DesignJET 5500 Color RTL.PLT, 200 SCALE, 16.7 X 121 ... 121 - Roll 9 … · BOWDEN BAILEY COLLEGE...

1
Texas Department of Transportation R C 2011 MELISSA ANNA BLUE RIDGE DESERT LOCATION MAP EASTLINE RD. SH 121 BEGIN PROJECT BEGIN CSJ: 0549-03-018 BEGIN STA: 67+54.08 75 455 160 78 545 5 2862 2862 5 9/30/2011 L:\110071\140-10336-000\prod\Exhibits\121 CROSS STREETS FM455_200.dgn bsowels 8:30:17 AM 0 200 300 10 0 GRAPHIC SCALE (IN FEET) 20 30 HORZ VERT 100 9/30/2011 L:\110071\140-10336-000\prod\Exhibits\121 CROSS STREETS FM455_200.dgn bsowels 8:30:17 AM MELISSA ANNA BLUE RIDGE DESERT LOCATION MAP EASTLINE RD. SH 121 BEGIN PROJECT BEGIN CSJ: 0549-03-018 BEGIN STA: 67+54.08 END PROJECT END CSJ: 0549-03-021 END STA: 865+37.66 75 455 160 78 545 5 2862 2862 5 545 0 200 300 10 0 GRAPHIC SCALE (IN FEET) 20 30 HORZ VERT 100 CITY LIMIT CROSS STREETS BRIDGE WATER UTILITY 3"w SH 121 PAVEMENT LEGEND RETAINING WALL INDEX OF ROLLS INDEX OF ROLLS SH 121 CL STA 540+00 END CSJ: 0549-03-018 BEGIN CSJ: 0549-03-021 SH 121 CL STA 540+00 END CSJ: 0549-03-018 BEGIN CSJ: 0549-03-021 ROLL DESCRIPTION ROLL DESCRIPTION DRIVEWAYS CITY LIMIT CROSS STREETS BRIDGE WATER UTILITY 3"w SH 121 PAVEMENT LEGEND RETAINING WALL DRIVEWAYS NOTES: 1. MEDIAN OPENINGS ARE PRELIMINARY AND SUBJECT TO CHANGE. FINAL MEDIAN OPENING LOCATIONS TO BE DETERMINED DURING PS&E AND IN COORDINATION WITH THE CITIES OF MELISSA AND ANNA. 2. SOURCE OF TRAFFIC DATA: TEXAS DEPARTMENT OF TRANSPORTATION TRANSPORTATION, PROGRAMING AND PLANNING DIVISION MARCH 27, 2007 3. ALL URBAN SECTIONS WILL HAVE CONCRETE CURB AND GUTTER WITH BARRIER CURBS. NOTES: 1. MEDIAN OPENINGS ARE PRELIMINARY AND SUBJECT TO CHANGE. FINAL MEDIAN OPENING LOCATIONS TO BE DETERMINED DURING PS&E AND IN COORDINATION WITH THE CITIES OF MELISSA AND ANNA. 2. SOURCE OF TRAFFIC DATA: TEXAS DEPARTMENT OF TRANSPORTATION TRANSPORTATION, PROGRAMING AND PLANNING DIVISION MARCH 27, 2007 3. ALL URBAN SECTIONS WILL HAVE CONCRETE CURB AND GUTTER WITH BARRIER CURBS. Texas Department of Transportation R C 2011 EXISTING R.O.W. (ACCESS BY PERMIT ONLY) PROPERTY LINES PROPOSED R.O.W. (ACCESS BY PERMIT ONLY IN ACCORDANCE WITH TXDOT ACCESS CONTROL MANUAL) SH 121 CL OBLITERATE EXISTING ROADWAY EXISTING R.O.W. (ACCESS BY PERMIT ONLY) PROPERTY LINES PROPOSED R.O.W. (ACCESS BY PERMIT ONLY IN ACCORDANCE WITH TXDOT ACCESS CONTROL MANUAL) SH 121 CL OBLITERATE EXISTING ROADWAY X ROLL of 11 X ROLL of 11 These documents are not intended for Construction, Bidding or Permit Purposes. They were prepared by, or under the supervision of: NANCY D. MITCHELL, P.E. 79762 09/22/11 PROJECT MANAGER PE# DATE Lockwood, Andrews & Newnam, Inc. T.B.P.E. Firm # 2614 DESIGN ROADWAY LIMITS FUNCTIONAL CLASSIFICATION ADT DESIGN SPEED FROM TO 2012 2032 SH 121 (SUBURBAN) ARTERIAL 18800 29400 45 SH 121 (RURAL) ARTERIAL 13500 21000 70 SH 121 RAMPS RAMP NA NA 35 FM 2933 AT SH 121 COLLECTOR 1000 1600 40 455 N AT SH 121 ARTERIAL 1550 2250 40 455 S AT SH 121 COLLECTOR 500 700 40 E. HOUSTON ST (FM 2862) AT SH 121 COLLECTOR 1700 2700 50 SH 160 AT SH 121 ARTERIAL 4100 6600 50 N. McDonald Street (SH 5 SOUTH) AT SH 121 ARTERIAL 7300 11,300 40 MC KINNEY ST (SH 5 NORTH) AT SH 121 ARTERIAL 6400 9900 40 DENTON ST (FM 545) AT SH 121 COLLECTOR 4200 6500 30 COUNTY ROADS CR 418 AT SH 121 LOCAL 600 900 30 LANDFILL ENTRANCE AT SH 121 LOCAL NA NA 30 416 AT SH 121 LOCAL NA NA 30 419 AT SH 121 LOCAL 300 600 20 * 420 AT SH 121 LOCAL NA NA 20 * 475 AT SH 121 LOCAL 250 450 30 507(509) AT SH 121 LOCAL NA NA 20 * 424 / 513 AT SH 121 LOCAL NA NA 30 526 / 527 AT SH 121 LOCAL NA NA 20 * 528 / 581 AT SH 121 LOCAL NA NA 20 * 582 AT SH 121 LOCAL NA NA 20 * 936 AT SH 121 LOCAL NA NA 20 * 1002 AT SH 121 LOCAL NA NA 20 * COUNTY LINE RD AT SH 121 LOCAL 250 250 20 * EASTLINE RD AT SH 121 LOCAL 200 350 30 CITY STREETS FANNIN RD AT SH 121 COLLECTOR NA NA 30 BARTLETT RD AT SH 121 LOCAL NA NA 30 CREEKSIDE RD AT SH 121 LOCAL NA NA 30 BERRY RD AT SH 121 LOCAL 2600 4000 30 EASTWOOD RD AT SH 121 LOCAL NA NA 30 LILLIAN DR AT SH 121 LOCAL NA NA 30 NUGENT ST AT SH 121 LOCAL NA NA 30 LIBERTY WAY AT SH 121 LOCAL 900 1400 30 REDWOOD BLVD AT SH 121 LOCAL NA NA 30 * = UNPAVED COUNTY ROAD * = UNPAVED COUNTY ROAD DISPLACED STRUCTURE DISPLACED STRUCTURE + = FUTURE OUTER LOOP, BY OTHERS + = FUTURE OUTER LOOP, BY OTHERS Outer Loop + Outer Loop + Outer Loop + END PROJECT END CSJ: 0549-03-021 END STA: 865+37.66 STA 368+10.00 SH 5 STA 67+54.08 STA 368+10.00 STA 368+10.00 STA 865+37.66 CR 635 STA 865+37.66 CR 635 DESIGN ROADWAY LIMITS FUNCTIONAL CLASSIFICATION ADT DESIGN SPEED FROM TO 2012 2032 SH 121 (SUBURBAN) ARTERIAL 18800 29400 45 SH 121 (RURAL) ARTERIAL 13500 21000 70 SH 121 RAMPS RAMP NA NA 35 FM 2933 AT SH 121 COLLECTOR 1000 1600 40 455 N AT SH 121 ARTERIAL 1550 2250 40 455 S AT SH 121 COLLECTOR 500 700 40 E. HOUSTON ST (FM 2862) AT SH 121 COLLECTOR 1700 2700 50 SH 160 AT SH 121 ARTERIAL 4100 6600 50 N. McDonald Street (SH 5 SOUTH) AT SH 121 ARTERIAL 7300 11,300 40 MC KINNEY ST (SH 5 NORTH) AT SH 121 ARTERIAL 6400 9900 40 DENTON ST (FM 545) AT SH 121 COLLECTOR 4200 6500 30 COUNTY ROADS CR 418 AT SH 121 LOCAL 600 900 30 LANDFILL ENTRANCE AT SH 121 LOCAL NA NA 30 416 AT SH 121 LOCAL NA NA 30 419 AT SH 121 LOCAL 300 600 20 * 420 AT SH 121 LOCAL NA NA 20 * 475 AT SH 121 LOCAL 250 450 30 507(509) AT SH 121 LOCAL NA NA 20 * 424 / 513 AT SH 121 LOCAL NA NA 30 526 / 527 AT SH 121 LOCAL NA NA 20 * 528 / 581 AT SH 121 LOCAL NA NA 20 * 582 AT SH 121 LOCAL NA NA 20 * 936 AT SH 121 LOCAL NA NA 20 * 1002 AT SH 121 LOCAL NA NA 20 * COUNTY LINE RD AT SH 121 LOCAL 250 250 20 * EASTLINE RD AT SH 121 LOCAL 200 350 30 CITY STREETS FANNIN RD AT SH 121 COLLECTOR NA NA 30 BARTLETT RD AT SH 121 LOCAL NA NA 30 CREEKSIDE RD AT SH 121 LOCAL NA NA 30 BERRY RD AT SH 121 LOCAL 2600 4000 30 EASTWOOD RD AT SH 121 LOCAL NA NA 30 LILLIAN DR AT SH 121 LOCAL NA NA 30 NUGENT ST AT SH 121 LOCAL NA NA 30 LIBERTY WAY AT SH 121 LOCAL 900 1400 30 REDWOOD BLVD AT SH 121 LOCAL NA NA 30 Outer Loop + Outer Loop + Outer Loop + STA 368+10.00 SH 5 STA 67+54.08 STA 368+10.00 STA 368+10.00 STA 865+37.66 CR 635 STA 865+37.66 CR 635 1 SH 121 STA 67+54.08 TO STA. 187+00 2 SH 121 STA 187+00 TO STA. 327+00 3 SH 121 STA 327+00 TO STA. 467+00 4 SH 121 STA 467+00 TO STA. 607+00 5 SH 121 STA 607+00 TO STA. 747+00 6 SH 121 STA 747+00 TO CR 635 (FANNIN COUNTY LINE) 7 SH 121 STA 747+00 TO FANNIN COUNTY LINE (TRANSITION) 8 SH 5 AND FANNIN ROAD 9 FM 455 AND CONNECTING RAMPS 10 FM 2862 AND CONNECTING RAMPS 11 SH 160 AND CONNECTING RAMPS 1 SH 121 STA 67+54.08 TO STA. 187+00 2 SH 121 STA 187+00 TO STA. 327+00 3 SH 121 STA 327+00 TO STA. 467+00 4 SH 121 STA 467+00 TO STA. 607+00 5 SH 121 STA 607+00 TO STA. 747+00 6 SH 121 STA 747+00 TO CR 635 (FANNIN COUNTY LINE) 7 SH 121 STA 747+00 TO FANNIN COUNTY LINE (TRANSITION) 8 SH 5 AND FANNIN ROAD 9 FM 455 AND CONNECTING RAMPS 10 FM 2862 AND CONNECTING RAMPS 11 SH 160 AND CONNECTING RAMPS DALLAS DISTRICT WILLIAM HALE, P.E. DISTRICT ENGINEER SH 121 COLLIN COUNTY DESIGN SCHEMATIC SEPTEMBER 2011 FROM: SH 5 IN MELISSA TO: CR 635 (EAST LINE ROAD) BRIDGE REPLACEMENT AND HIGHWAY RECONSTRUCTION PROJECT LENGTH: 15.11 MILES (79784’) BRIDGE: 0.30 MILES (1560’) ROADWAY: 14.81 MILES (78224’) CSJ: 0549-03-018 (SH 5 to FM 455) CSJ: 0549-03-021 (FM 455 to CR 635/FANNIN COUNTY LINE) DALLAS DISTRICT WILLIAM HALE, P.E. DISTRICT ENGINEER SH 121 COLLIN COUNTY DESIGN SCHEMATIC SEPTEMBER 2011 FROM: SH 5 IN MELISSA TO: CR 635 (EAST LINE ROAD) BRIDGE REPLACEMENT AND HIGHWAY RECONSTRUCTION PROJECT LENGTH: 15.11 MILES (79784’) BRIDGE: 0.30 MILES (1560’) ROADWAY: 14.81 MILES (78224’) CSJ: 0549-03-018 (SH 5 to FM 455) CSJ: 0549-03-021 (FM 455 to CR 635/FANNIN COUNTY LINE) SH 121 NB SH 121 SB L L END BRIDGE C STA. 11+14.53 BEGIN BRIDGE C STA. 9+72.53 16.84’ CLEAR 10+00 600 610 620 630 640 650 FM 455 STA = 6+50.00 EL = 642.01’ L = 120.00’ K = 264 ex = 0.07’ STA = 9+50.00 EL = 646.54’ L = 330.00’ K = 86 ex = -1.59’ STA = 12+25.00 EL = 640.12’ L = 160.00’ K = 100 ex = 0.32’ VPC 5+90.00 EL. = 641.38’ VPT 7+10.00 EL. = 642.91’ VPC 7+85.00 EL. = 644.05’ VPT 11+15.00 EL. = 642.69’ VPC 11+45.00 EL. = 641.99’ VPT 13+05.00 EL. = 639.53’ 10+00 600 610 620 630 640 650 641.48 642.77 644.26 645.01 644.60 643.02 640.85 639.57 15+00 5+00 641.06 640.34 640.92 641.39 637.16 642.29 643.70 644.15 644.55 638.84 640.43 EXISTING GROUND C C L SH 121 STA 465+17.16 = L FM 455 STA 10+43.55 600 610 620 630 640 650 600 610 620 630 640 650 PROP PGL BEGIN CONST. STA. 5+00.00 MATCH EXIST PAVEMENT EL = 640.43 END CONST. STA. 14+00.00 EL = 638.84 MATCH FM 455 CSJ: 2845-01-015 SCHEMATIC BY OTHERS (+)1.0551% (+)1.5104% (-)2.3347% (-)0.7328% 60+00 65+00 Ramp SE455 60+00 65+00 600 610 620 630 640 650 RAMP SE455 644.10 644.25 644.10 644.09 644.06 644.06 643.90 644.00 643.62 EXISTING GROUND 600 610 620 630 640 650 600 610 620 630 640 650 SPLINE GRADE CONTROLLED BY SH 121 PGL C C L FM 455 STA 11+75.57 = L RAMP SE455 STA = 65+18.69 PROP PGL 642.35 639.99 637.20 634.99 633.83 633.71 634.63 636.36 638.44 640.91 (-)2.6400 % (+)1.7717 % (+)1.7717 % (+)2.5928 % EL = 637.03 BEGIN RAMP PROFILE STA.58+10.41 STA = 60+20.00 EL = 631.38’ ex = 2.34’ K = 96 L = 425.00’ VPC 58+07.50 EL. = 636.99’ VPT 62+32.50 EL. = 635.15’ STA = 63+75.00 EL = 637.67’ ex = 0.21’ K = 244 L = 200.00’ VPC 62+75.00 EL. = 635.90’ VPT 64+75.00 EL. = 640.26’ (+)2.0547% OBSCURED OBSCURED PIPE 117 628.65 S GATE S CULVERT CULVERT S S S S CULVERT S S GATE S CULVERT S OBSCURED PIPE OBSCURED S FUTURE FM 455 CR 475 WKG ENTERPRISES LTD POWELL M C SR SHERLEY PARTNERS LTD "W 2.5"W 2"W 2.5"W UNINCORPORATED CITY OF ANNA UNINCORPORATED UNINCORPORATED CITY OF ANNA CR 475 FM 455 80’ 195’ 160’ 460+00 465+00 470+00 475+00 N 50%%d 48’ 42.38" E POT 5+00.00 5+00 PC 5+36.04 PCC 8+61.95 10+00 15+00 PT 15+24.27 N 0%%d 15’ 24.90" E N 43%%d 16’ 51.70" E N 50%%d 48’ 42.38" E 60+00 65+00 60+00 65+00 N 50%%d 48’ 42.34" E N 55%%d 08’ 16.78" E 70+00 75+00 70+00 75+00 N 50%%d 48’ 42.34" E N 46%%d 22’ 50.09" E N 50%%d 48’ 42.38" E CL455-1 CL455-2 S GATE S CULVERT CULVERT CULVERT GATE CULVERT S OBSCURED PIPE S S 124 647.11 CULVERT CULVERT CULVERT CULVERT S GATE SLAB GATE TFP PIPE S FUTURE FM 455 CR 475 WKG ENTERPRISES LTD WKG ENTERPRISES LTD DZANSKI RICHARD WKG ENTERPRISES LTD BERA INCORPORATED HAGEN MARIANNE HAGEN MARIANNE 2.5"W 2.5"W 2.5"W 2"W UNINCORPORATED CITY OF ANNA UNINCORPORATED PROP. ROW CR 475 26’ 26’ 450’ ACCELERATION 600’ TAPER PROP ROW VARIES 91’ - 168’ 80’ 170’ 195’ 160’ 440+00 445+00 450+00 455+00 460+00 465+00 470+00 5+00 10+00 15+00 N 0%%d 15’ 24.90" E N 49%%d 39’ 57.63" E N 50%%d 22’ 20.82" E N 43%%d 16’ 51.70" E N 50%%d 48’ 42.38" E PI 46+00.00 50+00 PI 52+00.12 PC 54+71.95 55+00 PT 58+26.54 60+00 PC 60+48.10 PT 63+10.98 65+00 PC 47+00.00 50+00 PT 51+00.03 55+00 PC 59+99.34 60+00 PT 62+08.78 65+00 N 54%%d 48’ 42.38" E N 50%%d 48’ 42.34" E PC 68+96.42 70+00 N 50%%d 48’ 42.34" E \ SH 121 STA 465+17.16 = \ FM 455 STA 10+43.55 N 50%%d 48’ 42.38" E SE455-1 SE455-2 NX455-1 NX455-2 S GATE S CULVERT CULVERT CULVERT GATE CULVERT S OBSCURED PIPE S S 124 647.11 CULVERT CULVERT CULVERT CULVERT S GATE SLAB GATE TFP PIPE S FUTURE FM 455 CR 475 WKG ENTERPRISES LTD WKG ENTERPRISES LTD WKG ENTERPRISES LTD BERA INCORPORATED HAGEN MARIANNE HAGEN MARIANNE 2.5"W 2.5"W 2.5"W UNINCORPORATED CITY OF ANNA UNINCORPORATED PROP. ROW CR 475 445+00 450+00 455+00 460+00 465+00 470+00 5+00 10+00 15+00 N 0%%d 15’ 24.90" E N 49%%d 39’ 57.63" E N 50%%d 22’ 20.82" E N 43%%d 16’ 51.70" E N 50%%d 48’ 42.38" E PI 46+00.00 50+00 PI 52+00.12 PC 54+71.95 55+00 PT 58+26.54 60+00 PC 60+48.10 PT 63+10.98 65+00 PC 47+00.00 50+00 PT 51+00.03 55+00 PC 59+99.34 60+00 PT 62+08.78 65+00 N 54%%d 48’ 42.38" E N 50%%d 48’ 42.34" E 70+00 N 50%%d 48’ 42.34" E \ SH 121 STA 465+17.16 = \ FM 455 STA 10+43.55 N 50%%d 48’ 42.38" E SE455-1 SE455-2 NX455-1 NX455-2 55+00 60+00 65+00 600 610 620 630 640 650 RAMP NX455 646.93 645.78 644.12 643.24 642.61 642.53 642.21 642.64 642.60 642.37 642.37 642.08 641.83 641.89 641.88 641.45 641.04 630.76 630.22 EXISTING GROUND 600 610 620 630 640 650 SPLINE GRADE CONTROLLED BY SH 121 PGL C C L FM 455 STA 9+11.49 = L RAMP NX455 STA = 65+26.27 PROP PGL PROP PGL 647.24 646.53 645.43 644.30 643.17 642.04 640.92 640.32 640.54 641.05 641.57 642.08 642.97 644.52 (-)1.1300 % (-)1.1300 % (+)0.5135 % (+)0.5135 % BEGIN RAMP PROFILE STA. 53+87.83 EL = 645.57 VPC 63+00.00 EL. = 642.08’ VPT 64+50.00 EL. = 643.70’ END NX455 STA.65+26.27 EL = 645.03 END RAMP PROFILE VPI STA = 65+08.25 (+)2.0315% (+)1.6472% STA = 63+75.00 EL = 642.47’ ex = 0.21’ K = 132 L = 150.00’ STA = 58+85.00 EL = 639.95’ ex = 0.41’ K = 122 L = 200.00’ VPC 57+85.00 EL. = 641.08’ VPT 59+85.00 EL. = 640.46’ CULVERT OBSCURED S OBSCURED OBSCURED 122 582.10 S S S S S S S S S S S S S S GATE PIPES S S S S OBSCURED OBSCURED OBSCURED PIPE S S S S OBSCURED OBSCURED OBSCURED OBSCURED OBSCURED OBSCURED TANK LP PIPE TFP 117 628.65 S GATE S CULVERT CULVERT S S S S S CULVERT S S S S S S GATE GATE S CULVERT S GATE PIPE WE 612.96 WE 612.96 OBSCURED OBSCURED OBSCURED OBSCURED PIPE OBSCURED OBSCURED FUTURE FM 455 CR 475 SISTER GROVE CREEK FM 455 POWELL M C SR SHERLEY PARTNERS LTD SHERLEY PARTNERS LTD WOMACK A E SHERLEY PARTNERS LTD WOMACK ALBERT CARTER SHERLEY PARTNERS LTD WOMACK ALBERT CARTER 2.5"W 2"W 2.5"W 2.5"W 2.5"W 2.5"W UNINCORPORATED CITY OF ANNA UNINCORPORATED UNINCORPORATED UNINCORPORATED CITY OF ANNA CITY OF ANNA UNINCORPORATED UNINCORPORATED CITY OF ANNA CITY OF ANNA CITY OF ANNA UNINCORPORATED UNINCORPORATED UNINCORPORATED UNINCORPORATED UNINCORPORATED EXIST. ROW EXIST. ROW EXIST. ROW PROP. ROW PROP. ROW PROP. ROW PROP. ROW FM 455 FM 455 SISTER GROVE CREEK 460+00 465+00 470+00 475+00 480+00 485+00 490+00 495+00 N 50%%d 48’ 42.38" E 5+00 10+00 15+00 N 43%%d 16’ 51.70" E N 50%%d 48’ 42.38" E PT 63+10.98 65+00 60+00 PT 62+08.78 65+00 N 50%%d 48’ 42.34" E N 55%%d 08’ 16.78" E PC 68+96.42 70+00 PT 71+22.94 75+00 PC 79+06.74 80+00 PT 83+39.39 70+00 PC 72+31.76 PT 73+47.77 75+00 PC 79+70.51 80+00 PT 83+88.53 85+00 PI 86+02.71 90+00 PI 92+02.83 N 50%%d 48’ 42.34" E N 46%%d 22’ 50.09" E N 49%%d 39’ 57.67" E N 50^22’20.74" E N 50%%d 48’ 42.38" E CL455-1 CL455-2 SX455-1 SX455-2 NE455-2 NE455-1 EL = 640.97’ STA = 67+25.00 EL = 639.09’ L = 330.00’ K = 84 ex = -1.62’ STA = 74+35.00 EL = 604.13’ L = 410.00’ K = 98 ex = 2.15’ VPC 65+60.00 EL. = 640.74’ VPT 68+90.00 EL. = 630.97’ VPC 72+30.00 EL. = 614.22’ VPT 76+40.00 EL. = 602.65’ 70+00 75+00 590 600 610 620 630 640 650 640.24 638.17 634.92 630.47 625.55 620.63 615.70 611.03 607.33 604.67 603.02 VPI STA = 65+36.70 65+00 590 600 610 620 630 640 650 RAMP SX455 643.60 638.37 635.12 630.97 623.34 619.00 613.97 602.01 592.18 585.09 581.45 578.45 576.67 575.52 EXISTING GROUND 602.61 SPLINE GRADE CONTROLLED BY SH 121 PGL BEGIN NE455 STA.65+26.27 BEGIN RAMP PROFILE C C L FM 455 STA 11+75.57 = L RAMP NX455 STA = 65+18.69 END NX455 STA.65+18.69 EL = 641.03 EL = 602.61 END RAMP PROFILE STA.76+45.41 PROP PGL (-)1.9267% (-)1.0000% (-)4.9240% (-)4.9240% (-)0.7200% CULVERT OBSCURED S OBSCURED OBSCURED 122 582.10 S S S S S S S S S S S S S S GATE PIPES S S S S OBSCURED OBSCURED OBSCURED PIPE S S S S OBSCURED OBSCURED OBSCURED OBSCURED OBSCURED OBSCURED TANK LP PIPE TFP 117 628.65 622.15 S GATE S CULVERT CULVERT S S S S S CULVERT S S S S S S S GATE GATE S CULVERT S GATE PIPE WE 612.96 WE 612.96 OBSCURED OBSCURED OBSCURED OBSCURED PIPE OBSCURED OBSCURED FUTURE FM 455 CR 475 SISTER GROVE CREEK FM 455 POWELL M C SR SHERLEY PARTNERS LTD SHERLEY PARTNERS LTD WOMACK A E SHERLEY PARTNERS LTD WOMACK ALBERT CARTER SHERLEY PARTNERS LTD WOMACK ALBERT CARTER 2.5"W 2"W 2.5"W 2.5"W 2.5"W 2.5"W UNINCORPORATED CITY OF ANNA UNINCORPORATED UNINCORPORATED UNINCORPORATED CITY OF ANNA CITY OF ANNA UNINCORPORATED UNINCORPORATED CITY OF ANNA CITY OF ANNA CITY OF ANNA UNINCORPORATED UNINCORPORATED UNINCORPORATED UNINCORPORATED UNINCORPORATED EXIST. ROW EXIST. ROW EXIST. ROW PROP. ROW PROP. ROW PROP. ROW PROP. ROW FM 455 FM 455 SISTER GROVE CREEK 26’ 26’ 450’ ACCEL. 600’ TAPER 130’ 80’ 190’ 195’ 160’ 101’ 39’ 170’ 84’ 460+00 465+00 470+00 475+00 480+00 485+00 490+00 495+00 N 50%%d 48’ 42.38" E 5+00 10+00 15+00 N 43%%d 16’ 51.70" E N 50%%d 48’ 42.38" E 60+00 PC 60+48.10 PT 63+10.98 65+00 60+00 PT 62+08.78 65+00 N 50%%d 48’ 42.34" E N 55%%d 08’ 16.78" E PC 68+96.42 70+00 PT 71+22.94 75+00 PC 79+06.74 80+00 PT 83+39.39 70+00 PC 72+31.76 PT 73+47.77 75+00 PC 79+70.51 80+00 PT 83+88.53 85+00 PI 86+02.71 90+00 PI 92+02.83 N 50%%d 48’ 42.34" E N 46%%d 22’ 50.09" E N 49%%d 39’ 57.67" E N 50^22’20.74" E N 50%%d 48’ 42.38" E CL455-1 CL455-2 SX455-1 SX455-2 NE455-2 NE455-1 EL = 644.67’ STA = 67+00.00 EL = 639.99’ 70+00 75+00 590 600 610 620 630 640 650 80+00 65+00 590 600 610 620 630 640 650 VPI STA = 65+44.29 RAMP NE455 641.04 630.79 630.22 623.70 615.93 609.39 602.66 597.46 590.21 586.69 582.14 579.00 576.81 576.18 577.63 575.51 L = 240.00’ K = 91 ex = -0.79’ STA = 73+20.00 EL = 605.03’ L = 480.00’ K = 98 ex = 2.95’ VPC 65+80.00 EL. = 643.59’ VPT 68+20.00 EL. = 633.23’ VPC 70+80.00 EL. = 618.56’ VPT 75+60.00 EL. = 603.30’ 642.97 639.20 634.33 628.71 623.07 617.46 612.53 608.64 605.76 603.92 603.01 602.29 601.57 600.85 EXISTING GROUND SPLINE GRADE CONTROLLED BY SH 121 PGL C C L FM 455 STA 9+11.49 = L RAMP NE455 STA = 65+26.27 BEGIN NE455 STA.65+26.27 EL = 645.03 BEGIN RAMP PROFILE END RAMP PROFILE STA.79+10.44 EL = 600.78 PROP PGL (-)1.9978% (-)3.0000% (-)5.6400% (-)5.6400% (-)0.7200% PGL 12’ LANE 2.0% CSJ 0549-03-018 NTS 12’ TURN LANE 12’ TURN LANE 4’ SH L C RAMP 4’ SH 12’ PROP C-L 12’ LANE 4’ SH CSJ 0549-03-018 NTS PGL 2.0% PROPOSED ROW 4’ SH 44’ PROPOSED ROW L C RAMP PROP C-L 32’ CSJ 0549-03-018 NTS 2’ 9’ MEDIAN 2’ 9’ MEDIAN PGL 12’ TURN LANE 12’ TURN LANE 12’ LANE 12’ LANE 12’ LANE 12’ LANE 1’ 1’ 96’ OVERALL WIDTH 2.0% CSJ 0549-03-018 NTS 2.0% 2.0% 2.0% PROP C-L PROP C-L 2.0% 2.0% 1.5% 4:1 USUAL 3:1 MAX 1.5% 4:1 USUAL 3:1 MAX STA. 5+00 TO STA. 9+72.53 STA. 9+72.53 TO STA. 11+14.53 STA. 11+14.53 TO STA. 15+24.27 PGL 2.0% CSJ 0549-03-018 NTS EXISTING FM 455 TYPICAL SECTION 2.0% 12’ LANE 12’ LANE EXISTING ROW EXISTING ROW EXIST C-L L C FM 455 50’ PGL VAR CSJ 0549-03-018 NTS EXISTING CR 475 TYPICAL SECTION VAR L C CR 475 22’ EXIST C-L EXISTING ROW 50’ ROW EXISTING ROW 25’ C L C L C-L EB PGL L C C-L WB PGL PGL PGL L C PROPOSED ROW VARIES 46’-66’ VARIES 54’-66’ 2.0% CSJ 0549-03-018 NTS 2.0% PROP C-L 12’ LANE 12’ LANE 2’ SH 2’ SH 12’ LANE 12’ LANE 2’ SH 2’ SH 40’ 40’ 2.0% 2.0% C L C-L EB PGL L C C-L WB PGL PGL PGL L C PROPOSED ROW FUTURE 12’ LANE 19.5’ 7.5’ 12’ TURN LANE 160’ ROW PROPOSED RAMP TYPICAL SECTION AT FM 455 NB EXIT PROPOSED RAMP TYPICAL SECTION AT FM 455 NB ENTRANCE PROPOSED CR 475/FM 455 BRIDGE TYPICAL SECTION 8.5’ MIN 8.5’ MIN 4:1 USUAL 3:1 MAX 1.5% 8.5’ MIN 1.5% 4:1 USUAL 3:1 MAX 8.5’ MIN 25’ 50’ EXISTING 88’ ROW PROPOSED FM 455 TYPICAL SECTION PROPOSED FM 455 TYPICAL SECTION STA. 53+87.83 TO STA. 59+53.57 STA. 59+53.57 TO STA. 64+80.48 12’ 6:1 6:1 4:1 RET WALL 14’ LANE 4’ SH 8’ SHLDR PGL 2.0% L C RAMP PROP C-L PROPOSED ROW CSJ 0549-03-018 NTS 26’ PROPOSED RAMP TYPICAL SECTION AT FM 455 NB EXIT VARIES 12’-30’ 6:1 4:1 USUAL 3:1 MAX STA. 65+72.75 TO STA. 72+95.43 STA. 72+95.43 TO STA. 79+10.44 6:1 14’ LANE 4’ SH 8’ SHLDR PGL 2.0% L C RAMP PROP C-L PROPOSED ROW CSJ 0549-03-018 NTS 26’ VARIES 74’-98’ 6:1 PROPOSED RAMP TYPICAL SECTION AT FM 455 NB ENTRANCE 4:1 RET WALL 3:1 MAX 3:1 MAX 6:1 VARIES 15’-33’ VARIES 25’-33’ RET WALL 3:1 MAX 6:1 VARIES 17’-25’ VARIES 54’-74’ 6:1 4:1 STA. 58+10.41 TO STA. 64+73.08 14’ LANE 4’ SH 8’ SHLDR 2.0% CSJ 0549-03-018 NTS 26’ 6:1 PROPOSED RAMP TYPICAL SECTION AT FM 455 SB ENTRANCE 4:1 L C RAMP PROP C-L PGL 6:1 3:1 MAX RET WALL VARIES 13’-44’ PROPOSED ROW VARIES 20’-28’ LANE VARIES 0’-12’ 12’ LANE 2.0% CSJ 0549-03-018 NTS 12’ TURN LANE 12’ TURN LANE 4’ SH 4’ SH 12’ 44’ PROPOSED RAMP TYPICAL SECTION AT FM 455 SB EXIT STA. 70+88.27 TO STA. 76+45.41 STA. 65+18.69 TO STA. 70+88.27 12’ 6:1 6:1 4:1 14’ LANE 4’ SH 8’ SHLDR 2.0% CSJ 0549-03-018 NTS 26’ PROPOSED RAMP TYPICAL SECTION AT FM 455 SB EXIT VARIES 19’-53’ 6:1 3:1 MAX VARIES 22’-33’ 3:1 MAX 6:1 VARIES 17’-22’ PGL PROPOSED ROW RET WALL PROP C-L L C RAMP VARIES 20’-31’ 4:1 USUAL 3:1 MAX PGL RET WALL L C RAMP PROP C-L PROPOSED ROW PROPOSED ROW PROPOSED ROW VARIES 100’-132’ 80’ 80’ VARIES 20’-32’ VARIES 23’-43’ LANE VARIES 0’-12’ LANE VARIES 0’-12’ VARIES 0’-7’ VARIES 0’-19’ LANE VARIES 0’-12’ LANE VARIES 11’-12’ LANE VARIES 11’-12’ VARIES 0’-2’ VARIES 0’-2’ VARIES 0’-2’ VARIES 0’-2’ VARIES 11’-28’ VARIES 11’-40’ 6’ 6:1 6:1 12’ 6:1 6’ 12’ 6:1 6’ 6:1 20’ 6’ 6:1 SUPERELEVATION TABLE ROADWAY EVENT LEFT RIGHT STA. X- SLOPE STA. X- SLOPE RAMP BEGIN SE TRANSITION 60+12 2.00% SE 455 END SE TRANSITION 60+64 -3.80% BEGIN SE TRANSITION 62+95 -3.80% END SE TRANSITION 63+47 2.00% RAMP SE455 RAMP NX455 RAMP SX455 RAMP NE455 PI STATION DEGREE OF CURVE = 0%%d 59’ 59.73" PC STATION PT STATION DELTA TANGENT LENGTH RADIUS = 49+00.10 = 4%%d 00’ 00.00" (RT) = 200.10 = 400.03 = 5,730.00 = 47+00.00 = 51+00.03 PI STATION DELTA DEGREE OF CURVE = 1%%d 59’ 59.47" TANGENT LENGTH RADIUS PC STATION PT STATION = 56+49.47 = 7%%d 05’ 28.90" (LT) = 177.52 = 354.59 = 2,865.00 = 54+71.95 = 58+26.54 PI STATION DELTA DEGREE OF CURVE = 1%%d 54’ 35.49" TANGENT LENGTH RADIUS PC STATION PT STATION = 61+04.10 = 4%%d 00’ 00.04" (LT) = 104.76 = 209.44 = 3,000.00 = 59+99.34 = 62+08.78 = 61+79.73 = 7%%d 31’ 50.68" (RT) DEGREE OF CURVE = 2%%d 51’ 53.24" = 131.63 = 262.87 = 2,000.00 = 60+48.10 = 63+10.98 TANGENT LENGTH RADIUS PC STATION PT STATION PI STATION DELTA NX455-1 SE455-1 NX455-2 SE455-2 = 4%%d 19’ 34.40" (RT) PI STATION DELTA DEGREE OF CURVE = 3%%d 49’ 10.99" TANGENT LENGTH RADIUS PC STATION PT STATION = 72+89.79 = 4%%d 25’ 52.25" (LT) = 58.03 = 116.01 = 1,500.00 = 72+31.76 = 73+47.77 = 70+09.73 DEGREE OF CURVE = 1%%d 54’ 35.49" = 113.31 = 226.52 = 3,000.00 = 68+96.42 = 71+22.94 PI STATION DELTA TANGENT LENGTH RADIUS PC STATION PT STATION SX455-1 NE455-1 DEGREE OF CURVE = 0%%d 59’ 59.73" PC STATION PT STATION = 81+23.17 = 4%%d 19’ 34.40" (LT) = 216.43 = 432.65 = 5,730.00 = 79+06.74 = 83+39.39 DELTA TANGENT LENGTH RADIUS PI STATION SX455-2 PI STATION DEGREE OF CURVE = 0%%d 57’ 17.75" TANGENT LENGTH RADIUS PC STATION PT STATION DELTA = 81+79.60 = 3%%d 59’ 30.65" (RT) = 209.10 = 418.03 = 6,000.00 = 79+70.51 = 83+88.53 NE455-2 PI STATION DELTA DEGREE OF CURVE = 1%%d 44’ 10.44" TANGENT LENGTH RADIUS PC STATION PT STATION = 11+94.23 = 11%%d 29’ 58.45" (LT) = 332.28 = 662.33 = 3,300.00 = 8+61.95 = 15+24.27 PI STATION DEGREE OF CURVE = 11%%d 01’ 06.31" TANGENT LENGTH RADIUS PC STATION PT STATION = 7+04.55 = 35%%d 54’ 33.30" (LT) = 168.50 = 325.90 = 520.00 = 5+36.04 = 8+61.95 DELTA CL455-1 CL455-2 END BRIDGE \ STA. 11+14.53 BEGIN BRIDGE \ STA. 9+72.53 \ SH 121 STA 465+17.16 = \ FM 455 STA 10+43.55 C FM 455 STA. 9+11.49 = B RAMP NX455 STA.= 65+26.27 B RAMP NE455 STA. = 65+26.27 L L L L L L C FM 455 STA. 9+11.49 = B RAMP NE455 STA. = 65+26.27 L L \ FM 455 STA. 9+11.49 = L RAMP NX455 STA. 65+26.27 \ SH 121 STA 465+17.16 = \ FM 455 STA 10+43.55 FM 455 END CONSTRUCTION \ FM 455 STA. 14+00.00 \ SH 121 L RAMP SX455 L RAMP SE455 L RAMP SE455 L RAMP NE455 \ FM 455 \ FM 455 \ FM 455 \ FM 455 \ FM 455 \ SH 121 \ SH 121 \ SH 121 \ SH 121 L RAMP SE455 L RAMP NX455 L RAMP NX455 L RAMP SE455 L RAMP SX455 L RAMP NE455 36’ R 20’ R 20’ R 20’ 20’ 26’ 39’ 44’ 20’ 26’ 32’ 58’ 180’ TAPER 100’ 28’ 245’ LANE TAPER 193’ LANE TAPER 22’ TEXAS 121 FARM ROAD 455 TEXAS 121 FARM ROAD 455 TEXAS 121 FARM ROAD 455 FARM ROAD 455 TEXAS 121 FARM ROAD 455 TEXAS 121 425’ TURN LANES BOTH SIDES 100’ TAPER 425’ TURN LANE BOTH SIDES 100’ TAPER BEGIN CONSTRUCTION \ FM 455 STA. 5+00.00 MATCH EXIST PAVEMENT 37’ 25’ FUTURE FM 455 CSJ: 2845-01-015 SCHEMATIC BY OTHERS L L L L L L L L C FM 455 STA. 11+75.56 = B RAMP SE455 STA.= 65+18.69 B RAMP SX455 STA. = 65+18.69 BEGIN RAMP B SE455 STA. 46+00.00 END RAMP B SE455 STA. 64+73.08 BEGIN RAMP B NX455 STA. 47+00.00 END RAMP B NX455 STA. 64+80.48 BEGIN RAMP B SX455 STA. 65+64.04 END RAMP B SX455 STA. 83+39.39 END RAMP B NE455 STA. 92+02.83 BEGIN RAMP B NE455 STA. 65+72.75 \ FM 455 STA. 11+75.57 = L RAMP SE455 STA.= 65+18.69 \ FM 455 STA. 11+75.57 = L RAMP SX455 STA. 65+18.69 B B B B B B B B B B B B 9 9 R 50’ R 50’ R 50’ R 50’ R 20’

Transcript of DesignJET 5500 Color RTL.PLT, 200 SCALE, 16.7 X 121 ... 121 - Roll 9 … · BOWDEN BAILEY COLLEGE...

Page 1: DesignJET 5500 Color RTL.PLT, 200 SCALE, 16.7 X 121 ... 121 - Roll 9 … · BOWDEN BAILEY COLLEGE GEORGIA PICCADILLY BROADWAY SOUTH HIGHT Old Grounds 0.9 Blue Ridge Cemetery 0.5 0.3

FT (HORIZONTAL) Texas Department of Transportation

R C 2011

MELISSA

ANNA

BLUE RIDGE

DESERT

LOCATION MAP

EA

ST

LIN

E R

D.

SH 1

21

BEGIN PROJECT

BEGIN CSJ: 0549-03-018

BEGIN STA: 67+54.08

FO

RK

TR

INIT

Y

RIV

ER

Thro

ckm

ort

on

Cre

ek

Highland

Cemetery

Melissa

Cemetery

COUNTRY

RID

GE

ME

AD

OW

CR

EE

K

BROOK

ME

LIS

SA

CIT

Y

LIM

IT

2.3

1.0

0.4

1.3

SO

UT

HE

RN

PA

CIF

IC

MELISSA

Fit

zhugh

Bra

nch

Pull

iam

Branch

Cle

mons

Cre

ek

Stiff

Creek

1.2

0.6

GREENWAY

GROVE VIEW

1.0

4.0

Brinlee

Bra

nch

Hurr

icane

Cre

ek

Thro

ckm

ort

on

Cre

ek

Sla

yte

r

Cre

ek

ANNA

CITY

LIMIT

ANNA

0.3

2ND

3RD

4TH

5TH

6TH

7TH

4.4

Pop 904

Pop 557

6.0

Coffman

2.0

Lair

6.5

4.5

4.3

1.5

ANNA

CITY

LIMIT

Branch

Hatler

3.2

Stony Point

Cemetery

Elm

Gro

ve

Cre

ek

Sister

Grove

Creek

2.0

1.5

1.1

1.3

2.3

2.0

WESTMINSTER

BLUE RIDGE

Elm Grove

Cemetery

HOUSTON

AUSTIN

BAILEY

BO

WD

EN

CO

LL

EG

E

GE

OR

GIA

PIC

CA

DIL

LY

BROADWAY

SOUTH

HIG

HT

Old

Grounds

0.9

Blue Ridge

Cemetery

0.5

0.3

2.2

0.9

7.6

Bra

nch

Harrin

gto

n

Lic

kB

ranch

Pilot

Gro

ve

Cre

ek

Pot

Rack

Cre

ek

Des

ert

Cre

ek

Cre

ek

Dese

rt

Dese

rtC

reek

Pilo

t

Gro

ve

Creek

Pilo

t

Gro

ve

Cre

ek

Creek

Red

Oak

Wolf

Run

Cr

Sis

ter

Gro

ve

Cre

ek

Sister

Gro

ve

Cre

ek

Coleman

WESTMINSTER

LIM

IT

WESTM

INSTER

CIT

Y

LIM

IT

WESTMINSTER CITY LIMIT

WESTMINSTER

CITY

LIM

IT

LAMMLYLE

BA

KE

R

CH

UR

CH

CO

UN

TY

LIN

ER

OA

D

VERONA

Pop 388

CHAMBLISSVALDASTA

Pop 521

FAYBURG

SNOW

HILL

0.4

2.1

1.2

1.4

1.2

5.3

CIT

Y

SCHOOL

DUNN

DAVIS

WHITE

CENTER

BRATCHER

JAMES

HEAD

ROBY

STEPP

PRICHARD

RIDGETOP

BRENDA

RIDGEWAY

India

n

Pot

Rack

Cre

ek

FROGNOT

Cle

mons

EA

ST

2.1

Stiff

Creek

6.9

Branch

Cem

Verona

Herrin

gto

n

Pilo

t

Gro

ve

Cre

ek

Rack

Lic

k

Bra

nch

VERONA

Cre

ek

0.8

Brinlee

D

B78

D

B78

ALTOGA

75

5

75

2933

2933

121

121

5

5

545

545

455 455

121

545

75

121

121

121

1377

455455

1827

545

545

78

78

78

78

981

981

1377

3133

2933

1827

1377

1827

2862

2862

C

SP

LIM

IT

CITY

MC KINNEY

MC KINNEY

CITY LIMIT

CITY

LIM

IT

SP

5

2862

Water

3.8

Cr

1.3

0.6

1.0

4.9

DESERT

5

1213133

Sweet

78

S.H.ADY-

RuS.H.

West

S.H.ady

Grove

160

78

545

5

2862

2862

5

9/3

0/2

011

L:\

110071\1

40-10336-000\p

rod\E

xhib

its\1

21 C

RO

SS

ST

RE

ET

S F

M455_200.d

gn

bso

wels

8:3

0:1

7 A

M

0 200 300

100

GRAPHIC SCALE

(IN FEET)

20 30

HORZ

VERT

100

0 200 300

100 20 30

HORZ

VERT

100

9/3

0/2

011

L:\

11

00

71

\14

0-1

03

36

-0

00

\ pro

d\ E

xh

ibit

s\1

21

CR

OS

S S

TR

EE

TS

FM

45

5_

20

0.d

gn

bsow

el s

8:3

0:1

7 A

M

MELISSA

ANNA

BLUE RIDGE

DESERT

LOCATION MAP

EA

ST

LIN

E R

D.

SH 1

21

BEGIN PROJECT

BEGIN CSJ: 0549-03-018

BEGIN STA: 67+54.08

END PROJECT

END CSJ: 0549-03-021

END STA: 865+37.66

FO

RK

TR

INIT

Y

RIV

ER

Thro

ckm

ort

on

Cre

ek

Highland

Cemetery

Melissa

Cemetery

COUNTRY

RID

GE

ME

AD

OW

CR

EE

K

BROOK

ME

LIS

SA

CIT

Y

LIM

IT

2.3

1.0

0.4

1.3

SO

UT

HE

RN

PA

CIF

IC

MELISSA

Fit

zhugh

Bra

nch

Pull

iam

Branch

Cle

mons

Cre

ek

Stiff

Creek

1.2

0.6

GREENWAY

GROVE VIEW

1.0

4.0

Brinlee

Bra

nch

Hurr

icane

Cre

ek

Thro

ckm

ort

on

Cre

ek

Sla

yte

r

Cre

ek

ANNA

CITY

LIMIT

ANNA

0.3

2ND

3RD

4TH

5TH

6TH

7TH

4.4

Pop 904

Pop 557

6.0

Coffman

2.0

Lair

6.5

4.5

4.3

1.5

ANNA

CITY

LIMIT

Branch

Hatler

3.2

Stony Point

Cemetery

Elm

Gro

ve

Cre

ek

Sister

Grove

Creek

2.0

1.5

1.1

1.3

2.3

2.0

WESTMINSTER

BLUE RIDGE

Elm Grove

Cemetery

HOUSTON

AUSTIN

BAILEY

BO

WD

EN

CO

LL

EG

E

GE

OR

GIA

PIC

CA

DIL

LY

BROADWAY

SOUTH

HIG

HT

Old

Grounds

0.9

Blue Ridge

Cemetery

0.5

0.3

2.2

0.9

7.6

Bra

nch

Harrin

gto

n

Lic

kB

ranch

Pilot

Gro

ve

Cre

ek

Pot

Rack

Cre

ek

Des

ert

Cre

ek

Cre

ek

Dese

rt

Dese

rtC

reek

Pilo

t

Gro

ve

Creek

Pilo

t

Gro

ve

Cre

ek

Creek

Red

Oak

Wolf

Run

Cr

Sis

ter

Gro

ve

Cre

ek

Sister

Gro

ve

Cre

ek

Coleman

WESTMINSTER

LIM

IT

WESTM

INSTER

CIT

Y

LIM

IT

WESTMINSTER CITY LIMIT

WESTMINSTER

CITY

LIM

IT

LAMMLYLE

BA

KE

R

CH

UR

CH

CO

UN

TY

LIN

ER

OA

D

VERONA

Pop 388

CHAMBLISSVALDASTA

Pop 521

FAYBURG

SNOW

HILL

0.4

2.1

1.2

1.4

1.2

5.3

CIT

Y

SCHOOL

DUNN

DAVIS

WHITE

CENTER

BRATCHER

JAMES

HEAD

ROBY

STEPP

PRICHARD

RIDGETOP

BRENDA

RIDGEWAY

India

n

Pot

Rack

Cre

ek

FROGNOT

Cle

mons

EA

ST

2.1

Stiff

Creek

6.9

Branch

Cem

Verona

Herrin

gto

n

Pilo

t

Gro

ve

Cre

ek

Rack

Lic

k

Bra

nch

VERONA

Cre

ek

0.8

Brinlee

D

B78

D

B78

ALTOGA

75

5

75

2933

2933

121

121

5

5

545

545

455 455

121

545

75

121

121

121

1377

455455

1827

545

545

78

78

78

78

981

981

1377

3133

2933

1827

1377

1827

2862

2862

C

SP

LIM

IT

CITY

MC KINNEY

MC KINNEY

CITY LIMIT

CITY

LIM

IT

SP

5

2862

Water

3.8

Cr

1.3

0.6

1.0

4.9

DESERT

5

1213133

Sweet

78

S.H.ADY-

RuS.H.

West

S.H.ady

Grove

160

78

545

5

2862

2862

5

545

0 200 300

100

GRAPHIC SCALE

(IN FEET)

20 30

HORZ

VERT

100

CITY LIMIT

CROSS STREETS

BRIDGE

WATER UTILITY3"w

SH 121 PAVEMENT

LEGEND

RETAINING WALL

INDEX OF ROLLSINDEX OF ROLLS

SH 121 CL STA 540+00

END CSJ: 0549-03-018

BEGIN CSJ: 0549-03-021

SH 121 CL STA 540+00

END CSJ: 0549-03-018

BEGIN CSJ: 0549-03-021

ROLL DESCRIPTIONROLL DESCRIPTION

DRIVEWAYS

CITY LIMIT

CROSS STREETS

BRIDGE

WATER UTILITY3"w

SH 121 PAVEMENT

LEGEND

RETAINING WALL

DRIVEWAYS

NOTES:

1. MEDIAN OPENINGS ARE PRELIMINARY AND

SUBJECT TO CHANGE. FINAL MEDIAN OPENING

LOCATIONS TO BE DETERMINED DURING PS&E

AND IN COORDINATION WITH THE CITIES OF

MELISSA AND ANNA.

2. SOURCE OF TRAFFIC DATA:

TEXAS DEPARTMENT OF TRANSPORTATION

TRANSPORTATION, PROGRAMING AND PLANNING DIVISION

MARCH 27, 2007

3. ALL URBAN SECTIONS WILL HAVE CONCRETE CURB

AND GUTTER WITH BARRIER CURBS.

NOTES:

1. MEDIAN OPENINGS ARE PRELIMINARY AND

SUBJECT TO CHANGE. FINAL MEDIAN OPENING

LOCATIONS TO BE DETERMINED DURING PS&E

AND IN COORDINATION WITH THE CITIES OF

MELISSA AND ANNA.

2. SOURCE OF TRAFFIC DATA:

TEXAS DEPARTMENT OF TRANSPORTATION

TRANSPORTATION, PROGRAMING AND PLANNING DIVISION

MARCH 27, 2007

3. ALL URBAN SECTIONS WILL HAVE CONCRETE CURB

AND GUTTER WITH BARRIER CURBS.

Texas Department of Transportation

R C 2011

EXISTING R.O.W. (ACCESS BY PERMIT ONLY)

PROPERTY LINES

PROPOSED R.O.W. (ACCESS BY PERMIT ONLY

IN ACCORDANCE WITH TXDOT ACCESS CONTROL MANUAL)

SH 121 CL

OBLITERATE EXISTING

ROADWAY

EXISTING R.O.W. (ACCESS BY PERMIT ONLY)

PROPERTY LINES

PROPOSED R.O.W. (ACCESS BY PERMIT ONLY

IN ACCORDANCE WITH TXDOT ACCESS CONTROL MANUAL)

SH 121 CL

OBLITERATE EXISTING

ROADWAY

L:\...\RESOURCE\DesignJET 5500 Color RTL.PLT, 200 SCALE, 16.7 X 121, ROTATE 90 cw, STRIP-2

RASTER OPTIONS: QUALITY FACTOR=16.7, BRIGHTNESS=30, CONTRAST=-10

SAVE PLOT FILES UNDER "BATCH PLOT" FOLDER

XROLL of 11 XROLL of 11

These documents are not intended for Construction,

Bidding or Permit Purposes. They were prepared by,

or under the supervision of:

NANCY D. MITCHELL, P.E. 79762 09/22/11

PROJECT MANAGER PE# DATE

Lockwood, Andrews & Newnam, Inc.

T.B.P.E. Firm # 2614

DESIGN ROADWAYLIMITS FUNCTIONAL

CLASSIFICATION

ADT DESIGN

SPEEDFROM TO 2012 2032

SH 121 (SUBURBAN) ARTERIAL 18800 29400 45

SH 121 (RURAL) ARTERIAL 13500 21000 70

SH 121 RAMPS RAMP NA NA 35

FM 2933 AT SH 121 COLLECTOR 1000 1600 40

455 N AT SH 121 ARTERIAL 1550 2250 40

455 S AT SH 121 COLLECTOR 500 700 40

E. HOUSTON ST (FM 2862) AT SH 121 COLLECTOR 1700 2700 50

SH 160 AT SH 121 ARTERIAL 4100 6600 50

N. McDonald Street (SH 5 SOUTH) AT SH 121 ARTERIAL 7300 11,300 40

MC KINNEY ST (SH 5 NORTH) AT SH 121 ARTERIAL 6400 9900 40

DENTON ST (FM 545) AT SH 121 COLLECTOR 4200 6500 30

COUNTY ROADS

CR 418 AT SH 121 LOCAL 600 900 30

LANDFILL ENTRANCE AT SH 121 LOCAL NA NA 30

416 AT SH 121 LOCAL NA NA 30

419 AT SH 121 LOCAL 300 600 20 *

420 AT SH 121 LOCAL NA NA 20 *

475 AT SH 121 LOCAL 250 450 30

507(509) AT SH 121 LOCAL NA NA 20 *

424 / 513 AT SH 121 LOCAL NA NA 30

526 / 527 AT SH 121 LOCAL NA NA 20 *

528 / 581 AT SH 121 LOCAL NA NA 20 *

582 AT SH 121 LOCAL NA NA 20 *

936 AT SH 121 LOCAL NA NA 20 *

1002 AT SH 121 LOCAL NA NA 20 *

COUNTY LINE RD AT SH 121 LOCAL 250 250 20 *

EASTLINE RD AT SH 121 LOCAL 200 350 30

CITY STREETS

FANNIN RD AT SH 121 COLLECTOR NA NA 30

BARTLETT RD AT SH 121 LOCAL NA NA 30

CREEKSIDE RD AT SH 121 LOCAL NA NA 30

BERRY RD AT SH 121 LOCAL 2600 4000 30

EASTWOOD RD AT SH 121 LOCAL NA NA 30

LILLIAN DR AT SH 121 LOCAL NA NA 30

NUGENT ST AT SH 121 LOCAL NA NA 30

LIBERTY WAY AT SH 121 LOCAL 900 1400 30

REDWOOD BLVD AT SH 121 LOCAL NA NA 30

* = UNPAVED COUNTY ROAD * = UNPAVED COUNTY ROAD

DISPLACED STRUCTURE DISPLACED STRUCTURE

+ = FUTURE OUTER LOOP, BY OTHERS+ = FUTURE OUTER LOOP, BY OTHERS

Outer Loop +

Outer Loop +

Outer Loop +

END PROJECT

END CSJ: 0549-03-021

END STA: 865+37.66

STA 368+10.00

SH 5

STA 67+54.08

STA 368+10.00

STA 368+10.00

STA 865+37.66

CR 635

STA 865+37.66

CR 635

DESIGN ROADWAYLIMITS FUNCTIONAL

CLASSIFICATION

ADT DESIGN

SPEEDFROM TO 2012 2032

SH 121 (SUBURBAN) ARTERIAL 18800 29400 45

SH 121 (RURAL) ARTERIAL 13500 21000 70

SH 121 RAMPS RAMP NA NA 35

FM 2933 AT SH 121 COLLECTOR 1000 1600 40

455 N AT SH 121 ARTERIAL 1550 2250 40

455 S AT SH 121 COLLECTOR 500 700 40

E. HOUSTON ST (FM 2862) AT SH 121 COLLECTOR 1700 2700 50

SH 160 AT SH 121 ARTERIAL 4100 6600 50

N. McDonald Street (SH 5 SOUTH) AT SH 121 ARTERIAL 7300 11,300 40

MC KINNEY ST (SH 5 NORTH) AT SH 121 ARTERIAL 6400 9900 40

DENTON ST (FM 545) AT SH 121 COLLECTOR 4200 6500 30

COUNTY ROADS

CR 418 AT SH 121 LOCAL 600 900 30

LANDFILL ENTRANCE AT SH 121 LOCAL NA NA 30

416 AT SH 121 LOCAL NA NA 30

419 AT SH 121 LOCAL 300 600 20 *

420 AT SH 121 LOCAL NA NA 20 *

475 AT SH 121 LOCAL 250 450 30

507(509) AT SH 121 LOCAL NA NA 20 *

424 / 513 AT SH 121 LOCAL NA NA 30

526 / 527 AT SH 121 LOCAL NA NA 20 *

528 / 581 AT SH 121 LOCAL NA NA 20 *

582 AT SH 121 LOCAL NA NA 20 *

936 AT SH 121 LOCAL NA NA 20 *

1002 AT SH 121 LOCAL NA NA 20 *

COUNTY LINE RD AT SH 121 LOCAL 250 250 20 *

EASTLINE RD AT SH 121 LOCAL 200 350 30

CITY STREETS

FANNIN RD AT SH 121 COLLECTOR NA NA 30

BARTLETT RD AT SH 121 LOCAL NA NA 30

CREEKSIDE RD AT SH 121 LOCAL NA NA 30

BERRY RD AT SH 121 LOCAL 2600 4000 30

EASTWOOD RD AT SH 121 LOCAL NA NA 30

LILLIAN DR AT SH 121 LOCAL NA NA 30

NUGENT ST AT SH 121 LOCAL NA NA 30

LIBERTY WAY AT SH 121 LOCAL 900 1400 30

REDWOOD BLVD AT SH 121 LOCAL NA NA 30

Outer Loop +

Outer Loop +

Outer Loop +

STA 368+10.00

SH 5

STA 67+54.08

STA 368+10.00

STA 368+10.00

STA 865+37.66

CR 635

STA 865+37.66

CR 635

1 SH 121 STA 67+54.08 TO STA. 187+00

2 SH 121 STA 187+00 TO STA. 327+00

3 SH 121 STA 327+00 TO STA. 467+00

4 SH 121 STA 467+00 TO STA. 607+00

5 SH 121 STA 607+00 TO STA. 747+00

6 SH 121 STA 747+00 TO CR 635 (FANNIN COUNTY LINE)

7 SH 121 STA 747+00 TO FANNIN COUNTY LINE (TRANSITION)

8 SH 5 AND FANNIN ROAD

9 FM 455 AND CONNECTING RAMPS

10 FM 2862 AND CONNECTING RAMPS

11 SH 160 AND CONNECTING RAMPS

1 SH 121 STA 67+54.08 TO STA. 187+00

2 SH 121 STA 187+00 TO STA. 327+00

3 SH 121 STA 327+00 TO STA. 467+00

4 SH 121 STA 467+00 TO STA. 607+00

5 SH 121 STA 607+00 TO STA. 747+00

6 SH 121 STA 747+00 TO CR 635 (FANNIN COUNTY LINE)

7 SH 121 STA 747+00 TO FANNIN COUNTY LINE (TRANSITION)

8 SH 5 AND FANNIN ROAD

9 FM 455 AND CONNECTING RAMPS

10 FM 2862 AND CONNECTING RAMPS

11 SH 160 AND CONNECTING RAMPS

DALLAS DISTRICT

WILLIAM HALE, P.E. DISTRICT ENGINEER

SH 121

COLLIN COUNTY

DESIGN SCHEMATIC

SEPTEMBER 2011

FROM: SH 5 IN MELISSA TO: CR 635 (EAST LINE ROAD)

BRIDGE REPLACEMENT AND HIGHWAY RECONSTRUCTION

PROJECT LENGTH: 15.11 MILES (79784’)

BRIDGE: 0.30 MILES (1560’)

ROADWAY: 14.81 MILES (78224’)

CSJ: 0549-03-018 (SH 5 to FM 455)

CSJ: 0549-03-021 (FM 455 to CR 635/FANNIN COUNTY LINE)

DALLAS DISTRICT

WILLIAM HALE, P.E. DISTRICT ENGINEER

SH 121

COLLIN COUNTY

DESIGN SCHEMATIC

SEPTEMBER 2011

FROM: SH 5 IN MELISSA TO: CR 635 (EAST LINE ROAD)

BRIDGE REPLACEMENT AND HIGHWAY RECONSTRUCTION

PROJECT LENGTH: 15.11 MILES (79784’)

BRIDGE: 0.30 MILES (1560’)

ROADWAY: 14.81 MILES (78224’)

CSJ: 0549-03-018 (SH 5 to FM 455)

CSJ: 0549-03-021 (FM 455 to CR 635/FANNIN COUNTY LINE)

SH

121 N

B

SH

12

1 S

B

L

L

END BRIDGE

C STA. 11+14.53

BEGIN BRIDGE

C STA. 9+72.53

16

.84

CL

EA

R

10+00

600

610

620

630

640

650

FM 455

STA = 6+50.00

EL = 642.01’

L = 120.00’

K = 264

ex = 0.07’

STA = 9+50.00

EL = 646.54’

L = 330.00’

K = 86

ex = -1.59’

STA = 12+25.00

EL = 640.12’

L = 160.00’

K = 100

ex = 0.32’

VP

C 5

+9

0.0

0 E

L.

= 6

41

.38

VP

T 7

+1

0.0

0 E

L.

= 6

42

.91

VP

C 7

+8

5.0

0 E

L.

= 6

44

.05

VP

T 1

1+

15

.00

EL

. =

64

2.6

9’

VP

C 1

1+

45.0

0 E

L. =

641.9

9’

VP

T 1

3+

05

.00

EL

. =

63

9.5

3’

10+00

600

610

620

630

640

650

641.4

8

64

2.7

7

644.2

6

64

5.0

1

64

4.6

0

643.0

2

640.8

5

63

9.5

7

15+005+00

641.0

6

64

0.3

4

640.9

2

641.3

9

637.1

6

642.2

9

64

3.7

0

644.1

5

644.5

5

63

8.8

4

640.4

3

EXISTING GROUND

C

CL SH 121 STA 465+17.16 =

L FM 455 STA 10+43.55

600

610

620

630

640

650

600

610

620

630

640

650

PROP PGL

BE

GIN

CO

NS

T. S

TA

. 5+

00.0

0

MA

TC

H E

XIS

T P

AV

EM

EN

T

EL

= 6

40.4

3

EN

D C

ON

ST

. S

TA

. 1

4+

00

.00

EL

= 6

38.8

4

MA

TC

H F

M 4

55

CS

J:

28

45

-0

1-0

15

SC

HE

MA

TIC

BY

OT

HE

RS

(+)1.0551%

(+)1.5104% (-)2.3347%

(-)0.7328%

60+00 65+00

Ramp SE455

60+00 65+00

600

610

620

630

640

650

RAMP SE455

64

4.1

0

644.2

5

64

4.1

0

644.0

9

644.0

6

644.0

6

64

3.9

0

64

4.0

0

643.6

2

EXISTING GROUND

600

610

620

630

640

650

600

610

620

630

640

650

SPLINE GRADE

CONTROLLED BY

SH 121 PGL

C

CL FM 455 STA 11+75.57 =

L RAMP SE455 STA = 65+18.69

PROP PGL

642.3

5

639.9

9

63

7.2

0

634.9

9

633.8

3

63

3.7

1

634.6

3

636.3

6

63

8.4

4

64

0.9

1

(-)2.6400 %(+)1.7717 %

(+)1.7717 %(+)2.5928 %

EL

= 6

37.0

3

BE

GIN

RA

MP

PR

OF

IL

E S

TA

.58+

10.4

1

STA = 60+20.00

EL = 631.38’

ex = 2.34’

K = 96

L = 425.00’

VP

C 5

8+

07.5

0 E

L. =

636.9

9’

VP

T 6

2+

32

.50

EL

. =

63

5.1

5’

STA = 63+75.00

EL = 637.67’

ex = 0.21’

K = 244

L = 200.00’

VP

C 6

2+

75.0

0 E

L. =

635.9

0’

VP

T 6

4+

75

.00

EL

. =

64

0.2

6’

(+)2.0547%

OB

SCU

RED

OB

SCU

RED

PIP

E

117628.6

5

S

GA

TE

S

CU

LV

ER

TC

ULV

ER

T S

SS

S

CU

LV

ER

T

S

S

GA

TE

S

CU

LV

ER

T

S

OB

SCU

RED

PIP

E

OB

SCU

RED

S

FU

TU

RE

FM

455

CR 4

75

WK

G E

NT

ER

PR

ISE

S L

TD

PO

WE

LL

M C

SR

SH

ER

LE

Y P

AR

TN

ER

S L

TD

2.5

"W

2.5

"W

2"W

2.5

"W

UN

INC

OR

PO

RA

TE

D

CIT

Y O

F A

NN

A

UN

INC

OR

PO

RA

TE

D

UNINCORPORATED

CITY OF ANNA

CR 4

75

FM 455

80’

195’

160’

460+

00

465+

00

470+

00

475+

00

N 5

0%

%d 4

8’ 4

2.3

8" E

PO

T 5

+00.0

0

5+00

PC

5+36.0

4

PC

C 8

+61.9

5

10+00

15+00

PT

15+

24.2

7

N 0%

%d 15’ 24.90" E

N 4

3%

%d 1

6’ 5

1.7

0" E

N 5

0%

%d 4

8’ 4

2.3

8" E

60+

00

65+

00

60+

00

65+

00

N 5

4%

%d 4

8’ 4

2.3

8" E

N 5

0%

%d 4

8’ 4

2.3

4" E

N 5

5%

%d 0

8’ 1

6.7

8" E

70+

00

75+

00

70+

00

75+

00

N 5

0%

%d 4

8’ 4

2.3

4" E

N 4

6%

%d 2

2’ 5

0.0

9" E

N 5

0%

%d 4

8’ 4

2.3

8" E

CL455-1

CL455-2

S

GA

TE

S

CULVERT CULVERT

CULVERT

GA

TE

CULVERT

S

OBSCURED

PIPE

S

S

124 647.11

CULVERT

CULVERT

CULVERT

CULVERT

S

GA

TE

SLAB

GA

TE

TFP

PIPE

S

FUTURE

FM

455

CR 4

75

WKG ENTERPRISES LTD

WKG ENTERPRISES LTD

DZANSKI RICHARD

WKG ENTERPRISES LTD

BERAINCORPORATEDHAGEN

MARIANNE

HAGENMARIANNE

2.5"W 2.5"W

2.5

"W

2"W

UNINCORPORATED

CITY OF ANNA

UNINCORPORATED

PROP. ROW

CR 4

75

26’

26’

450’

ACCELERATION

600’

TAPER

PR

OP

RO

W V

AR

IES

91’

- 168’

80’

17

0’

19

5’

160’

440+00 445+00 450+00 455+00 460+00 465+00 470+00

5+00

10+

00

15+

00

N 0

%%

d 1

5’ 24.9

0"

E

N 49%%d 39’ 57.63" E N 50%%d 22’ 20.82" E

N 43%%d 16’ 51.70" E

N 50%%d 48’ 42.38" E

PI 4

6+

00.0

0

50+00

PI 5

2+

00.1

2

PC

54+

71.9

5

55+00

PT

58+

26.5

4

60+00

PC

60+

48.1

0

PT

63+

10.9

8

65+00

PC

47

+0

0.0

0

50+00

PT

51+

00.0

3

55+00

PC

59+

99.3

4

60+00

PT

62+

08.7

8

65+00

N 54%%d 48’ 42.38" E

N 50%%d 48’ 42.34" E

PC

68+

96.4

2

70+00

N 50%%d 48’ 42.34" E

\ SH 121 STA 465+17.16 =

\ FM 455 STA 10+43.55

N 50%%d 48’ 42.38" E

SE455-1

SE455-2

NX455-1

NX455-2

S

GA

TE

S

CULVERT CULVERT

CULVERT

GA

TE

CULVERT

S

OBSCURED

PIPE

S

S

124 647.11

CULVERT

CULVERT

CULVERT

CULVERT

S

GA

TE

SLAB

GA

TE

TFP

PIPE

S

FUTURE

FM

455

CR 4

75

WKG ENTERPRISES LTD

WKG ENTERPRISES LTD

WKG ENTERPRISES LTD

BERAINCORPORATEDHAGEN

MARIANNE

HAGENMARIANNE

2.5"W 2.5"W

2.5

"W

UNINCORPORATED

CITY OF ANNA

UNINCORPORATED

PROP. ROW

CR 4

75

445+00 450+00 455+00 460+00 465+00 470+00

5+00

10+

00

15+

00

N 0

%%

d 1

5’ 24.9

0"

E

N 49%%d 39’ 57.63" E N 50%%d 22’ 20.82" E

N 43%%d 16’ 51.70" E

N 50%%d 48’ 42.38" E

PI 4

6+

00.0

0

50+00

PI 5

2+

00.1

2

PC

54+

71.9

5

55+00

PT

58+

26.5

4

60+00

PC

60+

48.1

0

PT

63+

10.9

8

65+00

PC

47

+0

0.0

0

50+00

PT

51+

00.0

3

55+00

PC

59+

99.3

4

60+00

PT

62+

08.7

8

65+00

N 54%%d 48’ 42.38" E

N 50%%d 48’ 42.34" E

70+00

N 50%%d 48’ 42.34" E

\ SH 121 STA 465+17.16 =

\ FM 455 STA 10+43.55

N 50%%d 48’ 42.38" E

SE455-1

SE455-2

NX455-1

NX455-2

55+00 60+00 65+00

600

610

620

630

640

650

RAMP NX455

646.9

3

645.7

8

644.1

2

64

3.2

4

64

2.6

1

642.5

3

64

2.2

1

64

2.6

4

64

2.6

0

64

2.3

7

64

2.3

7

642.0

8

641.8

3

641.8

9

641.8

8

641.4

5

64

1.0

4

630.7

6

630.2

2

EXISTING GROUND

600

610

620

630

640

650

SPLINE GRADE

CONTROLLED BY

SH 121 PGL

C

C

L FM 455 STA 9+11.49 =

L RAMP NX455 STA = 65+26.27

PROP PGLPROP PGL

64

7.2

4

646.5

3

645.4

3

64

4.3

0

64

3.1

7

64

2.0

4

640.9

2

640.3

2

64

0.5

4

641.0

5

64

1.5

7

642.0

8

64

2.9

7

644.5

2

(-)1.1300 %

(-)1.1300 % (+)0.5135 %

(+)0.5135 %

BE

GIN

RA

MP

PR

OF

IL

E S

TA

. 5

3+

87

.83

EL

= 6

45.5

7

VP

C 6

3+

00.0

0 E

L. =

642.0

8’

VP

T 6

4+

50

.00

EL

. =

64

3.7

0’

EN

D N

X455 S

TA

.65+

26.2

7

EL

= 6

45.0

3

EN

D R

AM

P P

RO

FIL

E

VP

I S

TA

= 6

5+

08

.25

(+)2.0315%

(+)1.6472%

STA = 63+75.00

EL = 642.47’

ex = 0.21’

K = 132

L = 150.00’

STA = 58+85.00

EL = 639.95’

ex = 0.41’

K = 122

L = 200.00’

VP

C 5

7+

85.0

0 E

L. =

641.0

8’

VP

T 5

9+

85

.00

EL

. =

64

0.4

6’

POO

L

PILE

PIPE

PIPE

GA

TE

OBSCURED

CULVERT

OBSCURED

S

OBSCURED

OBSCURED

122 582.10

S

S

S

S

S

S

S

S

S

SS S S S

GA

TE

PIPES

S

S

S S

OBSCURED

OBSCURED

OBSCURED

PIPESS

S S

OBSCURED

OBSCURED

OBSCURED

OBSCURED

OBSCURED

OBSCURED

TANK LP

PIPE

TFP

117628.65

S

GA

TE

S

CULVERT CULVERT

S

S S

SS

CULVERT

S

S

S

S

S

S

GA

TE

GA

TE

S

CULVERT

S

GA

TE

PIPE

WE 612.96

WE 612.96

OBSCURED

OBSCURED

OBSCURED

OBSCURED

PIPE

OBSCURED

OBSCURED

FUTURE

FM

455

CR 4

75

SISTER

GROVE

CREEK

FM

455

POWELL M C SR

SHERLEY PARTNERS LTD

SHERLEY PARTNERS LTD

WOMACK A E

SHERLEY PARTNERS LTD

WOMACK ALBERT CARTER

SHERLEYPARTNERS LTD

WOMACK ALBERTCARTER

2.5

"W

2"W

2.5"W 2.5"W

2.5

"W

2.5"W

UNINCORPORATED

CITY OF ANNA

UNINCORPORATED

UN

INC

OR

PO

RA

TE

D

UN

INC

OR

PO

RA

TE

D

CIT

Y O

F A

NN

A

CITY OF ANNA

UNINCORPORATED

UNINCORPORATED

CIT

Y O

FA

NN

A

CIT

Y O

FA

NN

A

CITY

OF A

NN

A

UN

INCO

RPORA

TED

UN

INC

OR

PO

RA

TE

D

UN

INC

OR

PO

RA

TE

D

UN

INC

OR

PO

RA

TE

D

UN

INC

OR

PO

RA

TE

D

EXIST. ROWEXIST. ROW

EXIST. ROW

PROP. ROW

PROP. ROW

PROP. ROW

PROP. ROW

FM

455

FM

455

SIS

TER G

RO

VE C

REEK

460+00 465+00 470+00 475+00 480+00 485+00 490+00 495+00

N 50%%d 48’ 42.38" E

5+00

10+

00

15+

00

N 43%%d 16’ 51.70" E

N 50%%d 48’ 42.38" E

PT

63+

10.9

8

65+00

60+00

PT

62+

08.7

8

65+00

N 50%%d 48’ 42.34" E

N 55%%d 08’ 16.78" E

PC

68+

96.4

2

70+00

PT

71+

22.9

4

75+00

PC

79+

06.7

4

80+00

PT

83

+3

9.3

9

70+00

PC

72

+3

1.7

6

PT

73+

47.7

7

75+00

PC

79+

70.5

1

80+00

PT

83+

88.5

3

85+00

PI 8

6+

02

.71

90+00

PI 9

2+

02.8

3

N 50%%d 48’ 42.34" E

N 46%%d 22’ 50.09" E

N 49%%d 39’ 57.67" EN 50^22’20.74" E

N 50%%d 48’ 42.38" E

CL

455-1

CL

455-2

SX455-1

SX455-2

NE455-2

NE455-1

EL

=

640.9

7’

STA = 67+25.00

EL = 639.09’

L = 330.00’

K = 84

ex = -1.62’

STA = 74+35.00

EL = 604.13’

L = 410.00’

K = 98

ex = 2.15’

VP

C 6

5+

60.0

0 E

L. =

640.7

4’

VP

T 6

8+

90

.00

EL

. =

63

0.9

7’

VP

C 7

2+

30.0

0 E

L. =

614.2

2’

VP

T 7

6+

40

.00

EL

. =

60

2.6

5’

70+00 75+00

590

600

610

620

630

640

650

64

0.2

4

63

8.1

7

634.9

2

63

0.4

7

625.5

5

620.6

3

61

5.7

0

611.0

3

607.3

3

60

4.6

7

603.0

2

VP

I S

TA

= 6

5+

36

.70

65+00

590

600

610

620

630

640

650

RAMP SX455

64

3.6

0

63

8.3

7

635.1

2

63

0.9

7

62

3.3

4

61

9.0

0

61

3.9

7

60

2.0

1

592.1

8

585.0

9

581.4

5

578.4

5

57

6.6

7

575.5

2

EXISTING GROUND

60

2.6

1

SPLINE GRADE

CONTROLLED BY

SH 121 PGL

BE

GIN

NE

455 S

TA

.65+

26.2

7

BE

GIN

RA

MP

PR

OF

IL

E

C

C

L FM 455 STA 11+75.57 =

L RAMP NX455 STA = 65+18.69

EN

D N

X4

55

ST

A.6

5+

18

.69

EL

= 6

41.0

3

EL

= 6

02.6

1

EN

D R

AM

P P

RO

FIL

E S

TA

.76

+4

5.4

1

PROP PGL

(-)1.9267% (-)1.0000%

(-)4.9240%

(-)4.9240%

(-)0.7200%

POO

L

PILE

PIPE

PIPE

GA

TE

OBSCURED

CULVERT

OBSCURED

S

OBSCURED

OBSCURED

122 582.10

S

S

S

S

S

S

S

S

S

SS S S S

GA

TE

PIPES

S

S

S S

OBSCURED

OBSCURED

OBSCURED

PIPESS

S S

OBSCURED

OBSCURED

OBSCURED

OBSCURED

OBSCURED

OBSCURED

TANK LP

PIPE

TFP

117628.65

622.15

S

GA

TE

S

CULVERT CULVERT

S

S S

SS

CULVERT

S

S

S

S

S

S

S

GA

TE

GA

TE

S

CULVERT

S

GA

TE

PIPE

WE 612.96

WE 612.96

OBSCURED

OBSCURED

OBSCURED

OBSCURED

PIPE

OBSCURED

OBSCURED

FUTURE

FM

455

CR 4

75

SISTER

GROVE

CREEK

FM

455

POWELL M C SR

SHERLEY PARTNERS LTD

SHERLEY PARTNERS LTD

WOMACK A E

SHERLEY PARTNERS LTD

WOMACK ALBERT CARTER

SHERLEYPARTNERS LTD

WOMACK ALBERTCARTER

2.5

"W

2"W

2.5"W 2.5"W

2.5

"W

2.5"W

UNINCORPORATED

CITY OF ANNA

UNINCORPORATED

UN

INC

OR

PO

RA

TE

D

UN

INC

OR

PO

RA

TE

D

CIT

Y O

F A

NN

A

CITY OF ANNA

UNINCORPORATED

UNINCORPORATED

CIT

Y O

FA

NN

A

CIT

Y O

FA

NN

A

CITY

OF A

NN

A

UN

INCO

RPORA

TED

UN

INC

OR

PO

RA

TE

D

UN

INC

OR

PO

RA

TE

D

UN

INC

OR

PO

RA

TE

D

UN

INC

OR

PO

RA

TE

D

EXIST. ROWEXIST. ROW

EXIST. ROW

PROP. ROW

PROP. ROW

PROP. ROW

PROP. ROW

FM

455

FM

455

SIS

TER G

RO

VE C

REEK

26’

26’

450’

ACCEL.

600’

TAPER

13

0’

80’

19

0’

19

5’

160’

10

1’

39

17

0’

84

460+00 465+00 470+00 475+00 480+00 485+00 490+00 495+00

N 50%%d 48’ 42.38" E

5+00

10+

00

15+

00

N 43%%d 16’ 51.70" E

N 50%%d 48’ 42.38" E60+00

PC

60+

48.1

0

PT

63+

10.9

8

65+00

60+00

PT

62+

08.7

8

65+00

N 50%%d 48’ 42.34" E

N 55%%d 08’ 16.78" E

PC

68+

96.4

2

70+00

PT

71+

22.9

4

75+00

PC

79+

06.7

4

80+00

PT

83

+3

9.3

9

70+00

PC

72

+3

1.7

6

PT

73+

47.7

7

75+00

PC

79+

70.5

1

80+00

PT

83+

88.5

3

85+00

PI 8

6+

02

.71

90+00

PI 9

2+

02.8

3

N 50%%d 48’ 42.34" E

N 46%%d 22’ 50.09" E

N 49%%d 39’ 57.67" EN 50^22’20.74" E

N 50%%d 48’ 42.38" E

CL

455-1

CL

455-2

SX455-1

SX455-2

NE455-2

NE455-1

EL

=

644.6

7’

STA = 67+00.00

EL = 639.99’

70+00 75+00

590

600

610

620

630

640

650

80+0065+00

590

600

610

620

630

640

650

VP

I S

TA

= 6

5+

44.2

9

RAMP NE455

64

1.0

4

630.7

9

630.2

2

62

3.7

0

615.9

3

609.3

9

602.6

6

597.4

6

59

0.2

1

586.6

9

58

2.1

4

57

9.0

0

57

6.8

1

576.1

8

577.6

3

57

5.5

1

L = 240.00’

K = 91

ex = -0.79’

STA = 73+20.00

EL = 605.03’

L = 480.00’

K = 98

ex = 2.95’

VP

C 6

5+

80.0

0 E

L. =

643.5

9’

VP

T 6

8+

20

.00

EL

. =

63

3.2

3’

VP

C 7

0+

80.0

0 E

L. =

618.5

6’

VP

T 7

5+

60

.00

EL

. =

60

3.3

0’

64

2.9

7

63

9.2

0

634.3

3

62

8.7

1

62

3.0

7

617.4

6

612.5

3

60

8.6

4

605.7

6

603.9

2

60

3.0

1

602.2

9

60

1.5

7

600.8

5

EXISTING GROUND

SPLINE GRADE

CONTROLLED BY

SH 121 PGL

C

C

L FM 455 STA 9+11.49 =

L RAMP NE455 STA = 65+26.27

BE

GIN

NE

455 S

TA

.65+

26.2

7

EL

= 6

45.0

3

BE

GIN

RA

MP

PR

OF

IL

E

EN

D R

AM

P P

RO

FIL

E S

TA

.79+

10.4

4

EL

= 6

00.7

8

PROP PGL

(-)1.9978%(-)3.0000%

(-)5.6400%

(-)5.6400%

(-)0.7200%

PGL

12’

LANE

2.0%

CSJ 0549-03-018NTS

12’

TURN

LANE

12’

TURN

LANE

4’

SH

LC RAMP

4’

SH

12’

PROP C-L

12’

LANE

4’

SH

CSJ 0549-03-018NTS

PGL

2.0%

PR

OP

OS

ED

RO

W

4’

SH

44’

PR

OP

OS

ED

RO

W

LC RAMP

PROP C-L

32’

CSJ 0549-03-018NTS

2’

9’

MEDIAN

2’

9’

MEDIAN

PGL

12’

TURN

LANE

12’

TURN

LANE

12’

LANE

12’

LANE

12’

LANE

12’

LANE

1’1’

96’ OVERALL WIDTH

2.0%

CSJ 0549-03-018NTS

2.0%

2.0% 2.0%

PROP C-L

PROP C-L

2.0%2.0%1.5%

4:1 USUAL

3:1 MAX

1.5%

4:1 USUAL

3:1 MAX

STA. 5+00 TO STA. 9+72.53

STA. 9+72.53 TO STA. 11+14.53

STA. 11+14.53 TO STA. 15+24.27

PGL

2.0%

CSJ 0549-03-018NTS

EXISTING FM 455 TYPICAL SECTION

2.0%

12’

LANE

12’

LANE

EX

IST

ING

RO

W

EX

IST

ING

RO

W

EXIST C-LLC FM 455

50’

PGL

VAR

CSJ 0549-03-018NTS

EXISTING CR 475 TYPICAL SECTION

VAR

LC CR 475

22’

EXIST C-L

EX

IST

ING

RO

W

50’ ROW

EX

IST

ING

RO

W

25’

CL

CL

C-L EB PGL LC

C-L WB PGL

PGLPGL

LC

PR

OP

OS

ED

RO

W

VARIES

46’-66’

VARIES

54’-66’

2.0%

CSJ 0549-03-018NTS

2.0%

PROP C-L

12’

LANE

12’

LANE

2’

SH

2’

SH

12’

LANE

12’

LANE

2’

SH

2’

SH

40’ 40’

2.0%2.0%

CL

C-L EB PGL LC

C-L WB PGL

PGLPGL

LC

PR

OP

OS

ED

RO

W

FUTURE

12’

LANE

19.5’7.5’

12’

TURN

LANE

160’ ROW

PROPOSED RAMP TYPICAL SECTION

AT FM 455 NB EXIT

PROPOSED RAMP TYPICAL SECTION

AT FM 455 NB ENTRANCE

PROPOSED CR 475/FM 455 BRIDGE TYPICAL SECTION

8.5’

MIN

8.5’

MIN

4:1 USUAL

3:1 MAX

1.5%

8.5’

MIN

1.5%

4:1 USUAL

3:1 MAX

8.5’

MIN

25’

50’

EXISTING 88’ ROW

PROPOSED FM 455 TYPICAL SECTION

PROPOSED FM 455 TYPICAL SECTION

STA. 53+87.83 TO STA. 59+53.57

STA. 59+53.57 TO STA. 64+80.48

12’

6:16:1 4:1

RET WALL

14’

LANE

4’

SH

8’

SHLDR

PGL2.0%

LC RAMP

PROP C-L

PR

OP

OS

ED

RO

W

CSJ 0549-03-018 NTS

26’

PROPOSED RAMP TYPICAL SECTION

AT FM 455 NB EXIT

VARIES

12’-30’

6:1

4:1 USUAL

3:1 MAX

STA. 65+72.75 TO STA. 72+95.43STA. 72+95.43 TO STA. 79+10.44

6:1

14’

LANE

4’

SH

8’

SHLDR

PGL2.0%

LC RAMP

PROP C-L

PR

OP

OS

ED

RO

W

CSJ 0549-03-018 NTS

26’ VARIES

74’-98’

6:1

PROPOSED RAMP TYPICAL SECTION

AT FM 455 NB ENTRANCE

4:1

RET WALL

3:1

MAX

3:1

MAX

6:1

VARIES

15’-33’

VARIES

25’-33’

RET WALL

3:1

MAX

6:1

VARIES

17’-25’

VARIES

54’-74’

6:1 4:1

STA. 58+10.41 TO STA. 64+73.08

14’

LANE

4’

SH

8’

SHLDR

2.0%

CSJ 0549-03-018NTS

26’

6:1

PROPOSED RAMP TYPICAL SECTION

AT FM 455 SB ENTRANCE

4:1

LC RAMP

PROP C-L

PGL

6:1

3:1MAX

RET WALL

VARIES

13’-44’

PR

OP

OS

ED

RO

W

VARIES

20’-28’

LANE

VARIES

0’-12’

12’

LANE

2.0%

CSJ 0549-03-018 NTS

12’

TURN

LANE

12’

TURN

LANE

4’

SH

4’

SH

12’

44’

PROPOSED RAMP TYPICAL SECTION

AT FM 455 SB EXIT STA. 70+88.27 TO STA. 76+45.41

STA. 65+18.69 TO STA. 70+88.27

12’

6:16:14:1

14’

LANE

4’

SH

8’

SHLDR

2.0%

CSJ 0549-03-018NTS

26’

PROPOSED RAMP TYPICAL SECTION

AT FM 455 SB EXIT

VARIES

19’-53’

6:1

3:1MAX

VARIES

22’-33’

3:1MAX

6:1

VARIES

17’-22’

PGL

PR

OP

OS

ED

RO

W

RET WALL

PROP C-LLC RAMP

VARIES

20’-31’

4:1 USUAL

3:1 MAX

PGLRET WALL

LC RAMP

PROP C-L

PR

OP

OS

ED

RO

W

PR

OP

OS

ED

RO

WP

RO

PO

SE

D R

OW

VARIES 100’-132’

80’ 80’

VARIES

20’-32’

VARIES

23’-43’

LANE

VARIES

0’-12’

LANE

VARIES

0’-12’

VARIES

0’-7’

VARIES

0’-19’

LANE

VARIES

0’-12’

LANE

VARIES

11’-12’

LANE

VARIES

11’-12’

VARIES

0’-2’

VARIES

0’-2’

VARIES

0’-2’

VARIES

0’-2’

VARIES

11’-28’

VARIES

11’-40’

6’

6:1

6:1

12’

6:1

6’

12’

6:1

6’

6:1

20’

6’

6:1

SUPERELEVATION TABLE

ROADWAY EVENTLEFT RIGHT

STA. X- SLOPE STA. X- SLOPE

RAMP BEGIN SE TRANSITION 60+12 2.00%

SE 455 END SE TRANSITION 60+64 -3.80%

BEGIN SE TRANSITION 62+95 -3.80%

END SE TRANSITION 63+47 2.00%

RAMP SE455 RAMP NX455 RAMP SX455 RAMP NE455

PI STATION

DEGREE OF CURVE = 0%%d 59’ 59.73"

PC STATION

PT STATION

DELTA

TANGENT

LENGTH

RADIUS

= 49+00.10

= 4%%d 00’ 00.00" (RT)

= 200.10

= 400.03

= 5,730.00

= 47+00.00

= 51+00.03

PI STATION

DELTA

DEGREE OF CURVE = 1%%d 59’ 59.47"

TANGENT

LENGTH

RADIUS

PC STATION

PT STATION

= 56+49.47

= 7%%d 05’ 28.90" (LT)

= 177.52

= 354.59

= 2,865.00

= 54+71.95

= 58+26.54

PI STATION

DELTA

DEGREE OF CURVE = 1%%d 54’ 35.49"

TANGENT

LENGTH

RADIUS

PC STATION

PT STATION

= 61+04.10

= 4%%d 00’ 00.04" (LT)

= 104.76

= 209.44

= 3,000.00

= 59+99.34

= 62+08.78

= 61+79.73

= 7%%d 31’ 50.68" (RT)

DEGREE OF CURVE = 2%%d 51’ 53.24"

= 131.63

= 262.87

= 2,000.00

= 60+48.10

= 63+10.98

TANGENT

LENGTH

RADIUS

PC STATION

PT STATION

PI STATION

DELTA

NX455-1SE455-1

NX455-2SE455-2

= 4%%d 19’ 34.40" (RT) PI STATION

DELTA

DEGREE OF CURVE = 3%%d 49’ 10.99"

TANGENT

LENGTH

RADIUS

PC STATION

PT STATION

= 72+89.79

= 4%%d 25’ 52.25" (LT)

= 58.03

= 116.01

= 1,500.00

= 72+31.76

= 73+47.77

= 70+09.73

DEGREE OF CURVE = 1%%d 54’ 35.49"

= 113.31

= 226.52

= 3,000.00

= 68+96.42

= 71+22.94

PI STATION

DELTA

TANGENT

LENGTH

RADIUS

PC STATION

PT STATION

SX455-1NE455-1

DEGREE OF CURVE = 0%%d 59’ 59.73"

PC STATION

PT STATION

= 81+23.17

= 4%%d 19’ 34.40" (LT)

= 216.43

= 432.65

= 5,730.00

= 79+06.74

= 83+39.39

DELTA

TANGENT

LENGTH

RADIUS

PI STATION

SX455-2

PI STATION

DEGREE OF CURVE = 0%%d 57’ 17.75"

TANGENT

LENGTH

RADIUS

PC STATION

PT STATION

DELTA

= 81+79.60

= 3%%d 59’ 30.65" (RT)

= 209.10

= 418.03

= 6,000.00

= 79+70.51

= 83+88.53

NE455-2

PI STATION

DELTA

DEGREE OF CURVE = 1%%d 44’ 10.44"

TANGENT

LENGTH

RADIUS

PC STATION

PT STATION

= 11+94.23

= 11%%d 29’ 58.45" (LT)

= 332.28

= 662.33

= 3,300.00

= 8+61.95

= 15+24.27

PI STATION

DEGREE OF CURVE = 11%%d 01’ 06.31"

TANGENT

LENGTH

RADIUS

PC STATION

PT STATION

= 7+04.55

= 35%%d 54’ 33.30" (LT)

= 168.50

= 325.90

= 520.00

= 5+36.04

= 8+61.95

DELTA

CL455-1CL455-2

END BRIDGE

\ STA. 11+14.53

BEGIN BRIDGE

\ STA. 9+72.53

\ SH 121 STA 465+17.16 =

\ FM 455 STA 10+43.55

C FM 455 STA. 9+11.49 =

B RAMP NX455 STA.= 65+26.27

B RAMP NE455 STA. = 65+26.27

L

L

LL

L

L

C FM 455 STA. 9+11.49 =

B RAMP NE455 STA. = 65+26.27

L

L

\ FM 455 STA. 9+11.49 =

L RAMP NX455 STA. 65+26.27

\ SH 121 STA 465+17.16 =

\ FM 455 STA 10+43.55

FM 455

END CONSTRUCTION

\ FM 455 STA. 14+00.00

\ SH 121

L RAMP SX455

L RAMP SE455

L RAMP SE455

L RAMP NE455

\ FM 455

\ FM 455

\ FM 455

\ FM 455

\ FM 455

\ SH 121

\ SH 121

\ SH 121

\ SH 121

L RAMP SE455

L RAMP NX455L RAMP NX455

L RAMP SE455L RAMP SX455

L RAMP NE455

36’

R 2

0’

R 2

0’

R 2

0’

20’

26’

39’

44

20

26’

32

58

180’ TAPER

100’

28’

245’LANE TAPER

193’

LANE TAPER

22’

FARM

ROAD

455

FARM

ROAD

2862

TEXAS

5

TEXAS

121

TEXAS

160

TEXAS

121

FARM

ROAD

455

TEXAS

121

FARM

ROAD

455

TEXAS

121

FARM

ROAD

455

FARM

ROAD

455

TEXAS

121

FARM

ROAD

455

TEXAS

121

425’ TURN LANES

BOTH SIDES

100’

TAPER

425’ TURN LANE

BOTH SIDES

100’

TAPER

BEGIN CONSTRUCTION

\ FM 455 STA. 5+00.00

MATCH EXIST PAVEMENT

37’

25’

FUTURE FM 455

CSJ: 2845-01-015

SCHEMATIC BY OTHERS

L

L

L

L

L

L

L

L

C FM 455 STA. 11+75.56 =

B RAMP SE455 STA.= 65+18.69

B RAMP SX455 STA. = 65+18.69

BEGIN RAMP

B SE455 STA. 46+00.00

END RAMP

B SE455 STA. 64+73.08

BEGIN RAMP

B NX455 STA. 47+00.00

END RAMP

B NX455 STA. 64+80.48

BEGIN RAMP

B SX455 STA. 65+64.04

END RAMP

B SX455 STA. 83+39.39

END RAMP

B NE455 STA. 92+02.83

BEGIN RAMP

B NE455 STA. 65+72.75

\ FM 455 STA. 11+75.57 =

L RAMP SE455 STA.= 65+18.69

\ FM 455 STA. 11+75.57 =

L RAMP SX455 STA. 65+18.69

B

B

B

B

B

B

B

B

B

B

B

B

9 9

R 5

0’

R 5

0’

R 5

0’

R 5

0’

R 2

0’