PCI Fundamentals of Prestressed Concrete of Prestressed Concrete Design
Design of Prestressed Concrete -
-
Upload
s-m-rahat-rahman -
Category
Design
-
view
1.249 -
download
10
description
Transcript of Design of Prestressed Concrete -
![Page 1: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/1.jpg)
1
AHSANULLAH UNIVERSITY OF SCIENCE AND TECHNOLOGY
DEPERTMENT OF CIVIL ENGINEERING
1/23/2014
![Page 2: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/2.jpg)
2
Presented byS. M. Rahat
Rahman
1/23/2014
![Page 3: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/3.jpg)
3
Continuous Beam
TOPIC
1/23/2014
![Page 4: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/4.jpg)
Continuous Beams
A continuous beam is a statically indeterminate multi span beam on hinged support.
The end spans may be cantilever, may be freely supported or fixed supported.
Beams are made continuous over the supports to increase structural integrity.
Figure : Jamuna Bridge
1/23/2014
4
![Page 5: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/5.jpg)
5
Advantage and Disadvantage of Continuous Prestress beam over
Simply Supported BeamAdvantages :
1. Reduce the depth and cross-sectional area2. Reduce the self-weight which adds to the total
capacity of the member
Disadvantage:
3. More frictional loss in continuous beam4. Shortening of continuous beam under prestress may
produce excess lateral force and moment in the supporting member .
5. Concurrence of maximum moment and shear over support
6. Difficulties in achieving continuity for precast elements
1/23/2014
![Page 6: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/6.jpg)
6
METHODS OF ACHIEVING
CONTINUITY1/23/2014
![Page 7: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/7.jpg)
7
• Higher resistance
to stress
• Longer spans
USING CURVED CABLES
1/23/2014
![Page 8: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/8.jpg)
8
• Wide web is
necessary
• Large anchorage
blocks
• Skilled workmen
USING STRAIGHT CABLES
Curved tendon can be replaced by straight tendon but behavior is same due to cross sectional change .
1/23/2014
![Page 9: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/9.jpg)
9
Cross Sectional Change Of a Continuos Beam
Figure : Jamuna Bridge 1/23/2014
![Page 10: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/10.jpg)
10
Assumption for Continuous Prestress
Concrete Beam The eccentricity of the prestressing cables are small compared to the length of the members.
e < L
Frictional loss of prestress is neglected.
Same tendon should run through the entire length of the member.
1/23/2014
![Page 11: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/11.jpg)
11
Determining the Resisting Moment for Continuous Beam
Step 1 : Plot the primary moment diagram for the entire continuous beam as produced only by prestress eccentricity , as if there were no support to the beam
Step 2 : Plot the shear diagram Step 3 : Plot the loading diagram Step 4 : Plot the moment diagram
corresponding to the loading diagram considering all supports
1/23/2014
![Page 12: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/12.jpg)
12
Primary Moment : In simple beam , the moment is produced due to tendon variation is called primary moment.
Secondary Moment : In continuous beam , moment produced due to internal reaction is called secondary moment .
Primary and Secondary Moment
1/23/2014
![Page 13: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/13.jpg)
1. PRIMARY MOMENT DIAGRAM DUE TO PRESTRESS CONSIDERING NO SUPPORT
2. SHEAR DIAGRAM TO PRIMARY MOMENT
3. LOADING DIAGRAM FOR SHEAR
4. RESULTING MOMENT DIAGRAM DUE TO PRESTRESS
1/23/2014 13
![Page 14: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/14.jpg)
14
LOAD BALANCING METHOD
TOPIC
1/23/2014
![Page 15: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/15.jpg)
15
• It’s the third principal of Prestressed Concrete.
• Developed by T.Y Lin & Ned H. Burns
HISTORY
1/23/2014
![Page 16: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/16.jpg)
16
• Taking concrete as a free body.
• Replacing tendons with forces or moments along the span.
MAIN CONCEPT
1/23/2014
![Page 17: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/17.jpg)
17
Illustration of CONCEPT
1/23/2014
![Page 18: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/18.jpg)
18
CONCEPT
• For Prestressed load moment at mid-span = P*h
• For Hypotheoritcal load moment at mid- span = w2L²/8
• Now both are equal.
• At last the result is w2 = 8Ph/L²
1/23/2014
![Page 19: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/19.jpg)
19
CONCEPT
1/23/2014
![Page 20: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/20.jpg)
20
CONCEPT• For Prestressed load , moment at mid-span = P*h
• For Hypotheoritcal load , moment at mid span = w2 L/4
• Now both are equal.
• At last the result is , w2 =4Ph/L
1/23/2014
![Page 21: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/21.jpg)
21
CONCEPT
1/23/2014
![Page 22: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/22.jpg)
22
• For Prestressed load moment at mid-span = P*h
• So the produced moment should be , M=P*h
CONCEPT
1/23/2014
![Page 23: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/23.jpg)
23
CONCEPT
1/23/2014
![Page 24: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/24.jpg)
24
• Continuous beam act as a simply supported beam
• After Load balancing method it is act as a non-prestressed continuous beam.
• For analysis only consider unbalanced portion.
CONCEPT
1/23/2014
![Page 25: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/25.jpg)
25
Cable Layout
TOPIC
1/23/2014
![Page 26: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/26.jpg)
26
Contents >>
• Cable layout• Simple Beam Layout• Layouts for pretensioned beams• Layouts for posttensioned beams• Cable profiles• Cantilever beam layout• Single cantilevers beam layout• Double cantilevers beam layout
1/23/2014
![Page 27: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/27.jpg)
27
Cable Layout
The schematic arrangement of a group of tendons is called Cable Layout.
Tendon : A stretched element used in a concrete member for the purpose of prestressing.
1/23/2014
![Page 28: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/28.jpg)
28
Simple Beam Layout
Controlled by Two Critical Sections :
The Maximum Moment : The maximum moment section is controlled by two
loading stage : 1) The initial stage 2) The working-load stage The End Section : The end sections are controlled by the area.
1/23/2014
![Page 29: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/29.jpg)
29
Layouts for Pretensioned Beams
1/23/2014
![Page 30: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/30.jpg)
30
Layouts for posttensioned beams
1/23/2014
![Page 31: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/31.jpg)
31
Cable profiles
The method is intended for simple beams.
It also applicable for complicated layouts, such as complicated and continuous layouts.
The method is a graphical one ; giving limiting zone within which the c.g.s. must pass in order that no tensile stresses will be produced.
Compressive stresses in concrete are not checked by this method.
1/23/2014
![Page 32: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/32.jpg)
32
Cable profiles
1/23/2014
![Page 33: Design of Prestressed Concrete -](https://reader035.fdocuments.in/reader035/viewer/2022081421/5583f8c1d8b42a33318b5204/html5/thumbnails/33.jpg)
33
THANK YOU