Design Excellence Strategy · 2020. 3. 6. · 1 6 February 2020 Design Excellence Strategy –...

20
Attachment D Design Excellence Strategy 176

Transcript of Design Excellence Strategy · 2020. 3. 6. · 1 6 February 2020 Design Excellence Strategy –...

  • Attachment D

    Design Excellence Strategy

    176

  • 1

    6 February 2020

    Design Excellence Strategy – Stamford on Macquarie 93-97 Macquarie Street Sydney This Design Excellence Strategy (Strategy) is prepared on behalf of Stamford Property Services Pty Ltd (the Proponent) for the development of land at 93-97 Macquarie Street, Sydney (the site). The site and the extent of the competitive design process is shown below in Figure 1.

    This Strategy is prepared in accordance with Clause 1.2 under the Competitive Design Policy 2013 (the Policy) and Section 3.3.2 (Design Excellence Strategy) of the Sydney Development Control Plan 2012 (SDCP 2012):

    1. In accordance with Clause 1.2 of the Policy and Section 3.3.2 of SDCP 2012, this Design Excellence Strategy defines:

    a) The location and extent of each competitive design process;

    b) The type of competitive design process(es) to be undertaken:

    i. an architectural design competition, open or invited; or

    ii. the preparation of design alternatives on a competitive basis.

    c) The number of designers involved in the process(es);

    d) How architectural design variety is to be achieved across large sites;

    e) Whether the competitive design process is pursuing additional floor space or height;

    Figure 1 Extent of the Competition Site (outlined in red).

    177

  • 2

    f) Options for distributing any additional floor space area or building height which may be granted by the consent authority for demonstrating design excellence through a competitive design process and

    g) The target benchmarks for ecologically sustainable development.

    Note: Nothing in this Design Excellence Strategy represents an approval from the consent authority for a departure from the relevant State Environmental Planning Polices (SEPPs), Sydney Local Environmental Plan 2012 (SLEP 2012), SDCP 2012 or Concept DA consent. Where there is any inconsistency the SEPPs, SLEP 2012, SDCP 2012 and Concept DA consent prevail.

    In compliance with Section 1.2 of the City of Sydney Competitive Design Policy and 3.3.2 of the Sydney DCP 2012, the Proponent proposes the following Design Excellence Strategy:

    Requirement Response a) The location and extent of each competitive design process.

    The location and extent of the Competitive Design Process is shown in Figure 1). The site is located at 93-97 Macquarie Street, Sydney (legally described as Lot 12 DP1197140).

    Requirement Response b) The type of competitive design process(es) to be undertaken:

    (i) an architectural design competition, open or invited; or

    (ii) the preparation of design alternatives on a competitive basis.

    The type of competitive design process to be undertaken is an invited Architectural Design Competition (Competition).

    c) The number of designers involved in the process(es).

    The Proponent will invite a minimum of five (5) Competitors to participate in the Competition.

    178

  • 3

    Requirement Response d) How architectural design variety is to be achieved across large sites.

    Architectural design variety is to be achieved across the site with an architectural approach which breaks each street frontage into distinct and unique building forms.

    e) Whether the competitive design process is pursuing additional floor space or height.

    The Competition will not be pursuing additional building height or floor space under Clause 6.21(7) of the SLEP 2012.

    f) Options for distributing any additional floor space area or building height which may be granted by the consent authority for demonstrating design excellence through a competitive design process.

    The Competition will not be pursuing any additional floor space area of building height.

    g) the target benchmarks for ecologically sustainable development

    At a minimum, the competition undertaken will be required to achieve the following ecologically sustainable development targets:

    • For the residential component:

    o Energy consumption requirements of 2,553.8kg CO2 per person per year (35% reduction)(BASIX Energy score of 35)

    o Thermal comfort; • Individual heating load ≤ 28.2 MJ/m2

    per annum • Individual cooling load ≤ 31.8 MJ/m2

    per annum • Average heating load ≤ 25 MJ/m2 per

    annum • Average cooling load ≤ 28.2 MJ/m2

    per annum o Water consumption requirement of 4,5170L

    per person per annum (50% reduction)(BASIX Water score of 50)

    • The non residential component of the proposed development is to be assessed using JV3 Alternative Verification pathway to meet the compliance requirements with Section J and provide with more balanced and practical target for the fabric performance.

    • Reflectivity index permitted for external glazed elements is not to exceed 20%.

    Environmental Sustainable Development (ESD) targets and sustainability initiatives will be carried through the competitive process phase, design development, construction, and through to completion of the project to deliver an exemplar of environmentally sustainable development.

    179

  • 4

    ASSESSMENT AND DECISION MAKING In establishing a Jury for the Competition, it is understood that:

    The Jury is to comprise a total of six (6) members;

    The Jury will be constituted of:

    o Three (3) members nominated by the Proponent; o Three (3) members nominated by the City of Sydney (including the Jury chair);

    Jury members are to:

    o Represent the public interest; o Be appropriate to the type of development proposed; o Include only persons who have expertise and experience in the development,

    design and construction professions and industry; and

    o Include a majority of registered architects with urban design expertise. The Chairperson of the Jury will have expertise in architecture and urban design and be a recognised proponent of design excellence;

    The City of Sydney will nominate an Observer(s) to verify that the Competition has been followed appropriately and fairly; and

    The Jury’s decision will be via a majority vote.

    The decision of the Jury will not fetter the discretion of the Consent Authority in its determination of any subsequent development application associated with the development site that is the subject of the competition. Unless stated otherwise herein, Clause 3.4 of the City of Sydney Competitive Design Policy will apply with regard the decision-making and resolution process and Clause 3.5 in relation to the preparation of an Architectural Design Competition Report.

    SELECTION AND NUMBER OF DESIGNERS The Competition Brief is to be developed in accordance with the following principles:

    Selection of a range of established, emerged and emerging architectural firms to participate in the competition;

    The Proponent will invite a minimum of five (5) competitors to participate in the Competition the selection of the invitees to the Competition will be undertaken in consultation with the City of Sydney;

    Each competitor will be a person, corporation or firm registered as an architect in accordance with the NSW Architects Act 2003 or, in the case of interstate or overseas competitors, eligible for registration with their equivalent association;

    180

  • 5

    REQUIREMENTS FOR A COMPETITION BRIEF In establishing an Architectural Design Competition Brief (Brief) for the site, the Proponent will ensure that:

    All details about the conduct of the Competition process are contained within the Brief only;

    This Design Excellence Strategy and the Brief will be reviewed and endorsed in writing by the Consent Authority prior to commencement of the Competition and its distribution to Competition entrants; and

    The Brief is to be generally in accordance with the Council’s Model Competitive Design Process Brief and the Competitive Design Policy.

    DESIGN INTEGRITY The designer of the winning scheme as determined by the Jury, is to be appointed as the Lead Design Architect and perform this role to completion of the project. The role of the Lead Design Architect will include at a minimum the following:

    Prepare a detailed (Stage 2) DA for the preferred design;

    Prepare the design drawings for a construction certificate for the preferred design;

    Prepare design drawings for the contract documentation; and

    Maintain continuity during the construction phases, through to completion of the project.

    The Lead Design Architect may work in association with other architectural practices

    but is to retain a leadership role over design decisions.

    181

  • Repo

    rt:

    Sust

    ain

    ab

    ility

    Des

    ign

    Stra

    tegy

    P

    roje

    ct:

    93 -

    97 M

    acq

    uarie

    Stre

    et, S

    ydne

    y F

    or: Sta

    mfo

    rd P

    rop

    erty

    Ser

    vice

    s Pty

    Ltd

    B

    y: Inha

    bit

    Aus

    trala

    sia P

    ty L

    td.

    Doc.

    No:

    84

    04-R

    PT-E

    S000

    1 D

    ate

    : 20

    19-0

    3-11

    Re

    visio

    n:

    02

    In

    habi

    t Gro

    up

    Offi

    ce: L

    evel

    11,

    88

    Philli

    p S

    treet

    , Syd

    ney,

    NSW

    , 300

    0 T.

    +61

    (0)2

    800

    3 63

    33 W

    .ww

    w.in

    hab

    itgro

    up.c

    om E

    .con

    tact

    @in

    hab

    itgro

    up.c

    om

    Aus

    tralia

    | C

    hina

    | H

    ong

    Kong

    | U

    nite

    d A

    rab

    Emira

    tes

    | Un

    ited

    King

    dom

    182

  • Rep

    ort:

    Sust

    ain

    ab

    ility

    Des

    ign

    Stra

    tegy

    Pr

    ojec

    t: 93

    - 97

    Ma

    cqua

    rie S

    treet

    , Syd

    ney

    Da

    te: 2

    019-

    03-1

    1 Re

    v: 0

    0

    Ta

    ble

    of C

    onte

    nts

    Exec

    utiv

    e Su

    mm

    ary

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ..... 2

    Resid

    entia

    l Dw

    ellin

    gs fo

    r BA

    SIX

    Com

    plia

    nce

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    2

    Mixe

    d Us

    e/ R

    etai

    l Are

    a C

    ompl

    ianc

    e ...

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    .... 2

    Refle

    ctiv

    ity o

    f Gla

    zed

    Faça

    de ...

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ... 2

    Sust

    aina

    ble

    stra

    tegi

    es a

    dopt

    ed ..

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    . 3

    1.In

    trodu

    ctio

    n ...

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ..... 4

    2.C

    ompl

    ianc

    e Re

    quire

    men

    ts ..

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    .... 5

    3.Si

    te a

    nd U

    sage

    .....

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    .... 5

    3.1

    Sydn

    ey C

    limat

    e ...

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ..... 5

    3.2

    Sun

    Path

    .....

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ... 6

    3.3

    Faça

    de ..

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    . 7

    4.ES

    D O

    bjec

    tives

    .....

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    .... 8

    5.

    Resid

    entia

    l Are

    a ...

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ..... 8

    5.1

    Gen

    eral

    Info

    rmat

    ion

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    8

    5.2

    Ener

    gy ..

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ... 9

    5.3

    Ther

    mal

    Com

    fort

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    9

    5.4

    Wat

    er ...

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    .. 11

    6.Re

    tail A

    rea

    Com

    plia

    nce

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ... 11

    7.W

    aste

    Man

    agem

    ent P

    lan

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    11

    8.Pa

    rkin

    g Pr

    ovisi

    ons f

    or A

    ctiv

    e tra

    nspo

    rt ....

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    . 12

    8.1

    Acc

    essib

    ility

    Scor

    e ...

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    .... 1

    2

    9.C

    oncl

    usio

    n ...

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ..... 1

    3

    9.1

    Resid

    entia

    l Dw

    ellin

    gs fo

    r BA

    SIX

    Com

    plia

    nce

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    13

    9.2

    Mixe

    d Us

    e/ R

    etai

    l Are

    a C

    ompl

    ianc

    e ...

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    .... 1

    3

    9.3

    Refle

    ctiv

    ity o

    f Gla

    zed

    Faça

    de ..

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ......

    ... 13

    Revi

    sion

    Dat

    e Fil

    enam

    e 84

    04-R

    PT-E

    S000

    1

    00

    2018

    -11-

    15

    Des

    crip

    tion

    Sust

    aina

    bilit

    y de

    sign

    stra

    tegi

    es a

    t sta

    ge 1

    -DA

    .

    Prep

    ared

    by

    Che

    cked

    by

    App

    rove

    d by

    Nam

    e N

    eha

    Yada

    v Sa

    man

    tha

    And

    erso

    n Ja

    son

    Gae

    kwad

    Sign

    atur

    e

    01

    2018

    -11-

    21

    Des

    crip

    tion

    Revi

    sions

    as p

    er d

    esig

    n ch

    ange

    s and

    com

    men

    ts.

    Prep

    ared

    by

    Che

    cked

    by

    App

    rove

    d by

    Nam

    e N

    eha

    Yada

    v Sa

    man

    tha

    And

    erso

    n Ja

    son

    Gae

    kwad

    Sign

    atur

    e

    02

    2019

    -03-

    11

    Des

    crip

    tion

    Revi

    sions

    as p

    er c

    ounc

    il com

    men

    ts.

    Prep

    ared

    by

    Che

    cked

    by

    App

    rove

    d by

    Nam

    e N

    eha

    Yada

    v A

    lex

    Smith

    A

    lex

    Smith

    Sign

    atur

    e

    183

  • Rep

    ort:

    Sust

    ain

    ab

    ility

    Des

    ign

    Stra

    tegy

    Pr

    ojec

    t: 93

    - 97

    Ma

    cqua

    rie S

    treet

    , Syd

    ney

    Da

    te: 2

    019-

    03-1

    1 Re

    v: 0

    0

    Exec

    utiv

    e Su

    mm

    ary

    Th

    e pa

    ssiv

    e de

    sign

    prin

    cipl

    es a

    nd th

    e bu

    ildin

    g su

    stai

    nabi

    lity

    aspe

    cts o

    f the

    pro

    pose

    d de

    velo

    pmen

    t 93

    -97

    Mac

    quar

    ie

    Stre

    et, S

    ydne

    y N

    SW a

    re a

    ll di

    scus

    sed

    furth

    er a

    head

    in th

    is re

    port.

    The

    env

    ironm

    enta

    l des

    ign

    stra

    tegi

    es p

    ropo

    sed

    in

    this

    docu

    men

    t are

    bas

    ed o

    n th

    e ‘In

    dica

    tive

    Refe

    renc

    e Sc

    hem

    e’ fo

    r a C

    once

    pt P

    lan

    DA

    issu

    ed b

    y Ka

    nnfin

    ch. F

    urth

    er

    deta

    iled

    desig

    n w

    ill be

    und

    erta

    ken

    durin

    g a

    desig

    n co

    mpe

    titio

    n an

    d st

    age

    2 D

    A.

    The

    prop

    osed

    initi

    ativ

    es fo

    rm th

    e ba

    sis o

    f the

    dev

    elop

    men

    t’s a

    chie

    vem

    ent o

    f wat

    er, t

    herm

    al c

    omfo

    rt, b

    iodi

    versi

    ty,

    was

    te a

    nd e

    nerg

    y be

    nchm

    arks

    . The

    cur

    rent

    des

    ign

    is ai

    min

    g to

    ach

    ieve

    /exc

    eed

    min

    imum

    com

    plia

    nce

    requ

    irem

    ents

    . Th

    e ex

    pect

    ed t

    arge

    ts a

    nd b

    ench

    mar

    ks re

    quire

    men

    ts fo

    r a c

    lass

    2 (

    mul

    ti dw

    ellin

    g) re

    siden

    tial p

    roje

    ct a

    re s

    how

    n in

    be

    low

    Tab

    le 1

    , Tab

    le 2

    and

    Tab

    le 3

    .

    Resid

    entia

    l Dw

    ellin

    gs fo

    r BA

    SIX

    Com

    plia

    nce

    Fo

    llow

    ing

    targ

    ets h

    ave

    been

    set f

    or th

    e re

    siden

    tial c

    ompo

    nent

    of t

    he b

    uild

    ing

    desig

    n co

    mpl

    ianc

    e an

    d be

    yond

    .

    Tabl

    e 1:

    Ene

    rgy

    Con

    sum

    ptio

    n Re

    quire

    men

    ts a

    nd E

    stim

    ate

    BASI

    X be

    nchm

    ark

    3,92

    9kg

    CO

    2 pe

    r per

    son

    per y

    ear

    Estim

    ated

    con

    sum

    ptio

    n 25

    53.8

    kg C

    O2 pe

    r per

    son

    per y

    ear

    Redu

    ctio

    n 35

    %

    Ta

    ble

    2: T

    herm

    al C

    omfo

    rt: H

    eatin

    g an

    d C

    oolin

    g Lo

    ad R

    equi

    rem

    ents

    as p

    er re

    vise

    d BA

    SIX

    targ

    ets (

    01/0

    7/20

    17).

    BASI

    X Be

    nchm

    ark

    (MJ/

    m2 .a

    nnum

    )

    Indi

    vidu

    al H

    eatin

    g Lo

    ad

    ≤ 28

    .2

    Indi

    vidu

    al C

    oolin

    g Lo

    ad

    ≤ 31

    .8

    Ave

    rage

    Hea

    ting

    Load

    25.0

    Ave

    rage

    Coo

    ling

    Load

    28.2

    Ta

    ble

    3: W

    ater

    Con

    sum

    ptio

    n Re

    quire

    men

    ts a

    nd E

    stim

    ate

    Mixe

    d Us

    e/ R

    etai

    l Are

    a C

    ompl

    ianc

    e

    The

    non-

    resid

    entia

    l com

    pone

    nt o

    f the

    pro

    pose

    d de

    velo

    pmen

    t nee

    ds to

    be

    asse

    ssed

    usin

    g JV

    3 A

    ltern

    ativ

    e V

    erifi

    catio

    n pa

    thw

    ay t

    o m

    eet

    the

    com

    plia

    nce

    requ

    irem

    ents

    with

    sec

    tion

    – J

    and

    prov

    ide

    with

    mor

    e ba

    lanc

    ed a

    nd p

    ract

    ical

    targ

    et fo

    r the

    fabr

    ic p

    erfo

    rman

    ce.

    Re

    flect

    ivity

    of G

    laze

    d Fa

    çade

    The

    City

    of S

    ydne

    y C

    ounc

    il stip

    ulat

    es th

    e re

    flect

    ivity

    inde

    x pe

    rmitt

    ed fo

    r ext

    erna

    l gla

    zed

    elem

    ents

    shou

    ld n

    ot

    exce

    ed 2

    0%. T

    he p

    ropo

    sed

    glaz

    ed fa

    çade

    shou

    ld m

    eet t

    his r

    equi

    rem

    ent,

    whi

    ch is

    exp

    ecte

    d to

    resu

    lt in

    an

    effic

    ient

    proj

    ect.

    BASI

    X be

    nchm

    ark

    90,3

    40 L

    per

    per

    son

    per y

    ear

    Estim

    ated

    con

    sum

    ptio

    n 45

    170

    L pe

    r per

    son

    per y

    ear

    Redu

    ctio

    n 50

    % (f

    or B

    ASI

    X co

    mpl

    ianc

    e ≥4

    0% re

    quire

    d)

    184

  • Rep

    ort:

    Sust

    ain

    ab

    ility

    Des

    ign

    Stra

    tegy

    Pr

    ojec

    t: 93

    - 97

    Ma

    cqua

    rie S

    treet

    , Syd

    ney

    Da

    te: 2

    019-

    03-1

    1 Re

    v: 0

    0

    Su

    stai

    nabl

    e st

    rate

    gies

    ado

    pted

    The

    Tabl

    e be

    low

    sum

    mar

    ises v

    ario

    us su

    stai

    nabl

    e st

    rate

    gies

    inco

    rpor

    ated

    at c

    once

    ptua

    l des

    ign

    stag

    e.

    (*

    ) The

    men

    tione

    d st

    rate

    gies

    are

    subj

    ect t

    o ch

    ange

    s as t

    he d

    esig

    n ev

    olve

    s at f

    urth

    er d

    etai

    led

    desig

    n st

    ages

    .

    Asp

    ect o

    f Env

    ironm

    enta

    l Des

    ign

    Resp

    onse

    for t

    his d

    evel

    opm

    ent (

    *)

    Gre

    enho

    use

    gas e

    miss

    ions

    ab

    atem

    ent i

    nclu

    ding

    ene

    rgy

    effic

    ienc

    y in

    itiat

    ives

    The

    BASI

    X sc

    ore

    targ

    ets h

    ave

    been

    set 1

    0% a

    bove

    the

    min

    imum

    co

    mpl

    ianc

    e re

    quire

    men

    t to

    redu

    ce G

    HG e

    miss

    ions

    . A

    ccor

    ding

    ly, s

    trate

    gies

    hav

    e be

    en in

    corp

    orat

    ed in

    the

    prop

    osed

    des

    ign

    such

    as e

    ffici

    ent l

    ight

    ing

    syst

    em, B

    uild

    ing

    Man

    agem

    ent C

    ontro

    l Sys

    tem

    (B

    MC

    S) sy

    stem

    , hig

    h ra

    ted

    fixtu

    res e

    tc.

    Refe

    r sec

    tion

    4 an

    d 5

    for d

    etai

    ls.

    Pass

    ive

    desig

    n fo

    r the

    rmal

    com

    fort,

    ah

    ead

    of re

    lianc

    e up

    on

    mec

    hani

    cal a

    ir co

    nditi

    onin

    g so

    lutio

    ns

    The

    prop

    osed

    des

    ign

    has i

    nclu

    ded

    stra

    tegi

    es to

    enh

    ance

    ther

    mal

    co

    mfo

    rt us

    ing

    pass

    ive

    tech

    niqu

    es su

    ch a

    s cro

    ss v

    entil

    atio

    n an

    d hi

    gh-

    perfo

    rman

    ce b

    uild

    ing

    fabr

    ic sy

    stem

    , sha

    ding

    , orie

    ntat

    ion

    etc.

    Ref

    er

    sect

    ion

    3.3,

    5.3

    and

    6 fo

    r det

    ails.

    Rene

    wab

    le e

    nerg

    y ge

    nera

    tion

    &

    ener

    gy st

    orag

    e in

    itiat

    ives

    To m

    eet t

    he e

    nerg

    y ta

    rget

    s, pr

    ovisi

    on h

    as b

    een

    mad

    e fo

    r PV

    pan

    els.

    Allo

    wan

    ce fo

    r PV

    to b

    e in

    vest

    igat

    ed d

    urin

    g de

    taile

    d de

    sign.

    (T

    o be

    incl

    uded

    at f

    urth

    er st

    ages

    )

    Des

    ign

    for c

    limat

    e re

    silie

    nce

    Plan

    ter b

    oxes

    and

    light

    -col

    oure

    d fin

    ishes

    are

    pro

    pose

    d on

    the

    roof

    te

    rrace

    s to

    redu

    ce h

    eat i

    sland

    effe

    ct.

    Shad

    ing

    stru

    ctur

    es a

    re to

    be

    prop

    osed

    in th

    e op

    en sp

    aces

    for e

    ffici

    ent

    use

    durin

    g su

    mm

    er m

    onth

    s and

    hea

    t wav

    e co

    nditi

    ons.

    (Lan

    dsca

    pe

    desig

    n to

    be

    incl

    uded

    at f

    urth

    er st

    ages

    ) In

    crea

    sed

    sizin

    g of

    the

    rain

    wat

    er ta

    nk a

    s per

    exp

    ecte

    d pe

    ak ra

    ins t

    o ca

    ptur

    e m

    axim

    um w

    ater

    whe

    n av

    aila

    ble.

    (H

    ydra

    ulic

    eng

    inee

    r’s re

    port

    to b

    e in

    clud

    ed a

    t fur

    ther

    stag

    es)

    Mai

    ns p

    otab

    le w

    ater

    savi

    ngs /

    wat

    er

    effic

    ienc

    y in

    itiat

    ives

    The

    BASI

    X sc

    ore

    targ

    ets h

    ave

    been

    set 1

    0% a

    bove

    the

    min

    imum

    co

    mpl

    ianc

    e re

    quire

    men

    t to

    impr

    ove

    wat

    er e

    ffici

    ency

    . A

    ccor

    ding

    ly, s

    trate

    gies

    hav

    e be

    en in

    corp

    orat

    ed in

    the

    prop

    osed

    des

    ign

    such

    as B

    uild

    ing

    Man

    agem

    ent C

    ontro

    l Sys

    tem

    (BM

    CS)

    syst

    em, h

    igh

    rate

    d fix

    ture

    s etc

    . Re

    fer s

    ectio

    n 5.

    4 fo

    r det

    ails.

    Stor

    mw

    ater

    man

    agem

    ent:

    qual

    ity &

    qu

    antit

    y

    Ons

    ite w

    ater

    stor

    age

    tank

    with

    cap

    acity

    30k

    L ha

    s bee

    n pr

    opos

    ed.

    Furth

    er d

    etai

    led

    desig

    n to

    be

    inco

    rpor

    ated

    as p

    er h

    ydra

    ulic

    eng

    inee

    r’s

    repo

    rt at

    furth

    er st

    ages

    . Re

    fer s

    ectio

    n 5.

    4 fo

    r det

    ails.

    Con

    stru

    ctio

    n-ph

    ase

    was

    te

    redu

    ctio

    n, re

    sour

    ce re

    cove

    ry,

    mat

    eria

    ls re

    -use

    and

    recy

    clin

    g

    The

    cons

    truct

    ion

    was

    te m

    anag

    emen

    t pla

    n ha

    s bee

    n pr

    opos

    ed to

    div

    ert

    80%

    of t

    he c

    onst

    ruct

    ion

    was

    te a

    way

    from

    the

    land

    fill a

    s per

    the

    City

    of

    Sydn

    ey’s

    ‘Was

    te S

    trate

    gy a

    nd A

    ctio

    n Pl

    an 2

    017-

    2030

    ’. (W

    aste

    man

    agem

    ent p

    lan

    to b

    e in

    clud

    ed a

    t fur

    ther

    stag

    es)

    Ope

    ratio

    nal-p

    hase

    was

    te re

    duct

    ion,

    re

    sour

    ce re

    cove

    ry, r

    ecyc

    ling

    The

    oper

    atio

    nal w

    aste

    man

    agem

    ent p

    lan

    has b

    een

    prop

    osed

    to d

    iver

    t ar

    ound

    70%

    of t

    he g

    ener

    ated

    was

    te fr

    om th

    e de

    velo

    pmen

    t as p

    er th

    e ‘E

    nviro

    nmen

    tal S

    trate

    gy a

    nd A

    ctio

    n Pl

    an 2

    016-

    2021

    ’. Re

    fer s

    ectio

    n 7

    for d

    etai

    ls.

    Biod

    iver

    sity

    enha

    ncem

    ent,

    City

    gr

    eeni

    ng

    Sinc

    e th

    ere

    is le

    ss o

    ppor

    tuni

    ty fo

    r dee

    p so

    il pla

    ntin

    g on

    site

    , pla

    nter

    bo

    xes h

    ave

    been

    pro

    pose

    d on

    the

    roof

    are

    as w

    here

    pos

    sible

    . (F

    urth

    er d

    etai

    led

    land

    scap

    e de

    sign

    to b

    e in

    clud

    ed a

    t fur

    ther

    stag

    es)

    End

    of T

    rip fa

    cilit

    ies a

    nd p

    rom

    otio

    n of

    act

    ive

    and

    publ

    ic tr

    ansp

    ort

    Prov

    ision

    s for

    bik

    e st

    orag

    e fo

    r res

    iden

    ts a

    nd v

    isito

    rs ca

    n be

    pro

    vide

    d. T

    he

    loca

    tion

    of th

    e de

    velo

    pmen

    t allo

    ws f

    or a

    ctiv

    e us

    e of

    pub

    lic tr

    ansp

    ort.

    Refe

    r sec

    tion

    8 fo

    r det

    ails.

    App

    licat

    ion

    of R

    atin

    g To

    ols:

    Resid

    entia

    l apa

    rtmen

    ts

    Resid

    entia

    l com

    plia

    nce:

    BA

    SIX

    Ener

    gy sc

    ore

    35, B

    ASI

    X W

    ater

    scor

    e 50

    Re

    tail

    Com

    plia

    nce:

    JV

    3 co

    mpl

    ianc

    e A

    ltern

    ativ

    e V

    erifi

    catio

    n pa

    thw

    ay

    for s

    ectio

    n J

    com

    plia

    nce.

    Re

    fer s

    ectio

    n 5

    and

    6 fo

    r det

    ails.

    185

  • Rep

    ort:

    Sust

    ain

    ab

    ility

    Des

    ign

    Stra

    tegy

    Pr

    ojec

    t: 93

    - 97

    Ma

    cqua

    rie S

    treet

    , Syd

    ney

    Da

    te: 2

    019-

    03-1

    1 Re

    v: 0

    0

    1.

    Intro

    duc

    tion

    St

    amfo

    rd P

    rope

    rty S

    ervi

    ces P

    ty L

    td h

    as a

    ppoi

    nted

    Inha

    bit t

    o pr

    ovid

    e an

    out

    line

    of th

    e su

    stai

    nabi

    lity

    obje

    ctiv

    es o

    n

    the

    prop

    osed

    93

    -97

    Mac

    quar

    ie S

    treet

    dev

    elop

    men

    t in

    Sydn

    ey, N

    ew S

    outh

    Wal

    es.

    Th

    is do

    cum

    ent h

    as b

    een

    prep

    ared

    to st

    ate

    the

    ecol

    ogic

    ally

    sust

    aina

    ble

    desig

    n (E

    SD) i

    nitia

    tives

    to b

    e in

    clud

    ed in

    the

    new

    mixe

    d us

    e an

    d m

    ulti-

    resid

    entia

    l dev

    elop

    men

    t. Th

    is st

    rate

    gy w

    ill be

    furth

    er re

    fined

    as t

    he p

    roje

    ct m

    oves

    forw

    ard.

    Th

    e sit

    e is

    loca

    ted

    at 9

    3 -9

    7 M

    acqu

    arie

    Stre

    et, w

    ithin

    the

    Sydn

    ey C

    entra

    l Bus

    ines

    s Dist

    rict.

    The

    prop

    osed

    dev

    elop

    men

    t

    will

    com

    prise

    of o

    ne b

    uild

    ing

    with

    a 1

    5-st

    orey

    tow

    er in

    clud

    ing

    73 re

    siden

    tial u

    nits

    and

    136

    2 m

    2 of

    reta

    il/co

    mm

    erci

    al

    spac

    e. T

    he b

    uild

    ing

    is ai

    min

    g to

    ach

    ieve

    the

    follo

    win

    g ES

    D in

    itiat

    ives

    :

    Exce

    edan

    ce o

    f BA

    SIX

    benc

    hmar

    ks fo

    r wat

    er, t

    herm

    al c

    omfo

    rt an

    d en

    ergy

    by

    10%

    .

    •In

    clus

    ion

    of a

    sola

    r PV

    syst

    em to

    redu

    ce g

    reen

    hous

    e ga

    s em

    issio

    ns.

    Incl

    usio

    n of

    ene

    rgy

    effic

    ient

    LED

    light

    ing

    and

    cont

    rols,

    HV

    AC

    equ

    ipm

    ent u

    sing

    heat

    pum

    ps.

    Incl

    usio

    n of

    pas

    sive

    desig

    n fo

    r the

    rmal

    com

    fort

    thro

    ugh

    cros

    s ven

    tilat

    ion

    in a

    partm

    ent w

    here

    pos

    sible

    .

    •In

    clus

    ion

    of so

    lar a

    cces

    s for

    all a

    partm

    ents

    .

    •In

    clus

    ion

    of o

    nsite

    rain

    wat

    er c

    aptu

    re fo

    r irri

    gatio

    n an

    d to

    ilet f

    lush

    ing.

    •In

    clus

    ion

    of h

    ighe

    st st

    ar ra

    tings

    for w

    ater

    effi

    cien

    cy o

    f fixt

    ures

    •In

    clus

    ion

    of w

    ater

    effi

    cien

    t poo

    l pum

    p an

    d ba

    ckw

    ash

    clea

    ning

    equ

    ipm

    ent

    Incl

    usio

    n of

    stor

    mw

    ater

    trea

    tmen

    t, ab

    ove

    the

    man

    dato

    ry c

    ounc

    il req

    uire

    men

    ts.

    Con

    stru

    ctio

    n an

    d op

    erat

    iona

    l was

    te m

    anag

    emen

    t alo

    ng w

    ith d

    iver

    ter s

    yste

    m, m

    anag

    ed b

    y oc

    cupa

    nts a

    nd

    appo

    inte

    d bu

    ildin

    g m

    anag

    ers.

    Incl

    usio

    n of

    was

    te m

    anag

    emen

    t fac

    ilitie

    s for

    effi

    cien

    t sto

    rage

    and

    sepa

    ratio

    n of

    land

    fill,

    recy

    clin

    g an

    d or

    gani

    c w

    aste

    stre

    ams.

    Incl

    usio

    n of

    out

    door

    com

    mun

    al ro

    ofto

    p te

    rrace

    spac

    es to

    fost

    er a

    sens

    e of

    com

    mun

    ity.

    Ease

    of a

    cces

    s to

    publ

    ic tr

    ansp

    ort d

    ue to

    the

    site’

    s cen

    tral lo

    catio

    n in

    the

    Sydn

    ey C

    entra

    l Bus

    ines

    s Dist

    rict.

    Pote

    ntia

    l for

    Incl

    usio

    n of

    end

    of t

    rip fa

    cilit

    ies f

    or re

    tail a

    nd a

    dmin

    istra

    tive

    staf

    f to

    enco

    urag

    e ac

    tive

    mod

    es o

    f tra

    nspo

    rt

    Figur

    e 1:

    Ren

    der o

    f the

    pro

    pose

    d bu

    ildin

    g en

    velo

    pe. (

    Sour

    ce: A

    rchi

    tect

    s)

    186

  • Rep

    ort:

    Sust

    ain

    ab

    ility

    Des

    ign

    Stra

    tegy

    Pr

    ojec

    t: 93

    - 97

    Ma

    cqua

    rie S

    treet

    , Syd

    ney

    Da

    te: 2

    019-

    03-1

    1 Re

    v: 0

    0

    2.C

    ompl

    ianc

    e Re

    quire

    men

    ts

    Th

    e pr

    opos

    al is

    aim

    ing

    to a

    chie

    ve a

    hig

    her s

    tand

    ard

    of e

    nviro

    nmen

    tal p

    erfo

    rman

    ce th

    an p

    resc

    ribed

    by

    the

    BASI

    X

    SEPP

    as d

    emon

    stra

    ted

    in th

    is re

    port.

    The

    pro

    posa

    l aim

    s to:

    -

    Exce

    ed th

    e BA

    SIX

    benc

    hmar

    ks fo

    r wat

    er, t

    herm

    al c

    omfo

    rt an

    d en

    ergy

    .

    •In

    clud

    e PV

    syst

    em to

    supp

    ly c

    omm

    on a

    rea

    pow

    er, r

    educ

    ing

    runn

    ing

    cost

    ove

    r tim

    e.

    Ach

    ieve

    the

    BASI

    X en

    ergy

    requ

    irem

    ent o

    f 10%

    , with

    the

    expe

    ctat

    ion

    this

    will

    be im

    prov

    e fu

    rther

    as t

    he d

    esig

    n de

    velo

    ps.

    Ach

    ieve

    an

    effic

    ient

    solu

    tion

    to th

    e pr

    opos

    ed b

    uild

    ing

    fabr

    ic o

    f the

    reta

    il com

    pone

    nt b

    y ex

    ceed

    ing

    the

    com

    plia

    nce

    benc

    hmar

    k.

    3.Si

    te a

    nd U

    sage

    Th

    e sit

    e is

    loca

    ted

    with

    in th

    e Sy

    dney

    CBD

    , app

    roxim

    atel

    y 30

    0m fr

    om C

    ircul

    ar q

    uay

    train

    stat

    ion.

    Hen

    ce, p

    rovi

    ding

    easy

    acc

    ess f

    or fu

    ture

    bui

    ldin

    g us

    ers a

    nd o

    ccup

    ants

    .

    The

    new

    dev

    elop

    men

    t will

    be b

    ound

    ed b

    y A

    lber

    t St t

    o th

    e no

    rth, M

    acqu

    arie

    St t

    o th

    e ea

    st a

    nd a

    djoi

    ning

    site

    s to

    the

    wes

    t as w

    ell a

    s sou

    th. T

    he d

    evel

    opm

    ent o

    ccup

    ies a

    1,6

    10m

    2 sit

    e. T

    he in

    dica

    tive

    refe

    renc

    e sc

    hem

    e is

    mad

    e up

    of a

    15-

    stor

    ey to

    wer

    with

    1,3

    62m

    2 of

    reta

    i/com

    mer

    cial

    . The

    sche

    me

    cons

    ists o

    f 73

    NC

    C C

    lass

    2 a

    partm

    ents

    with

    a

    mixt

    ure

    of o

    ne, t

    wo

    and

    thre

    e-be

    droo

    m d

    wel

    lings

    with

    a c

    ar p

    ark,

    and

    reta

    il com

    pone

    nt to

    the

    grou

    nd fl

    oor.

    Var

    ious

    ESD

    com

    plia

    nce

    requ

    irem

    ents

    and

    add

    ition

    al sa

    lient

    feat

    ures

    hav

    e be

    en a

    ddre

    ssed

    in th

    is re

    port

    for t

    he

    prop

    osed

    des

    ign.

    Fig

    ure

    2: L

    ocat

    ion

    of p

    ropo

    sed

    site

    from

    the

    Sydn

    ey C

    BD

    3.1

    Sydn

    ey C

    limat

    e

    The

    Sydn

    ey c

    limat

    e is

    gene

    rally

    tem

    pera

    te, w

    ith w

    arm

    to h

    ot su

    mm

    ers a

    nd c

    ool w

    inte

    rs.

    Fig

    ure

    3: S

    ydne

    y cl

    imat

    e da

    ta

    If

    pass

    ive

    desig

    n pr

    inci

    ples

    iden

    tifie

    d ab

    ove

    in th

    e ps

    ychr

    omet

    ric c

    hart,

    are

    ado

    pted

    for a

    ny re

    siden

    tial b

    uild

    ing

    desig

    n, th

    is te

    mpe

    rate

    clim

    ate

    enab

    les r

    esid

    entia

    l dev

    elop

    men

    ts to

    redu

    ce it

    s hea

    ting

    and

    cool

    ing

    ener

    gy

    dem

    ands

    Circ

    ula

    r Qua

    y Tr

    ain

    Sta

    tion

    Prop

    osed

    Loc

    atio

    n

    187

  • Rep

    ort:

    Sust

    ain

    ab

    ility

    Des

    ign

    Stra

    tegy

    Pr

    ojec

    t: 93

    - 97

    Ma

    cqua

    rie S

    treet

    , Syd

    ney

    Da

    te: 2

    019-

    03-1

    1 Re

    v: 0

    0

    3.

    2Su

    n Pa

    th

    Th

    e su

    n pa

    th d

    iagr

    ams s

    how

    n be

    low

    illus

    trate

    the

    seas

    onal

    var

    iatio

    n in

    sunp

    ath

    trave

    l for

    the

    93 –

    97

    Mac

    quar

    ie

    Stre

    et, S

    ydne

    y lo

    catio

    n.

    The

    sola

    r ana

    lysis

    has

    pro

    duce

    d th

    e fo

    llow

    ing

    obse

    rvat

    ions

    :

    •Lo

    cate

    d at

    a la

    titud

    e of

    33.

    95° b

    elow

    the

    equa

    tor,

    mon

    thly

    sola

    r loa

    ds v

    ary

    thou

    ghou

    t the

    yea

    r.

    •Th

    e w

    est f

    açad

    e is

    expe

    cted

    to b

    e sh

    aded

    by

    the

    near

    by b

    uild

    ings

    whe

    reas

    eas

    t sid

    e is

    open

    to re

    ceiv

    e su

    nlig

    ht.

    •Th

    e so

    uth

    faça

    de re

    ceiv

    es lim

    ited

    sola

    r rad

    iatio

    n th

    roug

    hout

    the

    year

    •Th

    e se

    t-bac

    ks to

    the

    uppe

    r lev

    els p

    rovi

    de su

    ffici

    ent s

    hadi

    ng o

    n th

    e gl

    azed

    faça

    de

    •Th

    ere

    is so

    me

    shad

    ing

    prov

    ided

    by

    adja

    cent

    stru

    ctur

    es, p

    artic

    ular

    ly a

    t gro

    und

    leve

    l on

    the

    north

    and

    eas

    t or

    ient

    atio

    n

    Figur

    e 5

    Sun

    Path

    for 9

    3-97

    Mac

    quar

    ie S

    treet

    , NSW

    . (El

    evat

    ion

    Vie

    w)

    Fig

    ure

    4 Su

    n Pa

    th fo

    r 93-

    97 M

    acqu

    arie

    Stre

    et, N

    SW. (

    Plan

    Vie

    w)

    Dur

    ing

    win

    ter w

    hen

    the

    sun

    trave

    ls lo

    wer

    in t

    he s

    ky t

    he

    north

    ern

    faça

    de re

    ceiv

    es

    ben

    efic

    ial s

    ola

    r ga

    in

    Dur

    ing

    sum

    mer

    the

    sun

    trave

    ls hi

    gher

    in th

    e sk

    y, th

    eref

    ore

    limite

    d d

    irect

    sola

    r gai

    n on

    the

    sout

    hern

    orie

    ntat

    ion.

    Nor

    th

    188

  • Rep

    ort:

    Sust

    ain

    ab

    ility

    Des

    ign

    Stra

    tegy

    Pr

    ojec

    t: 93

    - 97

    Ma

    cqua

    rie S

    treet

    , Syd

    ney

    Da

    te: 2

    019-

    03-1

    1 Re

    v: 0

    0

    3.3

    Faça

    de

    Th

    e bu

    ildin

    g en

    velo

    pe is

    the

    boun

    dary

    bet

    wee

    n th

    e co

    nditi

    oned

    inte

    rior o

    f a b

    uild

    ing

    and

    the

    outd

    oors.

    The

    ther

    mal

    per

    form

    ance

    of b

    uild

    ing

    enve

    lope

    com

    pone

    nts s

    uch

    as e

    xter

    nal w

    alls,

    roof

    and

    floo

    r, ar

    e cr

    itica

    l in

    dete

    rmin

    ing

    how

    muc

    h en

    ergy

    is re

    quire

    d fo

    r hea

    ting

    and

    cool

    ing,

    ther

    efor

    e op

    timisa

    tion

    of th

    e fa

    çade

    is

    para

    mou

    nt in

    any

    effi

    cien

    t des

    ign.

    The

    93 –

    97

    Mac

    quar

    ie S

    treet

    dev

    elop

    men

    t has

    bee

    n de

    signe

    d w

    ith p

    assiv

    e de

    sign

    prin

    cipl

    es in

    min

    d. T

    his

    enco

    mpa

    sses

    the

    desig

    n hi

    erar

    chy

    of re

    duci

    ng d

    eman

    d as

    the

    first

    prio

    rity

    and

    not r

    elyi

    ng so

    lely

    on

    the

    effic

    ienc

    y

    of th

    e bu

    ildin

    g se

    rvic

    es p

    lant

    to re

    duce

    ene

    rgy

    cons

    umpt

    ion

    and

    asso

    ciat

    ed g

    reen

    hous

    e ga

    s em

    issio

    ns. T

    he w

    arm

    tem

    pera

    te S

    ydne

    y cl

    imat

    e w

    ill be

    take

    n ad

    vant

    age

    of w

    ith a

    com

    bina

    tion

    of o

    ptim

    al o

    rient

    atio

    ns, w

    indo

    w to

    wal

    l

    ratio

    s (W

    WR)

    , fab

    ric c

    onst

    ruct

    ions

    and

    gla

    zing

    mak

    e-up

    s.

    The

    site

    lend

    s its

    elf w

    ell t

    o he

    atin

    g an

    d co

    olin

    g lo

    ad re

    duct

    ion.

    The

    dom

    inan

    t orie

    ntat

    ions

    of n

    orth

    -eas

    t and

    eas

    t

    allo

    w fo

    r ben

    efic

    ial s

    olar

    gai

    n du

    ring

    the

    win

    ter m

    onth

    s. Th

    e so

    lar l

    oads

    are

    redu

    ced

    durin

    g th

    e su

    mm

    er m

    onth

    s

    thro

    ugh

    the

    inco

    rpor

    atio

    n of

    shad

    ing

    devi

    ces a

    nd b

    alco

    nies

    abo

    ve.

    The

    prop

    osed

    faça

    de’s

    gla

    zed

    area

    s also

    pro

    vide

    suffi

    cien

    t acc

    ess t

    o da

    ylig

    ht. T

    his r

    educ

    es th

    e re

    quire

    men

    t for

    elec

    trica

    l ligh

    ting

    and

    prov

    ides

    ple

    asin

    g ae

    sthe

    tics f

    or th

    e bu

    ildin

    g oc

    cupa

    nts.

    The

    faça

    de is

    des

    igne

    d in

    an

    atte

    mpt

    to b

    alan

    ce b

    etw

    een

    min

    imisi

    ng H

    VA

    C lo

    ads a

    nd m

    axim

    ising

    acc

    ess t

    o da

    ylig

    ht.

    Ever

    y ap

    artm

    ent f

    eatu

    res a

    larg

    e pr

    ivat

    e ex

    tern

    al sp

    ace,

    with

    slid

    ing

    door

    s for

    acc

    ess a

    nd n

    atur

    al v

    entil

    atio

    n to

    mai

    ntai

    n in

    door

    air

    qual

    ity, e

    ncou

    ragi

    ng fr

    ee c

    oolin

    g in

    sum

    mer

    whe

    n ex

    tern

    al c

    ondi

    tions

    allo

    w. T

    his w

    ill al

    so h

    elp

    in e

    nsur

    ing

    exce

    llent

    indo

    or a

    ir qu

    ality

    with

    out r

    elyi

    ng o

    n oc

    cupa

    nts o

    peni

    ng w

    indo

    ws.

    The

    deve

    lopm

    ent i

    s wel

    l

    self-

    shad

    ed d

    ue to

    its a

    rchi

    tect

    ural

    feat

    ures

    and

    bal

    coni

    es, i

    n ad

    ditio

    n to

    adj

    acen

    t bui

    ldin

    g st

    ruct

    ures

    .

    O

    ptim

    ised

    on th

    e us

    e of

    gl

    azin

    g du

    e to

    shad

    ing

    form

    adj

    acen

    t stru

    ctur

    es, t

    o

    m

    inim

    ise h

    eat l

    osse

    s/ga

    ins.

    Sh

    adin

    g p

    rovi

    ded

    by

    bal

    coni

    es a

    long

    with

    sli

    din

    g do

    ors t

    o a

    llow

    fo

    r inc

    rea

    sed

    na

    tura

    l ve

    ntila

    tion

    and

    free

    cool

    ing.

    Inst

    alla

    tion

    of P

    V pa

    nels

    as a

    n a

    ltern

    ate

    sour

    ce o

    f ene

    rgy.

    Effic

    ienc

    y of

    HV

    AC

    pla

    nt, l

    ight

    ing

    cont

    rols,

    VSD

    s

    Op

    timise

    orie

    nta

    tion,

    win

    dow

    pro

    file,

    con

    stru

    ctio

    n fa

    bric

    , sh

    adi

    ng d

    evic

    es, n

    atu

    ral v

    entil

    atio

    n

    189

  • Rep

    ort:

    Sust

    ain

    ab

    ility

    Des

    ign

    Stra

    tegy

    Pr

    ojec

    t: 93

    - 97

    Ma

    cqua

    rie S

    treet

    , Syd

    ney

    Da

    te: 2

    019-

    03-1

    1 Re

    v: 0

    0

    4.ES

    D O

    bjec

    tives

    The

    proj

    ect i

    s aim

    ing

    to d

    eliv

    er a

    hig

    h de

    gree

    of a

    men

    ity a

    nd c

    omfo

    rt to

    the

    deve

    lopm

    ent.

    The

    follo

    win

    g el

    emen

    ts,

    cent

    ral t

    o th

    e de

    sign

    are

    key

    to d

    eliv

    erin

    g th

    is: -

    •D

    oub

    le g

    laze

    d, lo

    w e

    -gla

    ss to

    the

    faça

    de – a

    chie

    ving

    syst

    em U

    -va

    lues

    of 4

    .2 W

    /m2 .K

    or l

    ess;

    and

    SHG

    C 0

    .20

    – 0.

    35

    •M

    inim

    um R

    -val

    ue o

    f 2.3

    m2 .K

    /m to

    all e

    xter

    nal n

    on -

    glaz

    ed w

    alls

    •Ex

    pose

    d flo

    or to

    hav

    e a

    min

    imum

    R-v

    alue

    1.9

    m2 K

    /W

    Thes

    e ke

    y en

    velo

    pe d

    esig

    n fe

    atur

    es e

    nsur

    e th

    e bu

    ildin

    g in

    here

    ntly

    ach

    ieve

    s hig

    h le

    vels

    of th

    erm

    al p

    erfo

    rman

    ce.

    In a

    dditi

    on to

    thos

    e ab

    ove,

    the

    deve

    lopm

    ent i

    s also

    exp

    lorin

    g th

    e fe

    asib

    ility

    of th

    e fo

    llow

    ing

    stra

    tegi

    es:

    •In

    clus

    ion

    of a

    PV

    syst

    em to

    supp

    ly th

    e co

    mm

    on a

    rea

    light

    ing

    and

    ener

    gy c

    onsu

    mpt

    ion;

    •In

    clus

    ion

    of a

    n el

    ectri

    c ch

    argi

    ng st

    atio

    ns in

    the

    base

    men

    t

    •Se

    nsor

    con

    trolle

    d au

    tom

    ated

    light

    ing

    to d

    wel

    lings

    and

    com

    mon

    are

    as.

    •C

    olle

    ctio

    n of

    rain

    wat

    er.

    •W

    ater

    effi

    cien

    t tap

    s.

    •En

    ergy

    effi

    cien

    t lig

    ht fit

    tings

    .

    •En

    ergy

    effi

    cien

    t app

    lianc

    es.

    •En

    ergy

    effi

    cien

    t VV

    VF

    lifts

    .

    •En

    ergy

    -effi

    cien

    t var

    iabl

    e sp

    eed

    fans

    for m

    echa

    nica

    l exh

    aust

    syst

    em.

    5.Re

    siden

    tial A

    rea

    Th

    is se

    ctio

    n ou

    tline

    s the

    min

    imum

    com

    plia

    nce

    requ

    irem

    ents

    to a

    chie

    ve B

    ASI

    X sc

    ore

    and

    beyo

    nd.

    5.

    1G

    ener

    al In

    form

    atio

    n

    The

    desig

    n sp

    ecifi

    catio

    ns th

    at p

    ropo

    sed

    Tabl

    e 4.

    Tabl

    e 4:

    Site

    Info

    rmat

    ion

    (*)

    Site

    Site

    Are

    a 16

    10m

    2

    Roof

    Are

    a 36

    0m2

    ( TBD

    )

    Num

    ber o

    f Apa

    rtmen

    ts

    73

    Num

    ber o

    f Res

    iden

    tial C

    ar S

    pace

    s 49

    Res

    iden

    tial (

    Incl

    udin

    g 11

    Ada

    ptab

    le)

    2 C

    ar S

    hare

    Num

    ber N

    on-re

    siden

    tial C

    ar S

    pace

    s 4

    Reta

    il/ C

    omm

    erci

    al S

    pace

    s

    Num

    ber o

    f 2-w

    heel

    er p

    rovi

    sions

    79

    (Res

    iden

    tial B

    ike

    Stor

    age

    Cag

    es)

    11 (R

    etai

    l Bik

    e Pa

    rkin

    g)

    5 (M

    otor

    cycl

    e pa

    rkin

    g)

    (*) T

    he m

    entio

    ned

    sche

    dule

    is su

    bjec

    t to

    chan

    ges a

    s the

    des

    ign

    evol

    ves a

    t fur

    ther

    det

    aile

    d st

    ages

    .

    In

    NSW

    , BA

    SIX

    is th

    e m

    anda

    ted

    com

    plia

    nce

    path

    way

    with

    the

    201

    6 N

    CC

    (BC

    A)

    Sect

    ion

    J fo

    r C

    lass

    1,

    2, a

    nd 4

    build

    ings

    . Th

    is ap

    proa

    ch a

    llow

    s for

    a m

    ore

    flexib

    le d

    esig

    n as

    bui

    ldin

    g en

    velo

    pes a

    re si

    mul

    ated

    in N

    atHE

    RS a

    ppro

    ved

    softw

    are

    and

    are

    requ

    ired

    to a

    chie

    ve h

    eatin

    g an

    d co

    olin

    g be

    nchm

    arks

    bas

    ed o

    n ap

    plic

    able

    clim

    ate

    zone

    s. In

    addi

    tion

    to th

    e N

    atHE

    RS re

    quire

    men

    ts, B

    ASI

    X in

    clud

    es b

    oth

    ener

    gy e

    ffici

    ency

    and

    wat

    er e

    ffici

    ency

    requ

    irem

    ents

    .

    190

  • Rep

    ort:

    Sust

    ain

    ab

    ility

    Des

    ign

    Stra

    tegy

    Pr

    ojec

    t: 93

    - 97

    Ma

    cqua

    rie S

    treet

    , Syd

    ney

    Da

    te: 2

    019-

    03-1

    1 Re

    v: 0

    0

    5.

    2En

    ergy

    BASI

    X re

    quire

    s a 2

    5% re

    duct

    ion

    in e

    nerg

    y fro

    m th

    e be

    nchm

    ark

    3,92

    9kg

    CO

    2 pe

    r per

    son

    per y

    ear.

    Follo

    win

    g ar

    e th

    e

    stra

    tegi

    es p

    ropo

    sed

    to b

    e in

    clud

    ed in

    the

    desig

    n to

    ach

    ieve

    com

    plia

    nce

    and

    10%

    ove

    r to

    achi

    eve

    effic

    ient

    perfo

    rman

    ce:

    Cen

    tral h

    ot w

    ater

    syst

    em w

    ith c

    entra

    lised

    gas

    -fire

    d bo

    iler w

    ith R

    1.0

    pipe

    insu

    latio

    n.

    •G

    earle

    ss tr

    actio

    n w

    ith V

    VV

    F m

    otor

    lifts

    .

    •Bu

    ildin

    g m

    anag

    emen

    t con

    trol s

    yste

    m to

    met

    er a

    nd m

    onito

    r con

    sum

    ptio

    n

    •D

    wel

    ling

    fixtu

    res:

    Coo

    ling

    3-Ph

    ase

    Reve

    rse C

    ycle

    EER

    >4.

    0

    •D

    wel

    ling

    fixtu

    res:

    Heat

    ing

    3-Ph

    ase

    Reve

    rse C

    ycle

    EER

    > 4

    .0

    •V

    entil

    ated

    Frid

    ge S

    pace

    •D

    edic

    ated

    LED

    /Flu

    ores

    cent

    Fitt

    ing

    •Ba

    thro

    om, k

    itche

    n an

    d la

    undr

    y ex

    haus

    t to

    the

    roof

    or f

    açad

    e in

    terlo

    cked

    with

    light

    .

    •G

    as c

    ook

    top

    •El

    ectri

    c ov

    en

    •4-

    star

    rate

    d di

    shw

    ashe

    r

    •4-

    star

    rate

    d cl

    othe

    s was

    her

    •3

    - sta

    r rat

    ed c

    loth

    es d

    ryer

    The

    abov

    e de

    sign

    is lik

    ely

    to a

    chie

    ve a

    35%

    redu

    ctio

    n an

    d m

    eets

    BA

    SIX

    requ

    irem

    ent

    Ta

    ble

    5: E

    nerg

    y C

    onsu

    mpt

    ion

    BASI

    X be

    nchm

    ark

    3,92

    9kg

    CO

    2 pe

    r per

    son

    per y

    ear

    Estim

    ated

    con

    sum

    ptio

    n 25

    53.8

    kg C

    O2 pe

    r per

    son

    per y

    ear

    Redu

    ctio

    n 35

    %

    5.3

    Ther

    mal

    Com

    fort

    BA

    SIX

    stip

    ulat

    es a

    max

    imum

    hea

    ting

    and

    cool

    ing

    load

    for e

    ach

    Cla

    ss 2

    apa

    rtmen

    ts b

    ased

    on

    the

    build

    ing’

    s loc

    atio

    n.

    Apa

    rtmen

    ts a

    t 93

    -97

    Mac

    quar

    ie S

    treet

    , N

    SW s

    ite a

    re r

    equi

    red

    to a

    chie

    ve a

    max

    imum

    hea

    ting

    load

    of

    28.2

    MJ/

    m2 /

    annu

    m a

    nd a

    coo

    ling

    load

    of 3

    1.8

    MJ/

    m2 /

    annu

    m.

    The

    aver

    age

    heat

    ing

    and

    cool

    ing

    load

    am

    ongs

    t all a

    partm

    ents

    mus

    t not

    exc

    eed

    25.0

    MJ/

    m2 /

    annu

    m a

    nd a

    coo

    ling

    load

    of 2

    8.2

    MJ/

    m2 /

    annu

    m. T

    he a

    partm

    ents

    at t

    he d

    evel

    opm

    ent n

    eeds

    to b

    e as

    sess

    ed u

    sing

    Acc

    uRat

    e; s

    oftw

    are

    accr

    edite

    d un

    der

    the

    Nat

    ionw

    ide

    Hous

    e En

    ergy

    Rat

    ing

    Sche

    me

    (Nat

    HERS

    ). To

    mee

    t BA

    SIX

    ther

    mal

    com

    fort

    requ

    irem

    ents

    , the

    indi

    cativ

    e th

    erm

    al p

    erfo

    rman

    ces o

    f con

    stru

    ctio

    n el

    emen

    ts h

    ave

    been

    show

    n.

    •So

    lid fa

    çade

    (inc

    ludi

    ng sp

    andr

    els)

    and

    any

    solid

    wal

    l faç

    ade

    elem

    ents

    to a

    partm

    ent f

    acad

    es to

    hav

    e:

    Tota

    l R-v

    alue

    ≥ 2

    .3 m

    2 .K/W

    •G

    laze

    d sy

    stem

    U-v

    alue

    ≤ 4

    .2 W

    /m2 K

    •G

    laze

    d sy

    stem

    SHG

    C ra

    nge

    0.20

    – 0

    .35

    with

    light

    col

    oure

    d fra

    mes

    (sol

    ar a

    bsor

    ptiv

    ity 0

    .50)

    •Th

    e R-

    valu

    e fo

    r the

    roof

    to b

    e ≥

    R3.6

    m2 K

    /W in

    sula

    tion

    The

    R-va

    lue

    for t

    he fl

    oor/

    ceilin

    g to

    be

    R0.9

    – R

    2.0

    m2 K

    /W in

    sula

    tion

    Th

    e ap

    artm

    ents

    thro

    ugho

    ut th

    e de

    velo

    pmen

    t are

    not

    pro

    pose

    d to

    exc

    eed

    the

    max

    imum

    hea

    ting

    cool

    ing

    load

    s to

    mee

    t the

    BA

    SIX

    requ

    irem

    ents

    for T

    herm

    al C

    omfo

    rt.

    Ta

    ble

    6: T

    herm

    al C

    omfo

    rt: H

    eatin

    g an

    d C

    oolin

    g Lo

    ad R

    equi

    rem

    ents

    as p

    er re

    vise

    d BA

    SIX

    targ

    ets (

    01/0

    7/20

    17).

    BASI

    X Be

    nchm

    ark

    (MJ/

    m2 .a

    nnum

    )

    Indi

    vidu

    al H

    eatin

    g Lo

    ad

    ≤ 28

    .2

    Indi

    vidu

    al C

    oolin

    g Lo

    ad

    ≤ 31

    .8

    Ave

    rage

    Hea

    ting

    Load

    25.0

    Ave

    rage

    Coo

    ling

    Load

    28.2

    Ke

    epin

    g in

    min

    d th

    e ab

    ove

    inte

    nt, t

    he c

    urre

    nt d

    esig

    n in

    corp

    orat

    es st

    rate

    gies

    to m

    axim

    ise v

    entil

    atio

    n an

    d da

    ylig

    ht

    with

    in th

    e un

    its to

    ach

    ieve

    max

    imum

    ene

    rgy

    and

    ther

    mal

    com

    fort.

    191

  • Rep

    ort:

    Sust

    ain

    ab

    ility

    Des

    ign

    Stra

    tegy

    Pr

    ojec

    t: 93

    - 97

    Ma

    cqua

    rie S

    treet

    , Syd

    ney

    Da

    te: 2

    019-

    03-1

    1 Re

    v: 0

    0

    5.

    3.1

    Nat

    ural

    Ven

    tilat

    ion

    Th

    e be

    low

    stud

    y sh

    ows t

    he p

    rovi

    sion

    for n

    atur

    al v

    entil

    atio

    n w

    ithin

    the

    bedr

    oom

    s of t

    he u

    nits

    . Bas

    ed o

    n th

    e be

    low

    stud

    y 78

    .85%

    of t

    he p

    ropo

    sed

    units

    ach

    ieve

    acc

    epta

    ble

    natu

    ral v

    entil

    atio

    n th

    us re

    duci

    ng th

    e co

    olin

    g lo

    ads w

    ithin

    the

    units

    .

    Figur

    e 6

    Ven

    tilat

    ion

    Stud

    y (A

    rchi

    tect

    s)

    5.3.

    2So

    lar I

    mpa

    ct A

    naly

    sis: D

    aylig

    ht

    Th

    e be

    low

    stud

    y sh

    ows t

    he p

    rovi

    sion

    for d

    aylig

    ht w

    ithin

    the

    units

    at e

    ach

    leve

    l. It

    is ob

    serv

    ed th

    at m

    ore

    than

    80%

    of t

    he to

    tal

    no. o

    f pro

    pose

    d un

    its re

    ceiv

    e m

    ore

    than

    2hr

    s of d

    aylig

    ht, h

    ence

    redu

    cing

    the

    light

    ing

    load

    of t

    he d

    evel

    opm

    ent.

    Fig

    ure

    7 D

    aylig

    ht S

    tudy

    (Arc

    hite

    cts)

    192

  • Rep

    ort:

    Sust

    ain

    ab

    ility

    Des

    ign

    Stra

    tegy

    Pr

    ojec

    t: 93

    - 97

    Ma

    cqua

    rie S

    treet

    , Syd

    ney

    Da

    te: 2

    019-

    03-1

    1 Re

    v: 0

    0

    5.

    4W

    ater

    BASI

    X re

    quire

    s a 4

    0% re

    duct

    ion

    in w

    ater

    from

    the

    benc

    hmar

    k of

    90,

    340L

    per

    per

    son

    per y

    ear t

    o ac

    hiev

    e co

    mpl

    ianc

    e

    Follo

    win

    g ar

    e th

    e st

    rate

    gies

    pro

    pose

    d to

    be

    incl

    uded

    in th

    e de

    sign

    to a

    chie

    ve c

    ompl

    ianc

    e an

    d 10

    % o

    ver,

    to a

    chie

    ve

    effic

    ient

    per

    form

    ance

    .

    •Ro

    of A

    rea

    Div

    erte

    d to

    rain

    wat

    er ta

    nk 3

    60 m

    2 (T

    BD).

    •Im

    perv

    ious

    Are

    a D

    iver

    ted

    to ra

    in w

    ater

    tank

    . (A

    rea

    TBD

    )

    •O

    verfl

    ow D

    iver

    ted

    to ra

    in w

    ater

    tank

    . (A

    rea

    TBD

    )

    •C

    olle

    cted

    stor

    m w

    ater

    use

    d fo

    r lan

    dsca

    ping

    and

    car

    was

    h in

    the

    bay

    area

    •3

    – st

    ar ra

    ted

    fixtu

    res u

    sed

    in th

    e co

    mm

    on a

    rea

    i.e to

    ilets

    and

    show

    er ro

    oms i

    n po

    ol a

    rea.

    •Pr

    opos

    ed c

    apac

    ity o

    f 30k

    L fo

    r the

    wat

    er Ta

    nk.

    •3-

    star

    wat

    er ra

    ted

    (>7.

    5 bu

    t <=9

    L/m

    in) f

    or th

    e un

    it’s s

    how

    er h

    eads

    •4-

    star

    wat

    er ra

    ted

    taps

    for t

    oile

    ts

    •3-

    star

    wat

    er ra

    ted

    taps

    for k

    itche

    n an

    d ba

    thro

    oms

    •3-

    star

    wat

    er ra

    ted

    clot

    hes w

    ashe

    r

    •5.

    5 - w

    ater

    rate

    d di

    shw

    ashe

    r

    The

    abov

    e de

    sign

    is as

    sum

    ed to

    ach

    ieve

    a 5

    0% re

    duct

    ion

    and

    mee

    ts B

    ASI

    X re

    quire

    men

    ts

    Ta

    ble

    7: W

    ater

    Con

    sum

    ptio

    n

    BASI

    X be

    nchm

    ark

    90,3

    40L

    per p

    erso

    n pe

    r yea

    r

    Estim

    ated

    con

    sum

    ptio

    n 45

    170

    L pe

    r per

    son

    per y

    ear

    Redu

    ctio

    n 50

    %

    6.Re

    tail A

    rea

    Com

    plia

    nce

    Th

    e no

    n- r

    esid

    entia

    l co

    mpo

    nent

    of

    the

    prop

    osed

    dev

    elop

    men

    t ne

    eds

    to b

    e as

    sess

    ed u

    sing

    JV3

    Alte

    rnat

    ive

    Ver

    ifica

    tion

    path

    way

    to

    mee

    t th

    e co

    mpl

    ianc

    e re

    quire

    men

    ts w

    ith s

    ectio

    n –

    J an

    d pr

    ovid

    e w

    ith h

    igh

    perfo

    rman

    ce

    build

    ing

    fabr

    ic.

    7.

    Was

    te M

    anag

    emen

    t Pla

    n

    Prov

    ision

    s fo

    r ope

    ratio

    nal w

    aste

    man

    agem

    ent h

    ave

    been

    pro

    pose

    d an

    d is

    desig

    ned

    to d

    iver

    t aro

    und

    70%

    of t

    he

    gene

    rate

    d w

    aste

    from

    the

    dev

    elop

    men

    t. Sh

    own

    belo

    w a

    re t

    he e

    xtra

    cts

    from

    the

    pro

    pose

    d w

    aste

    man

    agem

    ent

    repo

    rt by

    Ele

    phan

    ts F

    oot R

    ecyc

    ling

    Solu

    tions

    . (TB

    C)

    Fig

    ure

    8: E

    stim

    ated

    gen

    erat

    ed a

    nd re

    cycl

    ed w

    aste

    from

    the

    deve

    lopm

    ent.

    (Sou

    rce:

    was

    te m

    anag

    emen

    t pla

    n re

    port

    by E

    leph

    ant F

    oot R

    ecyc

    ling

    Solu

    tions

    )

    Add

    ition

    ally

    , pro

    visio

    ns to

    div

    ert 8

    0% o

    f the

    con

    stru

    ctio

    n w

    aste

    from

    the

    land

    fill h

    ave

    been

    incl

    uded

    to th

    e pr

    opos

    ed

    desig

    n sc

    hem

    e as

    per

    the

    City

    of S

    ydne

    y’s ‘

    Was

    te S

    trate

    gy a

    nd A

    ctio

    n Pl

    an 2

    017-

    2030

    ’.

    193

  • Rep

    ort:

    Sust

    ain

    ab

    ility

    Des

    ign

    Stra

    tegy

    Pr

    ojec

    t: 93

    - 97

    Ma

    cqua

    rie S

    treet

    , Syd

    ney

    Da

    te: 2

    019-

    03-1

    1 Re

    v: 0

    0

    8.Pa

    rkin

    g Pr

    ovisi

    ons f

    or A

    ctiv

    e tra

    nspo

    rt

    The

    curre

    nt d

    esig

    n in

    clud

    es p

    rovi

    sions

    and

    spac

    es to

    stor

    e bi

    cycl

    es fo

    r res

    iden

    tial o

    ccup

    ants

    , ret

    ail u

    sers

    and

    park

    ing

    for v

    isito

    rs in

    pro

    pose

    d ba

    sem

    ent

    layo

    ut. B

    elow

    is t

    he in

    dica

    tive

    park

    ing

    sche

    dule

    cor

    resp

    ondi

    ng t

    o th

    e pr

    opos

    ed

    spac

    es.

    Figur

    e 9:

    Indi

    cativ

    e pa

    rkin

    g sc

    hedu

    le. (

    *)

    (*) T

    he a

    bove

    -men

    tione

    d sc

    hedu

    le is

    subj

    ect t

    o ch

    ange

    s as t

    he d

    esig

    n ev

    olve

    s at f

    urth

    er d

    etai

    led

    stag

    es.

    8.

    1 A

    cces

    sibilit

    y Sc

    ore

    The

    prop

    osed

    dev

    elop

    men

    t is l

    ocat

    ed in

    a c

    lose

    pro

    ximity

    to th

    e C

    ircul

    ar Q

    uay

    train

    stat

    ion

    (300

    m) a

    nd b

    us st

    atio

    ns,

    mak

    ing

    it a

    favo

    urab

    le d

    evel

    opm

    ent f

    or a

    ctiv

    e an

    d pu

    blic

    tran

    spor

    t use

    rs. F

    igur

    e 10

    show

    s the

    cal

    cula

    ted

    wal

    kabi

    lity

    scor

    e an

    d tra

    nsit

    scor

    e fo

    r the

    dev

    elop

    men

    t use

    rs to

    con

    duct

    dai

    ly a

    ctiv

    ities

    .

    Figur

    e 10

    : The

    acc

    ess s

    core

    of t

    he p

    ropo

    sed

    deve

    lopm

    ent (

    Sour

    ce:

    wal

    ksco

    re.c

    om)

    194

  • Rep

    ort:

    Sust

    ain

    ab

    ility

    Des

    ign

    Stra

    tegy

    Pr

    ojec

    t: 93

    - 97

    Ma

    cqua

    rie S

    treet

    , Syd

    ney

    Da

    te: 2

    019-

    03-1

    1 Re

    v: 0

    0

    9.C

    oncl

    usio

    n

    Follo

    win

    g ta

    rget

    s hav

    e be

    en se

    t for

    var

    ious

    com

    pone

    nts o

    f the

    bui

    ldin

    g de

    sign

    com

    plia

    nce

    and

    beyo

    nd.

    9.

    1Re

    siden

    tial D

    wel

    lings

    for B

    ASI

    X C

    ompl

    ianc

    e

    Th

    e ab

    ove

    disc

    usse

    d in

    itiat

    ives

    for

    m t

    he b

    asis

    of t

    he d

    evel

    opm

    ent’s

    ach

    ieve

    men

    t of

    wat

    er,

    ther

    mal

    com

    fort,

    bi

    odiv

    ersit

    y, w

    aste

    and

    ene

    rgy

    benc

    hmar

    ks. T

    he c

    urre

    nt d

    esig

    n is

    aim

    ing

    to a

    chie

    ve/e

    xcee

    d m

    inim

    um c

    ompl

    ianc

    e re

    quire

    men

    ts. T

    he e

    xpec

    ted

    targ

    ets

    and

    benc

    hmar

    ks re

    quire

    men

    ts fo

    r a c

    lass

    2 (

    mul

    ti dw

    ellin

    g) re

    siden

    tial p

    roje

    ct

    are

    show

    n be

    low

    .

    Tabl

    e 8:

    Ene

    rgy

    Con

    sum

    ptio

    n Re

    quire

    men

    ts a

    nd E

    stim

    ate

    BASI

    X be

    nchm

    ark

    3,92

    9kg

    CO

    2 pe

    r per

    son

    per y

    ear

    Estim

    ated

    con

    sum

    ptio

    n 25

    53.8

    kg C

    O2 pe

    r per

    son

    per y

    ear

    Redu

    ctio

    n 35

    %

    Ta

    ble

    9: T

    herm

    al C

    omfo

    rt: H

    eatin

    g an

    d C

    oolin

    g Lo

    ad R

    equi

    rem

    ents

    as p

    er re

    vise

    d BA

    SIX

    targ

    ets (

    01/0

    7/20

    17).

    BASI

    X Be

    nchm

    ark

    (MJ/

    m2 .a

    nnum

    )

    Indi

    vidu

    al H

    eatin

    g Lo

    ad

    ≤ 28

    .2

    Indi

    vidu

    al C

    oolin

    g Lo

    ad

    ≤ 31

    .8

    Ave

    rage

    Hea

    ting

    Load

    25.0

    Ave

    rage

    Coo

    ling

    Load

    28.2

    Ta

    ble

    10: W

    ater

    Con

    sum

    ptio

    n Re

    quire

    men

    ts a

    nd E

    stim

    ate

    9.2

    Mixe

    d Us

    e/ R

    etai

    l Are

    a C

    ompl

    ianc

    e

    The

    non-

    resid

    entia

    l com

    pone

    nt o

    f the

    pro

    pose

    d de

    velo

    pmen

    t nee

    ds to

    be

    asse

    ssed

    usin

    g JV

    3 A

    ltern

    ativ

    e V

    erifi

    catio

    n pa

    thw

    ay t

    o m

    eet

    the

    com

    plia

    nce

    requ

    irem

    ents

    with

    sec

    tion

    – J

    and

    prov

    ide

    with

    mor

    e ba

    lanc

    ed a

    nd p

    ract

    ical

    targ

    et fo

    r the

    fabr

    ic p

    erfo

    rman

    ce.

    9.

    3Re

    flect

    ivity

    of G

    laze

    d Fa

    çade

    The

    City

    of S

    ydne

    y C

    ounc

    il stip

    ulat

    es th

    e re

    flect

    ivity

    inde

    x pe

    rmitt

    ed fo

    r ext

    erna

    l gla

    zed

    elem

    ents

    shou

    ld n

    ot

    exce

    ed 2

    0%. T

    he p

    ropo

    sed

    glaz

    ed fa

    çade

    shou

    ld m

    eet t

    his r

    equi

    rem

    ent,

    whi

    ch is

    exp

    ecte

    d to

    resu

    lt in

    an

    effic

    ient

    proj

    ect.

    BASI

    X be

    nchm

    ark

    90,3

    40 L

    per

    per

    son

    per y

    ear

    Estim

    ated

    con

    sum

    ptio

    n 45

    170

    L pe

    r per

    son

    per y

    ear

    Redu

    ctio

    n 50

    % (f

    or B

    ASI

    X co

    mpl

    ianc

    e ≥4

    0% re

    quire

    d)

    195