World Bank Support to the Infrastructure Program in Indonesia
M. Benmaamar Developing Indonesia Seminar 2010,
Jakarta, November 8th, 2010
Contents
• Overview of infrastructure expenditure and needs
• Infrastructure and RPJMN (2010-2014)
• World Bank Support:
– Energy
– Water and Sanitation
– Urban and Local Government
– Transport
– CDD Program and Climate Change
Investment in Infrastructure by Sector and by Source (% of GDP)
Sources: Indonesian Government for statistics on national and sub-national governments; Annual reports for state-owned enterprises; World Bank PPI database for private investment, excluding cancelled projects.
0.0%
1.0%
2.0%
3.0%
4.0%
5.0%
6.0%
7.0%
8.0%
9.0%TELECOMS TRANSPORT IRRIGATION
WSS ENERGY
0.0%
1.0%
2.0%
3.0%
4.0%
5.0%
6.0%
7.0%
8.0%
9.0%
SOE Private Sub-national National Gov't
Total investment in infrastructure by sectors
Total investment in infrastructure by sources
Infrastructure spending represented less than 10% of total national spending and well below the spending on subsidies
Note: The chart includes central and sub-national spending
0
5
10
15
20
25
30
2001 2002 2003 2004 2005 2006 2007* 2008* 2009** 2010**
Sh
are
of
tota
l n
ati
on
al
ex
pe
nd
itu
re (
%)
Education
Government Admin
Int. payments
Infrastructure
Subsidies
Agriculture
Health
Private participation in infrastructure’s investment has slowly recovered recently, dominating by telecommunication and energy
sectors – 0.5% GDP in 2005 – target 0.75% in 2010
Source: World Bank’s PPI database. These figures record investments promised at the time of contracting.
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
1994 1996 1998 2000 2002 2004 2006 2008
US$
Mill
ion
Transport
Water & Sewerage
Telecom
Energy
…and well below Indonesia’s regional peers
Source: Philippine’s Transport for Growth, 2009 (World Bank), various years
Investment in infrastructure (% of GDP)
…Indonesia ranks among the lowest in the region with regard to the quality of infrastructure
Source: Global Competitiveness Index 2009-2010
0 1 2 3 4 5 6 7
Malaysia (rank 26)
Thailand (rank 40)
China (rank 46)
India (rank 76)
Indonesia (rank 84)
Philipines (rank 98)
Vietnam (rank 94)
Indices (scale 0-7; 7 is being the best)
GCI 2009-2010: Quality of Infrastructure
0 1 2 3 4 5 6 7
Quality of roads
Quality of railroad infrastructure
Quality of port infrastructure
Quality of air transport infrastructure
Quality of electricity supply
Indices (scale 0-7; 7 is being the best)
GCI 2009-2010: Quality of Indonesia's infrastructure
The government has set ambitious development targets to be achieved by 2014
Selected development targets Target
Construction of roads: Trans Sumatera, Trans Java, Trans Kalimantan, Trans Sulawesi, Trans West Nusa Tenggara, Trans East Nusa Tenggara, and Trans Papua 19,370 km (by end 2014)
Development of integrated infrastructure and transportation network inter-modes and inter-islands Completed by 2014
Completing optical fiber network development in Eastern Indonesia Completed before 2013
Refinement the transportation system and network in the 4 biggest cities (Jakarta, Bandung, Surabaya, Medan) Completed by 2014
Power plant capacity improvement 3,000 MW per annum
Increasing electrification ratio 80 % (by 2014)
Increasing access to water supply 70% (by 2014)
Selected priority activities in Infrastructure in the 2010-2014 RPJMN
No Priority activities Indicative budget 2010-14 (IDR Tlns)
1 Land utilization regulation harmonization to build integrated spatial planning and management
3.05
2 Completing Sumatera, Java, Bali, Kalimantan, Sulawesi, NTB, NTT and Papua highway reaching 19,370 km
143.2
3 Building transportation infrastructure based on National Transportation System and Transportation Blue Print
36.8
4 Building 685,000 subsidized houses, 180 Rusunami and 650 twin blocks by 2012
36.7
5 Finishing flood canal in Jakarta by 2012 and Solo by 2013 14.2
6 Completing optic fiber network in eastern Indonesia before 2013 9.8
7 Improvement of transportation system in 4 biggest cities based on urban transportation blue print
2.8
8 Increasing power capacity at average 3,000 MW per annum and oil production 1.2 million barrel per day
54.3
WORLD BANK ENERGY
SECTOR ENGAGEMENT
IN INDONESIA
Key Challenges Facing Indonesia’s Power
Sector
2007 29 GW
2018 87 GW
Looming power shortages in face of growing economy
Only about 70% of population with formal access to electricity
Lack of clear vision due to legal, policy and regulatory uncertainties
Sub-optimal power generation mix is dominated by fossil fuels - with heavy reliance on diesel and substantial expansion of coal underway
Momentous investment needs of around $4-$5 billion annually to meet demand
Geothermal 3.2%
Geothermal 7.0%
Sector/Institutional Reform
Electricity Network System Strengthening
Optimizing Power Generation Mix
Deployment of Energy
Resource Planning
System, ERP (under implementation)
Deployment of an ERP
system through three phases
to strengthen PLN
management capabilities and
governance
Tariff Rationalization
Study (ongoing)
Provide guidance on tariff
setting and policy
Java-Bali Power sector
Restructuring and
Strengthening Project (under implementation)
Strengthen power transmission
network to relieve key
bottlenecks
Power Transmission
Development Project (under implementation)
Improve reliability of
transmission network
Upper Cisokan Pumped
Storage Project (under preparation)
Finance first pumped storage in
Indonesia is key for managing peak
demand in the distribution system and helps reduce the
cost and reliability
Estimated investment around
$800 million.
World Bank in the Power Sector
Geothermal Sector Reform
Carbon Finance and Climate Change
Investment Lending to Strengthen Institutions
$4 million GEF Grant (under implementation)
Enhance policy framework by:
• Pricing & Incentives
• Upstream Risk Mitigation
• Legal & policy review and
amendments
Transactions to tender
projects for development
Long-term domestic capacity
building
Lahendong II CDM
Transaction (under implementation)
Purchase CER from PLN for
20 MW geothermal project
Carbon Finance
Framework for Geothermal (under preparation)
Wholesale provision of carbon
revenues through streamlined
programmatic approach
IBRD/CTF Loan to
Pertamina Geothermal
Energy (PGE) (under preparation)
Immediately scale-up
investment
Blended concessional financing
from IBRD and CTF (up to
$350 million)
Strengthen institutional
capacity for continued
expansion
The World Bank in Geothermal Development
Domestic Gas Development
Regional Electrification and Rural Access ???
Energy Efficiency ???
Domestic Gas Market
Development Project (under implementation)
Expand the use of natural gas
in West Java market
Improve efficiency and reduce
pollution by substituting
cleaner fuel
PGN Restructuring
Pricing Study
Rural Electrification
Project (dropped)
Conducted surveys and
prepared RE Masterplans for 4
regions
Policy Framework for
Regional Electrification
and Rural Access (completed)
Significantly influenced current
electricity law
Request from Ministry of
Industries (under identification)
Preliminary request to explore
EE enhancements within steel
and cement sectors
The World Bank in Energy Sector
WORLD BANK/INDONESIA PARTNERSHIPS IN ENERGY SECTOR
Focus Activity Concept/Status Cost (million)
Geo-
thermal
Geothermal Sector Reform
Project (GEF)
Under Implementation: Policy reforms & transaction
support to address key barriers to investment, funded
by GEF grant
$4
(GEF Grant)
Carbon Finance Framework
for Geothermal Development
Under Preparation: Programmatic application of CDM
to provide streamlined access to carbon financing and
reduce uncertainty for geothermal developers.
$20-$40 in initial
ER purchases from
first tranche
Lahendong Geothermal
Project
Under Implementation: Facilitate the carbon off-set
transaction on behalf of PLN
Geothermal Clean Energy
Investment Project
Under Preparation: Support Pertamina/PGE develop
up to 150 MW of additional power generation capacity
in Ulubelu and Lahendong geothermal fields.
up to $ 350
(IBRD and CTF)
Power
Sector
Java-Bali Power Sector
Restructuring and
Strengthening Project
Under Implementation, help PLN w/ strengthening
power system and improving management capailities
(also $6 million TA to PGN)
$141
(loan amount)
Additional Financing, Board approved, 2010:
Extended Deployment of the ERP System, building on
successful pilot in original project
$30
(loan amount)
Power Transmission
Development Project
Under Implementation, Board approved, 2010: Help
PLN strengthen bottlenecks in transmission network
$ 225
(loan amount)
Upper Cisokan Pumped
Storage Project
Under Preparation: Develop pump storage site in Java
to reduce high reliance on oil and gas for peaking
$800
(loan amount)
Gas
Sector
Domestic Gas Market
Development Project
Under Implementation: Improve the distribution
network in West Java to accommodate new gas
supplies from Sumatra
$80
(loan amount)
WATER AND SANITATION
The Gaps 2009
coverage MDG Targets Coverage
gaps
Non -Piped Water (protected)
Urban 50% 78% 28%
Rural 46% 62% 16%
Piped Water
Urban 44% 68% 24%
Rural 12% 20% 8%
Sanitation
Urban 63% 79% 16%
Rural 30% 60% 30%
Source: Indonesia National MDG Reports 2008 and Cipta Karya Renstra 2010
Estimated costs needed
to achieve MDGs
Targets in water and sanitation: USD 450 M
annually
Estimated costs needed to achieve
MDGs Targets in water and sanitation:
Indonesia vs other SE Asia countries
0 20 40 60 80 100 120
Lao
Myanmar
Cambodia
Indonesia
Philippines
Vietnam
Thailand
Coverage
Co
un
try
Improved Sanitation Rural Sanitation
Improved Sanitation Urban Sanitation
Improved Water Supply Rural WaterSupply
Improved Water Supply Urban WaterSupply
Source: JMP Report 2010
GOI Programs: •IKK ~ USD 480 M
•Poor households ~ USD 120 M •Special areas ~ USD 30 M
GOI Programs: •PAMSIMAS & Arid/isolated villages
and small islands ~USD 460 M •DAK Water Supply ~ USD 175 M
WB Support: •UWSSP USD 23.5 M
•GPOBA Jakarta USD 2.6 M •GPOBA Surabaya USD 2.4 M •Various TAs ~ USD 400,000
•Greater Bandung (pipeline) ~ USD50M •Umbulan (pipeline) ~ USD 200 M
•WSS Financing (pipeline) ~ USD300M
WB Support: •PAMSIMAS USD 150 M
•WSP studies
URBAN
RURAL
GOI Programs: •Debt Restructuring for PDAMs
•Interest Rate Subsidy & Guarantee •Water Hibah
•Support for regional facilities •Raw water support (with SDA)
WB Support: •WASAP USD 25 M
•National Road Map USD 180,000 •IDPL •DAK
NATIONAL POLICY AND REGULATIONS
GOI PROGRAMS & WB SUPPORT in WATER SECTOR Total GOI budget 2010-2014:
~USD 1,267 M
GOI PROGRAMS & WB SUPPORT in SANITATION
GOI Programs: •Sanitary landfill in 210 cities •Integrated 3R in 250 locations •Sewerage and Waste Water Treatment Plant in 11 cities
•Drainage improvement to cover area of 4,600 ha
GOI Programs: •PAMSIMAS
•DAK Sanitation ~ USD 175 M
WB Support: •Greater Bandung (pipeline) ~ USD
50 M •JUFMP USD 150 M
WB Support: •PAMSIMAS USD 150 M
•TA in Sanitation Marketing (WSP)
RURAL
GOI Programs: •Sanitation Hibah
•APBN Support for regional facilities
WB Support: •WASAP USD 25 M
•IDPL
URBAN
NATIONAL POLICY AND REGULATIONS
Total GOI budget 2010-2014: ~USD 1,436 M
21
22
• Cities accommodate half of Indonesia’s population and are responsible for a major share of national GDP
– Urbanization rate expected to be 68% by 2025
– Metropolitan Jakarta produces 20% of national GDP, with about 6% of population
– The Largest Cities are growing at an annual average 6-8% real GRDP
• Yet, cities are not delivering services as one would expect
– Delivery of basic services in Indonesia is low in terms of access, service coverage, and quality
– 90 million people do not have an electricity connection
– Water utilities serve only 14 percent of the population
– Only 1.3 percent of the population having access to a sewerage network.
• Investment in infrastructure is urgently needed in urban areas
– Investments in major infrastructure services has declined since the 1990s
– Government does not have enough resources to cope with huge infrastructure investment needs.
• Urban Poverty is increasing, yet not well understood
Urban$&LG Program (I) • PDO: Improve the accountability and reporting of the
Central Government’s Specific Purpose Grants (DAK) for the infrastructure sectors
• The Project will be a pilot in 5 Provinces, with a proposed size of US$ 220 million over four years and designed as a Specific Investment Lending and the proposed mechanism will be Output-Based Disbursement (OBD).
• Key Issues: Result-Based mechanism and use of country system
LG & Decentralization
Project (DAK Reimbursement)
• PDO: To pilot support to district governments in improving transparency, accountability and public participatory practices and in undertaking reforms in financial management and procurement
• The Project is a pilot in nine provinces and 14 districts with total Loan/Credit of US$ 29.5 million
• Main components: Local Governance Reform, Poverty Targeted Investment, and Implementation Support
Initiatives for Local
Governance Reform Project
(ILGRP)
23
• PDO: The project will strengthen local governance and improve the provision of selected urban services by participating ULGs and additional participating ULGs.
• The Project area coverage includes five provinces and 10 municipalities/districts, with total Loan of US$ 45 million.
• Main components: core governance reforms, urban institutional development program (UIDP) and investment.
Urban Sector Development
Reform Project (USDRP)
• PDO: Asist GOI to ensure that the urban poor benefit from improved socio-economic and local governance conditions.
• Community driven program in urban areas.
PNPM Urban / UPP Project
Urban$&LG Program (II)
Transport
26
TransJakarata
About 80 percent of infrastructure public spending is concentrated on transport sector
Sectoral composition of national public spending on infrastructure (%)
Sectoral composition of national public spending on infrastructure by level of government, 2009 (%)
0
10
20
30
40
50
60
70
80
90
100
2001 2002 2003 2004 2005 2006 2007 2008 2009
% o
f t
ota
l
Transport Irrigation WSS Energy Telecom
Central
Province
Districts
0
20
40
60
80
100
Transport Irrigation WSS Energy Telecom
Transport: recent development and key issues The transport sector has been the main priority of infrastructure public
spending representing 70 percent of infrastructure budget
Yet the current level of investment (< 2% of GDP) has not been sufficient to meet the growing demand for transport infrastructure
The current expressway networks (650 km) is only one third of the estimated needs (2000 km) – Around 10 km/year last 10 years - need 400km/year
More than a third of the provincial roads and more than half of the district-level road network is in bad condition
Land acquisition remains one of the main obstacles to expressway development
The contribution of the railways to total traffic is still very low (only 0.7%)
Passengers railway has decreased since the deregulation of the aviation industry. The performance of PT Kereta Api, KAI (the Railway Corporation) has deteriorated recently
Despite its important role in Indonesia domestic logistics system and inter-island shipping, the port capacity has not improved and much below the capacity of the international trans-shipment ports.
: Road network conditions
Road Status Length Share Condition
(km) (%) Good & Fair (%) Bad (%)
National 34,629 10 83 17
Provincial 46,499 13 63 37
Regency 240,946 69 43 57
City 25,518 7 96 4
Toll 649 0 100 0
Total 348,241 100 54 46
Source: PJM 2005 and KMPU 2006 and DGH 2008
Figure 1 Traffic demand 1998-2009
0
50000
100000
150000
200000
250000
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Pa
x/t
on
ne
s (
00
0)
0
5000
10000
15000
20000
25000
Pa
x/t
on
ne
-km
(m
ill)
Passenger Tonnes Passenger-km Tonne-km
Railways traffic demand
-
5
10
15
20
25
30
35
40
45
50
2001 2002 2003 2004 2005 2006 2007 2008*
Mill
ion
s
Passenger cars
Bus
Truck
Motorcycle
Exponential growth in cars and motorcycles in Indonesia
31
Transport Program (I)
• Improvements to Strategic National Roads
• Implementation Support (PAS)
• Road Sector Institutional Development
Strategic Road Improvement Project, SRIP (USD200m)
• improve condition o f the strategic road network
• support decentralization of planning and management responsibilities for civil works on Provincial and Kabupaten roads
Second Eastern Indonesia Road
Transport Project- EIRTP-2
(USD200m)-
• Developing the MEH for the narrowest and most congested 300 km section of the Straits and demonstrating its value for improving navigation safety and marine environmental protection,
• (b) Facilitating the integration of marine environment systems and data flow and information exchange through the MEH system
Marine Electronic Highway
Project, GEF (Malaysia,
Singapore and Indonesia):
USD17m
32
Transport Program (II)
• 700 km Road betterment along the Western Sumatera corridor – 530 meters of bridges
• Disaster mitigation measure (including landslide mitigations)
• A contingent emergency response component
• Empowering the procurement service units
Western Indonesia Road Improvement
Project, WINRIP($US300m)
• Refinancing using country systems along Output- based disbursement approach
Road Asset Preservation Project, RAPP
(FY12, $US300m)
33
Indonesia connectivity agenda
The challenge of connectivity in Indonesia
•Economic growth will be unbalanced, but development still can be inclusive.
•Economic agglomeration rather than spatial evenness •Make that high growth inclusive:-
-Provide access to affordable basic services across the country and targeted interventions to promote convergence in living standards -Join lagging regions to leading regions -Connect regions through inter-modal, efficient chain systems
Moving Ahead
Consolidation, Review
And Prioritization
Moving from a framework to actions
Suggested priorities for action:
1. Provide performance-based transfers for local governments to build and maintain infrastructure (especially roads)
2. Complete Trans-Java expressway and coordinate with rail services
3. Reduce cost of inter-island shipping - Provide transparent on-budget subsidies for pioneer shipping in Eastern Indonesia, and develop RO-RO nautical highways
4. Improve operational efficiency at Tanjung Priok and move ahead plans to develop a new deep water port
5. Development of an efficient public transport system in Jabodetabek
Sustainable Development
• Disaster Risk Management
• Community-based program, PNPM…
• I-DPL series
• CC-DPL series
• Indonesia Guarantee Fund, IGF
• Analytical Work (i.e. Infrastructure Public Expenditure Review)
WB contacts - ENERGY :
- Migara Wayawardena: [email protected]
- Leiping Wang: [email protected] and
- Khairy Al-Jamal: [email protected]
- WATER & SANITATION: - Fook Chuan: [email protected]
- Urban& LG: - George Soraya: [email protected] and
- Peter Ellis: [email protected]
- TRANSPORT: - Mustapha Benmaamar: [email protected]
Thank you