Reliable Connected Technology Solutions! Deepwater DEPLOYMENT SYSTEM The GMC ICP TM Lowering System uses GMC’s patented ICP TM Connection system for deploying deepwater modules to the seabed. The system can be used for safely lowering modules such as PLETs, PLEMs, Manifolds, and general subsea hardware, from any crane barge or vessel of opportunity, in deep water hostile environments. The ICP TM Lowering System offers fast deployment, using high fatigue, quick make-up connectors on light weight high strength tubulars. Once in position, the subsea module is released and the deployment system is recovered to the surface, ready for the next deployment. The ICP TM Lowering System decreases installation time and cost, and enables large heavy modules to be lowered safely in a controlled manner in deep water applications. Experience & Innovation in Pipeline Connection Technology from Surface to Seabed Tension = 2000 MT up to 3000M Water Depth Connection Type = GMC Connector High Fatigue Non-Rotational Quick Connect GMC Intelligently Connected Pipe (ICP TM ) Lowering System

Transcript of DEPLOYMENT SYSTEM - GMC Deep...

Page 1: DEPLOYMENT SYSTEM - GMC Deep Watergmcdeepwater.com/wp-content/uploads/2015/10/gmc-flyer-deepwat… · DEPLOYMENT SYSTEM The GMC ICPTM Lowering System uses GMC’s patented ICPTM Connection

Reliable Connected Technology Solutions!

DeepwaterDEPLOYMENT SYSTEM

The GMC ICPTM Lowering System uses GMC’s

patented ICPTM Connection system for deploying

deepwater modules to the seabed. The system can

be used for safely lowering modules such as PLETs,

PLEMs, Manifolds, and general subsea hardware,

from any crane barge or vessel of opportunity, in

deep water hostile environments.

The ICPTM Lowering System offers fast deployment,

using high fatigue, quick make-up connectors

on light weight high strength tubulars. Once in

position, the subsea module is released and the

deployment system is recovered to the surface,

ready for the next deployment. The ICPTM Lowering

System decreases installation time and cost, and

enables large heavy modules to be lowered safely

in a controlled manner in deep water applications.

Experience & Innovation in Pipeline Connection Technology from Surface to Seabed

• Tension = 2000 MT up to 3000M Water Depth• Connection Type = GMC Connector

— High Fatigue — Non-Rotational — Quick Connect

GMC Intelligently Connected Pipe (ICPTM) Lowering System

Page 2: DEPLOYMENT SYSTEM - GMC Deep Watergmcdeepwater.com/wp-content/uploads/2015/10/gmc-flyer-deepwat… · DEPLOYMENT SYSTEM The GMC ICPTM Lowering System uses GMC’s patented ICPTM Connection

• Final lowering joint connected when payload is approximately 50M off bottom.

• Crane used to land out payload on seabed.

Crane Hook

Payload ManifoldSubsea Foundation

For more information, visit www.gmcdeepwater.com, or contact [email protected]

GMC Limited © 2015 | All Rights Reserved V2:08/15

• Payload moved into position.• Rigging & ‘Launch Joint’ connected to crane’s

main block.• ‘Lower Rigging Joint’ connected to payload.• Payload lowered to make/break tool.

• 50m section lifted into position over make/break tool.

• Land out pipe.• Make-up connection

Payload Manifold with GMC Connector

Lower Rigging Joint in make/break tool

Make/Break Tool

50M Pipe Joint withGMC Pin/Box Connectors

Make/Break Tool

50M Pipe Joint withGMC Pin/Box Connectors

50M Pipe Joint withGMC Pin/Box Connectors

Make/ Break Tool

Payload Manifold

Payload Manifold

Lower Rigging Joint Held in Make/Break Tool

50M Pipe Joint withGMC Pin/Box Connectors

Lower Rigging Joint Held in Make/Break Tool

• Main block lowered until pipe collar is resting on make/break tool.• 50M section in position over make/break tool.• Make-up connection.• Additional pipe sections with GMC Connectors.