Developing HSE Excellence
Transcript of Developing HSE Excellence
-
8/8/2019 Developing HSE Excellence
1/26
DEVELOPING HSE EXCELLENCE
Developing HSE Excellence within Dodsal
Dodsal Engg. and Construction Pte. Ltd. 1
-
8/8/2019 Developing HSE Excellence
2/26
DEVELOPING HSE EXCELLENCE
INDEX
EMIRATES SAFETY GROUP
DODSAL ENGINEERING, PROCUREMENT AND CONSTRUCTION - A BRIEF SCOPE
TAKING AN INTEGRATED APPROACH
OUR ROAD TOWARDS HSE EXCELLENCE
A STRUCTURED APPROACH TO HSE MANAGEMENT
Policy, Goals and Strategy
Processes and Procedures Resources and Organisation
Implement, Monitor and Control Demonstrate Compliance
Management Review
LAGGING INDICATORS
IMPACT OF GLOBAL RECESSION
Dodsal Engg. and Construction Pte. Ltd. 2
-
8/8/2019 Developing HSE Excellence
3/26
HSEQ MANAGEMENT SYSTEM (HSEQ MS)
Headquartered in Dubai, the engineering, procurement and construction business has
DODSAL ENGINEERING, PROCUREMENT AND CONSTRUCTION
years.
Power Generation
Oil & GasMetallurgical Plants
Buildings
Desalination PlantsRoads & Highways
-
8/8/2019 Developing HSE Excellence
4/26
DEVELOPING HSE EXCELLENCE
Health, Safety, Environment, Security and Quality (HSE, Security and Quality)Dodsal have adopted an integrated approach to systems management and are developing an HSES and Quality
,
Management System to cover all aspects of our business processes and satisfy various standards.
QualityThis is an inherent part of our culture and our processes. Our Quality Management System is certified to ISO 9001:2008for provision of Engineering, Project Management, Procurement, Construction Management, Pre-CommissioningServices of Pipelines, Plants and Associated facilities for the Oil, Gas, Petrochemical, Water, Electricity Industries andBuildings, including Infrastructure Facilities and associated Civil, Mechanical, Piping, Electrical and InstrumentationInstallations.
,Dodsal maintains Health, Safety and Environment [HSE] arrangements of the highest standards. Our occupationalHealth, Safety and Environmental management systems are certified to OHSAS 18001:2007 and ISO 14001:2004 .Over the years we have achieved Lost Time Injury [LTI] frequency rates that are consistently well below theinternationally recognized averages.
SecuritySecurity, not only of people, equipment and premises but of our operations in general, is another essential aspect ofour business. At Dodsal we have revised both our IMS Philosophy (to identify security related risks) and our MSProgramme to (describe management of Security arrangements, as per ASIS - General Security Risk Assessment;
Dodsal Engg. and Construction Pte. Ltd. 4
Guidelines).
-
8/8/2019 Developing HSE Excellence
5/26
DEVELOPING HSE EXCELLENCE
Safety ExcellenceZero Harm
BSC 5 Star AwardHydrocarbon, Exploration
Businessexcellence
Certified toOHSAS 18001:2007
2008
Nov. 2008
First EPC project Kalba Pipeline
for SEWA.
2007
Certified to
First Issue ofHSEQ MS Programme
2007
Dodsal HQ movedfrom India to Dubai
1991
OHSAS 18001:19992005
First Issue ofMiddle East
First significant project inMiddle East
1969
Trading Co.
1996Operations set up1967
HSE Oath1991
Dodsal Engg. and Construction Pte. Ltd. 5
1948
-
8/8/2019 Developing HSE Excellence
6/26
DEVELOPING HSE EXCELLENCE
HSE ORGANISATION
Chairman and PresidentDodsal Group
Board of Directors
Management Appointeefor HSE
Dodsal E&C
Heads of Operations
Head of HSEQ(Management Rep.)
Corporate HSE ManagersHSEQ CoordinatorCorporate HSE
Dodsal Projects
Operations / SupportManagers
All other PersonnelLegend: Direct
Functional
Project HSE Manager
HSE Team
Dodsal Engg. and Construction Pte. Ltd. 6
-
8/8/2019 Developing HSE Excellence
7/26
DEVELOPING HSE EXCELLENCE
A STRUCTURED APPROACH TO SYSTEMS MANAGEMENT
1. POLICY, GOALS AND STRATEGY
2. PROCESSES AND PROCEDURES
3. RESOURCES AND ORGANISATION IMPROVE
PLAN DO
4. IMPLEMENT, MONITOR AND CONTROL
5. DEMONSTRATE COMPLIANCE REDEFINE
CHECK
ACT
6. MANAGEMENT REVIEW
Dodsal Engg. and Construction Pte. Ltd. 7
Based upon model used in HS (G) 65
-
8/8/2019 Developing HSE Excellence
8/26
DEVELOPING HSE EXCELLENCE
HSEQ Policy:
POLICY, GOALS AND STRATEGY
gne y a rman an res en o o sa . a s es a aspec s o a ree s an ar s.
All employees are introduced to HSEQ Policy.
Overall HSEQ Goal:Manage HSE, Security and Quality risks/vulnerabilities to a level that is as low as we can reasonably achieveand so deliver projects safely and effectively.
Primary HSEQ Objectives (derived and set from overall HSEQ Goal): Fully comply with all legal and other (contractual, standards, specifications, process/procedures wtc.)
requ remen s Minimise the exposure of our assets (people and property) and the environment to operational
hazards/threats Eliminate Lost Time Injuries. Maintain cost and schedule requirements
Eliminate customer complaints
From these objectives Corporate HSE and Quality targets are set for all projects.
Dodsal Engg. and Construction Pte. Ltd. 8
-
8/8/2019 Developing HSE Excellence
9/26
DEVELOPING HSE EXCELLENCE
Corporate HSE and Quality Targets for the Year 2010
POLICY, GOALS AND STRATEGY (Continued..)
The following Corporate HSE and Quality Targets are set for all projects:
HSE related
Zero Fatalities and Lost Time In uries100% HSE Inductions for all personnelA Minimum of 0.85% of Man-hours spent on HSE TrainingDaily PTST (Pre Task Safety Talk) for 100% of direct site man power.
Weekly completion of Management HSE WalkaboutsMonthly completion of HSE Committee meetingUpon arrival to project, complete medical screening (Blood Pressure and Diabetes) of all personnel.Maintain audit schedules with follow up and close out of all audit findings within one monthLess than 135 kW (power consumption) per 1000 man hours
Quality related 100% Quality Inductions for all key personnelMinimum 85% completion of training schedulesMaintain less than 1% (Pipeline) and less than 2% (Plant) rejections after RFI.Maintain less than 2% reworks
Dodsal Engg. and Construction Pte. Ltd. 9
.Maintain audit schedules with follow up / and close out of all audit findings within two months.
-
8/8/2019 Developing HSE Excellence
10/26
DEVELOPING HSE EXCELLENCE
Project Specific Targets/Key Performance Indicators (KPIs):
POLICY, GOALS AND STRATEGY (Continued..)
All projects shall identify project specific HSE and Quality Targets and KPIs to monitor the activitiesaccordingly
HSEQ Strate :Commitment, support and involvement of all personnel, including top management.Effective planning of key activities and interfaces.Provision of appropriate resources and continues employee training / development.
Clear identification of responsibility and accountability of all personnels a s e per ormance measures.
Compliance with HSEQ MS Programme.Adoption of industry best practices
Dodsal Engg. and Construction Pte. Ltd. 10
-
8/8/2019 Developing HSE Excellence
11/26
DEVELOPING HSE EXCELLENCE
Management Processes:
PROCESSES AND PROCEDURES
The activities associated with the development and implementation of policy, strategy, performancereview and continual improvement.
ore rocesses:
The activities employed directly to convert HSE and Quality requirements of international standards into
project results.
Support Processes:
The support activities employed by Dodsal, which support the consistent operation of the core
processes.
Dodsal Engg. and Construction Pte. Ltd. 11
-
8/8/2019 Developing HSE Excellence
12/26
DEVELOPING HSE EXCELLENCE
Document Hierarchy:
PROCESSES AND PROCEDURES
Dodsal Engg. and Construction Pte. Ltd. 12
-
8/8/2019 Developing HSE Excellence
13/26
DEVELOPING HSE EXCELLENCE
Key Roles and Responsibilities: Board of Directors and Senior Management be responsible for the provision of resourcesthat support and develop the organization such that the HSEQ policy can be put into effect. Line management must understand and
accept they are ultimately responsible for HSE and the HSE management system.
RESOURCES AND ORGANISATION
Resource Planning: what, when, from where and how we recruit and allocate, competent personnel. verify validity of inputs; evaluate stability, capability and performance of suppliers
account for constraints on resources; availability, cultural considerations, international agreements, labouragreemen s, governmen regu a ons an un ng
Resource Control; work the plan! regular data collection and reviews, to check against objectives, we can identify, analyze, actupon and record any deviations.
er ersonne re a e processes: Organizational Structures: at corporate and project levels to encourage effective and efficient communication and cooperation
between all participants Allocation of Personnel; define levels of competence, esp. key personnel, consider personal attributes, allow sufficient time for
recruitment, project manager involved, identify and communicate roles and responsibilities at all levels and functions including.
Team Development: leadership commitment, requires all to be competent, motivated, involved and willing to cooperate andparticipate in overall team building.
All aspects above should be documented in the Project Execution Plan.
Dodsal Engg. and Construction Pte. Ltd. 13
-
8/8/2019 Developing HSE Excellence
14/26
DEVELOPING HSE EXCELLENCE
Implementation of work: as per planned arrangements through Standard Project HSE Plan
IMPLEMENT, MONITOR AND CONTROL
process based e.g. interdependencies, scope, time, cost, communication, risk and purchasing.
Monitoring: Active Monitoring (planned) and Reactive Monitoring (unplanned)
ct ve mon tor ng measures comp ance w t co es, stan ar s an spec cat ons, anplans arrangements, schedule and objectives
Reactive monitoring assesses reports of incidents/accidents ill health, hazards, un safeactions/conditions and non-conformances.
Continual Improvement: Improvement to Resources/Organisation and Processes/Proceduresby the corrective actions and the preventive measures identified.
Dodsal Engg. and Construction Pte. Ltd. 14
-
8/8/2019 Developing HSE Excellence
15/26
DEVELOPING HSE EXCELLENCE
IMPLEMENT, MONITOR AND CONTROL (continued)
Site Safety Performance Assessment Safe and At Risk.
Performance
Dodsal Engg. and Construction Pte. Ltd. 15
-
8/8/2019 Developing HSE Excellence
16/26
DEVELOPING HSE EXCELLENCE
IMPLEMENT, MONITOR AND CONTROL (continued)
Dodsal Engg. and Construction Pte. Ltd. 16
-
8/8/2019 Developing HSE Excellence
17/26
DEVELOPING HSE EXCELLENCE
Demonstration of compliance requires measurement of:
Suitabilit of arran ements and controls in deliverin com liance with re uirements Extent of s stem re uirements
DEMONSTRATE COMPLIANCE
Consistent application of those arrangements and controls by Dodsal personnel (Effectiveness of implementation)
Means to demonstrate compliance include;
Site HSE Surveillance, Inspections and Audits: the systematic inspection of the premises, plant and equipment to ensurecontinued effective operation of controls
Compliance Audits: Dodsal have a procedure for internal audits, with a pool of trained internal auditors and they are
independent of the section being audited. Deficiencies are identified in the audit report and all corrective actions are listed in a. , ,
verified in follow up audits.
External and Supplier Audits: External audits are carried out by Client (Second Party) or Third Party (including regulatoryauthorities) on Dodsal HSE and Quality arrangements. Supplier/Subcontractor Audits are also carried by Dodsal HSE and Qualityde artments in accordance with a roved Audit Schedules.
HSEQ Performance Assessment: measure the suitability and adequacy of HSEQ arrangements, particularly the HSE andQuality critical processes/controls.
Business Improvement Plan: from various sources inc. HSEQ Performance Assessment, Lessons Learned, change to legal and
Dodsal Engg. and Construction Pte. Ltd. 17
other requirements, etc., demonstrate improvement, continual or otherwise.
-
8/8/2019 Developing HSE Excellence
18/26
DEVELOPING HSE EXCELLENCE
on nue
HSEQ PERFORMANCE ASSESSMENT 2006/2009
4.00
4.50
5.00
Element
1 - Manageme nt, Leadership, Commitment &
Accountability
2 - Risk Asses sme nt & Manageme nt
2.50
3.00
3.50
vel
3 - Design/Engineering
4 - Project Managment and Construction
Operations
5 - Employee Competency & Involveme nt
6 - Occupational Health
1.50
2.00Le 7 - Third Party Management
8 - Impact upon the Community & Eme rgency Plan
9 - Incident Investigation & Analysis
10 - Measurement, Audit & Review
0.00
0.50
.
1 2 3 4 5 6 7 8 9 10
Desired 2010ACTUAL 2009
Dodsal Engg. and Construction Pte. Ltd. 18
Element
ACTUAL 2007ACTUAL 2006
-
8/8/2019 Developing HSE Excellence
19/26
DEVELOPING HSE EXCELLENCE
Opportunity for improvement can be identified from following sources (inputs)
HSEQ Performance Assessments
DEMONSTRATE COMPLIANCE (Continued)
anagemen rev ew mee ngs Supervisory meetings Customer feed back Ongoing monitoring of Performance Indicators (KPIs) Pro ect conformance and Product conformit Results of audits and assessments Addition/revision to Client/PMC policy, legal and other requirements, procedures etc. Head office specific issues
New initiatives
With these sources and our Business Process Improvement Plan, opportunities for improvements can beprioritized (cost, schedule, HSE and Quality) and measured against progress to define earned value, whichover time, can demonstrate
Dodsal Engg. and Construction Pte. Ltd. 19
-
8/8/2019 Developing HSE Excellence
20/26
DEVELOPING HSE EXCELLENCE
DEMONSTRATION CONTINUAL IMPROVEMENT
Business Process Improvement Plan 2006 -2009
80.00
90.00
100.00
*= Sum(Earned Values)/Sum(Weighted Priorities)
40.00
50.00
60.00
.
EarnedValu
P1
P2
P3
Work load increased due
to Project Less ons Learnt
exercise (Number ofactivities incresed)
0.00
10.00
20.00
30.00
- *
P1 10.00 10.19 8.87 16.29 23.55 29.52 30.43 30.43
P2 13.51 14.82 14.41 21.40 31.82 44.93 52.69 55.21
P3 10 20 12.037037 16.11 16.11 12.56 64.30 55.00
-
2006
-
2006
-
2007
-
2007
-
2008
-
2008
-
2009
-
2009
Dodsal Engg. and Construction Pte. Ltd. 20
-
8/8/2019 Developing HSE Excellence
21/26
DEVELOPING HSE EXCELLENCE
Reports Review: All HSE related reports such as HSE audits/inspections, incidentinvestigations, non conformance etc. are reviewed by HSE Manager in liaison with the Project
MANAGEMENT REVIEW
.
HSE forums: are held at regular intervals (minimum monthly) and attended by the Project HSEManager, Construction Manager (s), Representatives of Supervisors, workers, medical personnel etc.as required, and chaired by the Project Manager. Project control assessments, unsafe acts/conditionsincidents/accidents statistics/analysis reports etc. are used for review.
HSEQ Management System Review: annual event attended by Senior corporate
management, HSE and Quality Mangers and are reported via HSEQ Review Reports
Feedback and Improvement: apart from the various avenues of feedback from the managementsystem, all personnel are encouraged to identify and propose areas of improvement. Proposals fornew, or amendments to, existing procedure is described in DOD-OP-IMS-001, Preparation and Issueof Procedures.
Dodsal Engg. and Construction Pte. Ltd. 21
-
8/8/2019 Developing HSE Excellence
22/26
DEVELOPING HSE EXCELLENCE
LAGGING INDICATORS
The Reality; even with diligence to extensive Safety Management arrangements accidents do occur.
Lost Time Injury Frequency Rate (LTIFR)
Industry ComparisonPer 1 Million Manhours worked
1.2
1.4
Dodsal
OGP Constructors
Total Recordable Injury Rate (TRIR)
Industry ComparisonPer 1 Million Manhours Worked
4
4.5
Dodsal
OGP Constructors
0.6
0.8
1
1.5
2
2.5
3
3.5
-0.2
0
0.2
.
2004 2005 2006 2007 20080
0.5
1
2004 2005 2006 2007 2008
Other considerations: not in OHSAS as such but also to be dealt with are Road Traffic Accidents, Fire/PropertyDamage and damage to workplace environment.
Dodsal Engg. and Construction Pte. Ltd. 22
-
8/8/2019 Developing HSE Excellence
23/26
DEVELOPING HSE EXCELLENCE
Aspects/Impacts include:
IMPACT OF GLOBAL RECESSION
e uct on o un ng an cost cutt ng exerc ses use of sub standard (cheaper) materials/equipment loss of most experienced (costly) HSE personnel and less effective implementation of HSE
Potential impact being:
increased likelihood of accidents
Dodsal Engg. and Construction Pte. Ltd. 23
-
8/8/2019 Developing HSE Excellence
24/26
DEVELOPING HSE EXCELLENCE
Safety Leadership Initiatives: FM22-100: US Army leadership framework; establishes what a leader must be, know and do.
THE ROAD AHEAD
. . Personal Safety Plans : demonstrate commitment; walk the walk, talk the talk
Contractor HSE Capability: the sharing and cascading of HSE standards and expectations to help assess HSE performance. them on us as well as an us and on them to raise the overall benchmark.
Competence Assurance, Training and Communication: Competence/Training matrix, MASK (levels of competency viz. master, skilled, knowledge and awareness) All other means of communication including , leadership/direction from management/supervision,
HSE committee meetings, workshops and training, risk assessments and pre-start safety meetings, hazard awareness,, , , .
Continuing our integrated approach: ISO 10006 Quality Management System Guidelines for quality management in projects systematic approach for
creation and maintenance of process and product quality ensuring that the stated and implied needs of the customercontract
are met.
Dodsal Engg. and Construction Pte. Ltd. 24
-
8/8/2019 Developing HSE Excellence
25/26
DEVELOPING HSE EXCELLENCE
HSE ExcellenceZero Harm
Businessexcellence
Measure Quality (Business)Performance and
November 2010
Implement Quality (Business)Performance procedure
September 2010
September 2010
Roll out Competence Assuranceprocess/procedure
BSC 5 Star Awardfor 3 projects
July 2010
Business ProcessesRe-Engineering
June 2010
new business sectorJuly 2010
Review Operationsagainst ISO 10006
BS 31100May 2010
Review Security
Fully Implement SafetyLeadership and
arrangementsagainst ISO/PAS 22399
May 2010
Capability programmesJune 2010
Roll out HSE Surveillanceand Inspection procedure
Dodsal Engg. and Construction Pte. Ltd. 25
G10G11
G12
-
8/8/2019 Developing HSE Excellence
26/26
Slide 25
G10 Quality Managment Systems - guidelines for quality management in projects.Across phases of project life cycleProject Management principles; Managment Resp., Resource Mgt., Product Realisation andMeasurement, Analysis and Improvement.
Product Related processes; Strategic, Resource and Personnel related, Interdependancy, Scope, Time Cost, Communication, Risk,Purchasing, Improvement, Measurment and Continual Improvment.GCrighton, 5/10/2010
G11 Risk Managment; Code of Practice.o achieve objectives
GCrighton, 5/10/2010
G12 Societal Security - Guideline for incident preparedness and operational continuity management.GCrighton, 5/10/2010