DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER 2018 ATTACHMENT TO ITEM DV18.154 DRAFT TOWN OF CAMBRIDGE WALKING TRAIL STRATEGY 2018-2021 - CONSIDERATION OF SUBMISSIONS AND FINAL ADOPTION

Transcript of DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16...

Page 1: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

DEVELOPMENT COMMITTEE MEETING

TUESDAY 16 OCTOBER 2018

ATTACHMENT TO ITEM DV18.154

DRAFT TOWN OF CAMBRIDGE WALKING TRAIL STRATEGY 2018-2021 - CONSIDERATION OF

SUBMISSIONS AND FINAL ADOPTION

Page 2: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

1

Town of Cambridge Draft Walking Trail Strategy 2018-2021

Page 3: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

2

Contents Executive Summary ........................................................................................................................................ 3

Introduction .................................................................................................................................................... 4

Western Australian Strategic Trails Blueprint 2017-2021 .......................................................................... 4

What is this Strategy? ................................................................................................................................. 5

Current Trail Network .................................................................................................................................... 5

a) State trails ............................................................................................................................................... 5

b) Regional trails ......................................................................................................................................... 6

c) Local trails ............................................................................................................................................... 9

Cambridge Heritage Trail ........................................................................................................................ 9

Bold Park Trails .....................................................................................................................................10

Strategy ........................................................................................................................................................11

New trails ..................................................................................................................................................11

1. City Beach Trails ................................................................................................................................11

2. Wembley Golf Course Trails ..............................................................................................................13

3. Wembley Wetlands Loop ..................................................................................................................14

4. Sunset Coast Trail ..............................................................................................................................15

Linkages ....................................................................................................................................................17

1. Extension of the Cambridge Heritage Trail .......................................................................................17

2. Perry Lakes Heritage Trail .................................................................................................................18

3. Whadjuk Trail Linkages .....................................................................................................................20

4. Bold Park ...........................................................................................................................................20

Implementation ...........................................................................................................................................20

1. Mapping ...........................................................................................................................................20

2. Signage .............................................................................................................................................22

a) Directional markers...........................................................................................................................23

b) Interpretive signage ..........................................................................................................................25

c) Stencilling ..........................................................................................................................................25

3. Digital wayfinding and information ..................................................................................................25

4. Marketing .........................................................................................................................................25

5. Aboriginal Consultation ....................................................................................................................26

6. Funding and grants ...........................................................................................................................26

7. Monitor and review ..........................................................................................................................26

8. Accessibility and Inclusion ................................................................................................................26

9. Further considerations .....................................................................................................................27

10. Consolidated Trail Information and Concept Map .......................................................................27

Page 4: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

3

Executive Summary

The Town of Cambridge benefits from very good existing infrastructure to support walking, both locally and linking with regional pathways. The Town's natural assets, cultural heritage and destinations combine to offer many reasons for walking.

The development of a trail network supports the Town's Strategic Community Plan 2018-2028. Goal 3 encourages an 'active, safe and inclusive community', strategy 3.4 aims to 'create and maintain safe, friendly and open environments that residents can access and enjoy'.

The Walking Trail Strategy has been developed to build upon these existing assets to recognise, promote and guide development of walking trails through the Town encouraging greater accessibility to our natural areas and open spaces.

Existing recognised regional and local trails within the Town total a distance of more than 40km, with the majority of these trails signposted and marketed through various channels.

This Strategy identifies an initial additional 20kms of trails using existing infrastructure that will be recognised, signposted and marketed in a staged approach. Future trails and linkages will be identified through public consultation involvement to create a diversified and connected network of trails through the Town.

Page 5: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

4

Introduction Recreational walking is the most popular form of exercise with 45.3%i of adults regularly walking for exercise. More than half of women regularly walk as well as nearly one-third of men. Walking trails are recognised routes that can combine physical exercise with cultural, historical and environmental learning and awareness. The benefits of walking trails are numerous and include the following:

• Encouraging more frequent outdoor physical activity leading to improved physical and mental wellbeing and a reduction in lifestyle diseases and associated medical costs;

• Improved lifestyle due to opportunities for outdoor recreation by individuals, groups, and education and community organisations;

• Providing low cost facilities for recreation accessible to many different groups in the community;

• Improved awareness and appreciation of the natural environment and support for its conservation and protection;

• Economic benefits from employment and business opportunities in trail development, management, maintenance, events and supporting products and services;

• Tourism growth to trail destinations with resulting economic stimulus of local economies;

• Protection and showcasing of natural, cultural and historic areas by providing for sustainable access routes; and

• Improved sustainability of local communities by making them more attractive places to live. Opportunities for social interaction and development of community identity through participation in trail activities, maintenance and conservation.

Source: Western Australian Strategic Blueprint 2017 - 2021, p.22.ii

Western Australian Strategic Trails Blueprint 2017-2021 The Department of Sport and Recreation (now called Department of Local Government, Sport and Cultural Industries) publication, 'Western Australian Strategic Trails Blueprint 2017 - 2021' (the Blueprint) provides an overarching guide for consistent and coordinated planning, development and management of quality trails and trail experiences across Western Australia. The Blueprint identifies 10 categories of trails:

1. Bushwalking Trails 2. Urban Walking Trails 3. Mountain Biking Trails 4. Cycle Trails 5. Equestrian Trails 6. Paddle Trails 7. Snorkle and Dive Trails 8. Trail Bike Trails 9. Drive Trails (2WD) 10. Drive Trails (4WD)

Page 6: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

5

Walking trails within the Town would fall under the Bushwalking Trails as local examples, and Urban Walking Trails category, though it is recognised that some trails are also used in part for cycling. The Blueprint recognises the levels of planning required for trail development throughout the State and encourages the development of Localised Trails Plans. This Strategy falls within this category. The Department of Local Government, Sports Cultural Industries (DLGSC) and Lotterywest offer trails grants to assist in developing trails. A key objective of this Strategy is to support grant funding applications to assist the implementation of the Strategy and therefore the Strategy has been prepared in accordance with the requirements of the DLGSC.

What is this Strategy? The Walking Trails Strategy has been prepared to recognise the existing walking trails within the Town and to utilise existing infrastructure and assets to identify new walking trails that can diversify or integrate into the existing trails. The Walking Trails Strategy will provide a holistic overview of existing regional and local recreational trails and identifying linking trails as well as creating a trail network that will benefit the whole community by making use of existing infrastructure and paths. The main purpose of a trail network is to increase physical activity, however, trails also allow for social connectivity. The Town of Cambridge has a wealth of public open spaces and natural areas. A trail network will allow for greater access to these areas whilst linking places of interest. Examples of similar Council trails can be found on the 'Be Active WA' website under walk maps.iii

Current Trail Network The Blueprint (page 51) classifies trails into: a) State trails; b) Regional trails; and c) Local trails.

a) State trails State trails are extended trails or a network of trails that is of sufficient quality and with appropriate facilities, products and services to be recognised beyond the State and to attract visitors to WA. An example of a State trail is the Bibbulmun Track stretching from Kalamunda to Albany through the South West.iv At present no State trails are located within the Town's boundaries; however the Whadjuk Regional Trail Network has the potential of becoming a State trial should the trails be extended into neighbouring Councils such as the cities of Stirling, Vincent and Wanneroo. These Councils have all indicated an interest into the extension of the trails.

Page 7: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

6

b) Regional trails Regional trails are major trails or a network of trails that service a population centre or large regional community, with facilities and services of a standard and appeal that could attract visitors from outside the region. Within the Town's boundaries the Whadjuk Regional Trail Network is a network of trails developed since 2001 in conjunction with the Western Suburbs Regional Organisation of Councils (WESROC). The purpose of the Whadjuk Regional Trail Network is to link natural areas and facilitate the appreciation of the land encouraging rehabilitation of natural areas to extend green corridors within suburbs.v There are three trails within the Whadjuk Regional Trail Network that run through the Town:

1. Bush to Beach Trail, running along the southern boundaries of Perry Lakes into Bold Park;

2. Yange Kep Bidi (Wetlands Trail), running from south to north along Herdsman Lake in the City of Stirling and looping back to Lake Monger; and

3. The newly installed Bidi Bo Djinoong ('Trails with views forever') runs along the coast and has the potential to extend north and south, creating a coastal network.

Page 8: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

7

Figure1. Whadjuk Trail Network - Bush to Beach Trail Source: http://whadjukwalkingtrails.org.au/trails/bush-to-beach/

Figure 2. Whadjuk Trail Network - Yange Kep Bidi (translation 'Wetland Trail') Source: http://whadjukwalkingtrails.org.au/trails/yange-kep-bidi/

Page 9: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

8

Figure 3. Whadjuk Trail Network - Bidi Bo Djinoong (translation 'Trail with views forever') Source: http://whadjukwalkingtrails.org.au/trails/yange-kep-bidi/

Page 10: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

9

c) Local trails Local trails service the local community and provide facilities suited to local use. Some regional and local trail may have potential to be upgraded subject to further development. Within the Town, there are two existing local trails: 1. The Town of Cambridge Heritage Trail; and 2. The Botanical Parks and Gardens Bold Park Walking and Bridle trail. Cambridge Heritage Trail The Cambridge Heritage Trail runs east west through the Town, capturing the Town's heritage in a series of interpretive signs, allowing residents and visitor to gain an insight into the Town's past. Currently 23 locations are marked with interpretative signs providing the local historical background of the area or site. The Heritage Trail has the potential to be extended even further acting as a link between local trails and regional trails. The Heritage Trail could also link to the Town's Local Government Inventory of Heritage Places (currently under review) to create a living document by displaying information and images on an interactive electronic platform, such as Google Maps. Mapping of the trail on Google maps will increase the visibility of the trail. The online promotion of the trail through videos is to be investigated such as the video compiled for the Whadjuk Regional Trailsvi. Short videos can be made for significant historical sites such as the Leederville Fire Station and Perry Lakes Stadium. The marking of the trail by installing directional signage as shown in Figure 19 of this document, Cambridge Trail directional markers, will be investigated, and will be subject to funding.

Figure 4. Cambridge Heritage Trail Source: https://www.cambridge.wa.gov.au/Town-Council/Town-Profile/Our-heritage

Page 11: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

10

Bold Park Trails The Bold Park walking trails and one bridle (equestrian) trails are managed by the Botanical Parks and Gardens Authority (BGPA). Over fifteen kilometres of trails run through the park and offer visitors beautiful views of the ocean and the city. The Whadjuk Bush to Beach, Yange Kep Bidi and the Bidi Bo Djinoong regional trails all intersect with the Bold Park trails.

Figure 5. Botanical Gardens and Parks Authority Trail Network Source: https://www.bgpa.wa.gov.au/images/boldpark/docs/bp_brochure_v0711.pdf

Page 12: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

11

Strategy Selection guidelines for future trails are based on the following:

1. To create local networks and linking places of interest; whilst 2. Allowing for greater public access to green spaces, natural areas and recreational

centres; and 3. Provide greater accessibility and inclusion to meet the needs of the community.

New trails 1. City Beach Trails The proposed City Beach Trails have been identified with the assistance of public interest and the City Beach North, Trail 2 subject to Council support will be implemented as the pilot trail network for the Cambridge trails. Subsequent trails implementation plans can will be based on the pilot to advance future projects. The proposed City Beach Trail network will link schools, parks and shopping areas potentially allowing for greater access to the public open spaces along Bent Park and Maloney Park in the northern section. The trail will be extended south into the newly upgraded paths through Templetonia Park connecting with the proposed Sunset coastal trails, City Beach North, Trail 3. The local trails promote physical activity and create a sense of community and connectivity. All the proposed trail routes are based on utilising existing infrastructure and footpaths. Additional infrastructure could should include benches, water fountains, directional markers and interpretative signs. Distances range from 3.2km for the shorter route to 7km for the total longer route. Map to be removed:

Page 13: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

12

Figure 6. Proposed City Beach North and South Trails Replaced with map below indicating the additional trial through Templetonia Park:

Page 14: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

13

Figure 7. Views along the City Beach Trail past the Empire Village Shopping Centre

2. Wembley Golf Course Trails The development of walking trails through the Wembley Golf Course were investigated in 2012 and a number of trails have been identified, however, the installation of an underpass east of the driving range to protect walkers was considered cost prohibitive. The development of a trail through the Golf Course was supported during public consultation; however, concerns were raised about the safety of walkers. The installation of internal loops to the west can be investigated as an alternative. The trails meet the requirements of this strategy as the trails will open up the use of green spaces to the public allowing for increases access to Council parks and facilities. The trails could potentially link to the regional Yange Kep Bidi, the Cambridge Heritage trail and the proposed City Beach Trail Network. The complete trail distance is 3km; however the trails can be broken up into smaller internal trails.

Page 15: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

14

Figure 8. Proposed Wembley Golf Course Trail Network

3. Wembley Wetlands Loop The proposed Wembley Wetlands Loop trail will link the suburb of Wembley with Lake Monger and the Herdsman Lake Wetlands. The proposed route will run along the existing Yange Kep Bidi regional trail. Further detailed investigation will be required as the trail will cross over into the City of Stirling and support will be required from the City of Stirling. The approximate distance of the trail is 4km and existing footpaths can be used along the way.

Page 16: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

15

Figure 9. Proposed Wembley Wetlands Loop

4. Sunset Coast Trail The proposed Sunset Coast trail will run along the coast from south City Beach linking in with the existing Bidi Bo Djinoong regional trails continuing north from City Beach to Floreat Beach along the boardwalk and potentially joining up with the Scarborough trails currently being developed. An accessible route can be developed along the existing footpaths and boardwalk and connect with the proposed City Beach trail network, the proposed distance is 2km. Remove:

Page 17: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

16

Figure 10. Proposed Sunset Coast Trail Replace with map below indicating the updated City Beach Trail Network:

Page 18: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

17

Figure 11. Views along the coastal boardwalk

Linkages Linkages, connecting points and the looping of trails are important funding considerations. The creation of networks are prioritised by the Department of Sport as identified during the development of the regional Whadjuk Trail Network. A number of opportunities to link various trails have been identified, including cooperating with neighbouring Councils such as the City of Stirling and the City of Vincent. . Linkages will enable walkers to combine walking trails to create extended routes, as well as to direct people to the recognised trails. The following potential linkages were identified: 1. Extension of the Cambridge Heritage Trail By extending the existing Cambridge Heritage trails north towards Lake Monger from the corner of Ruislip Street and Harborne Street, point 8 of the trail, a linkage will be created between the regional Whadjuk trail, the Yanke Kep Bidi running around Lake Monger and the Heritage trail the distance is approximately 700m following existing paths.

Page 19: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

18

Figure 12. Proposed Cambridge Heritage Trail Extension to Lake Monger

2. Perry Lakes Heritage Trail The Perry Lakes Heritage Trail formed part of the Perry Lakes development, but requires mapping. The boardwalk runs between the estate and the eastern lakes and provides a good opportunity to link the Bush to Beach regional trail with the Cambridge Heritage trail. Interpretive plaques are present proving information on the history and culture of the lakes, highlighting the importance of the lakes to the local aboriginal people. Recently funding was obtained through the Perth NRM (Natural Resource Management) to record an aboriginal story at Perry Lakes. The story will be available on the Cambridge website and will be available at the site by placing a QR (Quick Response) code sticker on one of the plaques. The story can be listened to by pointing an iphone camera to the QR code below. Android phones may require a QR code scanner. The approximate distance is 700m along the boardwalk and existing paths.

Page 20: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

19

Figure 13. Proposed Perry Lakes Heritage Trail

Figure 14. View along the boardwalk Perry Lakes Heritage Trail

Page 21: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

20

3. Whadjuk Trail Linkages Various linkages can be created between the regional trials and will be investigated further; however, for example, Bush to Beach can be linked to the Cambridge Heritage Trail through the previously mentioned Perry Lakes Heritage trail. These recommendations received support during the public consultation and create greater connectivity. 4. Bold Park Allowing and increasing access to public open spaces are an important aspect of this Strategy. The western side of Bold Park facilitates limited access; the newly installed Bidi Bo Djinoong coastal trail runs along the southern border of the park and makes use of the Westcoast Highway underpass to cross into City Beach. Future linkages can be achieved through Perry Lakes and along West Coast Highway. The Bush to Beach regional Whadjuk trail runs through Bold Park along the Zamia trail signage is shared to limit visual clutter.

Figure 15. Trail co-signage in Bold Park

Implementation

1. Mapping The trails identified in this Strategy have been mapped internally for the Town's purposes and will be published on the Town's Intramaps software. A consolidated concept map is presented in available on Figure 23 page 29 of this document. However, further mapping is

Page 22: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

21

required in Google maps to create 'open maps' that are available to the public on various websites. The mapping layers will be provided to other commonly used mapping databases such as Trails WAvii where the layers are compatible. All signage will comply with the Town of Cambridge Style Guide and requirements. Maps will be made available in Pdf. format on the Town's website and can be downloaded or paper copies can be distributed. Maps can be made available through electronic devices via Google maps, figure 16 indicates the Bush to Beach Whadjuk Regional Trail on Google maps, or schematic maps can be produced such as the example provided in figure 17 from the City of Joondalup. The following information will be made available on the maps:

• The trail route and distances; • Linkages and loops; • Public transport options, including bus stops and routes; • Seating locations and rest stops; • Water fountains; • Shops; • Accessibility; • Cycling friendly routes

Figure 16. Bush to Beach Trail information available on Google Maps Source: https://www.google.com/maps/d/viewer?mid=1BjWABjLsh7nEtlfvolqg61y6RVI&ll=-31.9709049165274%2C115.81157748723149&z=14

Page 23: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

22

Figure 17. Example of an urban map courtesy of the City of Joondalup Source: http://www.joondalup.wa.gov.au/Libraries/Documents/Walking_Map_2012.pdf

2. Signage Walking trail signage is necessary along the routes. All signage will be designed to:

• comply with Australian Standard (AS)2156 for walking tracks; • conform with the Town's style guide; • be corrosive and vandal resistant; and • be consistent with recognised trail signage where appropriate, for example the

Whadjuk Trails signage. Visual clutter from signage will be minimal and technology will be embraced, for example the use Quick Response (QR) codes to provide information where appropriate. QR codes directly link to a website when a camera of a smart phone, mainly iPhones, is aimed towards the image. Most android phones require QR reader applications.

Page 24: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

23

Figure 18. Example of a QR code installed on the Whadjuk Network Signage will generally be designed and installed to serve one of two functions, detailed below: a) Directional markers Directional markers could be installed along routes and indicates left, right and straight as shown in figure 19. The markers can be installed directly into the path as shown in figure 20 or on bollards, figure 21. Where no bollards exist along a walking trail, square recycled plastic bollards will be installed with the directional markers attached. These bollards are a strong and durable product, designed to withstand damage from white ants, salt, UV, rot and fire. Similar markers are currently installed along the Whadjuk Regional Trails. Installation of directional markers along the main connecting trails such as the Cambridge Heritage Trail will be investigated and will be subject to future funding.

Figure 19. Proposed Cambridge trial directional markers

Page 25: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

24

Figure 20. Installed direction maker (Yange Kep Bidi )

Figure 21. Installed direction maker on a bollard (Yange Kep Bidi )

Page 26: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

25

b) Interpretive signage Interpretive signage will be located where specific areas of importance are identified to portray particular information relevant to the location. Interpretive sign designs will include an information panel detailing the significance of the location, and a way finding panel - for example, 'You are here'.

Figure 22. Interpretive sign located along Underwood Avenue with QR code

c) Stencilling The stencilling of directional signage onto hard surfaces is a more cost effective option, but will require more maintenance in the long term. The implementation of this method will be investigated for the shorter local trails.

3. Digital wayfinding and information The use of technology on signage is a very effective way to relay information to walkers without contributing to excessive signage and expense. As mentioned previously, quick response codes (QR codes) are well used for walking trails and can be scanned by most mobile smart phones. By scanning the QR code, information from a website is transferred to the phone. This allows the use of audio snippets, enabling walkers to enjoy self-guided tours along each trail. Details about the area, nearby trail attractions and Noongar and local stories can be incorporated. An example of a QR code is indicated on the photograph above.

4. Marketing The walking trails will be promoted and accessible on the Town's website, including links to mapping layer on Google maps and brochures.

Page 27: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

26

The trails will also be published on the Trails WA website is a recognised location for trail information within Western Australia. The website is based in WA and links with Tourism WA providing the best information and exposure to trails with the State. The promotion of trails through online videos and audio stories will be investigated to provide additional inform on the trails. It has been shown that short videos increases the likelihood of people sharing the information on social media further assisting with promotion. The development of stories and videos will be subject to external funding.

5. Aboriginal Consultation The heritage, cultural and spiritual connection of Aboriginal people with the land and waterways is valued and encompassed in the prosed trail networks. High level Aboriginal consultation was undertaken during the development of this Strategy to identify and recognise significant sites as well as to identify areas where stories can be linked to trails.

6. Funding and grants The Strategy provides a clear framework for the development and enhancement of walking trails within the Town. The funding for implementation of the Strategy will be subject to normal annual budgetary processes as well as applying for grant funding through Lotterywest and the Department of Local Government, Sport and Cultural Industries. Grant funding from organisations such as Be Active WA and disability inclusion grants will be investigated to develop shorter local trails.

7. Monitor and review An annual review will be undertaken to determine trail usage, adaptations required and identification of potential new trails. Trail usage can be determined by visitation data to websites such as Trails WA or the Town of Cambridge website.

8. Accessibility and Inclusion Ensuring accessibility of trials were highlighted during community consultation including, wheelchair and pram access, hand rails, seating and clear mapping indicating difficulty levels. Providing greater accessibility and inclusion to meet the needs of the community was included in the selection guidelines of this Strategy. Trails will be investigated that cater for limited walking ability with seating or rest options and shorter, clearly marked routes. Accessibility and inclusion design principles will be implemented across the projects including website and mapping designs.

Page 28: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

27

9. Further considerations During the public consultation phase the following recommendations were submitted and will be considered during the development of future trails, but could potentially also be addresses under further infrastructure projects:

a) Wayfinding Signage: • The installation of wayfinding signage especially along the eastern end of the

Heritage Trail to indicate the train stations, Lake Monger and key destinations within the Town.

b) Improvement of walking environments: • Installation of lighting and public art will assist with creating a more walk

friendly environment. c) Path upgrades

• The widening of paths and safe crossing points were recommended at various locations; and

• All new trails will be subject to a risk assessment, including walkability and accessibility valuations.

10. Consolidated Trail Information and Concept Map The table below indicates the existing trials, proposed trails and linkages. Recommendations and improvements are noted. The concept map indicates current trail in the Town of Cambridge, excluding Bold Park trails as these are managed by the Botanical Parks and Gardens Authority, however linkages to these trails are encouraged.

Page 29: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

28

Consolidated Trail Map Reference

Name Trail Length

(km)

Classification Description Recommended improvements

Existing Trails 1 Cambridge Heritage

Trail 7.4 Walk

Cycle Heritage

Town of Cambridge trail linking recognised heritage places. Individual places are marked.

Possible extension of trail to create linkages with regional trails. Mapping of trail on Google Maps for inclusion on Trails WA website.

2 Whadjuk Trail Network - Yange Kep Bidi

6.3 Walk Cycle Bushland experience Heritage Noongar

Yange Kep Bidi translates to 'wetland trail' and this trail links waterholes between the foreshore and Lake Monger for a total trail length of 21.2km (6.3km is within Town). This trail is complete.

Continue marketing of trails. An asset register program will be launched through a WESROC project to register assets on databases.

3 Whadjuk Trail Network - Bush to Beach Trail

6.8 Walk Cycle Bushland experience Heritage Noongar

The total trail length is 16.3km (6.8km within Town) and as the name suggests, links bushland from Kings Park through to the coast. This trail is complete.

Continue marketing of trails. An asset register program will be launched through a WESROC project to register assets on databases.

4 Whadjuk Trail Network - Bidi Bo Djinoong

6.1 Walk Cycle Bushland experience Heritage Noongar

Bidi Bo Djinoong translates to 'trail with views forever' and this trail links high vantage points with views to Rottnest Island. This trail is complete.

Continue marketing of trails. An asset register program will be launched through a WESROC project to register assets on databases.

(BGPA) Bold Park Walking Trials

15 Walk Limited cycling Bushland experience Heritage Noongar

The trails are managed by the Botanical Parks and Gardens Authority.

Opening up access to the park to surrounding residential areas could be facilitated

Page 30: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

29

Consolidated Trail Map Reference

Name Trail Length

(km)

Classification Description Recommended improvements

One equestrian, bridle trail.

Total trails: 41.60 Proposed Trails

5 City Beach Trails Short: 3.2km

Long: 7km

Additional:

1.2km

Walk Cycle Bushland experience Heritage Noongar

The City Beach Trail network has been designed to service a large sector of the community, offering linkage to schools, old age homes, the beach, Empire Village and Ocean Village shopping areas. The trail also links with a recognised Aboriginal significant site, remnant bushlands and parklands.

Recognition and mapping of trail Signposting Marketing Collecting of stories from Noongar elders relating to bushland and significant site

6 Wembley Golf Couse Trails

3km Walk Bushland experience

Walking trials will open up the internal green spaces to the public.

Previous investigations were undertaken, however, the installation of an underpass east of the driving range was considered cost prohibitive. The installation of an internal loop linking to the west should be considered.

7 Wembley Wetlands Loop

4km Walk Cycle Bushland experience Heritage Noongar

The wetlands loop allows for increased access to Lake Monger and Herdsman Lake (City of Stirling) through Wembley.

Investigate save crossings and obtain permission from the City of Stirling.

8 Sunset Coastal Trail 2.3km Walk Cycle

The proposed trail will connect to the existing Bidi

Trail mapping and marking required

Page 31: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

30

Consolidated Trail Map Reference

Name Trail Length

(km)

Classification Description Recommended improvements

Bushland experience

Bo Djinoong regional trial and will run north along the coast

Total proposed trails: ±20km ±21km

Proposed Linkages 9 Extension of the

Cambridge Heritage Trail

670m Walk Cycle Heritage

Extension of the existing Cambridge Heritage Trail from point 8 ' New Subiaco' north towards Lake Monger linking with the existing Yange Kep Regional Whadjuk trail.

Existing infrastructure in place, additional plaque or interpretive sign required.

10 Proposed Perry Lakes Heritage Trail

680 Walk Bushland experience Heritage Noongar

Majority of trail infrastructure in place, trails requires documentation and formalising.

Whadjuk Linkages To be determined

Creating linkages between existing trails.

Linkages to be investigated.

BGPA Linkages To be determined

Creating linkages between existing trails.

Linkages to be investigated.

Total proposed linkages: 1.3km

Page 32: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

31

Remove:

Figure 23. Consolidated concept map indicating existing and proposed trails

Page 33: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

32

Replace with map below to include additional City Beach Trail:

Page 34: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

33

Sources: i http://www.roymorgan.com/findings/6123-australian-sports-participation-rates-among-children-and-adults-december-2014-201503182151 ii https://www.dsr.wa.gov.au/docs/default-source/file-about-us/file-plan-for-the-future/wa-trails-blueprint.pdf?sfvrsn=0 iii http://www.beactive.wa.gov.au/index.php?id=543 iv https://www.bibbulmuntrack.org.au/ v http://whadjukwalkingtrails.org.au/ vi http://whadjukwalkingtrails.org.au/ vii http://trailswa.com.au/trails/trail-types/urban-walk/

Page 35: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

DRAFT WALKING STRATEGY SCHEDULE OF SUBMISSIONS- SEPTEMBER 2018 Respondent Support Strategy Comments Theme Response 1 Yes Council to do more to promote

current trails and participation in the trails Make trails accessible- providing wheelchair access, hand rails, walking platforms Promote trails via online vide

Trail promotion Provide accessible trails Trial promotion

Amendment made to draft Strategy - Further promotion of trail to be undertaken Amendment made to draft Strategy - Examine trail accessibility options and include accessibility and inclusion in trail selection guidelines Amendment made to draft Strategy - Investigate creating short videos and stories to promote trail on social media

2 Yes List names of councils where trails could potentially link to Whadjuk regional trails Support Wembley Golf Course trail Support linkage and extension of the heritage trail Support mapping trails in Perry Lakes Support directional marking of trails and interpretive signage. Digital capability also important Under trail classification incorporate accessibility and pram friendly as trail categories Show how walking trail strategy links with the Strategic Community Plan.

Provide regional context Wembley Golf Course Trail Heritage trail Perry Lakes Signage Trail categories

Noted - investigate inclusion in future maps Noted Noted Noted Noted and amendment made to draft Strategy Amendment made to Strategy - Accessibility and inclusion incorporated under trail classifications and selection guidelines Amendment made to Strategy

3 Neither support or object

Cater for those with limited walking ability- place seats every 150m with rail to assist with sitting and standing. Seats could be placed at the beginning 2km or end 2km of a

Provide accessible trails

Noted - Investigate seat and hand rail installations during trail development

Page 36: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

DRAFT WALKING STRATEGY SCHEDULE OF SUBMISSIONS- SEPTEMBER 2018 Respondent Support Strategy Comments Theme Response

trail not entire length to cater for those that can't walk as far. Show seat on maps and included the distances between seats Include distances on maps for short sections of trails to assist those that can only walk short distances

Mapping Mapping

Noted - Investigate inclusion of information in future mapping Noted - Investigate inclusion of information in future mapping

4 Yes Include good directional signage Provide nearby public transport options on signage in case walkers find the trail too long to do in one attempt

Signage Signage

Amendment made to Strategy - Include directional signage along trails Noted

5 Yes Support strategy in general

Support Noted

6 Neither support or object

What is the cost of the strategy? Funding of strategy Noted - Investigate cost of implementing stages of strategy and include in future budgets, investigate and apply for external funding

7 Yes Support strategy

Support Noted

8 Yes Develop a booklet with maps including trail distances and notable features

Mapping Amendment made to Strategy - Maps to be placed on the Town's website in pdf format and can be downloaded

9 Neither support of object

Strategy should focus on connecting trails to public transport, especially West Leederville and Leederville train stations. Need wayfinding signage at train stations as they are key entry points to the Town. Need to identify key Town assets eg's. -wayfinding signage to Lake Monger

Connect trails to public transport Way finding signage

Amendment made to Strategy - Investigate opportunities for connecting trails to public transport Amendment made to Strategy - Investigate way finding signage at train Leederville and West Leederville train stations identifying key destinations in the Town. Possible inclusion in future infrastructure projects.

Page 37: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

DRAFT WALKING STRATEGY SCHEDULE OF SUBMISSIONS- SEPTEMBER 2018 Respondent Support Strategy Comments Theme Response

from Leederville train station -wayfinding signage on the south side of Railway Pde between Northwood and Kimberly Streets pointing to key destinations in the Town. Also need an obvious crossing point here. Improve dull and hostile walking environments with lighting or public art eg: -the wall along Southport St: public art -Vincent St/Lake Monger Dve underpass, dark: lighting, public art -Vincent St West, dark: lighting; major route for people walking from West Leederville to Leederville Wembley Golf Course trail not practical

Safe crossing point Activate dull and hostile pedestrian environments Wembley Golf Course Trail

Noted - proposals to be considered in future Infrastructure projects Investigate an obvious crossing point at this location - Amendment made to Strategy Investigate options to activate environments - Amendment made to Strategy Noted - alternative options to be investigated and safety measures considered

10 No Do not support the Wembley Gold Course trail- not safe, liability issues

Wembley Golf Course Trail

Noted

11 Neither support or object

Use durable materials in trails and a variety of walking surfaces which moderate temperature better

Materials Noted - to be investigate under Infrastructure projects - Outside Walking Strategy Scope

12 Neither support or object

Create a wide, uninterrupted walking/running track with seats, water stations and distance markers at Wembley Golf Course. Promote as a challenge

Wembley Golf Course Noted - Investigate trail options at Wembley Golf Course

13 Yes Prefer circular trails/walks- easier if trails start and finish at the same point to avoid transport issues in getting back to the starting point Include public transport info to

Circular trails

Noted - Emphasis placed on connectivity in the Strategy by identifying circular routes

Page 38: DEVELOPMENT COMMITTEE MEETING TUESDAY 16 OCTOBER … · development committee meeting . tuesday 16 october 2018 attachment to item dv18.15. 4. draft town of cambridge walking trail

DRAFT WALKING STRATEGY SCHEDULE OF SUBMISSIONS- SEPTEMBER 2018 Respondent Support Strategy Comments Theme Response

connect the end of long walks back to the start if not circular Avoid maps like those produced by the City of Joondalup referred to in the strategy- they don't provide sufficient context

Public transport information Provide regional context

Noted Noted

14 Yes Widen the path along Oban Rd connecting Kapinara Primary School to Empire Village- currently too narrow Need a safe crossing point across Oban Rd to Beecroft Park

Path widening Safe crossing point

Noted - Investigate path widening at this location through Infrastructure projects Noted - Investigate a safe crossing point at this location during future trail establishment

15 Yes Support for the North City Beach Trails Include the upgraded path through Templetonia Park as link to the Floreat Beach. Increased linkages supported between Durston/Empire/Chipping to the Golf Course and making use of the ocean views to the west.

North City Beach Trails Amendment made to Strategy - Investigate addition of a third City Beach trail through upgraded Templetonia path network