Development Plan Submission - Fingal...Development Plan Submission Pre-Draft Fingal Development Plan...
Transcript of Development Plan Submission - Fingal...Development Plan Submission Pre-Draft Fingal Development Plan...
Pre-Draft Fingal Development Plan 2017-2023 (Stage 1)
On behalf of: Noel McAllister
MAY 2015
Development Plan Submission
Development Plan Submission Pre-Draft Fingal Development Plan 2017-2023
Downey Planning on behalf of Noel McAllister 1
Executive Summary Downey Planning, 1 Westland Square, Pearse Street, Dublin 2, wishes to make this submission on the
“Pre-Draft Fingal County Development Plan 2017-2023” to Fingal County Council on behalf of our
client . This submission relates to the key
themes of ‘Settlement Strategy’, ‘Placemaking and Communities’ and ‘Infrastructure and Movement’.
The requirement for an additional 41,000 homes and the location of such units within the functional
area of Fingal is a key consideration. In particular, it is submitted that the established towns and
villages, and in particular Donabate should be the primary location for these housing units.
According to the 2011 Census statistics, Donabate and Portrane have a total population of
approximately 8,150 people, consisting predominately of a young age demographic. The population
of Donabate and Portrane is expected to increase significantly, with a population projection of circa
15,000 for Donabate and Portrane by 2020. Therefore it is anticipated that the development boundary
of Donabate will be required to be amended and additional lands for development be made available
to accommodate such growth. In this regard, this submission proposes the planned, consolidated
expansion of lands to the north east of Donabate immediately adjacent existing zoned and residential
constructed lands such that the development of Donabate is consolidated and does not occur in a
piecemeal ad-hoc manner.
It is submitted that the extension of the RS1 lands to the north of Donabate will reduce urban sprawl
and the inefficiencies associated with dispersed settlements patterns by accommodating growth
within Donabate. Noting that there is a quantum of existing constructed and granted residential
development to the north of Donabate, it is considered that the re-zoning of a portion of the lands
from ‘CI’ to ‘LC’, will increase employment opportunities within the village and increase the service
offerings and facilities available to residents north of the village of Donabate.
The Settlement Strategy Background Paper notes that rural villages (such as Donabate) are considered
to be local service centres and support will be given to the growth of local services and enterprise, and
sustainable increases in population which would not create unsustainable commuting patterns. It is
submitted, that the location of housing developments within Donabate should accordingly be
strategically located in close proximity to local centres in order to provide retail, commercial,
restaurant uses etc. in order to serve the existing and proposed residential areas.
This submission draws particular attention to the principles of sustainable development and the
importance of creating residential communities within close proximity of existing communities,
services and transportation nodes. The future development of Donabate should be encouraged
towards the north east of the town noting, that the proposed National Forensic Mental Hospital is to
be located at St. Ita’s hospital, which is accessed via the R126 which enters Donabate to the north
east. It is considered that the provision of such a service/employment opportunities will increase the
requirement for additional housing units within Donabate and the lands to the north east of Donabate
are a logical extension to the development boundary to the north east of the town.
Donabate
Submission to Pre Draft Fingal Development Plan 2017-2023Lands at Donabate on behalf of Noel Mc Allister
Submission to Pre Draft Fingal Development Plan 2017-2023Lands at Donabate on behalf of Noel Mc Allister
Development Plan Submission Pre-Draft Fingal Development Plan 2017-2023
Downey Planning on behalf of Noel McAllister 2
Table of Contents
Executive Summary ................................................................................................................................. 1
1.0 Introduction ................................................................................................................................ 3
2.0 Planning Legislation .................................................................................................................... 4
3.0 Fingal Development Plan 2017-2023 Pre-Draft Consultation Booklet ....................................... 7
4.0 Planning Submission ................................................................................................................... 8
4.1 National Spatial Strategy 2002-2020 ...................................................................................... 8
4.2 Regional Planning Guidelines for the Greater Dublin Area 2010-2022 .................................. 9
4.3 Fingal Development Plan 2011-2017 ...................................................................................... 9
4.4 Donabate LAP ........................................................................................................................ 10
4.5 Donabate Overview .............................................................................................................. 11
4.6 Planning Submission ............................................................................................................. 12
5.0 Conclusion ................................................................................................................................. 12
This planning submission is made in response to the statutory review of the Fingal County Development Plan. Stage 1, known as the ‘Pre-Draft’ stage, requires submissions to be of a strategic nature or what the Chief Executives have detailed (Pg.2) ‘the consideration of the “big picture” issues’. Accordingly, this submission has been prepared in the context of ‘Strategic Planning Issues’ which are detailed throughout this submissions to highlight some cross cutting themes that should be examined at the initial stage of the formulation of this important document which will steer development within Fingal until 2023. Whilst there might be mention of specific areas or locations, we wish to note that the submission contained herein is of a strategic content and is not site specific at this stage. We would therefore respectfully request that Fingal County Council consider the strategic content within this planning submission. Downey Planning would like to thank the Council for the opportunity to make this submission, on behalf of our clients whom are strategic landowners, business operators and residents of Fingal.
© Downey Planning 2015
Downey Planning Document Control
Name Date Version
Prepared by Anne McElligott MIPI Consultant Planner
08 May 2015 V_01_DRAFT
Approved by John Downey MIPI MRTPI Director
12 May 2015 V_02_Final
Development Plan Submission Pre-Draft Fingal Development Plan 2017-2023
Downey Planning on behalf of Noel McAllister 3
1.0 Introduction In accordance with Section 9, 10, 11 and 12 of the Planning and Development Act 2000 (as amended),
Downey Planning, 1 Westland Square, Pearse Street, Dublin 2, wishes to make this submission on the
“Pre-Draft Fingal County Development Plan 2017-2023” to Fingal County Council on behalf of our
client Mr. Noel McAllister, Portrane Road, Donabate, Co. Dublin. This written submission is made in
response to an invitation for comments from interested parties by Fingal County Council. This
submission is being made within the timeframe for submissions (15th May 2015) as set out within the
Consultation Booklet prepared by the Planning Authority.
This submission relates to the ‘Settlement Strategy’, ‘Placemaking and Communities’ and
‘Infrastructure and Movement’ strategies for Fingal County Council with particular reference to the
future development of Donabate and an extension to its existing development boundary.
According to the 2011 Census statistics, Donabate and Portrane have a total population of
approximately 8,150 people, consisting predominately of a young age demographic. The population
of Donabate and Portrane is expected to increase significantly, with a population projection of circa
15,000 for Donabate and Portrane by 2020. Therefore it is anticipated that the development boundary
of Donabate will be required to be amended and additional lands for development be made available
to accommodate such growth. Downey Planning are of the considered opinion that the village should
develop in a planned and sustainable manner that is integrated with high quality public transport and
such a planned extension should occur to the north east of Donabate.
Fig. 1 – Existing Built Area of Donabate
Development Plan Submission Pre-Draft Fingal Development Plan 2017-2023
Downey Planning on behalf of Noel McAllister 4
Fig. 2 – Existing Development Boundary of Donabate as set out in Fingal County Development Plan 2011-2017 It is submitted that the lands currently zoned for Local Centre Development are not appropriately
located within Donabate. There are lands zoned for Local Centre Development that are within a
Conservation area with some local centre designated lands too small to accommodate such services
or comprise residential development. It is submitted that additional Local Centre zoned lands are
required within the development boundary of Donabate.
The Department of Environment, Community and Local Government published the ‘Planning Policy
Statement’ in 2015 which notes that planning must proactively drive and support sustainable
development, integrating consideration of its economic, social and environmental aspects at the
earliest stage to deliver the homes, business and employment space, infrastructure and thriving urban
and rural locations in an economically viable manner that will sustain recovery and our future
prosperity.
In this regard, this submission proposes the planned, consolidated expansion of lands to the north
east of Donabate immediately adjacent existing zoned and constructed residential lands such that the
development of Donabate is consolidated and does not occur in a piecemeal ad-hoc manner.
2.0 Planning Legislation Section 9 of the Planning and Development Act 2000 (as amended) provides that, subject to the
requirements set out in Section 9, 10 and 11 of the Act, that a planning authority must adopt a new
LC Lands- Too Small and Restrictive
LC Lands- Not Appropriate for LC Facilities
LC Lands- Restricted within ACA Designation
LC Lands-Comprises Residential Development
Development Plan Submission Pre-Draft Fingal Development Plan 2017-2023
Downey Planning on behalf of Noel McAllister 5
Development Plan every six years. The contents of the Development Plan are set out within Section
10 of the Planning and Development Act 2000 (as amended) and must include a strategy for the proper
planning and sustainable development of the area of the Development Plan and shall consist of a
written statement and a plan or plans indicating the development objectives for the area in question.
The process for the preparation of the draft Development Plan is contained within Section 11 of the
Planning and Development Act 2000 (as amended) which states:
“11.—(1) Not later than 4 years after the making of a development plan, a planning authority
shall give notice of its intention to review its existing development plan and to prepare a new
development plan for its area.
(2) A notice under subsection (1) shall be given to the Minister, any prescribed authorities, any
adjoining planning authorities, the Board, any relevant regional authority and any town
commissioners and city and county development boards within the functional area of the
authority and shall be published in one or more newspapers circulating in the area to which the
development plan relates and shall—
(a) state that the planning authority intends to review the existing development plan and to
prepare a new development plan,
(b) indicate that submissions or observations regarding the review of the existing plan and the
preparation of a new development plan may be made in writing to the planning authority
within a specified period (which shall not be less than 8 weeks),
(c) indicate the time during which and the place or places where any background papers or
draft proposals (if any) regarding the review of the existing plan and the preparation of the
new development plan may be inspected.
(3) (a) As soon as may be after giving notice under this section of its intention to review a
development plan and to prepare a new development plan, a planning authority shall take
whatever additional measures it considers necessary to consult with the general public and
other interested bodies.
(b) Without prejudice to the generality of paragraph (a), a planning authority shall hold public
meetings and seek written submissions regarding all or any aspect of the proposed
development plan and may invite oral submissions to be made to the planning authority
regarding the plan.
(c) In addition to paragraphs (a) and (b), a planning authority shall take whatever measures it
considers necessary to consult with the providers of energy, telecommunications, transport
and any other relevant infrastructure and of education, health, policing and other services in
order to ascertain any long-term plans for the provision of the infrastructure and services in
the area of the planning authority and the providers shall furnish the necessary information
to the planning authority.
(4) (a) Not later than 16 weeks after giving notice under subsection (1), the manager of a
planning authority shall prepare a report on any submissions or observations received under
subsection (2) or (3) and the matters arising out of any consultations under subsection (3).
Development Plan Submission Pre-Draft Fingal Development Plan 2017-2023
Downey Planning on behalf of Noel McAllister 6
(b) A report under paragraph (a) shall—
(i) list the persons or bodies who made submissions or observations under this section as
well as any persons or bodies consulted by the authority,
(ii) summarise the issues raised in the submissions and during the consultations, where
appropriate,
(iii) give the opinion of the manager to the issues raised, taking account of the proper
planning and sustainable development of the area, the statutory obligations of any local
authority in the area, and any relevant policies or objectives for the time being of the
Government or of any Minister of the Government, and (iv) state the manager’s
recommendations on the policies to be included in the draft development plan.
(c) A report under paragraph (a) shall be submitted to the members of the planning authority,
or to a committee of the planning authority, as may be decided by the members of the
authority, for their consideration.
(d) Following the consideration of a report under paragraph (c), the members of the planning
authority or of the committee, as the case may be, may issue directions to the manager
regarding the preparation of the draft development plan, and any such directions must take
account of the statutory obligations of any local authority in the area and any relevant policies
or objectives for the time being of the Government or of any Minister of the Government, and
the manager shall comply with any such directions.
(e) Directions under paragraph (d) shall be issued not later than 10 weeks after the submission
of a report in accordance with paragraph (c).
(f) In issuing directions under paragraph (d), the members shall be restricted to considering
the proper planning and sustainable development of the area to which the development plan
relates.
(5) (a) The manager shall, not later than 12 weeks following the receipt of any directions under
subsection (4)(d), prepare a draft development plan and submit it to the members of the
planning authority for their consideration.
(b) The members of a planning authority shall, as soon as may be, consider the draft
development plan submitted by the manager in accordance with paragraph (a).
(c) Where the draft development plan has been considered in accordance with paragraph (b),
it shall be deemed to be the draft development plan, unless, within 8 weeks of the submission
of the draft development plan under paragraph (a), the planning authority, by resolution,
amends that draft development plan.
This submission to the pre-draft of the Development Plan is being made in accordance with Section
11 (2)(b) and 3(b) of the Planning and Development Act 2000 (as amended) and is being submitted
within the specified timeframe (15th May 2015) as set out in the Fingal Development Plan 2017-2023
Consultation Booklet.
Development Plan Submission Pre-Draft Fingal Development Plan 2017-2023
Downey Planning on behalf of Noel McAllister 7
3.0 Fingal Development Plan 2017-2023 Pre-Draft Consultation Booklet Fingal County Council have published a Pre- Draft Consultation Booklet in relation to the Fingal County
Development Plan 2017-2023. Noting that the Development Plan sets out the key policies and
objectives for the entire lands within the functional area of Fingal County Council, the purpose of this
booklet is to outline the key themes/issues to be investigated at this stage in the preparation of the
Development Plan. The booklet sets out 8 key themes as follows:
1. Settlement Strategy – Over the Plan period, Fingal expect to accommodate an additional
41,000 new housing units. How this housing target is to be met will be a key consideration for
the new Development Plan. Providing an appropriate scale and type of housing development
which respects and enhances the character of the urban and rural areas will be a key
challenge.
2. Placemaking & Communities – The Development Plan contains policies and objectives which
ultimately influence the sense of place, identity and character of areas. Good quality public
realm and the design of open spaces can respect and enhance the character and
distinctiveness of an area. The type of facilities provided, their location, building heights etc.
all contribute to creating attractive neighbourhoods, towns and villages and are a key
consideration in the long term development of Fingal.
3. Infrastructure & Movement – Integration between land use and transport is a key
consideration in choosing where to live or locate a business. Promoting walking, cycling and
public transport in conjunction with good road infrastructure are key considerations within
any Development Plan.
4. Economic Development – Fostering employment opportunities within the functional area of
Fingal is essential. Employment opportunities must be provided to coincide with the projected
population increase associated with the 41,000 new households anticipated within the
lifetime of the plan and to counteract the proportion of residents travelling out of Fingal to
work.
5. Green Infrastructure – Fingal’s natural capital including parks, wildlife, coastlines etc. is a
resource and a form of infrastructure that requires policies for its protection, creation and
management. Biodiversity, parks, open space and recreation, landscape, sustainable water
management and archaeological and architectural heritage are key areas of this resource to
be strengthened within the forthcoming Development Plan.
6. Natural Heritage – The Development Plan coincides with the Fingal Diversity Plan which seeks
to protect the natural heritage of Fingal through the development of the Final Ecological
network which sets out a spatial framework for nature conservation and management.
Management of the natural heritage of Fingal will be an integral element of the Fingal
Development Plan 2017-2023.
7. Cultural Heritage – Cultural Heritage encompasses monuments, history, folklore and
traditions that give a sense of identity and place. The Development Plan seeks to protect
Development Plan Submission Pre-Draft Fingal Development Plan 2017-2023
Downey Planning on behalf of Noel McAllister 8
structures of historical or cultural significance in accordance with the requirements of the
Planning and Development Act 2000 (as amended). Policies for their protection will form a
key element of the Development Plan.
8. Impacts on the Environment – Strategic Environmental Assessment, Appropriate Assessment
and Flood Risk Assessments must be carried out which in turn will inform the policies of the
Development Plan.
This submission relates to the key themes of ‘Settlement Strategy’, ‘Placemaking and Communities’
and ‘Infrastructure and Movement’. The requirement for an additional 41,000 homes and the location
of such units within the functional area of Fingal is a key consideration. In particular, it is submitted
that the established towns and villages should be the primary location for these housing units. The
Settlement Strategy Background Paper notes that rural villages (such as Donabate) are considered to
be local service centres and support will be given to the growth of local services and enterprise, and
sustainable increases in population which would not create unsustainable commuting patterns. It is
submitted, that the location of housing developments within Donabate should accordingly be
strategically located with additional local centres iestablished in order to provide retail, commercial,
restaurant uses etc. and serve the existing and proposed residential areas.
In order to facilitate the increase in housing units to meet the projected population increase of
Donabate, it is important that the future development of Donabate takes place in a planned and
sustainable manner that integrates housing and public transport in order to create attractive places
and communities that is transport and people orientated.
4.0 Planning Submission
4.1 National Spatial Strategy 2002-2020
The National Spatial Strategy (NSS) is a twenty year planning framework designed to achieve a better
balance of social, economic, physical development and population growth between the regions. It is
designed to improve the effectiveness of public investment in infrastructure and other relevant
services around the country. It sets out a spatial planning framework to support sustainable rural
settlement, taking account of the evolving nature of settlements.
According to the NSS, sustainable provision of housing in urban areas also involves:
Concentration of development in locations where it is possible to integrate employment,
community services, retailing and public transport;
Avoiding environmentally sensitive areas in developing proposals for major extensions to
built-up areas; and
Placing a high degree of emphasis on creating living environments of the highest quality
through attention to detail in urban design, integration of amenities, facilities for children,
older persons and section of the community with special needs.
Development Plan Submission Pre-Draft Fingal Development Plan 2017-2023
Downey Planning on behalf of Noel McAllister 9
4.2 Regional Planning Guidelines for the Greater Dublin Area 2010-2022
The Regional Planning Guidelines (RPGs) is a policy document which aims to direct
the future growth of the Greater Dublin Area over the medium to long term and
works to implement the strategic planning framework set out in the National Spatial
Strategy (NSS) published in 2002. It achieves this through appraisal of the critical
elements involved in ensuring sustainable and good planning, and through the
protection of sensitive and environmentally important locations.
The RPGs inform and direct the City and County Development Plans of each of the Councils in the
Greater Dublin Area.
Donabate is designated within the settlement hierarchy as a ‘Moderate Sustainable Growth Town’
and is described in the settlement hierarchy as a strong edge of metropolitan area district service
centre with high quality linkages and increased densities at nodes on public transport corridors. The
total population for the entire area of Donabate/Portrane was 8,733 persons in April 2011 with the
population of Donabate alone at 6,778 persons. Donabate is expanding rapidly with over 75% growth
in the last ten years with the establishment of household formation age cohorts with subsequently
the creation of now large numbers of children under 15 (almost 33%). Moreover, the population of
the area is anticipated to grow to 22,500 over the period of the next ten years or so (15,000 by 2020).
For Moderate Sustainable Growth Towns within the Metropolitan area, the RPG’s state they will
continue to have a strong role as commuter locations within the fabric of continued consolidation of
the metropolitan area. Growth in these towns needs to ensure that expansion is based on and related
to the capacity of high quality public transport connections and the capacity of social infrastructure.
Emphasis should be placed on encouraging good local connections to adjoining suburbs and towns
and employment locations within the metropolitan area through bus corridors and good cycling and
walking connections.
The future expansion of Donabate would therefore be in accordance with the RPG’s. It is considered
that the designation of additional lands to the north east of the town for residential development, and
the re-zoning of lands to provide for a local centre would contribute to the consolidation of Donabate
and provide for increased employment opportunities in conjunction with additional housing and
population growth.
4.3 Fingal Development Plan 2011-2017
The Fingal Development Plan 2011-2017 sets out Fingal County Council’s policies and objectives for
the development of the County over the Plan period. The Development Plan seeks to secure the
development and improvement in a sustainable manner of the economic, environmental, cultural and
social assets of the County. It is an objective of the current Development Plan to provide for housing
in accordance with the Housing Strategy and to:
“Ensure consolidated development in Fingal by facilitating residential
development in existing urban areas”.
Development Plan Submission Pre-Draft Fingal Development Plan 2017-2023
Downey Planning on behalf of Noel McAllister 10
The Background Paper on the Settlement Strategy notes that Fingal currently has a policy of
consolidation with the aim of reducing urban sprawl and the inefficiencies associated with dispersed
settlement patterns. Providing an appropriate scale and type of housing development which respects
and enhances the character of the urban and rural areas will be a key challenge and consideration of
the forthcoming Development Plan.
The strategic overview of the County Plan recognises that Donabate, as a Peninsula, which enjoys
many natural areas including the Rogerstown and Malahide Estuaries which form part of the Natura
2000 network. The plan sets out a development strategy for Donabate which seeks to:
“Protect and enhance the natural amenities and heritage of the peninsula by
consolidating future development within well-defined town boundaries. Promote the
development of a vibrant town core by providing a high quality living environment for the
existing and future population and providing for the development of the necessary
community, commercial, cultural and social facilities in tandem with new residential
development.”
It is a strategic policy of the plan to consolidate the development and protect the unique identities of
settlements such as Donabate.
4.4 Donabate LAP
The Donabate Local Area Plan (LAP) (adopted in 2006) related to the undeveloped residentially zoned
lands at Donabate which comprise four separate tracts of lands zoned RS1 (RA). RS1 zoned lands seeks
to provide for new residential communities in accordance with approved local area plans and subject
to the provision of the necessary social and physical infrastructure.
The overall LAP lands comprise a total of 144 hectares and comprise four separate tracts of lands - to
the west (Turvey); north (Rahillion); east (Ballymastone) and south (Corballis) of Donabate.
The Key Elements of the Strategy for the LAP lands include:
The overall number of residential units to be constructed will be consistent with the National
Spatial Strategy and with the Regional Planning Guidelines for the Greater Dublin Area 2004-
2016 which identifies Donabate as a moderate growth town;
Provide for a number of distinctive Character Areas within the LAP lands at Corballis and
Ballymastone;
Providing for the clustering of local service, educational and recreational facilities at Corballis
and Ballymastone within walking distance of the majority of residents;
Sustain and augment community services and facilities in Donabate;
Promote the provision of additional retail, service, office, educational, healthcare,
recreational and community facilities at appropriate locations to meet the demands of the
expanding town;
Promote principles of sustainable neighbourhood design in new housing areas;
Promote well-designed quality residential development at higher densities at suitable
locations;
Development Plan Submission Pre-Draft Fingal Development Plan 2017-2023
Downey Planning on behalf of Noel McAllister 11
Provide for a high quality sustainable urban environment with a high degree of legibility and
permeability for cyclists and pedestrians.
The extension of the boundary line to the north east of Donabate and the provision of a local centre
to serve existing and granted residential developments is considered to be in accordance with the
requirements of the Donabate Local Area Plan. It should be noted that the Donabate Local Area Plan
is also due for review.
4.5 Donabate Overview
The Donabate / Portrane area is a rapidly expanding area with an exceptional amount of pre-school
children and primary school children. This is due to the fact that the area has a large amount of
“parents” in the age cohorts of 30-49.
It should be noted that in Census 2001, the area had few children and a huge amount of newly married
couples indicating that the population pyramid for this area is a key fundamental of the composition,
inter alia, the amount of children in the area is far beyond the average of the state.
Moreover, the population of the area is anticipated to
grow to 22,500 over the period of the next ten years or so.
This is due to the fact that the amount of available zoned
lands in the area were never fully utilised during the
‘boom’ years due to restrictions on foul sewerage
provision.
With the recent completion of the new Donabate WWTP,
a housing shortage, its location adjoining a major rail line
into the city and by virtue of its designation with the
Regional Planning Guidelines as a Designated Growth
Area, it is our considered opinion that this anticipated
growth in population size has to be considered.
It is anticipated that as the economy of Dublin continues
to grow, further demand and pressure for housing in the
Dublin suburbs and commuter towns such as Donabate
will occur. The most sustainable form of development is to
integrate planning and land use to ensure that future
residential developments, with associated local amenities
and services, are located within walking/cycling distance
of high quality public transport corridors such as railway
stations and other key services.
It is also important to note, that the proposed National
Forensic Mental Hospital is to be located at St. Ita’s hospital, which is accessed via the R126 which
enters Donabate to the North East. It is considered that the provision of such a service will increase
the requirement for additional housing units within Donabate, given that 400-500 people will be
employed within the hospital and the lands to the north east of Donabate are a logical extension to
the development boundary of the town.
Development Plan Submission Pre-Draft Fingal Development Plan 2017-2023
Downey Planning on behalf of Noel McAllister 12
4.6 Planning Submission
The statutory Plans and Guidelines advocate and support the future growth of towns and villages,
such as Donabate, in a consolidated manner. The importance of rural villages to the growth and
viability of the Greater Dublin Area must be recognised and supported by the implementation of a
strategic planning approach to the future development of the villages. Such an approach should be
based on a policy of consolidation within development boundaries of villages and towns.
With regards to Donabate, the population of the village over the next 10 years is expected to nearly
double and accordingly amendments to the development boundary to provide for such an anticipated
population growth and associated housing growth is required.
It is submitted that the extension of the RS1 lands to the north east of Donabate will reduce urban
sprawl and the inefficiencies associated with dispersed settlements patterns by accommodating
growth within Donabate, consolidating the edge of Donabate and providing appropriate LC zoned
lands to the north east of the lands.
Noting that there is a quantum of existing constructed and granted residential development to the
north of Donabate, it is considered that the re-zoning of a portion of the lands from ‘CI - Provide for
and protect civic, religious, community, education, health care and social infrastructure’ to ‘LC-
Protect, provide for and/or improve local centre facilities’, will increase employment opportunities
within the village and increase the service offerings and facilities available to residents north of the
village of Donabate.
This submission draws particular attention to the principles of sustainable development and the
importance of creating residential communities within close proximity of existing communities,
services and transportation nodes. The future development of Donabate should be encouraged
towards the north east of the town noting, that the proposed National Forensic Mental Hospital is to
be located at St. Ita’s hospital, which is accessed via the R126 which enters Donabate to the north
east. It is considered that the provision of such service/employment opportunities will increase the
requirement for additional housing units within Donabate and the lands to the north east of Donabate
are a logical extension to the development boundary of the town.
The Background Paper on the Settlement Strategy notes that Fingal currently has a policy of
consolidation with the aim of reducing urban sprawl and the inefficiencies associated with dispersed
settlement patterns. Providing an appropriate scale and type of housing development which respects
and enhances the character of the urban and rural areas will be a key challenge and consideration of
the forthcoming Development Plan. The extension of the development boundary of Donabate to the
north east to provide for additional RS1 zoned lands and the re-zoning of CI lands to LC will consolidate
development and direct housing into Donabate village. The provision of a new local centre at this
location would represent a clear community and planning gain for the area.
Downey Planning are of the considered opinion that the extension of the development boundary of
Donabate to the north east would ensure that the future growth of the village will take place in a
sustainable and consolidated manner in accordance with National, Regional and Local planning policy.
5.0 Conclusion
Development Plan Submission Pre-Draft Fingal Development Plan 2017-2023
Downey Planning on behalf of Noel McAllister 13
This submission has been prepared by Downey Planning and relates to the key themes of ‘Settlement
Strategy’, ‘Placemaking and Communities’ and ‘Infrastructure and Movement’. The requirement for
an additional 41,000 homes and the location of such units within the functional area of Fingal is a key
consideration. In particular, it is submitted that the established towns and villages should be the
primary location for these housing units.
It is anticipated that as the economy of Dublin continues to grow, further demand and pressure for
housing in the Dublin suburbs and commuter towns such as Donabate will occur. The most sustainable
form of development is to integrate planning and land use to ensure that future residential
developments, with associated local amenities and services, are located within walking/cycling
distance of high quality public transport corridors such as railway stations and other key services.
It is submitted that the extension of the RS1 lands to the north of Donabate will reduce urban sprawl
and the inefficiencies associated with dispersed settlements patterns by accommodating growth
within the development boundary Donabate.
It is also important to note, that the proposed National Forensic Mental Hospital is to be located at St.
Ita’s hospital, which is accessed via the R126 which enters Donabate to the North East. It is considered
that the provision of such a service will increase the requirement for additional housing units within
Donabate and the lands to the north east of Donabate are a logical extension to the development
boundary to the north east of the town.
Noting that there is a quantum of existing constructed and granted residential development to the
north east of Donabate, it is considered that the re-zoning of a portion of the lands from ‘CI - Provide
for and protect civic, religious, community, education, health care and social infrastructure’ to ‘LC-
Protect, provide for and/or improve local centre facilities’, will increase employment opportunities
within the village and increase the service offerings and facilities available to residents north of the
village of Donabate. This will ensure the long term sustainability of the village.
Downey Planning are of the considered opinion that the extension of the development boundary of
Donabate to the north east would ensure that the future growth of the village will take place in a