFILL STUD

    ADDITIONAL ANCHORAGE @ JAMB

    BASE TRACK

    ANGLE

    HEADER TRACKS

    INFILL STUD

    HEADER MEMBERS

    TYPICAL BASE ANCHORAGE

    Use of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes. Back to back header reduces web-crippling reinforcement requirements. Boxed jamb studs welded together reduces material build-up and finish problems.

    1.

    2. 3.

    ADVANTAGES:

    Window - Load BearingBack to Back Header

    Boxed Jamb

    Page 6

  • CRIPPLE STUD

    CRIPPLE STUD

    TRACK PIECE @ OPEN SIDE

    JAMB

    SILL

    TYPICAL BASE ANCHORAGE

    INFILL STUD

    ADDITIONAL ANCHORAGE @ JAMB

    BASE TRACK

    ANGLE

    HEADER TRACKS

    HEADER MEMBERS

    INFILL STUD ADVANTAGES:Use of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes. Back to back header reduces web-crippling reinforcement requirements. Using a back to back jamb with a track cap piece at the opening eliminates welding so that thinner material can be used depending on the load requirements.Reduces the need to reinforce the web at the end reactions of the jamb studs.

    1.

    2. 3.

    4.

    Window - Load BearingBack to Back HeaderBack to Back Jamb

    Page 7

  • CRIPPLE STUD

    CRIPPLE STUD

    JAMB

    TYPICAL BASE ANCHORAGE

    SILL

    INFILL STUD

    ADDITIONAL ANCHORAGE @ JAMB

    BASE TRACK

    ANGLE

    HEADER MEMBERS

    HEADER TRACKS

    INFILL STUDUse of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes. Boxed header members provide backing for attachment of window covering support.Using a wider flange and thicker jamb stud material reduces cost of installation compared to built-up jamb studs. Using a wider flange reduces possibility of installing a wall stud as a jamb stud.

    ADVANTAGES:1.

    2. 3.

    4.

    Window - Load BearingBoxed HeaderSingle Jamb

    Page 8

  • CRIPPLE STUD

    CRIPPLE STUD

    JAMB

    SILL

    TYPICAL BASE ANCHORAGE

    INFILL STUD

    ADDITIONAL ANCHORAGE @ JAMB

    BASE TRACK

    ANGLE

    HEADER MEMBERS

    HEADER TRACKS

    INFILL STUD ADVANTAGES:Use of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes. Boxed jamb studs welded together reduces material build-up and finish problems.Boxed header members provide backing for attachment of window covering support.

    1.

    2. 3.

    Window - Load BearingBoxed HeaderBoxed Jamb

    Page 9

  • CRIPPLE STUD

    CRIPPLE STUD

    TRACK PIECE @ OPEN SIDE

    JAMB

    SILL

    TYPICAL BASE ANCHORAGE

    INFILL STUD

    ADDITIONAL ANCHORAGE @ JAMB

    BASE TRACK

    ANGLE

    HEADER TRACKS

    HEADER MEMBERS

    INFILL STUD ADVANTAGES:Use of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes. Boxed jamb studs welded together reduces material build-up and finish problems. Using a back to back jamb with a track cap piece at the opening eliminates welding so that thinner material can be used depending on the load requirements.Reduces the need to reinforce the web at the end reactions of the jamb studs.

    1.

    2. 3.

    4.

    Window - Load BearingBoxed Header

    Back to Back Jamb

    Page 10

  • CRIPPLE STUD

    CRIPPLE STUDHEADER TRACK

    TYPICAL BASE ANCHORAGE

    INFILL STUD

    ADDITIONAL ANCHORAGE @ JAMB

    BASE TRACK

    SILL

    JAMB

    STRONGBACK

    INFILL STUD

    ADVANTAGES:Use of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes. Strongback header minimizes number of members to be installed vs. back to back or boxed header. Using a wider flange and thicker jamb stud material reduces cost of installation compared to built-up jamb studs. Using a wider flange reduces possibility of installing a wall stud as a jamb stud.Provides good vertical load transfer at each strongback header into jamb stud.Reduces web-crippling reinforcement being required at end of strongback header.

    1.

    2.

    3.

    4.

    5.

    6.

    Window - Load BearingSingle Header with Strongback

    Single Jamb

    Page 11

  • CRIPPLE STUD

    CRIPPLE STUDHEADER TRACK

    TYPICAL BASE ANCHORAGE

    INFILL STUD

    ADDITIONAL ANCHORAGE @ JAMB

    BASE TRACK

    SILL

    JAMB

    STRONGBACK

    INFILL STUD

    ADVANTAGES:Use of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes. Strongback header minimizes number of members to be installed vs. back to back or boxed header. Boxed jamb studs welded together reduces material build-up and finish problems.Provides good vertical load transfer at each strongback header into jamb stud.Reduces web-crippling reinforcement being required at end of strongback header.

    1.

    2.

    3.

    4.

    5.

    Window - Load BearingSingle Header with Strongback

    Boxed Jamb

    Page 12

  • CRIPPLE STUD

    CRIPPLE STUD

    TRACK PIECE @ OPEN SIDE

    TYPICAL BASE ANCHORAGE

    HEADER TRACK

    INFILL STUD

    ADDITIONAL ANCHORAGE @ JAMB

    BASE TRACK

    SILL

    JAMB

    STRONGBACK

    INFILL STUD

    ADVANTAGES:Use of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes. Strongback header minimizes number of members to be installed vs. back to back or boxed header. Using a back to back jamb with a track cap piece at the opening eliminates welding so that thinner material can be used depending on the load requirements.Reduces the need to reinforce the web at the end reactions of the jamb studs.Provides good vertical load transfer at each strongback header into jamb stud.Reduces web-crippling reinforcement being required at end of strongback header.

    1.

    2.

    3.

    4.

    5.

    6.

    Window - Load BearingSingle Header with Strongback

    Back to Back Jamb

    Page 13

  • ADDITIONAL ANCHORAGE @ JAMB

    JAMB

    Use of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes. Using a wider flange and thicker jamb stud material reduces cost of installation compared to built-up jamb studs. Using a wider flange reduces possibility of installing a wall stud as a jamb stud.

    SILL

    HEADER TRACKS

    INFILL STUD

    INFILL STUD

    ADVANTAGES:1. 2.

    3.

    BASE TRACK

    CRIPPLE STUD

    CRIPPLE STUD

    Window - Non-Load BearingSingle Track Header

    Single Jamb

    Page 14

  • HEADER TRACKS

    SILL

    INFILL STUD

    INFILL STUD

    Use of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes. Boxed jamb studs welded together reduces material build-up and finish problems.

    ADVANTAGES:1. 2.

    JAMB

    CRIPPLE STUD

    CRIPPLE STUD

    ADDITIONAL ANCHORAGE @ JAMB

    BASE TRACK

    Window - Non-Load BearingSingle Track Header

    Boxed Jamb

    Page 15

  • BASE TRACK

    Use of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes. Using a back to back jamb with a track cap piece at the opening eliminates welding so that thinner material can be used depending on the load requirements.Reduces the need to reinforce the web at the end reactions of the jamb studs.HEADER TRACKS

    INFILL STUD

    INFILL STUD

    ADVANTAGES:

    SILL

    JAMB

    CRIPPLE STUD

    TRACK PIECE

    TRACK PIECE

    CRIPPLE STUD

    ADDITIONAL ANCHORAGE @ JAMB

    1.

    2.

    3.

    Window - Non-Load BearingSingle Track HeaderBack to Back Jamb

    Page 16

  • JAMB

    Use of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes.Back to back header reduces web-crippling reinforcement requirements. Using a wider flange and thicker jamb stud material reduces cost of installation compared to built-up jamb studs. Using a wider flange reduces possibility of installing a wall stud as a jamb stud.

    ANGLE

    HEADER TRACKS

    HEADER MEMBERS

    INFILL STUD ADVANTAGES:1.

    2. 3.

    4.

    ADDITIONAL ANCHORAGE

    @ JAMB

    CRIPPLE STUD

    Door - Load BearingBack to Back Header

    Single Jamb

    Page 17

  • HEADER TRACKS

    HEADER MEMBERS

    INFILL STUD Use of cripple stud to receive head/sill tracks at jamb studs helps maintain alignment of finishes. Back to back header reduces web-crippling reinforcement requirements. Boxed jamb studs welded together reduces material build-up and finish problems.Provides better load transfer from jamb stud to base track vs. single jamb stud.

    ADVANTAGES:1.

    2. 3.

    4.

    ANCHORAGE

    JAMB

    CRIPPLE STUD

    ANGLE

    Door - Load BearingBack to Back Header

    Boxed Jamb

    Page 18

  • Use of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes. Back to back header reduces web-crippling reinforcement requirements. Using a back to back jamb with a track cap piece at the opening eliminates welding so that thinner material can be used depending on the load requirements.Reduces the need to reinforce the web at the end reactions of the jamb studs.Provides better load transfer from jamb stud to base track vs. single jamb stud.

    HEADER TRACKS

    HEADER MEMBERS

    INFILL STUD ADVANTAGES:1.

    2. 3.

    4.

    5.

    ANGLE

    JAMB

    CRIPPLE STUD

    TRACK PIECE

    BASE TRACK

    ADDITIONALANCHORAGE

    @ JAMB

    Door - Load BearingBack to Back HeaderBack to Back Jamb

    Page 19

  • JAMB

    ANGLE

    ADDITIONAL ANCHORAGE

    @ JAMB

    Use of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes. Boxed header members provide backing for attachment of window covering support.Using a wider flange and thicker jamb stud material reduces cost of installation compared to built-up jamb studs. Using a wider flange reduces possibility of installing a wall stud as a jamb stud.

    HEADER TRACKS

    HEADER MEMBERS

    ADVANTAGES:1.

    2. 3.

    4.

    INFILL STUD CRIPPLE STUD

    Door - Load BearingBoxed HeaderSingle Jamb

    Page 20

  • HEADER TRACKS

    HEADER MEMBERS

    INFILL STUD Use of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes. Boxed jamb studs welded together reduces material build-up and finish problems.Boxed header members provide backing for attachment of window covering support.Provides better load transfer from jamb stud to base track vs. single jamb stud.

    1.

    2. 3.

    4.

    ADVANTAGES:

    ANCHORAGE

    JAMB

    ANGLE

    CRIPPLE STUD

    Door - Load BearingBoxed HeaderBoxed Jamb

    Page 21

  • Use of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes. Boxed jamb studs welded together reduces material build-up and finish problems. Using a back to back jamb with a track cap piece at the opening eliminates welding so that thinner material can be used depending on the load requirements.Reduces the need to reinforce the web at the end reactions of the jamb studs.Provides better load transfer from jamb stud to base track vs. single jamb stud.

    ANGLE

    HEADER TRACKS

    HEADER MEMBERS

    INFILL STUD ADVANTAGES:

    BASE TRACK

    JAMB

    CRIPPLE STUD

    TRACK PIECE

    ADDITIONAL ANCHORAGE

    1.

    2.

    3.

    4.

    5.

    Door - Load BearingBoxed Header

    Back to Back Jamb

    Page 22

  • JAMB

    Use of cripple stud to receive head/sill tracks at jamb studs helps maintain alignment of finishes. Strongback header minimizes number of members to be installed vs. back to back or boxed header. Using a wider flange and thicker jamb stud material reduces cost of installation compared to built-up jamb studs. Using a wider flange reduces possibility of installing a wall stud as a jamb stud.Provides good vertical load transfer at each strongback header into jamb stud.Reduces web-crippling reinforcement being required at end of strongback header.

    STRONGBACK

    HEADER TRACK

    ADVANTAGES:

    INFILL STUD

    ADDITIONAL ANCHORAGE

    @ JAMB

    CRIPPLE STUD

    1.

    2.

    3.

    4.

    5.

    6.

    Door - Load BearingSingle Header with Strongback

    Single Jamb

    Page 23

  • STRONGBACK

    HEADER TRACK

    INFILL STUD

    Use of cripple stud to receive head/sill tracks at jamb studs helps maintain alignment of finishes. Strongback header minimizes number of members to be installed vs. back to back or boxed header. Boxed jamb studs welded together reduces material build-up and finish problems.Provides good vertical load transfer at each strongback header into jamb stud.Reduces web-crippling reinforcement being required at end of strongback header.Provides better load transfer from jamb stud to base track vs. single jamb stud.

    ADVANTAGES:

    ANCHORAGE

    CRIPPLE STUD

    JAMB

    1.

    2.

    3.

    4.

    5.

    6.

    Door - Load BearingSingle Header with Strongback

    Boxed Jamb

    Page 24

  • Use of cripple stud to receive head/sill tracks at jamb studs helps maintain alignment of finishes. Strongback header minimizes number of members to be installed vs. back to back or boxed header. Using a back to back jamb with a track cap piece at the opening eliminates welding so that thinner material can be used depending on the load requirements.Reduces the need to reinforce the web at the end reactions of the jamb studs.Provides good vertical load transfer at each strongback header into jamb stud.Reduces web-crippling reinforcement being required at end of strongback header.Provides better load transfer from jamb stud to base track vs. single jamb stud.

    STRONGBACK

    HEADER TRACK

    INFILL STUD

    ADVANTAGES:

    BASE TRACK

    CRIPPLE STUD

    JAMB

    TRACK PIECE

    ADDITIONAL ANCHORAGE

    1.

    2.

    3.

    4.

    5.

    6.

    7.

    Door - Load BearingSingle Header with Strongback

    Back to Back Jamb

    Page 25

  • JAMB

    Use of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes. Using a wider flange and thicker jamb stud material reduces cost of installation compared to built-up jamb studs. Using a wider flange reduces possibility of installing a wall stud as a jamb stud.HEADER TRACKS

    ADVANTAGES:1. 2.

    3.

    INFILL STUD

    ADDITIONAL ANCHORAGE

    @ JAMB

    CRIPPLE STUD

    Door - Non-Load BearingSingle Track Header

    Single Jamb

    Page 26

  • HEADER TRACKS

    INFILL STUD

    Use of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes.Boxed jamb studs welded together reduces material build-up and finish problems.Provides better load transfer from jamb stud to base track vs. single jamb stud.

    ADVANTAGES:1. 2.

    3.

    ANCHORAGE

    CRIPPLE STUD

    JAMB

    Door - Non-Load BearingSingle Track Header

    Boxed Jamb

    Page 27

  • Use of cripple stud to receive head/sill tracks at the jamb studs helps maintain alignment of finishes. Using a back to back jamb with a track cap piece at the opening eliminates welding so that thinner material can be used depending on the load requirements.Reduces the need to reinforce the web at the end reactions of the jamb studs.Provides better load transfer from jamb stud to base track vs. single jamb stud.

    ADVANTAGES:

    HEADER TRACKS

    INFILL STUD

    1.

    2.

    3.

    4.

    BASE TRACK

    TRACK PIECE

    JAMB

    CRIPPLE STUD

    ADDITIONALANCHORAGE

    Door - Non-Load BearingSingle Track HeaderBack to Back Jamb

    Page 28

  • COLD-ROLLEDCHANNEL (CONT.)

    ADVANTAGES:1.

    CLIP ANGLE[DEPTH = 80% OFSTUD DEPTH (d)]

    SCREW ATTACHMENT

    Allows both vertical and horizontal movement of the structure above which supports the deflection track.

    Deflection Track AssemblySingle Track with

    Cold-rolled Channel

    Page 29

  • DEF'L TRACK

    SECTION A-A

    GA

    P -

    TR

    AC

    KLE

    G T

    O S

    CR

    EW

    DE

    F'L

    GA

    P

    TOP TRACK

    STUD

    SCREW ATTACHMENT

    ADVANTAGES:Provides lateral connection of the studs together without relying on cladding for lateral support parallel to the wall.Allows both vertical and horizontal movement of the structure above which supports the deflection track.

    1.

    2.

    Deflection Track AssemblyDouble Deflection Track

    Page 30

  • TAUT FLAT STRAP

    TRACK BLOCK PIECE TO MATCH WALL STUD

    CLIP FLANGE AND BENDINSTALL O.C.

    FRAMED WALL

    1. Good torsional resistance for studs of all depths.ADVANTAGES:

    FINISHSURFACE

    SCREWATTACHMENT

    BridgingSingle Flat Strap

    With Blocking

    Page 31

  • FRAMED WALL

    TAUT FLAT STRAPS

    SCREW ATTACHMENT

    ADVANTAGES:Provides good torsional restraint for axially-loaded studs for all stud sizes.Strap layout is independent of punchout location.

    1.

    2.TRACK BLOCK PIECE TO MATCH WALL STUD

    CLIP FLANGE AND BENDINSTALL O.C.

    BridgingDouble Flat Strap

    With Blocking

    Page 32

  • ATTACHMENTSCREW

    CLIP ANGLE[LENGTH = 80% OF STUD DEPTH (d)]

    COLD-ROLLEDCHANNEL

    43 mil MIN.THICKNESS

    Ease of installation of cold-rolled channel through pre-aligned stud punchouts.

    ADVANTAGES:1.

    BridgingCold-rolled Channel

    With Clip Angle

    Page 33

  • SLOT

    SCREW

    SLIDE CLIP

    STEEL WASHERS

    STUD

    ADVANTAGES:Allows floor/roof to move vertically without imparting any axial load to wall framing.Provides support for out-of-plane wind and seismic loads and for in-plane seismic loads.Accommodates variation of slab edge to maintain wall alignment.

    1.

    2.

    3.

    Full-height Curtain WallDeflection Clip

    Page 34

  • ATTACHMENTSCREW

    ANGLE CLIP

    ATTACHMENTSCREW

    STRUT

    STUD

    ADVANTAGES:Ease of installation.1.

    Spandrel Curtain WallSticker to Beam

    Page 35

  • ANGLE CLIP

    SCREW ATTACHMENT

    STUD ANCHORAGE

    ATTACHMENT

    KICKER

    SCREW

    CLIP ANGLE

    MAX. 45

    W.P.

    ADVANTAGES:Ease of installation.Increases spacing between support points which reduces lateral support reactions and decreases deflections.

    1.2.

    Spandrel Curtain WallDiagonal Brace

    Page 36

  • MAX. 45

    ANGLE CLIP

    SCREW

    STRUT

    ATTACHMENT

    SCREW ATTACHMENT

    STUDANCHORAGE

    ATTACHMENT

    KICKER

    SCREW

    CLIP ANGLE

    W.P.

    ADVANTAGES:Increases spacing between support points which reduces support reactions and decreases deflections.Transfers vertical load from the brace into bottom of beam rather than the wall.Allows support at floor/roof to be sized to take lateral and dead loads from wall only, rather than the brace.

    1.

    2. 3.

    Spandrel Curtain WallSticker with Vertical Drop

    And Diagonal Brace

    Page 37

  • ADVANTAGES:Provides lateral support for pony wall with spandrel glass.Eliminates costly retrofitting.

    1.

    2.

    Spandrel FramingAt Pony Wall

    Steel Post with Embed

    BASE TRACK

    STUD

    L.V.F.

    P EMBEDFLUSH WITHCONCRETE FLOOR

    L

    TS SUPPORT POST

    Page 38

  • BASE TRACK

    STUD

    LOW VELOCITY FASTENER

    ADVANTAGES:Economical to install vs. wedge anchor.1.

    Bottom Track AnchorageLow Velocity Fastener

    Page 39

  • BASE TRACK

    STUD

    WEDGE ANCHOR

    ADVANTAGES:Edge clearance requirement is minimized.Good holding capacity allows fewer anchors to be installed.

    1.2.

    Bottom Track AnchorageWedge Anchor

    Page 40

  • ADVANTAGES:Ease of installation.1.

    SCREW

    TAUT FLAT STRAP

    FRAMED WALL, SEEPLAN FOR SIZE &

    FINISH

    SPACING

    SURFACE

    ATTACHMENT

    BackingFlat Strap - Lightly Loaded

    (Paper towel dispensers, towelbars, toilet paper holders)

    Page 41

  • STUD

    SCREW ATTACHMENT

    CLIP FLANGES AT EA. STUDCONTINUOUS TRACK

    ADVANTAGES:Good load carrying capacity.1.

    BackingClipped Track - Heavily Loaded

    (Grab bars, handrails, wallhung cabinets)

    Phil R ClarkPage 42

  • FINISH

    AT LAP JOINTCLIP TRACK FLANGEATTACHMENT

    STUD

    TRACK

    SCREW

    ADVANTAGES:Provides good load transfer.Ties interior walls together.

    1.2.

    Wall Framing at CornerTrack Lap Connection

    Page 43

  • ADVANTAGES:Provides good load transfer from wall to kicker.Kicker does not place twisting load on wall top track.

    1.2.

    CEILING LINE

    STUD

    KICKER CLIP ANGLE

    ANCHORAGE

    MAX. 45

    SCREW ATTACHMENT

    SCREW ATTACHMENT

    Non-Load Bearing Interior WallFramed Above Ceiling with

    Diagonal Kicker

    Page 44

  • ADVANTAGES:Eliminates extending wall above top of ceiling.1.

    CEILING LINE

    STUD

    DEEP LEG TRACK

    ANCHORAGE

    MAX. 45

    TOP TRACK

    SCREW ATTACHMENT

    A

    SECTION A-A

    CLIP FLANGETO FORM

    SHOE

    A

    Non-Load Bearing Interior WallFramed to Ceiling with

    Diagonal Kicker

    Page 45

  • ADVANTAGES:Wide flat straps eliminate doubling the number of screws if corner gussets are used.A thin flat strap reduces the material build-up that can create finish problems.

    1.

    2.

    PER-TENSIONED STRAPS(EACH SIDE)

    ANCHOR BOLT

    SCREW ATTACHMENT

    TOP TRACK

    BASE TRACK

    ANCHORAGE(SIZED AND SPACED TO TAKE THE SHEAR LOAD FROM BRACE)

    HOLDOWN

    Shearwall X-Bracing

    Page 46

  • ADVANTAGES:Locating web stiffener on back side of web is easier to install than fitting the stiffener between joist flanges.Using screws to connect the web stiffeners is more economical than using a series of weld segments.

    1.

    2.

    SCREW ATTACHMENT

    JOIST

    JOIST

    TRACK OR STUD WEBSTIFFENER

    TRACK

    SCREWATTACHMENT

    STUD (ALIGNED WITH JOIST

    ABOVE)

    Typical Floor Framing

    Page 47

    Cover PageContentsDisclaimerWindowsLoad Bearing, Back to Back Header, Single JambLoad Bearing, Back to Back Header, Boxed JambLoad Bearing, Back to Back Header, Back to Back JambLoad Bearing, Boxed Header, Single JambLoad Bearing, Boxed Header, Boxed JambLoad Bearing, Boxed Header, Back to Back JambLoad Bearing, Single Header with Strongback, Single JambLoad Bearing, Single Header with Strongback, Boxed JambLoad Bearing, Single Header with Strongback, Back to Back JambNon-Load Bearing, Single Track Header, Single JambNon-Load Bearing, Single Track Header, Boxed JambNon-Load Bearing, Single Track Header, Back to Back Jamb

    DoorsLoad Bearing, Back to Back Header, Single JambLoad Bearing, Back to Back Header, Boxed JambLoad Bearing, Back to Back Header, Back to Back JambLoad Bearing, Boxed Header, Single JambLoad Bearing, Boxed Header, Boxed JambLoad Bearing, Boxed Header, Back to Back JambLoad Bearing, Single Header with Strongback, Single JambLoad Bearing, Single Header with Strongback, Boxed JambLoad Bearing, Single Header with Strongback, Back to Back JambNon-Load Bearing, Single Track Header, Single JambNon-Load Bearing, Single Track Header, Boxed JambNon-Load Bearing, Single Track Header, Back to Back Jamb

    Deflection Track AssemblySingle Track with Cold-rolled ChannelDouble Deflection Track

    BridgingSingle Flat Strap with BlockingDouble Flat Strap with BlockingCold-rolled Channel with Angle Clip

    Full-height Curtain Wall Deflection ClipSpandrel Curtain WallSticker to BeamDiagonal BraceSticker with Vertical Drop and Diagonal Brace

    Spandrel Framing at Pony Wall at Steel Post with EmbedBottom Track AnchorageLow Velocity FastenerWedge Anchor

    BackingFlat Strap - Lightly LoadedClipped Track - Heavy Loaded

    Wall Framing at CornerNon-Load Bearing Interior WallFramed Above Ceiling with Diagonal KickerFramed to Ceiling with Diagonal Kicker

    Shearwall X-BracingTypical Floor Framing