WATER SYSTEM ANALYSIS

FOR THE OCEAN KAMP PROJECT

IN THE

CITY OF OCEANSIDE

March 13, 2020

CAMP

PENDELTON

CITY OF

OCEANSIDE

AutoCAD SHX Text
76
AutoCAD SHX Text
76
AutoCAD SHX Text
5
AutoCAD SHX Text
INTERSTATE
AutoCAD SHX Text
CALIFORNIA
AutoCAD SHX Text
OCEANSIDE BLVD
AutoCAD SHX Text
MISSION AVE
AutoCAD SHX Text
FOUSSAT RD
AutoCAD SHX Text
RANCHO DEL ORO DR
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text
EL CAMINO REAL
AutoCAD SHX Text
N
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text
FIGURE 1
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
OCEAN KAMP
AutoCAD SHX Text
\\ARTIC\DWG\921003\REPORTS\PCO_FIGURE-1_VM.DWG 02-07-20 11:19:31 LAYOUT: LAYOUT1
muyeda
Callout
Break this out between West and East of SDG&E corridor, as well as, by residential lots.
muyeda
Callout
PROVIDE SOME EXPLANATION AS THIS ISN'T FROM WATER MASTER PLAN OR DESIGN MANUAL.

S

A

N

L

U

IS

R

E

Y

R

IV

E

R

S

A

N

L

U

I

S

R

E

Y

R

I

V

E

R

AutoCAD SHX Text
N
AutoCAD SHX Text
HIGHWAY 76
AutoCAD SHX Text
FOUSSAT
AutoCAD SHX Text
RD
AutoCAD SHX Text
MISSION AVE
AutoCAD SHX Text
PROJECT BOUNDARY
AutoCAD SHX Text
FOUSSAT RD
AutoCAD SHX Text
EX.8"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
LEGEND PROJECT BOUNDARY EXISTING PUBLIC WATER SYSTEM (320 PRESSURE ZONE)
AutoCAD SHX Text
EX.8"
AutoCAD SHX Text
HIGHWAY 76
AutoCAD SHX Text
FIRESIDE ST
AutoCAD SHX Text
HERITAGE ST
AutoCAD SHX Text
EX.30"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
EX.24"
AutoCAD SHX Text
BENET RD
AutoCAD SHX Text
EX.30"
AutoCAD SHX Text
EX.18"
AutoCAD SHX Text
EX.24"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
TO WIRE MOUNTAIN RESERVOIR
AutoCAD SHX Text
EX.24"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
EX.30"
AutoCAD SHX Text
EX.30"
AutoCAD SHX Text
MISSION AVE
AutoCAD SHX Text
0
AutoCAD SHX Text
400
AutoCAD SHX Text
FEET
AutoCAD SHX Text
TO JOHN PAUL STEIGER RESERVOIR
AutoCAD SHX Text
EX.24"
AutoCAD SHX Text
FIGURE 2
AutoCAD SHX Text
EXISTING WATER SYSTEM
AutoCAD SHX Text
OCEAN KAMP
AutoCAD SHX Text
\\ARTIC\DWG\921003\REPORTS\PCO_WTR_FIGURE-2_EXWTR.DWG 03-13-20 11:51:03 LAYOUT: LAYOUT
muyeda
Callout
UPSIZE EX 4" THAT SERVED FORMER SWAP MEET TO MIN 8"

S

A

N

L

U

IS

R

E

Y

R

IV

E

R

S

A

N

L

U

I

S

R

E

Y

R

I

V

E

R

AutoCAD SHX Text
N
AutoCAD SHX Text
HIGHWAY 76
AutoCAD SHX Text
FOUSSAT
AutoCAD SHX Text
RD
AutoCAD SHX Text
MISSION AVE
AutoCAD SHX Text
PROJECT BOUNDARY
AutoCAD SHX Text
FOUSSAT RD
AutoCAD SHX Text
0
AutoCAD SHX Text
300
AutoCAD SHX Text
FEET
AutoCAD SHX Text
RELOCATED 30" WATER TRANSMISSION MAIN
AutoCAD SHX Text
RELOCATED 24" WATER TRANSMISSION MAIN
AutoCAD SHX Text
RELOCATED 12" WATER DISTRIBUTION MAIN
AutoCAD SHX Text
EX.8"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
EX.8"
AutoCAD SHX Text
HIGHWAY 76
AutoCAD SHX Text
FIRESIDE ST
AutoCAD SHX Text
HERITAGE ST
AutoCAD SHX Text
EX.24"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
EX.30"
AutoCAD SHX Text
EX.30"
AutoCAD SHX Text
EX.24"
AutoCAD SHX Text
LEGEND PROJECT BOUNDARY EXISTING PUBLIC WATER SYSTEM RELOCATED PUBLIC WATER SYSTEM
AutoCAD SHX Text
EX.18"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
EX.30"
AutoCAD SHX Text
EX.24"
AutoCAD SHX Text
EX.24"
AutoCAD SHX Text
FIGURE 3
AutoCAD SHX Text
RELOCATION OF EXISTING WATER LINES
AutoCAD SHX Text
OCEAN KAMP
AutoCAD SHX Text
\\ARTIC\DWG\921003\REPORTS\PCO_WTR_FIGURE-3_RELOCATION.DWG 03-13-20 11:00:45 LAYOUT: LAYOUT
muyeda
Callout
PRIVATE WATER MAIN. UPDATE PER OUR LATEST MEETING
muyeda
PolyLine
muyeda
Callout
ADD EX 4" WATER MAIN TO BE UPSIZED
muyeda
Callout
ADD LOT NOS. (TYP ALL)
muyeda
Highlight
muyeda
Callout
NEW CONN WITH CUT IN TEE AND VALVES
muyeda
Callout
ADD DETAIL TO EXTEND VIW SHOWING CONNECTION OF 320 HGL TRANSMISSION MAIN CONNECTION TO EX 12" TO SOUTH AT FIRE STATION TO MAINTAIN THEIR WATER SERVICES.
muyeda
Text Box
MISSING RELOCATION OF 16" RECYCLED WATER MAIN (FORMERLY 16" FALLBROOK OUTFALL)
muyeda
Text Box
(511)
muyeda
Text Box
(320)
muyeda
Callout
in a proposed public waterline easement

S

A

N

L

U

IS

R

E

Y

R

IV

E

R

S

A

N

L

U

I

S

R

E

Y

R

I

V

E

R

AutoCAD SHX Text
N
AutoCAD SHX Text
HIGHWAY 76
AutoCAD SHX Text
FOUSSAT
AutoCAD SHX Text
RD
AutoCAD SHX Text
MISSION AVE
AutoCAD SHX Text
PROJECT BOUNDARY
AutoCAD SHX Text
FOUSSAT RD
AutoCAD SHX Text
0
AutoCAD SHX Text
300
AutoCAD SHX Text
FEET
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
12"
AutoCAD SHX Text
12"
AutoCAD SHX Text
12"
AutoCAD SHX Text
12"
AutoCAD SHX Text
12"
AutoCAD SHX Text
12"
AutoCAD SHX Text
12"
AutoCAD SHX Text
12"
AutoCAD SHX Text
10"
AutoCAD SHX Text
10"
AutoCAD SHX Text
10"
AutoCAD SHX Text
10"
AutoCAD SHX Text
10"
AutoCAD SHX Text
10"
AutoCAD SHX Text
10"
AutoCAD SHX Text
10" PRIVATE FIRE CONNECTION AND RPDA, TYP.
AutoCAD SHX Text
RELOCATED 30" WATER TRANSMISSION MAIN
AutoCAD SHX Text
RELOCATED 24" WATER TRANSMISSION MAIN
AutoCAD SHX Text
8"
AutoCAD SHX Text
RELOCATED 12" WATER DISTRIBUTION MAIN
AutoCAD SHX Text
EX.8"
AutoCAD SHX Text
12"
AutoCAD SHX Text
12"
AutoCAD SHX Text
12"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
8"
AutoCAD SHX Text
8" PRIVATE FIRE CONNECTION AND RPDA
AutoCAD SHX Text
EX.8"
AutoCAD SHX Text
HIGHWAY 76
AutoCAD SHX Text
FIRESIDE ST
AutoCAD SHX Text
HERITAGE ST
AutoCAD SHX Text
EX.24"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
EX.30"
AutoCAD SHX Text
LEGEND PROJECT BOUNDARY EXISTING PUBLIC WATER SYSTEM PROPOSED PUBLIC WATER SYSTEM PROPOSED PRIVATE FIRE PROTECTION SYSTEM DOMESTIC SERVICE AND BACKFLOW FIRE SERVICE AND RPDA PROPOSED PRIVATE FIRE HYDRANT
AutoCAD SHX Text
M
AutoCAD SHX Text
EX.30"
AutoCAD SHX Text
EX.24"
AutoCAD SHX Text
EX.18"
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
EX.24"
AutoCAD SHX Text
FIGURE 4
AutoCAD SHX Text
PROPOSED ONSITE WATER SYSTEM
AutoCAD SHX Text
OCEAN KAMP
AutoCAD SHX Text
\\ARTIC\DWG\921003\REPORTS\PCO_WTR_FIGURE-4_PROWTR.DWG 03-13-20 10:47:04 LAYOUT: LAYOUT
muyeda
Callout
UPDATE TO PRIVATE
muyeda
Callout
THERE SHOULD BE MORE THAN ONE METER FOR COMMERCIAL BLDGS, IF IT IS A RESTAURANT IT MUST HAVE A SEPARATE METER FROM RETAIL WHICH HAS DIFFERENT BILLING RATE
muyeda
PolyLine
muyeda
Highlight
muyeda
PolyLine
muyeda
Line
muyeda
Line
muyeda
Callout
MOVE METER & SERV CONN
muyeda
Callout
EXTEND SERVIE CONN TO PUBLIC MAIN BY SDGE CORRIDOR
muyeda
Callout
Double check detector assembies are for fire services. RPP backflows for domestic services. Shouldn't impact results much.
muyeda
Highlight
muyeda
Callout
Residual
muyeda
Callout
can you add column for size of looped main. If less than 12" dia ,max vel 15 fps?
muyeda
Callout
PORTION OF PUBLIC WATER MAIN WILL RUN IN SDG&E CORRIDOR
muyeda
Callout
DOUBLE CHECK DETECTOR ASSEMBLY FOR FIRE SERVICES AND REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER ON DOMESTIC SERVICES

City of Oceanside - Water, Sewer, and Recycled Water Design & Construction Manual

2-1 Approved 08/01/17

SECTION 2 – POTABLE WATER SYSTEMS DESIGN GUIDELINES

2.1 GENERAL

A. All water works construction shall conform to the most recent edition of the City of

Oceanside’s Water, Sewer, and Recycled Water Design & Construction Manual.

B. If a conflict arises between the requirements in this manual, the order of precedence shall take place:

a. Sections 1-4, Required Notes, & Appendix

b. Standard Drawings

c. Standard Specifications

C. If the standard that is sought does not appear in this manual, then the following standards shall be utilized in the order listed:

1. State Water Resources Control Board – Division of Drinking Water

2. American Water Works Association (AWWA) Standards

3. San Diego County Regional Standard Drawings

4. Standard Specifications for Public Works Construction (SSPWC or

“Greenbook”), latest Edition.

Exceptions to this and all other guidelines appearing in this manual may be allowed only upon the written approval of the Water Utilities Director.

B. All fire hydrants, blow offs, detector checks, air/vacuum assemblies, water sampling

stations, reduced pressure principle backflow (R.P.) devices, and meter services will be located out of driveways, sidewalks, walkways, and/or any concrete structures. All references to Section 3.15 of the Engineer’s Design and Processing Manual must also be adhered to.

C. PVC per AWWA C-900 and C-905. D. Transmission line construction materials shall be as determined by the Water Utilities

Director. For steel and ductile iron pipe, lay drawings must be submitted and approved before ordering materials.

E. Pressure systems in excess of 200 psi may require specialized design and materials.

F. The construction of all water systems for fire protection, from the main line to the

double check valve shall be governed by this section. The City of Oceanside Fire Department shall review and approve the underground fire systems from the double check valve to the building.

G. Telemetry and Control equipment is required for:

1. Water Pump Stations

City of Oceanside - Water, Sewer, and Recycled Water Design & Construction Manual

2-2 Approved 08/01/17

2. Pressure Regulating Stations

3. Pressure Relief Stations

4. Reservoirs

5. Wells

H. Demands:

1. Average daily water demands shall be: LAND USE CATEGORY GALLONS PER

DAY/PER ACRE Single Family Res. (1-2 DU/ac) 1,200 Single Family Res. (2-4 DU/ac) 2,100 Single Family Res. (4-8 DU/ac) 2,400 Single Family Res. (8-12 DU/ac) 2,500 Single Family Res. (12-15 DU/ac) 2,800 Single Family Res. (15-20 DU/ac) 3,200 Single Family Res. (20-30 DU/ac) 4,100

Agricultural Acres 1,750 Industrial Acres 2,000 Open Space Acres 1,300 Commercial Acres 1,850 Institutional Acres 1,675

DU – Dwelling Unit

2. Peak Factors:

a. Average Daily Demand ADD = 1.00 b. Maximum Daily Demand MDD = 2.0*ADD c. Peak Hourly Demand PHD = 3.0*ADD

2.2 FIRE FLOWS

The City of Oceanside currently utilizes the latest edition California Fire Code (CFC) requirements for determining fire flow requirements for buildings. The latest edition CFC incorporates many factors in determining fire flows, such as building construction type, building square footage, and fire protection systems. Several factors are combined to determine the minimum required fire flow requirements. Although General Guidelines contained in Table 2.1 represent typical fire flows for various land use categories, minimum fire flow calculations are governed by the latest edition CFC, Section 507, for each specific building type and construction.

The typical fire flow for the different land use categories are shown in the following Table. All fire flows are measured with a 20-PSI Residual Pressure.

City of Oceanside - Water, Sewer, and Recycled Water Design & Construction Manual

2-3 Approved 08/01/17

TABLE 2.1: General Fire Flow Guidelines

Land Use Classifications

Design Fire Flow (GPM)

Duration (HOURS)

Residual Pressure

(PSI)Residential - Single Family 1500 2 20 Residential - Multi-Family 3000 2 20 Commercial 4000 4 20 Industrial 4000 4 20 Governmental - Institutional 4000 4 20

All new developments that are required to have a fire suppression system shall have the system approved by the Fire Marshall. Sprinkler calculations shall be provided to the Fire Department for review and to verify the fire service connection and backflow assembly is properly sized.

2.3 PRESSURES

A. Minimum residual pressure shall be 20 PSI at design fire flow plus maximum day

domestic demand.

B. Minimum residual pressure shall be 35 PSI at peak hour domestic demand.

C. Minimum residual pressure shall be 45 PSI at peak day.

D. When static pressures exceed 80 PSI at property line, pressure-reducing valves will be required at the building. The pressure regulator shall be Class 150 or greater.

E. All new single-family residential water service in each pressure zone shall be

provided with a minimum static pressure of 50 PSI at the water meter.

2.4 MAINS

A. Minimum diameter shall be 8 inches. B. All mains not meeting the minimum main diameter and material requirements shall

be replaced to meet current design standards. This is applicable for all new commercial, industrial, institutional, and residential developments of four (4) units or more. Where the full replacement length along the frontage property is deemed in excess of the overall project cost, the developer may pay an in-lieu fee upon the approval of the Water Utilities Director.

C. All lines are to be looped.

D. Minimum depth of cover required:

1. 36 inches for 12-inch mains and smaller.

2. Mains over 12 inches require special design. E. Design shall be based on maximum day requirements plus fire flow. Maximum

velocity shall be 7.5 FPS not including fire flow.

City of Oceanside - Water, Sewer, and Recycled Water Design & Construction Manual

2-4 Approved 08/01/17

F. For fire flow conditions, velocities shall not exceed 15 FPS for less than 12-inch

existing mains, and velocities shall not exceed 10 FPS for 12-inch existing mains and above. For new mains, velocities shall not exceed 10 FPS with the fire flow demand flowing through one hydrant.

G. Thrust blocks shall be installed in accordance with Standard Drawing W-27. When

water pressures exceed 200 PSI and/or soil-bearing pressures are less than 2000 PSF a special design shall be required by a Registered Civil/Structural Engineer.

H. All mains shall be shown in profile on the improvement plans. I. All water mains not located within the Public right-of-way shall be provided with a

minimum 20-foot wide water easement. In some cases, a wider easement may be required, as determined by the Water Utilities Director.

J. Where water and sewer mains are located within the same easement, the minimum

easement size shall be 30 feet wide.

K. Easements shall be easily accessible to City maintenance equipment. Access shall be unobstructed with all-weather driveways and capable of withstanding a 40 ton load.

L. No trees, plantings, fences, structures, or building overhang shall be located within

City easements. M. Homeowners who purchase property containing a City easement will be responsible

for the maintenance of that easement property.

N. No building foundations will be allowed within 10 feet of the outside edge of a City easement.

O. The shortest pipe length shall be no less than 6 linear feet.

2.5 VALVES

A. Maximum valve spacing:

1. 500 feet in residential areas and high-point areas.

2. 1,000 feet on arteries and secondary feeders, supply lines and combination arteries and supply lines.

B. Valve locations: as required by the Water Utilities Director. C. Butterfly Valves shall conform to the “Standard for Rubber Seated Butterfly Valves”,

per AWWA C-504, as last revised and shall be tested and certified with the valve actuator installed on the valve.

D. Gate Valves sizes 3 inches through 12 inches shall conform to the “Standard for

Resilient Wedge Gate Valves for Water and Sewerage Systems”, per AWWA C-509, and C-550 for Interior Epoxy coating, and C-110 for Ductile Iron 250 PSI, latest revision. Gate valves shall be as described in Section 2.12.

����������� ��� �����������

�������������� �!�"#"�$�"�% �"%�&'�'��� ��($�)��%"� �$%��(!��"��$�!�$����*"($�!�$%��$�!����+"�!��#����!#!�!%�!��%,)'��������!�" !�(!$� ��!(!%� -��,!$ !���%�$��������'��������! !�+! ��.!��"/.������.$%/!����(��"#)����������! "/%-���% �����"�%-� �!�"#"�$�"�% -����($�!�"$, �0"�.������"���%��"�!�$%��0"�.����"%����"%/�$%)��1,"/$�"�%����($2!� ��.��.$%/! �$%��(��"#"�$�"�% ��%�������������� ���!+"�� ,)���� �1 !�3�!%�,)� �,�'4�1�5$(!��6666666666666666666666666666666666666666666� ��%��$������666666666666666666666666666666666666666666664�1�7��$�"�%��66666666666666666666666666666666666666666� 8����+$,��666666666666666666666666666666666666666666666�%/"%!!���66666666666666666666666666666666666666666666� ��%��$����9 �:'�'�5�'��66666666666666666666666666666666668����+$,��66666666666666666666666666666666666666666666� ;!��! !%�$�"+!��6666666666666666666666666666666666666666

<=>?=@�ABCDEFGHIJGH�KLGMMILG��NGOGJOPL�QMMGRSTUGMVWXYZ�[\][�_�\ �abcdd�_�[cdde�fgh�ijklm�nhophq�rstuv�whxyzhx�{ohqqyoh�vh|hz|}o�~qqh���phq�xhqp��hx��}o�yqh�p��yqhx�����pz�|p}�q��p|g�~y|}��|pz��poh�q�op���ho�q�q|h�q�z}�|�p�p���|}�pz�qy�q|��zhq��Y����Y������������������������� ��¡¡� ��¢£¡�  � ���¡��������  �¤¥¡¢� ��¦�����¦��¦ ¢¦£��� ¢ ��£������§���§��¦�¡¢£��£§�¡¦£���©�¡©��¡¢��ª�������� ���§���¢¡��¢�¦£�¥¦§«��¦�� �¬��¢¦�� ���£�����¦��¦ ¢¦£��� ¢ ��£�������x��p�g|ho��hp�g|��k�­��qq��p�h�g�q���|ho��h|ho�p��qhophq��p|g�������¬¬�¦©�§���§���§�¬��  �����  �¤¥¡«ª��®¦ �°��§�®¦  ��±¬¬�¦©�§�¥«�����²¦�£§��¢¦£��¦����¦  ³�¦£££���¢¦£��¦£��¦¡��£§���°«§���¡¢��� �������������µ£¢©�� ¢�«�¦��¶¦�����£���¡¢�¦�£¢�ª��·£§�����¢¡�¢ �²¡�£�§�¹Y���Wº»¼£���£¦£�¡¦ ��¦£§¢�¢¦£��������©�¡©� �¦£�����¥«³¬�  ��£§�¤�¢£¡¢£���£¢� ������¡¦ �§�¢���¬��  ����¥����£���������� ����¡¡�§�����½¦£���¥�¢£�¤�¢£­|�p�hx��|��h�q|�¾�qp�¿À¾��{�Á��}�ho�|g���|gh�p��h|��ohqqyoh���x�|gh�oh�ph��©�¡©��¢ �¤�¢£��¢£�§��¡¦ �§ª�¼������§¢�����£�¢�¡�¥����£�����½¦£���£§������¬ ����¤�¬��  ����§�¦¬ ��¦�¬ ¢�ÃÄÅ�Æ�Ç������§¢�����£�¢�¡���¡¢���©�¡©��¢¡¡�¦¬�£��¤�¢£��¢£¢£�¬�¦¬���½¦£��§¢�����£�¢�¡ª�����¥«³¬�  ���§���§�¬��  ����¥����¡¦ �¬��©�£����¢¡¡�¦¬������¢§�£�¢��¡¡«��¦�����¤�¢£¡¢£���  �¤¥¡«ªfgh���­��qq�}�h�q�|}�xh|hz|�p�p|p�����}����x�|gh���p��p�h�}�h�q��}o������}|gho���}�q�ȺÉYÊ���®�  �Ë��� ��®������£§�¥«³¬�  ���Ì������²ÌÍËÆÌι¹�ºÏ�Ê���±¬¬�¦©�§�¥«�����²¦�£§��¢¦£��¦����¦  ³�¦££���¢¦£��¦£��¦¡��£§���°«§���¡¢��� �������������µ£¢©�� ¢�«�¦��¶¦�����£���¡¢�¦�£¢�ªÐÐ��Ñ�¡©� �¤� ��¥�� �¬¬¡¢�§�¢����� ¢¡¢�£�� ����§� ���¦���©�¡©� ��¦��µ¶���£§�²Ì��¬¬�¦©�¡ ��¦�¥��¢£�������ª�µ®��£§�²Ì�®¢ �¢£ �¦£¡«��¬¬¡¢��¥¡��¢����¬¬�¦©�§�Ò¶ÓÔ���� ª

V¹YÕWÖWÕ��Wº»�whxyzhx��ohqqyoh�xh|hz|}o��qqh�����qg����z}�qpq|�}������p��p�h�ohxyzhx��ohqqyoh�z}��p�yohx���z���}���qqh�����p����o���h���p|g���ohxyzhx��ohqqyoh���­��qq��qqh�����²¡¦ ����©� � ��¡¡�¥��§¦��¤�£��§�¥«�¢£§�¬�£§�£��¡�¥¦���¦�«��� �¢£ª�Ì�¢£¡¢£��©�¡©��¥¦§¢� ��£§��¦©�� � ��¡¡�¥��¤�£��������§�¦��§���¢¡��¢�¦£�±¶�Ì�±³×ØÙ��Ë��§��Ù׳Å׳ÄÂ��£§� ��¡¡�¥���¡�£�§��±Ú¶¼�Û�ÄÙªÄ���¡�  �ÄÂ×��p�|ho������x�h�|ho�����yqp}��h�}���z}�|p�������¥«³¬�  � ��¡¡��¦£ ¢ ��¬�¢¤��¢¡«�¦����¥�¦£½�������¤�����¢£� ��¢� �¢�����¥�¦£½����§���§�¬��  ����¥����¡¦ �¬��©�£���ª±¡¡�¡¦ ��¡¦ �§�¤�£§ ��¬��¦���¤¢£¢¤�¤�¦��Ø�¬¤�ÃܪÄÝÞ�®Í Ç������¦�¬�  �¦£¡«����¦�������¥«³¬�  �¤������£§�¤����³ ¢½����§���§�¬��  �����  �¤­¥¡«��£§�¥����������¡«����¦�§�§ª�±¡¡��¡¦  ��¥¦©�������¦��Ø�¬¤�¢¡¡�¬�  ����¦���¥¦�������¡¢£�³ ¢½����§���§�¬��  �����  �¤¥¡«��£§�¥«³¬�  �¢��¦�����zzyo�|h�oh�pq|o�|p}�����}o�x����h�|}�|gh��h|ho�¶���¦���©�¡©� ��£§��� ��¦�� � ��¡¡�¥���� ¢¡¢�£�� ����§�¢�����¡¡��¡¦ �����­�z|hopq|pzq���x��oh�|}��h�z}�qpxhohx�p�|h�o���|}�|gh��qqh������fgh���p��p�h� ���³¦�� ������¡ ¦��¦�¥��Ò¶ÓÔ��µ®Í²Ì��¦���¢��¡¢£�� ��©¢��ªwhxyzhx��ohqqyoh�xh|hz|}o��qqh���phq�qg�����h�o�|hx�ßà¾�qp�láá{�¿Àsâi��¦�ÄÅÜã²Ç������¦�«��  �¤¥¡�§��£§��� ��§��¦��  ����¬�¦¬���¤�¢£¡¢£�Í¥«³¬�  �¥�¡�£����£§���¦  �¦©���¬���¦�¤�£��ª��§���§�¬��  ����§�����¦���  �¤­¥¡¢� � ��¡¡�¥��²·Û�Ò�¶��¢� �ÝÂÙÔ��¦��¬�¢¦���¬¬�¦©�§��ä��¡ª� fgh�����xo�p��pq��}|�xhqp��hx�|}�z�|zg�|gh����p�y��§¢ ������¬¦  ¢¥¡����¦¤�������¡¢���©�¡©�ª�����¢£ ��¡¡��¢¦£�¦��²·Û�Ò��¢���¬�¢�������§��¢£�¡¢£�����¤¢£��¢£��¥¦©�����¡¦¦��§��¢£�¢¡¡���£§¡���£«�£¦�¤�¡�§¢ ������¦��£�¢ �£��� ¬¢��¢£����¦���������¡¢���©�¡©�ª�°¦ �©�����¡¦¦��§��¢£� ¢½��¤�«�£��§��¦�¥��§� ¢£�§��¦�¬��©�£�������§�¤������ �§�¥«�������­ ��¦¬�¢����¢¡�����¦£§¢�¢¦£ª��¦�£¦����§�������� ¢½��¦������§��¢£�¡¢£����¦¤������po������p||p���å�Y����Y�æ�çYd¹Y�����YÌ�袤�¤�é¦��¢£�Æ��  ���ê� Äë׬ ¢�ÃĪÄ�¥��Ç°«§�¦ ���¢���� ��Æ��  ê� Ø×ܬ ¢�ÃÂŪÄ�¥��Ç��¤¬���������£�ê�� ØÂì²��¦�ÄÅÜì²�ÃÜì���¦�ÙÜì�ÇÈ��Y�W�Ê�Ì�¢£�Ñ�¡©��Û¦§«ê� � ����¢¡��¢�¦£���§��Ù׳Å׳ÄÂ��¬¦è«��¦���§���� � � p�|ho����ßí­sí��p�q¼£���£�¡�������±  �¤¥¡«ê� ¶��¢£¡�  �¶���¡��¢¤ê� � � Û�¦£½�Û«³Æ�  �Ñ�¡©��Û¦§«ê�� Û�¦£½�Û«³Æ�  �Ì����ê� � �¦��¡¢½¢£��Ä��¦�ÂÜ�¬¤�� ¢½��×ÍÝî�è�ØÍÅîÌ�¢£�Ñ�¡©��¶���¦�� ê�� Ò¶ÓÔ��µ®Í²Ì·¡� �¦¤�� ê� � Ú¢��¢¡���£§�Ú¢��¢¡�Í���¥�¢����¢£�¦���§�¤¦������§¢£��¡¦ �¤���� ��©�¢¡�¥¡�ª

ïðñòó

ôõö÷ ø øù�����

¼��¢ �¢¡¡��¡��¦�� ����¢ �¬�¦§����¢£��£«�¬¡�¤¥¢£� « ��¤�¬�¦©¢§¢£�������¦����¤�£��¦£ �¤¬�¢¦£�� ����� �§�¢£�¢£�¦��§¢ � � �¢£��¢£�����µ£¢��§�¶���� ª�Û��¦���¢£ ��¡¡¢£� ��£§��§�¤����¢�¡�¬�¦§������¦£ �¡��«¦���¡¦��¡�����������¦�¢�«��¥�¢¡§¢£��£§�¬¡�¤¥¢£��¦§� ª�����

����������� ��� �������� ������ � � � � ���� !� ����� "#$ %% "#$ %% "#$ %% "#$ %% "#$ %% "#$ %% &'($ )*($ &'($ )*($+,-+ ./ 01,-2 32. ++,-4 /.+ 1,-+ ,3, ,.0-4 2,. ,5,-2 +.5 +20 /026. ,02 +32640 45 2,0-2 ,5., +//-4 ./, 4,-+ +,. ++,-2 /./ ,5,-+ +.1 +34 .//6. ,/2 004642 ,55 /51-,. ,+4, 0+0-4 4++ ,, +13 +0,-2 /3, ,, +13 2.3 ,50,64 ,32 2+.64. ,/5 /30-2 ,/,4 04/-4 34, ,2 0/. 05,-2 1./ ,+ 05/ 1/+ ,./262031 410624 +55 .30-,. ,1/1 2.,-4 ,,1+ ,4 2/1 010-2 3/3 ,0 005 ,+51+.//62/01,,4,62,5 +/5 42,-2 +,25 /4,-4 ,21. ++ //3 24 ,+,3 ,2 0/. ,.,10//162 3/1+,5/62�789:;<8=;<�<>=?;�@A:�;=98;@BC�@BB=?@;D:�9E<F�G:�9@H:�I=A�;=A9@B�9@;EI@DFEA8;J�F=B:A@;D:<6

KLM��NN���OLPQR�SRTUVRT�WXRYYUXR�ZR[RV[\X�]YYR _a�YQ\UT�_R�bcY[dRT�Q\Xbe\c[da�fb[Q�d�YUggRY[RT�bcbU �VRdXdcVR�\h�ijk�lmnn ^o�_R[fRRc�[QR�dYYR _a�dcT�[QR�h\\X�\X�gXdTRp�PQRa�UY[�_R�bcY[dRT�fQRXR�TbYVQdXgR�hX\ �[QR�XRbRh�qdqR�fb�c\[�_R�\_rRV[b\cd_R�dcT�Vdc�_R�s\Yb[bqRa�TXdbcRT�dfdap�PQRa�YQ\UT�_R�bcY[dRT�tuvwv�vxyz{|�x}}vyyz~{v���w��vy�z����x����xz��v�x�}v�x�����y��~v��w��v}�v��hX\ �hXRRebcgp�PQRX d�fd[RX�R�sdcYb\c�dcT�\X�fd[RX�Qd ^RX�T\fcY[XRd �\h�[QR�_dV�h\f�sXRqRc[RX�Vdc�VdUYR�R�VRYYbqR�sXRYYUXRp���VRYYbqR�sXRYYUXR�Yb[Ud[b\cY�YQ\UT�_R�Rbbcd[RT�[\�dq\bT�s\YYb_R�Td dgR�[\�[QR�YaY[R �dcT�dYYR _ap����LM�OLM���������M�������������������� ���� �¡¡¢£¤¥£¦� §©©�ª¦� «¬©©�­¦� ¤¬¬©©��®°��±²³�µ¶� ·�� µ� ¹��º»� ´��µ¼� ¹��� ·� ·¼� µº� ¼½� º ��¾¿��� ¼¹¹� » � µ¶� ½·� ··¶�!¾¿��À�Á���

�®°��±²³�¶·� ·¹��µ¶� ·�� µ� ¹��º»� ´��� ´ � · � µ � ¼ � ¹ ��¾¿��� µ½� ¶º� ´µ¹� ¹·� » �!¾¿��À�Á���

�®°��±²³�µ¶� ·�� µ� ¹��º»� ´��µ¼� ¹��� ¹� ´ � ¹� · � ·¹��¾¿��� »� µ¶»� ¹¶� ¶º� »¹�!¾¿��À�Á���§¦� ¤¬©©��®°��±²³�µ¶� ·�� µ� ¹��º»� ´��µ¼� ¹��� µ � º � » � · � ¹ ��¾¿��� ´µ¹� ··¶� µ¼¹� ¼¹¼� ¹º½�!¾¿��À�Á��� «¦� £¬¬©©��®°��±²³�µ¶� ·�� µ� ¹��º»� ´��µ¼� ¹��� º � · � ½ � ·¼ � µ¸��¾¿��� ··¶� ¼¹¼� º½ � »½� ´¼ �!¾¿��À�Á��� ¤¬¦� £¬©©��®°��±²³�¶·� ·¹��µ¶� ·�� µ� ¹��º»� ´��� ´¸� ·¸� µ¸� ¼¸� ¹¸��¾¿��� µ½ � ¶º � ´¼ � ¹¼� »¸�!¾¿��À�Á���

ÂÃÄÅÆijÇÅ��ÈÆÉòÊÂÅ�ʱ±ÃÂÄË�ª¦� «¬©©��Ì�É°ÂÍÅÂÎ�ÏÐ������Á�«£§Ñ�ª¬¦��°Ò� Ó¬©©��¤£¦��³È� ª¬¬©©��ÊÍÍŲÄÅÔ

�³ÔÅ�Õ³ÅÖγÂÅ��×Ô°ÈÄ� À ÏÐ �

ØÙÚÛÚÜÝÞßà���áâãÝ� � ä�Ýåáâ�ÛØæçèéêëì��íîïð�ñòóóô�õöõ÷ø���������ð�ñòóóô�õòò÷���ø������ �ï��î�� �������ì��íîïð�ñ�ó�ô����÷�ó�ó������ð�ñ�ó�ô����÷õóöò������ �ï��î���������ë������ì��ñ��ô�òø÷øóóø÷òöóó������ð�ñ��ô�òø÷òóóó÷õó�ø������� �ï��î�� � �!"##$�!"#%&�'%()*+,+-.%$�/+01"*2

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 1 of 30

Appendix C

* * * * * * * * * * * * K Y P I P E * * * * * * * * * * * *

* *

* Pipe Network Modeling Software *

* *

* CopyRighted by KYPIPE LLC (www.kypipe.com) *

* Version: 9.023 06/04/2018 *

* Company: Dexter Serial #: 592169 *

* Interface: Classic *

* Licensed for Pipe2018 *

* *

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Date & Time: Thu Mar 12 16:31:57 2020

Master File : \\ARTIC\Eng\921003\KYPipe\2020-03-05\921003a1.KYP\921003a1.P2K

************************************************

S U M M A R Y O F O R I G I N A L D A T A

************************************************

U N I T S S P E C I F I E D

FLOWRATE ............ = gallons/minute

HEAD (HGL) .......... = feet

PRESSURE ............ = psig

P I P E L I N E D A T A

STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE

P I P E NODE NAMES LENGTH DIAMETER ROUGHNESS MINOR

N A M E #1 #2 (ft) (in) COEFF. LOSS COEFF.

-------------------------------------------------------------------------------

2 R1 1 4800.00 30.00 120.0000 1.75

4 1 3 820.00 18.00 120.0000 0.30

6 3 5 195.00 12.00 120.0000 0.30

8 5 7 385.00 12.00 120.0000 0.65

10 7 9 200.00 12.00 120.0000 3.47

12 9 11 200.00 12.00 120.0000 2.72

14 11 13 335.00 12.00 120.0000 5.32

16 13 15 135.00 12.00 120.0000 2.72

18 15 17 465.00 12.00 120.0000 3.47

20 17 19 330.00 12.00 120.0000 2.72

22 19 21 330.00 12.00 120.0000 1.10

24 23 7 152.00 12.00 120.0000 0.00

26 25 23 10.00 12.00 120.0000 0.30

28 27 25 248.00 12.00 120.0000 0.30

30 21 27 129.00 12.00 120.0000 0.65

32 25 I-BP1 20.00 10.00 120.0000 4.09

34 O-BP1 29 545.00 10.00 120.0000 3.12

36 29 31 75.00 8.00 120.0000 0.00

38 29 33 255.00 10.00 120.0000 1.05

40 33 35 145.00 8.00 120.0000 2.42

42 33 37 585.00 10.00 120.0000 3.07

44 37 39 56.00 8.00 120.0000 2.42

46 37 41 510.00 10.00 120.0000 3.42

48 41 43 300.00 10.00 120.0000 3.82

50 43 45 167.00 10.00 120.0000 2.72

52 45 47 583.00 10.00 120.0000 3.82

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 2 of 30

Appendix C

54 47 O-BP2 100.00 10.00 120.0000 3.17

56 I-BP2 49 20.00 10.00 120.0000 0.00

58 49 51 500.00 12.00 120.0000 0.30

60 51 53 342.00 12.00 120.0000 3.07

62 55 53 342.00 12.00 120.0000 3.07

64 55 57 350.00 12.00 120.0000 0.30

66 57 59 165.00 8.00 120.0000 3.17

68 57 61 160.00 12.00 120.0000 0.65

70 61 21 155.00 12.00 120.0000 0.30

72 49 63 540.00 12.00 120.0000 1.05

74 63 65 1780.00 12.00 120.0000 0.60

76 65 67 200.00 12.00 120.0000 3.17

78 67 69 293.00 12.00 120.0000 2.72

80 69 71 585.00 12.00 120.0000 3.07

82 71 73 780.00 12.00 120.0000 4.97

84 73 75 527.00 8.00 120.0000 3.07

86 75 77 527.00 8.00 120.0000 2.72

88 77 79 527.00 8.00 120.0000 2.72

90 65 79 520.00 12.00 120.0000 0.30

92 79 81 2600.00 12.00 120.0000 2.50

94 81 R2 3800.00 24.00 120.0000 0.30

P U M P/L O S S E L E M E N T D A T A

THERE IS A DEVICE AT NODE BP1 DESCRIBED BY THE FOLLOWING DATA: (ID= 2)

HEAD FLOWRATE EFFICIENCY

(ft) (gpm) (%)

-12.69 0.00 75.00 (Default)

-15.00 3000.00 75.00 (Default)

-32.31 4500.00 75.00 (Default)

THERE IS A DEVICE AT NODE BP2 ...............................> (ID= 2)

N O D E D A T A

NODE NODE EXTERNAL JUNCTION EXTERNAL

NAME TITLE DEMAND ELEVATION GRADE

(gpm) (ft) (ft)

--------------------------------------------------------------

1 0.00 43.00

3 0.00 45.00

5 0.00 43.50

7 0.00 44.00

9 19.50 45.00

11 0.00 45.00

13 19.50 45.00

15 0.00 45.00

17 19.50 45.00

19 0.00 45.00

21 0.00 46.00

23 0.00 46.00

25 6.60 46.00

27 25.00 49.00

29 0.00 43.50

31 0.00 43.50

33 0.00 43.50

35 0.00 43.50

37 0.00 41.50

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 3 of 30

Appendix C

39 0.00 41.50

41 0.00 40.00

43 0.00 40.00

45 0.00 40.00

47 0.00 41.00

49 6.60 41.00

51 0.00 47.00

53 10.00 48.00

55 0.00 48.00

57 0.00 48.00

59 0.00 48.00

61 0.00 47.00

63 0.00 38.00

65 0.00 42.00

67 13.00 46.00

69 13.00 50.00

71 13.00 44.00

73 0.00 40.00

75 3.25 33.00

77 3.25 37.00

79 0.00 43.00

81 0.00 56.00

I-BP1 0.00 46.00

I-BP2 0.00 41.00

R1 ---- 290.00 305.00

R2 ---- 290.00 305.00

O-BP1 0.00 46.00

O-BP2 0.00 41.00

O U T P U T O P T I O N D A T A

OUTPUT SELECTION: ALL RESULTS ARE INCLUDED IN THE TABULATED OUTPUT

MAXIMUM AND MINIMUM PRESSURES = 5

MAXIMUM AND MINIMUM VELOCITIES = 5

MAXIMUM AND MINIMUM HEAD LOSS/1000 = 5

S Y S T E M C O N F I G U R A T I O N

NUMBER OF PIPES ...................(P) = 47

NUMBER OF END NODES ...............(J) = 43

NUMBER OF PRIMARY LOOPS ...........(L) = 3

NUMBER OF SUPPLY NODES ............(F) = 2

NUMBER OF SUPPLY ZONES ............(Z) = 1

================================================================================

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 4 of 30

Appendix C

CASE 1: AVERAGE DAY DEMANDS

RESULTS OBTAINED AFTER 20 TRIALS: ACCURACY = 0.11793E-06

P I P E L I N E R E S U L T S

STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE

P I P E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/

N A M E #1 #2 LOSS LOSS VELO. 1000 1000

gpm ft ft ft/s ft/f ft/f

-----------------------------------------------------------------------------------------

2 R1 1 100.51 0.00 0.00 0.05 0.00 0.00

4 1 3 100.51 0.00 0.00 0.13 0.01 0.01

6 3 5 100.51 0.01 0.00 0.29 0.04 0.04

8 5 7 100.51 0.02 0.00 0.29 0.04 0.04

10 7 9 46.52 0.00 0.00 0.13 0.01 0.01

12 9 11 27.02 0.00 0.00 0.08 0.00 0.00

14 11 13 27.02 0.00 0.00 0.08 0.01 0.00

16 13 15 7.52 0.00 0.00 0.02 0.00 0.00

18 15 17 7.52 0.00 0.00 0.02 0.00 0.00

20 17 19 -11.98 0.00 0.00 0.03 0.00 0.00

22 19 21 -11.98 0.00 0.00 0.03 0.00 0.00

24 23 7 -53.99 0.00 0.00 0.15 0.01 0.01

26 25 23 -53.99 0.00 0.00 0.15 0.02 0.01

28 27 25 -47.39 0.00 0.00 0.13 0.01 0.01

30 21 27 -22.39 0.00 0.00 0.06 0.00 0.00

32 25 I-BP1 0.00 0.00 0.00 0.00 0.00 0.00

34 O-BP1 29 0.00 0.00 0.00 0.00 0.00 0.00

36 29 31 0.00 0.00 0.00 0.00 0.00 0.00

38 29 33 0.00 0.00 0.00 0.00 0.00 0.00

40 33 35 0.00 0.00 0.00 0.00 0.00 0.00

42 33 37 0.00 0.00 0.00 0.00 0.00 0.00

44 37 39 0.00 0.00 0.00 0.00 0.00 0.00

46 37 41 0.00 0.00 0.00 0.00 0.00 0.00

48 41 43 0.00 0.00 0.00 0.00 0.00 0.00

50 43 45 0.00 0.00 0.00 0.00 0.00 0.00

52 45 47 0.00 0.00 0.00 0.00 0.00 0.00

54 47 O-BP2 0.00 0.00 0.00 0.00 0.00 0.00

56 I-BP2 49 0.00 0.00 0.00 0.00 0.00 0.00

58 49 51 -0.41 0.00 0.00 0.00 0.00 0.00

60 51 53 -0.41 0.00 0.00 0.00 0.00 0.00

62 55 53 10.41 0.00 0.00 0.03 0.00 0.00

64 55 57 -10.41 0.00 0.00 0.03 0.00 0.00

66 57 59 0.00 0.00 0.00 0.00 0.00 0.00

68 57 61 -10.41 0.00 0.00 0.03 0.00 0.00

70 61 21 -10.41 0.00 0.00 0.03 0.00 0.00

72 49 63 -6.19 0.00 0.00 0.02 0.00 0.00

74 63 65 -6.19 0.00 0.00 0.02 0.00 0.00

76 65 67 33.30 0.00 0.00 0.09 0.01 0.01

78 67 69 20.30 0.00 0.00 0.06 0.00 0.00

80 69 71 7.30 0.00 0.00 0.02 0.00 0.00

82 71 73 -5.70 0.00 0.00 0.02 0.00 0.00

84 73 75 -5.70 0.00 0.00 0.04 0.00 0.00

86 75 77 -8.95 0.00 0.00 0.06 0.00 0.00

88 77 79 -12.20 0.00 0.00 0.08 0.01 0.01

90 65 79 -39.49 0.00 0.00 0.11 0.01 0.01

92 79 81 -51.69 0.03 0.00 0.15 0.01 0.01

94 81 R2 -51.69 0.00 0.00 0.04 0.00 0.00

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 5 of 30

Appendix C

P U M P/L O S S E L E M E N T R E S U L T S

INLET OUTLET PUMP EFFIC- USEFUL INCREMTL TOTAL NPSH

NAME FLOWRATE HEAD HEAD HEAD ENCY POWER COST COST Avail.

gpm ft ft ft % Hp $ $ ft

----------------------------------------------------------------------------------------

BP1 0.00 258.97 246.27 -12.7 75.00 0. 0.0 0.0 292.2

BP2 0.00 263.96 251.27 0.0 75.00 0. 0.0 0.0 297.2

N O D E R E S U L T S

NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE

NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE

gpm ft ft ft psi

------------------------------------------------------------------------------

1 0.00 305.00 43.00 262.00 113.53

3 0.00 304.99 45.00 259.99 112.66

5 0.00 304.98 43.50 261.48 113.31

7 0.00 304.97 44.00 260.97 113.09

9 19.50 304.96 45.00 259.96 112.65

11 0.00 304.96 45.00 259.96 112.65

13 19.50 304.96 45.00 259.96 112.65

15 0.00 304.96 45.00 259.96 112.65

17 19.50 304.96 45.00 259.96 112.65

19 0.00 304.96 45.00 259.96 112.65

21 0.00 304.96 46.00 258.96 112.22

23 0.00 304.97 46.00 258.97 112.22

25 6.60 304.97 46.00 258.97 112.22

27 25.00 304.96 49.00 255.96 110.92

29 0.00 292.27 43.50 248.77 107.80

31 0.00 292.27 43.50 248.77 107.80

33 0.00 292.27 43.50 248.77 107.80

35 0.00 292.27 43.50 248.77 107.80

37 0.00 292.27 41.50 250.77 108.67

39 0.00 292.27 41.50 250.77 108.67

41 0.00 292.27 40.00 252.27 109.32

43 0.00 292.27 40.00 252.27 109.32

45 0.00 292.27 40.00 252.27 109.32

47 0.00 292.27 41.00 251.27 108.88

49 6.60 304.96 41.00 263.96 114.38

51 0.00 304.96 47.00 257.96 111.78

53 10.00 304.96 48.00 256.96 111.35

55 0.00 304.96 48.00 256.96 111.35

57 0.00 304.96 48.00 256.96 111.35

59 0.00 304.96 48.00 256.96 111.35

61 0.00 304.96 47.00 257.96 111.78

63 0.00 304.96 38.00 266.96 115.68

65 0.00 304.96 42.00 262.96 113.95

67 13.00 304.96 46.00 258.96 112.22

69 13.00 304.96 50.00 254.96 110.48

71 13.00 304.96 44.00 260.96 113.08

73 0.00 304.96 40.00 264.96 114.82

75 3.25 304.96 33.00 271.96 117.85

77 3.25 304.96 37.00 267.96 116.12

79 0.00 304.97 43.00 261.97 113.52

81 0.00 305.00 56.00 249.00 107.90

I-BP1 0.00 304.97 46.00 258.97 112.22

I-BP2 0.00 304.96 41.00 263.96 114.38

R1 ---- 305.00 290.00 15.00 6.50

R2 ---- 305.00 290.00 15.00 6.50

O-BP1 0.00 292.27 46.00 246.27 106.72

O-BP2 0.00 292.27 41.00 251.27 108.88

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 6 of 30

Appendix C

M A X I M U M A N D M I N I M U M V A L U E S

P R E S S U R E S

JUNCTION MAXIMUM JUNCTION MINIMUM

NUMBER PRESSURES NUMBER PRESSURES

psi psi

--------------------- ---------------------

75 117.85 R1 6.50

77 116.12 R2 6.50

63 115.68 O-BP1 106.72

73 114.82 29 107.80

49 114.38 31 107.80

V E L O C I T I E S

PIPE MAXIMUM PIPE MINIMUM

NUMBER VELOCITY NUMBER VELOCITY

(ft/s) (ft/s)

--------------------- ---------------------

6 0.29 58 0.00

8 0.29 60 0.00

24 0.15 82 0.02

26 0.15 72 0.02

92 0.15 74 0.02

S U M M A R Y O F I N F L O W S A N D O U T F L O W S

(+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES

(-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES

NODE FLOWRATE NODE

NAME gpm TITLE

--------------------------------------------

R1 100.51

R2 51.69

NET SYSTEM INFLOW = 152.20

NET SYSTEM OUTFLOW = 0.00

NET SYSTEM DEMAND = 152.20

================================================================================

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 7 of 30

Appendix C

CASE 2: MAXIMUM DAY DEMANDS

RESULTS OBTAINED AFTER 3 TRIALS: ACCURACY = 0.29200E-06

P I P E L I N E R E S U L T S

STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE

P I P E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/

N A M E #1 #2 LOSS LOSS VELO. 1000 1000

gpm ft ft ft/s ft/f ft/f

-----------------------------------------------------------------------------------------

2 R1 1 200.91 0.01 0.00 0.09 0.00 0.00

4 1 3 200.91 0.02 0.00 0.25 0.02 0.02

6 3 5 200.91 0.03 0.00 0.57 0.16 0.15

8 5 7 200.91 0.06 0.00 0.57 0.16 0.15

10 7 9 92.56 0.01 0.00 0.26 0.05 0.04

12 9 11 53.56 0.00 0.00 0.15 0.02 0.01

14 11 13 53.56 0.00 0.00 0.15 0.02 0.01

16 13 15 14.56 0.00 0.00 0.04 0.00 0.00

18 15 17 14.56 0.00 0.00 0.04 0.00 0.00

20 17 19 -24.44 0.00 0.00 0.07 0.00 0.00

22 19 21 -24.44 0.00 0.00 0.07 0.00 0.00

24 23 7 -108.35 0.01 0.00 0.31 0.05 0.05

26 25 23 -108.35 0.00 0.00 0.31 0.09 0.05

28 27 25 -95.15 0.01 0.00 0.27 0.04 0.04

30 21 27 -45.15 0.00 0.00 0.13 0.01 0.01

32 25 I-BP1 0.00 0.00 0.00 0.00 0.00 0.00

34 O-BP1 29 0.00 0.00 0.00 0.00 0.00 0.00

36 29 31 0.00 0.00 0.00 0.00 0.00 0.00

38 29 33 0.00 0.00 0.00 0.00 0.00 0.00

40 33 35 0.00 0.00 0.00 0.00 0.00 0.00

42 33 37 0.00 0.00 0.00 0.00 0.00 0.00

44 37 39 0.00 0.00 0.00 0.00 0.00 0.00

46 37 41 0.00 0.00 0.00 0.00 0.00 0.00

48 41 43 0.00 0.00 0.00 0.00 0.00 0.00

50 43 45 0.00 0.00 0.00 0.00 0.00 0.00

52 45 47 0.00 0.00 0.00 0.00 0.00 0.00

54 47 O-BP2 0.00 0.00 0.00 0.00 0.00 0.00

56 I-BP2 49 0.00 0.00 0.00 0.00 0.00 0.00

58 49 51 -0.71 0.00 0.00 0.00 0.00 0.00

60 51 53 -0.71 0.00 0.00 0.00 0.00 0.00

62 55 53 20.71 0.00 0.00 0.06 0.00 0.00

64 55 57 -20.71 0.00 0.00 0.06 0.00 0.00

66 57 59 0.00 0.00 0.00 0.00 0.00 0.00

68 57 61 -20.71 0.00 0.00 0.06 0.00 0.00

70 61 21 -20.71 0.00 0.00 0.06 0.00 0.00

72 49 63 -12.49 0.00 0.00 0.04 0.00 0.00

74 63 65 -12.49 0.00 0.00 0.04 0.00 0.00

76 65 67 66.56 0.00 0.00 0.19 0.03 0.02

78 67 69 40.56 0.00 0.00 0.12 0.01 0.01

80 69 71 14.56 0.00 0.00 0.04 0.00 0.00

82 71 73 -11.44 0.00 0.00 0.03 0.00 0.00

84 73 75 -11.44 0.00 0.00 0.07 0.01 0.01

86 75 77 -17.94 0.01 0.00 0.11 0.01 0.01

88 77 79 -24.44 0.01 0.00 0.16 0.02 0.02

90 65 79 -79.05 0.01 0.00 0.22 0.03 0.03

92 79 81 -103.49 0.11 0.00 0.29 0.05 0.04

94 81 R2 -103.49 0.01 0.00 0.07 0.00 0.00

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 8 of 30

Appendix C

P U M P/L O S S E L E M E N T R E S U L T S

INLET OUTLET PUMP EFFIC- USEFUL INCREMTL TOTAL NPSH

NAME FLOWRATE HEAD HEAD HEAD ENCY POWER COST COST Avail.

gpm ft ft ft % Hp $ $ ft

-----------------------------------------------------------------------------------------

BP1 0.00 258.87 246.18 -12.7 75.00 0. 0.0 0.0 292.1

BP2 0.00 263.86 251.18 0.0 75.00 0. 0.0 0.0 297.1

N O D E R E S U L T S

NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE

NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE

gpm ft ft ft psi

------------------------------------------------------------------------------

1 0.00 304.99 43.00 261.99 113.53

3 0.00 304.97 45.00 259.97 112.66

5 0.00 304.94 43.50 261.44 113.29

7 0.00 304.88 44.00 260.88 113.05

9 39.00(2.00) 304.87 45.00 259.87 112.61

11 0.00 304.87 45.00 259.87 112.61

13 39.00(2.00) 304.86 45.00 259.86 112.61

15 0.00 304.86 45.00 259.86 112.61

17 39.00(2.00) 304.86 45.00 259.86 112.61

19 0.00 304.86 45.00 259.86 112.61

21 0.00 304.86 46.00 258.86 112.17

23 0.00 304.87 46.00 258.87 112.18

25 13.20(2.00) 304.87 46.00 258.87 112.18

27 50.00(2.00) 304.86 49.00 255.86 110.87

29 0.00 292.18 43.50 248.68 107.76

31 0.00 292.18 43.50 248.68 107.76

33 0.00 292.18 43.50 248.68 107.76

35 0.00 292.18 43.50 248.68 107.76

37 0.00 292.18 41.50 250.68 108.63

39 0.00 292.18 41.50 250.68 108.63

41 0.00 292.18 40.00 252.18 109.28

43 0.00 292.18 40.00 252.18 109.28

45 0.00 292.18 40.00 252.18 109.28

47 0.00 292.18 41.00 251.18 108.85

49 13.20(2.00) 304.86 41.00 263.86 114.34

51 0.00 304.86 47.00 257.86 111.74

53 20.00(2.00) 304.86 48.00 256.86 111.31

55 0.00 304.86 48.00 256.86 111.31

57 0.00 304.86 48.00 256.86 111.31

59 0.00 304.86 48.00 256.86 111.31

61 0.00 304.86 47.00 257.86 111.74

63 0.00 304.86 38.00 266.86 115.64

65 0.00 304.86 42.00 262.86 113.91

67 26.00(2.00) 304.86 46.00 258.86 112.17

69 26.00(2.00) 304.85 50.00 254.85 110.44

71 26.00(2.00) 304.85 44.00 260.85 113.04

73 0.00 304.85 40.00 264.85 114.77

75 6.50(2.00) 304.86 33.00 271.86 117.80

77 6.50(2.00) 304.86 37.00 267.86 116.07

79 0.00 304.88 43.00 261.88 113.48

81 0.00 304.99 56.00 248.99 107.90

I-BP1 0.00 304.87 46.00 258.87 112.18

I-BP2 0.00 304.86 41.00 263.86 114.34

R1 ---- 305.00 290.00 15.00 6.50

R2 ---- 305.00 290.00 15.00 6.50

O-BP1 0.00 292.18 46.00 246.18 106.68

O-BP2 0.00 292.18 41.00 251.18 108.85

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 9 of 30

Appendix C

M A X I M U M A N D M I N I M U M V A L U E S

P R E S S U R E S

JUNCTION MAXIMUM JUNCTION MINIMUM

NUMBER PRESSURES NUMBER PRESSURES

psi psi

--------------------- ---------------------

75 117.80 R1 6.50

77 116.07 R2 6.50

63 115.64 O-BP1 106.68

73 114.77 29 107.76

49 114.34 31 107.76

V E L O C I T I E S

PIPE MAXIMUM PIPE MINIMUM

NUMBER VELOCITY NUMBER VELOCITY

(ft/s) (ft/s)

--------------------- ---------------------

6 0.57 58 0.00

8 0.57 60 0.00

24 0.31 82 0.03

26 0.31 72 0.04

92 0.29 74 0.04

S U M M A R Y O F I N F L O W S A N D O U T F L O W S

(+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES

(-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES

NODE FLOWRATE NODE

NAME gpm TITLE

--------------------------------------------

R1 200.91

R2 103.49

NET SYSTEM INFLOW = 304.40

NET SYSTEM OUTFLOW = 0.00

NET SYSTEM DEMAND = 304.40

================================================================================

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 10 of 30

Appendix C

CASE 3: PEAK HOUR DEMANDS

RESULTS OBTAINED AFTER 3 TRIALS: ACCURACY = 0.99745E-07

P I P E L I N E R E S U L T S

STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE

P I P E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/

N A M E #1 #2 LOSS LOSS VELO. 1000 1000

gpm ft ft ft/s ft/f ft/f

-----------------------------------------------------------------------------------------

2 R1 1 301.27 0.02 0.00 0.14 0.00 0.00

4 1 3 301.27 0.04 0.00 0.38 0.05 0.04

6 3 5 301.27 0.06 0.00 0.85 0.34 0.32

8 5 7 301.27 0.12 0.01 0.85 0.34 0.32

10 7 9 138.40 0.02 0.01 0.39 0.12 0.08

12 9 11 79.90 0.01 0.00 0.23 0.04 0.03

14 11 13 79.90 0.01 0.00 0.23 0.04 0.03

16 13 15 21.40 0.00 0.00 0.06 0.00 0.00

18 15 17 21.40 0.00 0.00 0.06 0.00 0.00

20 17 19 -37.10 0.00 0.00 0.11 0.01 0.01

22 19 21 -37.10 0.00 0.00 0.11 0.01 0.01

24 23 7 -162.86 0.02 0.00 0.46 0.10 0.10

26 25 23 -162.86 0.00 0.00 0.46 0.20 0.10

28 27 25 -143.06 0.02 0.00 0.41 0.08 0.08

30 21 27 -68.06 0.00 0.00 0.19 0.02 0.02

32 25 I-BP1 0.00 0.00 0.00 0.00 0.00 0.00

34 O-BP1 29 0.00 0.00 0.00 0.00 0.00 0.00

36 29 31 0.00 0.00 0.00 0.00 0.00 0.00

38 29 33 0.00 0.00 0.00 0.00 0.00 0.00

40 33 35 0.00 0.00 0.00 0.00 0.00 0.00

42 33 37 0.00 0.00 0.00 0.00 0.00 0.00

44 37 39 0.00 0.00 0.00 0.00 0.00 0.00

46 37 41 0.00 0.00 0.00 0.00 0.00 0.00

48 41 43 0.00 0.00 0.00 0.00 0.00 0.00

50 43 45 0.00 0.00 0.00 0.00 0.00 0.00

52 45 47 0.00 0.00 0.00 0.00 0.00 0.00

54 47 O-BP2 0.00 0.00 0.00 0.00 0.00 0.00

56 I-BP2 49 0.00 0.00 0.00 0.00 0.00 0.00

58 49 51 -0.97 0.00 0.00 0.00 0.00 0.00

60 51 53 -0.97 0.00 0.00 0.00 0.00 0.00

62 55 53 30.97 0.00 0.00 0.09 0.01 0.00

64 55 57 -30.97 0.00 0.00 0.09 0.00 0.00

66 57 59 0.00 0.00 0.00 0.00 0.00 0.00

68 57 61 -30.97 0.00 0.00 0.09 0.01 0.00

70 61 21 -30.97 0.00 0.00 0.09 0.00 0.00

72 49 63 -18.83 0.00 0.00 0.05 0.00 0.00

74 63 65 -18.83 0.00 0.00 0.05 0.00 0.00

76 65 67 99.81 0.01 0.00 0.28 0.06 0.04

78 67 69 60.81 0.00 0.00 0.17 0.02 0.02

80 69 71 21.81 0.00 0.00 0.06 0.00 0.00

82 71 73 -17.19 0.00 0.00 0.05 0.00 0.00

84 73 75 -17.19 0.01 0.00 0.11 0.01 0.01

86 75 77 -26.94 0.01 0.00 0.17 0.03 0.03

88 77 79 -36.69 0.02 0.00 0.23 0.05 0.05

90 65 79 -118.64 0.03 0.00 0.34 0.06 0.06

92 79 81 -155.33 0.24 0.01 0.44 0.10 0.09

94 81 R2 -155.33 0.01 0.00 0.11 0.00 0.00

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 11 of 30

Appendix C

P U M P/L O S S E L E M E N T R E S U L T S

INLET OUTLET PUMP EFFIC- USEFUL INCREMTL TOTAL NPSH

NAME FLOWRATE HEAD HEAD HEAD ENCY POWER COST COST Avail.

gpm ft ft ft % Hp $ $ ft

-----------------------------------------------------------------------------------------

BP1 0.00 258.73 246.04 -12.7 75.00 0. 0.0 0.0 291.9

BP2 0.00 263.70 251.04 0.0 75.00 0. 0.0 0.0 296.9

N O D E R E S U L T S

NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE

NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE

gpm ft ft ft psi

------------------------------------------------------------------------------

1 0.00 304.98 43.00 261.98 113.53

3 0.00 304.94 45.00 259.94 112.64

5 0.00 304.88 43.50 261.38 113.26

7 0.00 304.75 44.00 260.75 112.99

9 58.50(3.00) 304.73 45.00 259.73 112.55

11 0.00 304.72 45.00 259.72 112.54

13 58.50(3.00) 304.70 45.00 259.70 112.54

15 0.00 304.70 45.00 259.70 112.54

17 58.50(3.00) 304.70 45.00 259.70 112.54

19 0.00 304.71 45.00 259.71 112.54

21 0.00 304.71 46.00 258.71 112.11

23 0.00 304.73 46.00 258.73 112.12

25 19.80(3.00) 304.73 46.00 258.73 112.12

27 75.00(3.00) 304.71 49.00 255.71 110.81

29 0.00 292.04 43.50 248.54 107.70

31 0.00 292.04 43.50 248.54 107.70

33 0.00 292.04 43.50 248.54 107.70

35 0.00 292.04 43.50 248.54 107.70

37 0.00 292.04 41.50 250.54 108.57

39 0.00 292.04 41.50 250.54 108.57

41 0.00 292.04 40.00 252.04 109.22

43 0.00 292.04 40.00 252.04 109.22

45 0.00 292.04 40.00 252.04 109.22

47 0.00 292.04 41.00 251.04 108.78

49 19.80(3.00) 304.70 41.00 263.70 114.27

51 0.00 304.70 47.00 257.70 111.67

53 30.00(3.00) 304.70 48.00 256.70 111.24

55 0.00 304.70 48.00 256.70 111.24

57 0.00 304.71 48.00 256.71 111.24

59 0.00 304.71 48.00 256.71 111.24

61 0.00 304.71 47.00 257.71 111.67

63 0.00 304.70 38.00 266.70 115.57

65 0.00 304.71 42.00 262.71 113.84

67 39.00(3.00) 304.70 46.00 258.70 112.10

69 39.00(3.00) 304.69 50.00 254.69 110.37

71 39.00(3.00) 304.69 44.00 260.69 112.96

73 0.00 304.69 40.00 264.69 114.70

75 9.75(3.00) 304.70 33.00 271.70 117.73

77 9.75(3.00) 304.71 37.00 267.71 116.01

79 0.00 304.74 43.00 261.74 113.42

81 0.00 304.99 56.00 248.99 107.89

I-BP1 0.00 304.73 46.00 258.73 112.12

I-BP2 0.00 304.70 41.00 263.70 114.27

R1 ---- 305.00 290.00 15.00 6.50

R2 ---- 305.00 290.00 15.00 6.50

O-BP1 0.00 292.04 46.00 246.04 106.62

O-BP2 0.00 292.04 41.00 251.04 108.78

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 12 of 30

Appendix C

M A X I M U M A N D M I N I M U M V A L U E S

P R E S S U R E S

JUNCTION MAXIMUM JUNCTION MINIMUM

NUMBER PRESSURES NUMBER PRESSURES

psi psi

--------------------- ---------------------

75 117.73 R1 6.50

77 116.01 R2 6.50

63 115.57 O-BP1 106.62

73 114.70 29 107.70

49 114.27 31 107.70

V E L O C I T I E S

PIPE MAXIMUM PIPE MINIMUM

NUMBER VELOCITY NUMBER VELOCITY

(ft/s) (ft/s)

--------------------- ---------------------

6 0.85 58 0.00

8 0.85 60 0.00

24 0.46 82 0.05

26 0.46 72 0.05

92 0.44 74 0.05

S U M M A R Y O F I N F L O W S A N D O U T F L O W S

(+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES

(-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES

NODE FLOWRATE NODE

NAME gpm TITLE

--------------------------------------------

R1 301.27

R2 155.33

NET SYSTEM INFLOW = 456.60

NET SYSTEM OUTFLOW = 0.00

NET SYSTEM DEMAND = 456.60

================================================================================

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 13 of 30

Appendix C

CASE 4: 3,000 GPM FIRE FLOW SPLIT BETWEEN NODES 35 AND 39

RESULTS OBTAINED AFTER 10 TRIALS: ACCURACY = 0.16141E-05

P I P E L I N E R E S U L T S

STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE

P I P E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/

N A M E #1 #2 LOSS LOSS VELO. 1000 1000

gpm ft ft ft/s ft/f ft/f

-----------------------------------------------------------------------------------------

2 R1 1 3065.23 1.30 0.05 1.39 0.28 0.27

4 1 3 3065.23 2.66 0.07 3.86 3.33 3.25

6 3 5 3065.23 4.57 0.35 8.69 25.22 23.41

8 5 7 3065.23 9.01 0.76 8.69 25.39 23.41

10 7 9 614.86 0.24 0.16 1.74 2.01 1.19

12 9 11 575.86 0.21 0.11 1.63 1.62 1.06

14 11 13 575.86 0.35 0.22 1.63 1.72 1.06

16 13 15 536.86 0.13 0.10 1.52 1.65 0.93

18 15 17 536.86 0.43 0.12 1.52 1.20 0.93

20 17 19 497.86 0.27 0.08 1.41 1.06 0.81

22 19 21 497.86 0.27 0.03 1.41 0.91 0.81

24 23 7 -2450.37 2.35 0.00 6.95 15.47 15.47

26 25 23 -2450.37 0.15 0.23 6.95 37.97 15.47

28 27 25 -58.60 0.00 0.00 0.17 0.02 0.02

30 21 27 -8.60 0.00 0.00 0.02 0.00 0.00

32 25 I-BP1 2378.57 0.71 5.99 9.72 335.28 35.57

34 O-BP1 29 2378.57 19.38 4.57 9.72 43.96 35.57

36 29 31 0.00 0.00 0.00 0.00 0.00 0.00

38 29 33 2378.57 9.07 1.54 9.72 41.60 35.57

40 33 35 2000.00 11.09 6.12 12.76 118.71 76.49

42 33 37 378.57 0.69 0.11 1.55 1.38 1.18

44 37 39 2000.00 4.28 6.12 12.76 185.81 76.49

46 37 41 -1621.43 8.92 2.33 6.62 22.06 17.49

48 41 43 -1621.43 5.25 2.60 6.62 26.16 17.49

50 43 45 -1621.43 2.92 1.85 6.62 28.59 17.49

52 45 47 -1621.43 10.20 2.60 6.62 21.96 17.49

54 47 O-BP2 -1621.43 1.75 2.16 6.62 39.08 17.49

56 I-BP2 49 -1621.43 0.35 0.00 6.62 17.49 17.49

58 49 51 -486.46 0.39 0.01 1.38 0.79 0.77

60 51 53 -486.46 0.26 0.09 1.38 1.04 0.77

62 55 53 506.46 0.29 0.10 1.44 1.12 0.83

64 55 57 -506.46 0.29 0.01 1.44 0.86 0.83

66 57 59 0.00 0.00 0.00 0.00 0.00 0.00

68 57 61 -506.46 0.13 0.02 1.44 0.96 0.83

70 61 21 -506.46 0.13 0.01 1.44 0.90 0.83

72 49 63 -1148.17 2.05 0.17 3.26 4.12 3.80

74 63 65 -1148.17 6.76 0.10 3.26 3.85 3.80

76 65 67 -93.19 0.01 0.00 0.26 0.05 0.04

78 67 69 -119.19 0.02 0.00 0.34 0.07 0.06

80 69 71 -145.19 0.05 0.01 0.41 0.10 0.08

82 71 73 -171.19 0.09 0.02 0.49 0.14 0.11

84 73 75 -171.19 0.42 0.06 1.09 0.91 0.81

86 75 77 -177.69 0.46 0.05 1.13 0.97 0.86

88 77 79 -184.19 0.49 0.06 1.18 1.03 0.92

90 65 79 -1054.98 1.69 0.04 2.99 3.33 3.25

92 79 81 -1239.17 11.38 0.48 3.52 4.56 4.38

94 81 R2 -1239.17 0.57 0.00 0.88 0.15 0.15

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 14 of 30

Appendix C

P U M P/L O S S E L E M E N T R E S U L T S

INLET OUTLET PUMP EFFIC- USEFUL INCREMTL TOTAL NPSH

NAME FLOWRATE HEAD HEAD HEAD ENCY POWER COST COST Avail.

gpm ft ft ft % Hp $ $ ft

-----------------------------------------------------------------------------------------

BP1 2378.57 230.79 217.42 -13.4 75.00 -8. -0.4 -0.4 262.5

BP2 1621.43 240.41 227.63 -12.8 75.00 -5. -0.3 -0.3 272.9

N O D E R E S U L T S

NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE

NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE

gpm ft ft ft psi

------------------------------------------------------------------------------

1 0.00 303.65 43.00 260.65 112.95

3 0.00 300.92 45.00 255.92 110.90

5 0.00 296.00 43.50 252.50 109.42

7 0.00 286.22 44.00 242.22 104.96

9 39.00(2.00) 285.82 45.00 240.82 104.36

11 0.00 285.50 45.00 240.50 104.21

13 39.00(2.00) 284.92 45.00 239.92 103.97

15 0.00 284.70 45.00 239.70 103.87

17 39.00(2.00) 284.14 45.00 239.14 103.63

19 0.00 283.79 45.00 238.79 103.48

21 0.00 283.49 46.00 237.49 102.91

23 0.00 283.87 46.00 237.87 103.08

25 13.20(2.00) 283.49 46.00 237.49 102.91

27 50.00(2.00) 283.49 49.00 234.49 101.61

29 0.00 239.46 43.50 195.96 84.92

31 0.00 239.46 43.50 195.96 84.92

33 0.00 228.85 43.50 185.35 80.32

35 2000.00 211.64 43.50 168.14 72.86

37 0.00 228.04 41.50 186.54 80.84

39 2000.00 217.64 41.50 176.14 76.33

41 0.00 239.29 40.00 199.29 86.36

43 0.00 247.14 40.00 207.14 89.76

45 0.00 251.92 40.00 211.92 91.83

47 0.00 264.72 41.00 223.72 96.94

49 13.20(2.00) 281.76 41.00 240.76 104.33

51 0.00 282.15 47.00 235.15 101.90

53 20.00(2.00) 282.51 48.00 234.51 101.62

55 0.00 282.89 48.00 234.89 101.79

57 0.00 283.19 48.00 235.19 101.92

59 0.00 283.19 48.00 235.19 101.92

61 0.00 283.35 47.00 236.35 102.42

63 0.00 283.98 38.00 245.98 106.59

65 0.00 290.84 42.00 248.84 107.83

67 26.00(2.00) 290.85 46.00 244.85 106.10

69 26.00(2.00) 290.88 50.00 240.88 104.38

71 26.00(2.00) 290.93 44.00 246.93 107.00

73 0.00 291.04 40.00 251.04 108.78

75 6.50(2.00) 291.52 33.00 258.52 112.02

77 6.50(2.00) 292.03 37.00 255.03 110.51

79 0.00 292.57 43.00 249.57 108.15

81 0.00 304.43 56.00 248.43 107.65

I-BP1 0.00 276.79 46.00 230.79 100.01

I-BP2 0.00 281.41 41.00 240.41 104.18

R1 ---- 305.00 290.00 15.00 6.50

R2 ---- 305.00 290.00 15.00 6.50

O-BP1 0.00 263.42 46.00 217.42 94.21

O-BP2 0.00 268.63 41.00 227.63 98.64

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 15 of 30

Appendix C

M A X I M U M A N D M I N I M U M V A L U E S

P R E S S U R E S

JUNCTION MAXIMUM JUNCTION MINIMUM

NUMBER PRESSURES NUMBER PRESSURES

psi psi

--------------------- ---------------------

1 112.95 R1 6.50

75 112.02 R2 6.50

3 110.90 35 72.86

77 110.51 39 76.33

5 109.42 33 80.32

V E L O C I T I E S

PIPE MAXIMUM PIPE MINIMUM

NUMBER VELOCITY NUMBER VELOCITY

(ft/s) (ft/s)

--------------------- ---------------------

40 12.76 30 0.02

44 12.76 28 0.17

32 9.72 76 0.26

34 9.72 78 0.34

38 9.72 80 0.41

S U M M A R Y O F I N F L O W S A N D O U T F L O W S

(+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES

(-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES

NODE FLOWRATE NODE

NAME gpm TITLE

--------------------------------------------

R1 3065.23

R2 1239.17

NET SYSTEM INFLOW = 4304.40

NET SYSTEM OUTFLOW = 0.00

NET SYSTEM DEMAND = 4304.40

================================================================================

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 16 of 30

Appendix C

CASE 5: 3,000 GPM FIRE FLOW SPLIT BETWEEN NODES 41 AND 43

RESULTS OBTAINED AFTER 4 TRIALS: ACCURACY = 0.97929E-06

P I P E L I N E R E S U L T S

STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE

P I P E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/

N A M E #1 #2 LOSS LOSS VELO. 1000 1000

gpm ft ft ft/s ft/f ft/f

-----------------------------------------------------------------------------------------

2 R1 1 2956.57 1.21 0.05 1.34 0.26 0.25

4 1 3 2956.57 2.49 0.06 3.73 3.12 3.04

6 3 5 2956.57 4.27 0.33 8.39 23.58 21.90

8 5 7 2956.57 8.43 0.71 8.39 23.74 21.90

10 7 9 631.68 0.25 0.17 1.79 2.12 1.26

12 9 11 592.68 0.22 0.12 1.68 1.71 1.12

14 11 13 592.68 0.37 0.23 1.68 1.81 1.12

16 13 15 553.68 0.13 0.10 1.57 1.76 0.98

18 15 17 553.68 0.46 0.13 1.57 1.27 0.98

20 17 19 514.68 0.28 0.09 1.46 1.13 0.86

22 19 21 514.68 0.28 0.04 1.46 0.97 0.86

24 23 7 -2324.89 2.13 0.00 6.59 14.03 14.03

26 25 23 -2324.89 0.14 0.20 6.59 34.29 14.03

28 27 25 -580.99 0.27 0.01 1.65 1.13 1.08

30 21 27 -530.99 0.12 0.02 1.51 1.09 0.91

32 25 I-BP1 1730.71 0.39 3.17 7.07 178.42 19.74

34 O-BP1 29 1730.71 10.76 2.42 7.07 24.18 19.74

36 29 31 0.00 0.00 0.00 0.00 0.00 0.00

38 29 33 1730.71 5.03 0.81 7.07 22.93 19.74

40 33 35 0.00 0.00 0.00 0.00 0.00 0.00

42 33 37 1730.71 11.55 2.38 7.07 23.81 19.74

44 37 39 0.00 0.00 0.00 0.00 0.00 0.00

46 37 41 1730.71 10.07 2.65 7.07 24.94 19.74

48 41 43 -269.29 0.19 0.07 1.10 0.87 0.63

50 43 45 -2269.29 5.44 3.63 9.27 54.33 32.60

52 45 47 -2269.29 19.01 5.10 9.27 41.34 32.60

54 47 O-BP2 -2269.29 3.26 4.23 9.27 74.89 32.60

56 I-BP2 49 -2269.29 0.65 0.00 9.27 32.60 32.60

58 49 51 -1025.66 1.54 0.04 2.91 3.16 3.08

60 51 53 -1025.66 1.05 0.40 2.91 4.26 3.08

62 55 53 1045.66 1.09 0.42 2.97 4.42 3.19

64 55 57 -1045.66 1.12 0.04 2.97 3.31 3.19

66 57 59 0.00 0.00 0.00 0.00 0.00 0.00

68 57 61 -1045.66 0.51 0.09 2.97 3.75 3.19

70 61 21 -1045.66 0.50 0.04 2.97 3.46 3.19

72 49 63 -1256.83 2.43 0.21 3.57 4.87 4.49

74 63 65 -1256.83 7.99 0.12 3.57 4.56 4.49

76 65 67 -108.47 0.01 0.00 0.31 0.07 0.05

78 67 69 -134.47 0.02 0.01 0.38 0.09 0.07

80 69 71 -160.47 0.06 0.01 0.46 0.12 0.10

82 71 73 -186.47 0.10 0.02 0.53 0.16 0.13

84 73 75 -186.47 0.50 0.07 1.19 1.07 0.94

86 75 77 -192.97 0.53 0.06 1.23 1.13 1.01

88 77 79 -199.47 0.56 0.07 1.27 1.20 1.07

90 65 79 -1148.36 1.98 0.05 3.26 3.89 3.80

92 79 81 -1347.83 13.29 0.57 3.82 5.33 5.11

94 81 R2 -1347.83 0.66 0.00 0.96 0.18 0.17

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 17 of 30

Appendix C

P U M P/L O S S E L E M E N T R E S U L T S

INLET OUTLET PUMP EFFIC- USEFUL INCREMTL TOTAL NPSH

NAME FLOWRATE HEAD HEAD HEAD ENCY POWER COST COST Avail.

gpm ft ft ft % Hp $ $ ft

-----------------------------------------------------------------------------------------

BP1 1730.71 235.40 222.58 -12.8 75.00 -6. -0.4 -0.8 267.8

BP2 2269.29 236.05 222.83 -13.2 75.00 -8. -0.3 -0.5 267.9

N O D E R E S U L T S

NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE

NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE

gpm ft ft ft psi

------------------------------------------------------------------------------

1 0.00 303.74 43.00 260.74 112.99

3 0.00 301.18 45.00 256.18 111.01

5 0.00 296.58 43.50 253.08 109.67

7 0.00 287.44 44.00 243.44 105.49

9 39.00(2.00) 287.02 45.00 242.02 104.87

11 0.00 286.68 45.00 241.68 104.73

13 39.00(2.00) 286.07 45.00 241.07 104.46

15 0.00 285.83 45.00 240.83 104.36

17 39.00(2.00) 285.24 45.00 240.24 104.10

19 0.00 284.87 45.00 239.87 103.94

21 0.00 284.55 46.00 238.55 103.37

23 0.00 285.31 46.00 239.31 103.70

25 13.20(2.00) 284.97 46.00 238.97 103.55

27 50.00(2.00) 284.69 49.00 235.69 102.13

29 0.00 255.40 43.50 211.90 91.82

31 0.00 255.40 43.50 211.90 91.82

33 0.00 249.55 43.50 206.05 89.29

35 0.00 249.55 43.50 206.05 89.29

37 0.00 235.62 41.50 194.12 84.12

39 0.00 235.62 41.50 194.12 84.12

41 2000.00 222.90 40.00 182.90 79.26

43 2000.00 223.16 40.00 183.16 79.37

45 0.00 232.24 40.00 192.24 83.30

47 0.00 256.34 41.00 215.34 93.31

49 13.20(2.00) 277.70 41.00 236.70 102.57

51 0.00 279.28 47.00 232.28 100.66

53 20.00(2.00) 280.74 48.00 232.74 100.85

55 0.00 282.25 48.00 234.25 101.51

57 0.00 283.41 48.00 235.41 102.01

59 0.00 283.41 48.00 235.41 102.01

61 0.00 284.01 47.00 237.01 102.70

63 0.00 280.33 38.00 242.33 105.01

65 0.00 288.45 42.00 246.45 106.79

67 26.00(2.00) 288.46 46.00 242.46 105.07

69 26.00(2.00) 288.49 50.00 238.49 103.35

71 26.00(2.00) 288.56 44.00 244.56 105.97

73 0.00 288.68 40.00 248.68 107.76

75 6.50(2.00) 289.25 33.00 256.25 111.04

77 6.50(2.00) 289.84 37.00 252.84 109.56

79 0.00 290.47 43.00 247.47 107.24

81 0.00 304.33 56.00 248.33 107.61

I-BP1 0.00 281.40 46.00 235.40 102.01

I-BP2 0.00 277.05 41.00 236.05 102.29

R1 ---- 305.00 290.00 15.00 6.50

R2 ---- 305.00 290.00 15.00 6.50

O-BP1 0.00 268.58 46.00 222.58 96.45

O-BP2 0.00 263.83 41.00 222.83 96.56

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 18 of 30

Appendix C

M A X I M U M A N D M I N I M U M V A L U E S

P R E S S U R E S

JUNCTION MAXIMUM JUNCTION MINIMUM

NUMBER PRESSURES NUMBER PRESSURES

psi psi

--------------------- ---------------------

1 112.99 R1 6.50

75 111.04 R2 6.50

3 111.01 41 79.26

5 109.67 43 79.37

77 109.56 45 83.30

V E L O C I T I E S

PIPE MAXIMUM PIPE MINIMUM

NUMBER VELOCITY NUMBER VELOCITY

(ft/s) (ft/s)

--------------------- ---------------------

50 9.27 76 0.31

52 9.27 78 0.38

54 9.27 80 0.46

56 9.27 82 0.53

6 8.39 94 0.96

S U M M A R Y O F I N F L O W S A N D O U T F L O W S

(+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES

(-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES

NODE FLOWRATE NODE

NAME gpm TITLE

--------------------------------------------

R1 2956.57

R2 1347.83

NET SYSTEM INFLOW = 4304.40

NET SYSTEM OUTFLOW = 0.00

NET SYSTEM DEMAND = 4304.40

================================================================================

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 19 of 30

Appendix C

CASE 6: 3,000 GPM FIRE FLOW SPLIT BETWEEN NODES 45 AND 47

RESULTS OBTAINED AFTER 4 TRIALS: ACCURACY = 0.46792E-06

P I P E L I N E R E S U L T S

STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE

P I P E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/

N A M E #1 #2 LOSS LOSS VELO. 1000 1000

gpm ft ft ft/s ft/f ft/f

-----------------------------------------------------------------------------------------

2 R1 1 2831.61 1.12 0.04 1.29 0.24 0.23

4 1 3 2831.61 2.30 0.06 3.57 2.88 2.81

6 3 5 2831.61 3.94 0.30 8.03 21.76 20.22

8 5 7 2831.61 7.78 0.65 8.03 21.91 20.22

10 7 9 668.22 0.28 0.19 1.90 2.36 1.39

12 9 11 629.22 0.25 0.13 1.78 1.92 1.25

14 11 13 629.22 0.42 0.26 1.78 2.03 1.25

16 13 15 590.22 0.15 0.12 1.67 1.98 1.11

18 15 17 590.22 0.52 0.15 1.67 1.43 1.11

20 17 19 551.22 0.32 0.10 1.56 1.29 0.98

22 19 21 551.22 0.32 0.04 1.56 1.10 0.98

24 23 7 -2163.39 1.87 0.00 6.14 12.28 12.28

26 25 23 -2163.39 0.12 0.18 6.14 29.82 12.28

28 27 25 -959.56 0.68 0.03 2.72 2.86 2.72

30 21 27 -909.56 0.32 0.07 2.58 2.99 2.47

32 25 I-BP1 1190.63 0.20 1.50 4.86 84.97 9.87

34 O-BP1 29 1190.63 5.38 1.15 4.86 11.98 9.87

36 29 31 0.00 0.00 0.00 0.00 0.00 0.00

38 29 33 1190.63 2.52 0.39 4.86 11.39 9.87

40 33 35 0.00 0.00 0.00 0.00 0.00 0.00

42 33 37 1190.63 5.78 1.13 4.86 11.80 9.87

44 37 39 0.00 0.00 0.00 0.00 0.00 0.00

46 37 41 1190.63 5.04 1.26 4.86 12.34 9.87

48 41 43 1190.63 2.96 1.40 4.86 14.55 9.87

50 43 45 1190.63 1.65 1.00 4.86 15.85 9.87

52 45 47 -809.37 2.82 0.65 3.31 5.94 4.83

54 47 O-BP2 -2809.37 4.84 6.48 11.48 113.22 48.41

56 I-BP2 49 -2809.37 0.97 0.00 11.48 48.41 48.41

58 49 51 -1440.78 2.89 0.08 4.09 5.94 5.78

60 51 53 -1440.78 1.98 0.80 4.09 8.11 5.78

62 55 53 1460.78 2.03 0.82 4.14 8.33 5.93

64 55 57 -1460.78 2.08 0.08 4.14 6.16 5.93

66 57 59 0.00 0.00 0.00 0.00 0.00 0.00

68 57 61 -1460.78 0.95 0.17 4.14 7.02 5.93

70 61 21 -1460.78 0.92 0.08 4.14 6.45 5.93

72 49 63 -1381.79 2.89 0.25 3.92 5.82 5.35

74 63 65 -1381.79 9.53 0.14 3.92 5.43 5.35

76 65 67 -126.02 0.01 0.01 0.36 0.09 0.06

78 67 69 -152.02 0.03 0.01 0.43 0.12 0.09

80 69 71 -178.02 0.07 0.01 0.50 0.14 0.12

82 71 73 -204.02 0.12 0.03 0.58 0.19 0.15

84 73 75 -204.02 0.59 0.08 1.30 1.27 1.12

86 75 77 -210.52 0.62 0.08 1.34 1.33 1.18

88 77 79 -217.02 0.66 0.08 1.39 1.40 1.25

90 65 79 -1255.77 2.33 0.06 3.56 4.60 4.48

92 79 81 -1472.79 15.66 0.68 4.18 6.28 6.02

94 81 R2 -1472.79 0.78 0.01 1.04 0.21 0.21

muyeda
Highlight
20.22 8 5 7 2831.61 7.78 0.65 8.03 21.91 20.22
muyeda
Highlight
56 I-BP2 49 -2809.37 0.97 0.00 11.48 48.41 48.41
muyeda
Highlight
54 47 O-BP2 -2809.37 4.84 6.48 11.48 113.22 48.41
muyeda
Highlight
6 3 5 2831.61 3.94 0.30 8.03 21.76 2

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 20 of 30

Appendix C

P U M P/L O S S E L E M E N T R E S U L T S

INLET OUTLET PUMP EFFIC- USEFUL INCREMTL TOTAL NPSH

NAME FLOWRATE HEAD HEAD HEAD ENCY POWER COST COST Avail.

gpm ft ft ft % Hp $ $ ft

-----------------------------------------------------------------------------------------

BP1 1190.63 238.93 226.23 -12.7 75.00 -4. -0.3 -1.1 271.8

BP2 2809.37 230.70 216.38 -14.3 75.00 -10. -0.4 -0.9 261.9

N O D E R E S U L T S

NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE

NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE

gpm ft ft ft psi

------------------------------------------------------------------------------

1 0.00 303.84 43.00 260.84 113.03

3 0.00 301.48 45.00 256.48 111.14

5 0.00 297.23 43.50 253.73 109.95

7 0.00 288.80 44.00 244.80 106.08

9 39.00(2.00) 288.33 45.00 243.33 105.44

11 0.00 287.94 45.00 242.94 105.28

13 39.00(2.00) 287.26 45.00 242.26 104.98

15 0.00 286.99 45.00 241.99 104.86

17 39.00(2.00) 286.33 45.00 241.33 104.58

19 0.00 285.90 45.00 240.90 104.39

21 0.00 285.54 46.00 239.54 103.80

23 0.00 286.93 46.00 240.93 104.40

25 13.20(2.00) 286.63 46.00 240.63 104.27

27 50.00(2.00) 285.92 49.00 236.92 102.67

29 0.00 265.70 43.50 222.20 96.29

31 0.00 265.70 43.50 222.20 96.29

33 0.00 262.80 43.50 219.30 95.03

35 0.00 262.80 43.50 219.30 95.03

37 0.00 255.89 41.50 214.39 92.90

39 0.00 255.89 41.50 214.39 92.90

41 0.00 249.60 40.00 209.60 90.83

43 0.00 245.24 40.00 205.24 88.94

45 2000.00 242.59 40.00 202.59 87.79

47 2000.00 246.05 41.00 205.05 88.86

49 13.20(2.00) 272.67 41.00 231.67 100.39

51 0.00 275.64 47.00 228.64 99.08

53 20.00(2.00) 278.41 48.00 230.41 99.85

55 0.00 281.26 48.00 233.26 101.08

57 0.00 283.42 48.00 235.42 102.01

59 0.00 283.42 48.00 235.42 102.01

61 0.00 284.54 47.00 237.54 102.93

63 0.00 275.81 38.00 237.81 103.05

65 0.00 285.48 42.00 243.48 105.51

67 26.00(2.00) 285.50 46.00 239.50 103.78

69 26.00(2.00) 285.53 50.00 235.53 102.06

71 26.00(2.00) 285.62 44.00 241.62 104.70

73 0.00 285.76 40.00 245.76 106.50

75 6.50(2.00) 286.43 33.00 253.43 109.82

77 6.50(2.00) 287.13 37.00 250.13 108.39

79 0.00 287.87 43.00 244.87 106.11

81 0.00 304.21 56.00 248.21 107.56

I-BP1 0.00 284.93 46.00 238.93 103.54

I-BP2 0.00 271.70 41.00 230.70 99.97

R1 ---- 305.00 290.00 15.00 6.50

R2 ---- 305.00 290.00 15.00 6.50

O-BP1 0.00 272.23 46.00 226.23 98.03

O-BP2 0.00 257.38 41.00 216.38 93.76

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 21 of 30

Appendix C

M A X I M U M A N D M I N I M U M V A L U E S

P R E S S U R E S

JUNCTION MAXIMUM JUNCTION MINIMUM

NUMBER PRESSURES NUMBER PRESSURES

psi psi

--------------------- ---------------------

1 113.03 R1 6.50

3 111.14 R2 6.50

5 109.95 45 87.79

75 109.82 47 88.86

77 108.39 43 88.94

V E L O C I T I E S

PIPE MAXIMUM PIPE MINIMUM

NUMBER VELOCITY NUMBER VELOCITY

(ft/s) (ft/s)

--------------------- ---------------------

54 11.48 76 0.36

56 11.48 78 0.43

6 8.03 80 0.50

8 8.03 82 0.58

24 6.14 94 1.04

S U M M A R Y O F I N F L O W S A N D O U T F L O W S

(+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES

(-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES

NODE FLOWRATE NODE

NAME gpm TITLE

--------------------------------------------

R1 2831.61

R2 1472.79

NET SYSTEM INFLOW = 4304.40

NET SYSTEM OUTFLOW = 0.00

NET SYSTEM DEMAND = 4304.40

================================================================================

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 22 of 30

Appendix C

CASE 7: 3,000 GPM FIRE FLOW SPLIT BETWEEN NODES 11 AND 13

RESULTS OBTAINED AFTER 20 TRIALS: ACCURACY = 0.27415E-05

P I P E L I N E R E S U L T S

STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE

P I P E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/

N A M E #1 #2 LOSS LOSS VELO. 1000 1000

gpm ft ft ft/s ft/f ft/f

-----------------------------------------------------------------------------------------

2 R1 1 2497.38 0.89 0.03 1.13 0.19 0.18

4 1 3 2497.38 1.82 0.05 3.15 2.28 2.22

6 3 5 2497.38 3.12 0.23 7.08 17.22 16.02

8 5 7 2497.38 6.17 0.51 7.08 17.33 16.02

10 7 9 1939.28 2.01 1.63 5.50 18.18 10.03

12 9 11 1900.28 1.93 1.23 5.39 15.79 9.66

14 11 13 400.28 0.18 0.11 1.14 0.86 0.54

16 13 15 -1138.72 0.51 0.44 3.23 7.00 3.74

18 15 17 -1138.72 1.74 0.56 3.23 4.95 3.74

20 17 19 -1177.72 1.31 0.47 3.34 5.41 3.98

22 19 21 -1177.72 1.31 0.19 3.34 4.56 3.98

24 23 7 -558.10 0.15 0.00 1.58 1.00 1.00

26 25 23 -558.10 0.01 0.01 1.58 2.17 1.00

28 27 25 -544.90 0.24 0.01 1.55 1.00 0.96

30 21 27 -494.90 0.10 0.02 1.40 0.95 0.80

32 25 I-BP1 0.00 0.00 0.00 0.00 0.00 0.00

34 O-BP1 29 0.00 0.00 0.00 0.00 0.00 0.00

36 29 31 0.00 0.00 0.00 0.00 0.00 0.00

38 29 33 0.00 0.00 0.00 0.00 0.00 0.00

40 33 35 0.00 0.00 0.00 0.00 0.00 0.00

42 33 37 0.00 0.00 0.00 0.00 0.00 0.00

44 37 39 0.00 0.00 0.00 0.00 0.00 0.00

46 37 41 0.00 0.00 0.00 0.00 0.00 0.00

48 41 43 0.00 0.00 0.00 0.00 0.00 0.00

50 43 45 0.00 0.00 0.00 0.00 0.00 0.00

52 45 47 0.00 0.00 0.00 0.00 0.00 0.00

54 47 O-BP2 0.00 0.00 0.00 0.00 0.00 0.00

56 I-BP2 49 0.00 0.00 0.00 0.00 0.00 0.00

58 49 51 702.82 0.77 0.02 1.99 1.57 1.53

60 51 53 702.82 0.52 0.19 1.99 2.08 1.53

62 55 53 -682.82 0.50 0.18 1.94 1.97 1.45

64 55 57 682.82 0.51 0.02 1.94 1.50 1.45

66 57 59 0.00 0.00 0.00 0.00 0.00 0.00

68 57 61 682.82 0.23 0.04 1.94 1.69 1.45

70 61 21 682.82 0.22 0.02 1.94 1.56 1.45

72 49 63 -716.02 0.86 0.07 2.03 1.71 1.58

74 63 65 -716.02 2.82 0.04 2.03 1.61 1.58

76 65 67 -32.17 0.00 0.00 0.09 0.01 0.01

78 67 69 -58.17 0.00 0.00 0.16 0.02 0.02

80 69 71 -84.17 0.02 0.00 0.24 0.03 0.03

82 71 73 -110.17 0.04 0.01 0.31 0.06 0.05

84 73 75 -110.17 0.19 0.02 0.70 0.40 0.36

86 75 77 -116.67 0.21 0.02 0.74 0.44 0.40

88 77 79 -123.17 0.23 0.03 0.79 0.49 0.44

90 65 79 -683.86 0.76 0.02 1.94 1.49 1.46

92 79 81 -807.02 5.14 0.20 2.29 2.06 1.98

94 81 R2 -807.02 0.26 0.00 0.57 0.07 0.07

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 23 of 30

Appendix C

P U M P/L O S S E L E M E N T R E S U L T S

INLET OUTLET PUMP EFFIC- USEFUL INCREMTL TOTAL NPSH

NAME FLOWRATE HEAD HEAD HEAD ENCY POWER COST COST Avail.

gpm ft ft ft % Hp $ $ ft

----------------------------------------------------------------------------------------

BP1 0.00 246.00 236.15 0.0 75.00 0. -0.2 -1.3 279.2

BP2 0.00 253.84 241.15 -12.7 75.00 0. -0.5 -1.4 287.0

N O D E R E S U L T S

NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE

NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE

gpm ft ft ft psi

------------------------------------------------------------------------------

1 0.00 304.08 43.00 261.08 113.13

3 0.00 302.21 45.00 257.21 111.46

5 0.00 298.85 43.50 255.35 110.65

7 0.00 292.18 44.00 248.18 107.54

9 39.00(2.00) 288.54 45.00 243.54 105.53

11 1500.00 285.38 45.00 240.38 104.17

13 1539.00( ** ) 285.10 45.00 240.10 104.04

15 0.00 286.04 45.00 241.04 104.45

17 39.00(2.00) 288.34 45.00 243.34 105.45

19 0.00 290.13 45.00 245.13 106.22

21 0.00 291.63 46.00 245.63 106.44

23 0.00 292.03 46.00 246.03 106.61

25 13.20(2.00) 292.00 46.00 246.00 106.60

27 50.00(2.00) 291.76 49.00 242.76 105.19

29 0.00 282.15 43.50 238.65 103.41

31 0.00 282.15 43.50 238.65 103.41

33 0.00 282.15 43.50 238.65 103.41

35 0.00 282.15 43.50 238.65 103.41

37 0.00 282.15 41.50 240.65 104.28

39 0.00 282.15 41.50 240.65 104.28

41 0.00 282.15 40.00 242.15 104.93

43 0.00 282.15 40.00 242.15 104.93

45 0.00 282.15 40.00 242.15 104.93

47 0.00 282.15 41.00 241.15 104.50

49 13.20(2.00) 294.84 41.00 253.84 110.00

51 0.00 294.06 47.00 247.06 107.06

53 20.00(2.00) 293.35 48.00 245.35 106.32

55 0.00 292.67 48.00 244.67 106.02

57 0.00 292.14 48.00 244.14 105.80

59 0.00 292.14 48.00 244.14 105.80

61 0.00 291.87 47.00 244.87 106.11

63 0.00 295.76 38.00 257.76 111.70

65 0.00 298.62 42.00 256.62 111.20

67 26.00(2.00) 298.62 46.00 252.62 109.47

69 26.00(2.00) 298.63 50.00 248.63 107.74

71 26.00(2.00) 298.65 44.00 254.65 110.35

73 0.00 298.70 40.00 258.70 112.10

75 6.50(2.00) 298.91 33.00 265.91 115.23

77 6.50(2.00) 299.14 37.00 262.14 113.59

79 0.00 299.40 43.00 256.40 111.11

81 0.00 304.74 56.00 248.74 107.79

I-BP1 0.00 292.00 46.00 246.00 106.60

I-BP2 0.00 294.84 41.00 253.84 110.00

R1 ---- 305.00 290.00 15.00 6.50

R2 ---- 305.00 290.00 15.00 6.50

O-BP1 0.00 282.15 46.00 236.15 102.33

O-BP2 0.00 282.15 41.00 241.15 104.50

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 24 of 30

Appendix C

M A X I M U M A N D M I N I M U M V A L U E S

P R E S S U R E S

JUNCTION MAXIMUM JUNCTION MINIMUM

NUMBER PRESSURES NUMBER PRESSURES

psi psi

--------------------- ---------------------

75 115.23 R1 6.50

77 113.59 R2 6.50

1 113.13 O-BP1 102.33

73 112.10 29 103.41

63 111.70 31 103.41

V E L O C I T I E S

PIPE MAXIMUM PIPE MINIMUM

NUMBER VELOCITY NUMBER VELOCITY

(ft/s) (ft/s)

--------------------- ---------------------

6 7.08 76 0.09

8 7.08 78 0.16

10 5.50 80 0.24

12 5.39 82 0.31

20 3.34 94 0.57

S U M M A R Y O F I N F L O W S A N D O U T F L O W S

(+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES

(-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES

NODE FLOWRATE NODE

NAME gpm TITLE

--------------------------------------------

R1 2497.38

R2 807.02

NET SYSTEM INFLOW = 3304.40

NET SYSTEM OUTFLOW = 0.00

NET SYSTEM DEMAND = 3304.40

================================================================================

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 25 of 30

Appendix C

CASE 8: 3,000 GPM FIRE FLOW SPLIT BETWEEN NODES 17 AND 19

RESULTS OBTAINED AFTER 4 TRIALS: ACCURACY = 0.41215E-05

P I P E L I N E R E S U L T S

STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE

P I P E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/

N A M E #1 #2 LOSS LOSS VELO. 1000 1000

gpm ft ft ft/s ft/f ft/f

-----------------------------------------------------------------------------------------

2 R1 1 2445.52 0.85 0.03 1.11 0.18 0.18

4 1 3 2445.52 1.75 0.04 3.08 2.19 2.14

6 3 5 2445.52 3.00 0.22 6.94 16.56 15.41

8 5 7 2445.52 5.93 0.49 6.94 16.67 15.41

10 7 9 1131.10 0.74 0.55 3.21 6.47 3.69

12 9 11 1092.10 0.69 0.41 3.10 5.49 3.46

14 11 13 1092.10 1.16 0.79 3.10 5.83 3.46

16 13 15 1053.10 0.44 0.38 2.99 6.03 3.24

18 15 17 1053.10 1.51 0.48 2.99 4.27 3.24

20 17 19 -485.90 0.25 0.08 1.38 1.02 0.77

22 19 21 -1985.90 3.46 0.54 5.63 12.12 10.48

24 23 7 -1314.42 0.74 0.00 3.73 4.88 4.88

26 25 23 -1314.42 0.05 0.06 3.73 11.35 4.88

28 27 25 -1301.22 1.19 0.06 3.69 5.05 4.79

30 21 27 -1251.22 0.57 0.13 3.55 5.44 4.45

32 25 I-BP1 0.00 0.00 0.00 0.00 0.00 0.00

34 O-BP1 29 0.00 0.00 0.00 0.00 0.00 0.00

36 29 31 0.00 0.00 0.00 0.00 0.00 0.00

38 29 33 0.00 0.00 0.00 0.00 0.00 0.00

40 33 35 0.00 0.00 0.00 0.00 0.00 0.00

42 33 37 0.00 0.00 0.00 0.00 0.00 0.00

44 37 39 0.00 0.00 0.00 0.00 0.00 0.00

46 37 41 0.00 0.00 0.00 0.00 0.00 0.00

48 41 43 0.00 0.00 0.00 0.00 0.00 0.00

50 43 45 0.00 0.00 0.00 0.00 0.00 0.00

52 45 47 0.00 0.00 0.00 0.00 0.00 0.00

54 47 O-BP2 0.00 0.00 0.00 0.00 0.00 0.00

56 I-BP2 49 0.00 0.00 0.00 0.00 0.00 0.00

58 49 51 754.68 0.87 0.02 2.14 1.79 1.75

60 51 53 754.68 0.60 0.22 2.14 2.39 1.75

62 55 53 -734.68 0.57 0.21 2.08 2.27 1.66

64 55 57 734.68 0.58 0.02 2.08 1.72 1.66

66 57 59 0.00 0.00 0.00 0.00 0.00 0.00

68 57 61 734.68 0.27 0.04 2.08 1.94 1.66

70 61 21 734.68 0.26 0.02 2.08 1.79 1.66

72 49 63 -767.88 0.97 0.08 2.18 1.95 1.80

74 63 65 -767.88 3.21 0.04 2.18 1.83 1.80

76 65 67 -39.52 0.00 0.00 0.11 0.01 0.01

78 67 69 -65.52 0.01 0.00 0.19 0.02 0.02

80 69 71 -91.52 0.02 0.00 0.26 0.04 0.04

82 71 73 -117.52 0.04 0.01 0.33 0.07 0.06

84 73 75 -117.52 0.21 0.03 0.75 0.45 0.40

86 75 77 -124.02 0.23 0.03 0.79 0.49 0.44

88 77 79 -130.52 0.26 0.03 0.83 0.54 0.49

90 65 79 -728.36 0.85 0.02 2.07 1.67 1.64

92 79 81 -858.88 5.77 0.23 2.44 2.31 2.22

94 81 R2 -858.88 0.29 0.00 0.61 0.08 0.08

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 26 of 30

Appendix C

P U M P/L O S S E L E M E N T R E S U L T S

INLET OUTLET PUMP EFFIC- USEFUL INCREMTL TOTAL NPSH

NAME FLOWRATE HEAD HEAD HEAD ENCY POWER COST COST Avail.

gpm ft ft ft % Hp $ $ ft

---------------------------------------------------------------------------------------

BP1 0.00 245.81 234.84 0.0 75.00 0. 0.0 -1.3 279.0

BP2 0.00 252.53 239.84 -12.7 75.00 0. 0.0 -1.4 285.7

N O D E R E S U L T S

NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE

NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE

gpm ft ft ft psi

------------------------------------------------------------------------------

1 0.00 304.11 43.00 261.11 113.15

3 0.00 302.32 45.00 257.32 111.50

5 0.00 299.09 43.50 255.59 110.75

7 0.00 292.67 44.00 248.67 107.76

9 39.00(2.00) 291.37 45.00 246.37 106.76

11 0.00 290.28 45.00 245.28 106.29

13 39.00(2.00) 288.32 45.00 243.32 105.44

15 0.00 287.51 45.00 242.51 105.09

17 1539.00( ** ) 285.52 45.00 240.52 104.23

19 1500.00 285.86 45.00 240.86 104.37

21 0.00 289.86 46.00 243.86 105.67

23 0.00 291.93 46.00 245.93 106.57

25 13.20(2.00) 291.81 46.00 245.81 106.52

27 50.00(2.00) 290.56 49.00 241.56 104.68

29 0.00 280.84 43.50 237.34 102.85

31 0.00 280.84 43.50 237.34 102.85

33 0.00 280.84 43.50 237.34 102.85

35 0.00 280.84 43.50 237.34 102.85

37 0.00 280.84 41.50 239.34 103.72

39 0.00 280.84 41.50 239.34 103.72

41 0.00 280.84 40.00 240.84 104.37

43 0.00 280.84 40.00 240.84 104.37

45 0.00 280.84 40.00 240.84 104.37

47 0.00 280.84 41.00 239.84 103.93

49 13.20(2.00) 293.53 41.00 252.53 109.43

51 0.00 292.64 47.00 245.64 106.44

53 20.00(2.00) 291.82 48.00 243.82 105.66

55 0.00 291.05 48.00 243.05 105.32

57 0.00 290.45 48.00 242.45 105.06

59 0.00 290.45 48.00 242.45 105.06

61 0.00 290.14 47.00 243.14 105.36

63 0.00 294.59 38.00 256.59 111.19

65 0.00 297.84 42.00 255.84 110.86

67 26.00(2.00) 297.84 46.00 251.84 109.13

69 26.00(2.00) 297.85 50.00 247.85 107.40

71 26.00(2.00) 297.87 44.00 253.87 110.01

73 0.00 297.92 40.00 257.92 111.77

75 6.50(2.00) 298.16 33.00 265.16 114.90

77 6.50(2.00) 298.42 37.00 261.42 113.28

79 0.00 298.71 43.00 255.71 110.81

81 0.00 304.71 56.00 248.71 107.77

I-BP1 0.00 291.81 46.00 245.81 106.52

I-BP2 0.00 293.53 41.00 252.53 109.43

R1 ---- 305.00 290.00 15.00 6.50

R2 ---- 305.00 290.00 15.00 6.50

O-BP1 0.00 280.84 46.00 234.84 101.77

O-BP2 0.00 280.84 41.00 239.84 103.93

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 27 of 30

Appendix C

M A X I M U M A N D M I N I M U M V A L U E S

P R E S S U R E S

JUNCTION MAXIMUM JUNCTION MINIMUM

NUMBER PRESSURES NUMBER PRESSURES

psi psi

--------------------- ---------------------

75 114.90 R1 6.50

77 113.28 R2 6.50

1 113.15 O-BP1 101.77

73 111.77 29 102.85

3 111.50 31 102.85

V E L O C I T I E S

PIPE MAXIMUM PIPE MINIMUM

NUMBER VELOCITY NUMBER VELOCITY

(ft/s) (ft/s)

--------------------- ---------------------

6 6.94 76 0.11

8 6.94 78 0.19

22 5.63 80 0.26

24 3.73 82 0.33

26 3.73 94 0.61

S U M M A R Y O F I N F L O W S A N D O U T F L O W S

(+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES

(-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES

NODE FLOWRATE NODE

NAME gpm TITLE

--------------------------------------------

R1 2445.52

R2 858.88

NET SYSTEM INFLOW = 3304.40

NET SYSTEM OUTFLOW = 0.00

NET SYSTEM DEMAND = 3304.40

================================================================================

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 28 of 30

Appendix C

CASE 9: 3,000 GPM FIRE FLOW SPLIT BETWEEN NODES 69 AND 71

RESULTS OBTAINED AFTER 20 TRIALS: ACCURACY = 0.10624E-04

P I P E L I N E R E S U L T S

STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE

P I P E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/

N A M E #1 #2 LOSS LOSS VELO. 1000 1000

gpm ft ft ft/s ft/f ft/f

-----------------------------------------------------------------------------------------

2 R1 1 1480.31 0.34 0.01 0.67 0.07 0.07

4 1 3 1480.31 0.69 0.02 1.87 0.86 0.84

6 3 5 1480.31 1.19 0.08 4.20 6.50 6.08

8 5 7 1480.31 2.34 0.18 4.20 6.54 6.08

10 7 9 486.39 0.15 0.10 1.38 1.29 0.77

12 9 11 447.39 0.13 0.07 1.27 1.00 0.66

14 11 13 447.39 0.22 0.13 1.27 1.06 0.66

16 13 15 408.39 0.08 0.06 1.16 0.98 0.56

18 15 17 408.39 0.26 0.07 1.16 0.72 0.56

20 17 19 369.39 0.15 0.05 1.05 0.61 0.47

22 19 21 369.39 0.15 0.02 1.05 0.52 0.47

24 23 7 -993.92 0.44 0.00 2.82 2.91 2.91

26 25 23 -993.92 0.03 0.04 2.82 6.61 2.91

28 27 25 -980.72 0.70 0.04 2.78 2.98 2.84

30 21 27 -930.72 0.33 0.07 2.64 3.12 2.57

32 25 I-BP1 0.00 0.00 0.00 0.00 0.00 0.00

34 O-BP1 29 0.00 0.00 0.00 0.00 0.00 0.00

36 29 31 0.00 0.00 0.00 0.00 0.00 0.00

38 29 33 0.00 0.00 0.00 0.00 0.00 0.00

40 33 35 0.00 0.00 0.00 0.00 0.00 0.00

42 33 37 0.00 0.00 0.00 0.00 0.00 0.00

44 37 39 0.00 0.00 0.00 0.00 0.00 0.00

46 37 41 0.00 0.00 0.00 0.00 0.00 0.00

48 41 43 0.00 0.00 0.00 0.00 0.00 0.00

50 43 45 0.00 0.00 0.00 0.00 0.00 0.00

52 45 47 0.00 0.00 0.00 0.00 0.00 0.00

54 47 O-BP2 0.00 0.00 0.00 0.00 0.00 0.00

56 I-BP2 49 0.00 0.00 0.00 0.00 0.00 0.00

58 49 51 -1280.11 2.32 0.06 3.63 4.77 4.65

60 51 53 -1280.11 1.59 0.63 3.63 6.48 4.65

62 55 53 1300.11 1.64 0.65 3.69 6.68 4.78

64 55 57 -1300.11 1.67 0.06 3.69 4.96 4.78

66 57 59 0.00 0.00 0.00 0.00 0.00 0.00

68 57 61 -1300.11 0.77 0.14 3.69 5.64 4.78

70 61 21 -1300.11 0.74 0.06 3.69 5.19 4.78

72 49 63 1266.91 2.46 0.21 3.59 4.95 4.56

74 63 65 1266.91 8.11 0.12 3.59 4.63 4.56

76 65 67 2480.01 3.16 2.44 7.03 27.99 15.81

78 67 69 2454.01 4.54 2.05 6.96 22.49 15.51

80 69 71 928.01 1.50 0.33 2.63 3.13 2.56

82 71 73 -597.99 0.89 0.22 1.70 1.42 1.13

84 73 75 -597.99 4.31 0.69 3.82 9.49 8.18

86 75 77 -604.49 4.40 0.63 3.86 9.53 8.34

88 77 79 -610.99 4.48 0.64 3.90 9.73 8.51

90 65 79 -1213.11 2.19 0.06 3.44 4.31 4.21

92 79 81 -1824.09 23.28 1.04 5.17 9.35 8.95

94 81 R2 -1824.09 1.16 0.01 1.29 0.31 0.31

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 29 of 30

Appendix C

P U M P/L O S S E L E M E N T R E S U L T S

INLET OUTLET PUMP EFFIC- USEFUL INCREMTL TOTAL NPSH

NAME FLOWRATE HEAD HEAD HEAD ENCY POWER COST COST Avail.

gpm ft ft ft % Hp $ $ ft

----------------------------------------------------------------------------------------

BP1 0.00 253.65 240.95 -12.7 75.00 0. 0.0 -1.3 286.8

BP2 0.00 247.18 245.95 0.0 75.00 0. 0.0 -1.4 280.4

N O D E R E S U L T S

NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE

NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE

gpm ft ft ft psi

------------------------------------------------------------------------------

1 0.00 304.65 43.00 261.65 113.38

3 0.00 303.94 45.00 258.94 112.21

5 0.00 302.67 43.50 259.17 112.31

7 0.00 300.16 44.00 256.16 111.00

9 39.00(2.00) 299.90 45.00 254.90 110.46

11 0.00 299.70 45.00 254.70 110.37

13 39.00(2.00) 299.34 45.00 254.34 110.21

15 0.00 299.21 45.00 254.21 110.16

17 39.00(2.00) 298.88 45.00 253.88 110.01

19 0.00 298.68 45.00 253.68 109.93

21 0.00 298.51 46.00 252.51 109.42

23 0.00 299.71 46.00 253.71 109.94

25 13.20(2.00) 299.65 46.00 253.65 109.91

27 50.00(2.00) 298.91 49.00 249.91 108.29

29 0.00 286.95 43.50 243.45 105.50

31 0.00 286.95 43.50 243.45 105.50

33 0.00 286.95 43.50 243.45 105.50

35 0.00 286.95 43.50 243.45 105.50

37 0.00 286.95 41.50 245.45 106.36

39 0.00 286.95 41.50 245.45 106.36

41 0.00 286.95 40.00 246.95 107.01

43 0.00 286.95 40.00 246.95 107.01

45 0.00 286.95 40.00 246.95 107.01

47 0.00 286.95 41.00 245.95 106.58

49 13.20(2.00) 288.18 41.00 247.18 107.11

51 0.00 290.56 47.00 243.56 105.54

53 20.00(2.00) 292.78 48.00 244.78 106.07

55 0.00 295.06 48.00 247.06 107.06

57 0.00 296.80 48.00 248.80 107.81

59 0.00 296.80 48.00 248.80 107.81

61 0.00 297.70 47.00 250.70 108.64

63 0.00 285.50 38.00 247.50 107.25

65 0.00 277.27 42.00 235.27 101.95

67 26.00(2.00) 271.67 46.00 225.67 97.79

69 1526.00( ** ) 265.08 50.00 215.08 93.20

71 1526.00( ** ) 263.25 44.00 219.25 95.01

73 0.00 264.36 40.00 224.36 97.22

75 6.50(2.00) 269.36 33.00 236.36 102.42

77 6.50(2.00) 274.39 37.00 237.39 102.87

79 0.00 279.51 43.00 236.51 102.49

81 0.00 303.83 56.00 247.83 107.39

I-BP1 0.00 299.65 46.00 253.65 109.91

I-BP2 0.00 288.18 41.00 247.18 107.11

R1 ---- 305.00 290.00 15.00 6.50

R2 ---- 305.00 290.00 15.00 6.50

O-BP1 0.00 286.95 46.00 240.95 104.41

O-BP2 0.00 286.95 41.00 245.95 106.58

Ocean Kamp Project March 12, 2020

City of Oceanside Dexter Wilson Eng., Inc.

Computer Hydraulic Model Job 921-003

Page 30 of 30

Appendix C

M A X I M U M A N D M I N I M U M V A L U E S

P R E S S U R E S

JUNCTION MAXIMUM JUNCTION MINIMUM

NUMBER PRESSURES NUMBER PRESSURES

psi psi

--------------------- ---------------------

1 113.38 R1 6.50

5 112.31 R2 6.50

3 112.21 69 93.20

7 111.00 71 95.01

9 110.46 73 97.22

V E L O C I T I E S

PIPE MAXIMUM PIPE MINIMUM

NUMBER VELOCITY NUMBER VELOCITY

(ft/s) (ft/s)

--------------------- ---------------------

76 7.03 2 0.67

78 6.96 20 1.05

92 5.17 22 1.05

6 4.20 16 1.16

8 4.20 18 1.16

S U M M A R Y O F I N F L O W S A N D O U T F L O W S

(+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES

(-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES

NODE FLOWRATE NODE

NAME gpm TITLE

--------------------------------------------

R1 1480.31

R2 1824.09

NET SYSTEM INFLOW = 3304.40

NET SYSTEM OUTFLOW = 0.00

NET SYSTEM DEMAND = 3304.40

***** HYDRAULIC ANALYSIS COMPLETED *****

S

A

N

L

U

IS

R

E

Y

R

IV

E

R

S

A

N

L

U

I

S

R

E

Y

R

I

V

E

R

AutoCAD SHX Text
N
AutoCAD SHX Text
HIGHWAY 76
AutoCAD SHX Text
FOUSSAT
AutoCAD SHX Text
RD
AutoCAD SHX Text
MISSION AVE
AutoCAD SHX Text
FOUSSAT RD
AutoCAD SHX Text
0
AutoCAD SHX Text
300
AutoCAD SHX Text
FEET
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
HIGHWAY 76
AutoCAD SHX Text
FIRESIDE ST
AutoCAD SHX Text
HERITAGE ST
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
LEGEND EXISTING PUBLIC WATER SYSTEM PROPOSED PUBLIC WATER SYSTEM PROPOSED PRIVATE FIRE PROTECTION SYSTEM PROPOSED PRIVATE FIRE HYDRANT COMPUTER MODEL NODE NUMBER COMPUTER MODEL PIPE NUMBER
AutoCAD SHX Text
1
AutoCAD SHX Text
4
AutoCAD SHX Text
R1
AutoCAD SHX Text
1
AutoCAD SHX Text
81
AutoCAD SHX Text
R2
AutoCAD SHX Text
3
AutoCAD SHX Text
5
AutoCAD SHX Text
7
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
13
AutoCAD SHX Text
15
AutoCAD SHX Text
17
AutoCAD SHX Text
19
AutoCAD SHX Text
21
AutoCAD SHX Text
23
AutoCAD SHX Text
25
AutoCAD SHX Text
27
AutoCAD SHX Text
BP1
AutoCAD SHX Text
29
AutoCAD SHX Text
31
AutoCAD SHX Text
33
AutoCAD SHX Text
35
AutoCAD SHX Text
37
AutoCAD SHX Text
39
AutoCAD SHX Text
41
AutoCAD SHX Text
43
AutoCAD SHX Text
45
AutoCAD SHX Text
47
AutoCAD SHX Text
BP2
AutoCAD SHX Text
49
AutoCAD SHX Text
51
AutoCAD SHX Text
53
AutoCAD SHX Text
55
AutoCAD SHX Text
57
AutoCAD SHX Text
59
AutoCAD SHX Text
61
AutoCAD SHX Text
63
AutoCAD SHX Text
65
AutoCAD SHX Text
67
AutoCAD SHX Text
69
AutoCAD SHX Text
71
AutoCAD SHX Text
73
AutoCAD SHX Text
75
AutoCAD SHX Text
77
AutoCAD SHX Text
79
AutoCAD SHX Text
2
AutoCAD SHX Text
EX.30"
AutoCAD SHX Text
4
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
6
AutoCAD SHX Text
12"
AutoCAD SHX Text
8
AutoCAD SHX Text
12"
AutoCAD SHX Text
12
AutoCAD SHX Text
12"
AutoCAD SHX Text
14
AutoCAD SHX Text
12"
AutoCAD SHX Text
16
AutoCAD SHX Text
12"
AutoCAD SHX Text
18
AutoCAD SHX Text
12"
AutoCAD SHX Text
20
AutoCAD SHX Text
12"
AutoCAD SHX Text
22
AutoCAD SHX Text
12"
AutoCAD SHX Text
10
AutoCAD SHX Text
12"
AutoCAD SHX Text
24
AutoCAD SHX Text
12"
AutoCAD SHX Text
26
AutoCAD SHX Text
12"
AutoCAD SHX Text
28
AutoCAD SHX Text
12"
AutoCAD SHX Text
30
AutoCAD SHX Text
12"
AutoCAD SHX Text
32
AutoCAD SHX Text
10"
AutoCAD SHX Text
34
AutoCAD SHX Text
10"
AutoCAD SHX Text
40
AutoCAD SHX Text
8"
AutoCAD SHX Text
36
AutoCAD SHX Text
8"
AutoCAD SHX Text
38
AutoCAD SHX Text
10"
AutoCAD SHX Text
42
AutoCAD SHX Text
10"
AutoCAD SHX Text
44
AutoCAD SHX Text
8"
AutoCAD SHX Text
46
AutoCAD SHX Text
10"
AutoCAD SHX Text
48
AutoCAD SHX Text
10"
AutoCAD SHX Text
50
AutoCAD SHX Text
10"
AutoCAD SHX Text
52
AutoCAD SHX Text
10"
AutoCAD SHX Text
54
AutoCAD SHX Text
10"
AutoCAD SHX Text
56
AutoCAD SHX Text
10"
AutoCAD SHX Text
58
AutoCAD SHX Text
12"
AutoCAD SHX Text
60
AutoCAD SHX Text
12"
AutoCAD SHX Text
62
AutoCAD SHX Text
12"
AutoCAD SHX Text
64
AutoCAD SHX Text
12"
AutoCAD SHX Text
66
AutoCAD SHX Text
8"
AutoCAD SHX Text
68
AutoCAD SHX Text
12"
AutoCAD SHX Text
70
AutoCAD SHX Text
12"
AutoCAD SHX Text
72
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
74
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
76
AutoCAD SHX Text
12"
AutoCAD SHX Text
78
AutoCAD SHX Text
12"
AutoCAD SHX Text
80
AutoCAD SHX Text
12"
AutoCAD SHX Text
82
AutoCAD SHX Text
12"
AutoCAD SHX Text
84
AutoCAD SHX Text
EX.8"
AutoCAD SHX Text
86
AutoCAD SHX Text
EX.8"
AutoCAD SHX Text
88
AutoCAD SHX Text
EX.8"
AutoCAD SHX Text
92
AutoCAD SHX Text
EX.12"
AutoCAD SHX Text
94
AutoCAD SHX Text
EX.24"
AutoCAD SHX Text
90
AutoCAD SHX Text
EX.8"
AutoCAD SHX Text
EXHIBIT A
AutoCAD SHX Text
NODE AND PIPE DIAGRAM
AutoCAD SHX Text
OCEAN KAMP
AutoCAD SHX Text
\\ARTIC\DWG\921003\REPORTS\PCO_WTR_EXHIBIT-A_N&P.DWG 03-13-20 14:11:02 LAYOUT: LAYOUT
muyeda
Callout
UPDATE METER LOCATIONS AND PRIVATE AND PUBLIC MAINS
muyeda
Arrow
muyeda
Highlight
muyeda
Highlight
muyeda
Highlight
muyeda
Highlight
muyeda
Highlight
muyeda
Highlight