Pakistan MTBF
Quarterly Report October December 2004
QR MTBFOct_Dec04_20Oct04ver3.1.doc Page 1 of 14
Final 3.1
17 January 2005 PricewaterhouseCoopers LLP
Department for International
Development
Pakistan Strengthening the Medium Term Budgeting
Framework
CNTR 02 4259
Quarterly Report: October December 2004
-
7/27/2019 Department for International.pdf
2/14
Pakistan MTBF
Quarterly Report October December 2004
QR MTBFOct_Dec04_20Oct04ver3.1.doc Page 2 of 14
Final 3.1
17 January 2005 PricewaterhouseCoopers LLP
Contents
Section Page
Document Control ............................................................ ............................................................. ..................... 3
Abbreviations and Acronyms ....................................................... ........................................................... ........... 3
1 Summary.......................................................... ........................................................... ................................ 3
2 Project Deliverables October December 2004.............................. ........................................................... 3
3 Work Programme January March 2005..................................................................... .............................. 3
Annex 1 Work Plan ............................................................... ............................................................... ........... 3
-
7/27/2019 Department for International.pdf
3/14
Pakistan MTBF
Quarterly Report October December 2004
QR MTBFOct_Dec04_20Oct04ver3.1.doc Page 3 of 14
Final 3.1
17 January 2005 PricewaterhouseCoopers LLP
Document Control
Authorisation
Name Date
Prepared by: Farooq Khan 10 January 2005
Reviewed by: Stuart Tibbs 14 January 2005
Authorised by:
Change history
Version No Date Comments Summary of changes
Draft 1.0 10 January 2005
Final draft 2.0 14 January 2005 Layout changes. Minor amendments. Annex added.
Final 3.0 17 January 2005
Distribution list
This document has been distributed to:
PwC project team
MTBF Secretariat
DFID Pakistan
DFID London
CaveatNo reliance should be placed on this draft report and it does not constitute our definitive opinions and conclusions at this stage. These
will be contained solely in our final written reports or letters. Any oral comments made in discussions with you as concerns our reports
and letters are not intended to have any greater significance than explanations of matters contained in the final written reports or letters.
We shall not be held responsible for oral advice unless we confirm such advice formally in writing.
This report has been prepared for and only for the UK Department of International Development (DFID) in accordance with the terms of
our engagement letter for contractCNTR 02 4259 and for no other purpose. We do not accept or assume any liability or duty of care for
any other purpose or to any other person to whom this report is shown or into whose hands it may come save where expressly agreed by
our prior consent in writing.
-
7/27/2019 Department for International.pdf
4/14
Pakistan MTBF
Quarterly Report October December 2004
QR MTBFOct_Dec04_20Oct04ver3.1.doc Page 4 of 14
Final 3.1
17 January 2005 PricewaterhouseCoopers LLP
Abbreviations and Acronyms
ADB Asian Development Bank
AGPR Accountant General Pakistan Revenues
AM Aide Mmoire
BCC Budget Call Circular
CGA Controller General of Accounts
CoA Chart of Accounts
DAO District Account Office
DDO Drawing and Disbursing Officer
DFID Department for International Development
FABS Financial Accounting and Budgeting System
FAD Fiscal Affairs DepartmentFAO Financial Advisors Organisation
FAQ Frequently Asked Questions
FMU Financial Management Unit
GFS Government Financial Statistics
GoP Government of Pakistan
IMF International Monetary Fund
MoF Ministry of Finance
MoH Ministry of Health
MoPD Ministry of Planning and Development
MoPW Ministry of Population Welfare
MTEF Medium Term Expenditure FrameworkMTBF Medium Term Budgetary Framework
NHF National Health and Population Welfare Facility
NFC National Finance Committee
PandD Planning and Development
PAO Principal Accounting Officer
PEMD Planning and Economic Management Department
PIFRA Pakistan Improvement to Financial Reporting and Audit
PRMP Punjab Resource Management Programme
PSDP Public Sector Development Programme
PwC PricewaterhouseCoopers
SAP Enterprise resource planning model implemented under PIFRATAMA Technical Assistance Management Agency
TN Technical Note
-
7/27/2019 Department for International.pdf
5/14
Pakistan MTBF
Quarterly Report October December 2004
QR MTBFOct_Dec04_20Oct04ver3.1.doc Page 5 of 14
Final 3.1
17 January 2005 PricewaterhouseCoopers LLP
1 Summary1.1 The MTBF Budget Call Circular (MTBF BCC) was issued by the Budget Wing
(Ministry of Finance) to the Ministries of Health and Population Welfare (MoPW)
on 12 November 2004. The BCC included guidelines, instructions and forms to be
filled by the Drawing and Disbursing Officers (DDO) and other officials involved in
budget preparation.
1.2 A four-day MTBF workshop was held for all the DDOs and budget preparingofficers for Ministry of Health. This workshop helped in building capacity relating
to MTBF over one hundred DDOs and budget preparing officers. The feedback has
been very positive. TAMA provided logistical support in holding these workshops.
1.3 The sector review process began in December with the assistance of TechnicalAssistance Management Agency (TAMA). The first draft of the Sector Review for
MoPW has been received. The progress on the Sector Review for Ministry of Health
has been slower.
1.4 During the last meeting of the MTBF Ceiling Committee held on 23 December2004 discussion was held on providing indicative budget ceilings to MoPW.
1.5 The MTBF Project Team has been further strengthened with two full time financialanalysts working in Ministry of Health where an MTBF Cell has been created. The
objective of the cell is to provide comprehensive implementation support to the
MTBF process. MoPW has also been strengthened with an additional financialanalyst.
1.6 An MTBF Coordination Committee in the Ministry of Health (MoH) has beenformed headed by the Joint Secretary Administration. This committee meets on a
regular basis to monitor MTBF progress in MoH.
1.7 The Financial Management Application (FMA) is currently being piloted atPakistan Institute of Management Sciences (PIMS). The application is being tested
and refined to meet the user requirements. It is expected that the application will be
ready to accept live data in the third week of January 2004.
1.8 Paul Harnett visited the Project in November for ten days. During his visit hereviewed the preliminary results of the planning exercise carried out in MoPW and
also finalised the Terms of Reference for the Sector Reviews.
1.9 A DFID mission took place in the third week of November 2004 to look at futuredirection and requirements of the Project.
1.10 MoF has given official approval for hosting the MTBF website(www.mtbfpakistan.gov.pk) which is now live and running. It is being updated on a
regular basis.
-
7/27/2019 Department for International.pdf
6/14
Pakistan MTBF
Quarterly Report October December 2004
QR MTBFOct_Dec04_20Oct04ver3.1.doc Page 6 of 14
Final 3.1
17 January 2005 PricewaterhouseCoopers LLP
2 Project Deliverables October December 2004MTBF Budget Call Circular
2.1 The MTBF BCC was finalised in November after wide ranging discussions andvarious iterations held in the Budget Wing, Planning and Development Division,
Ministry of Health and Ministry of Population Welfare.
2.2 The MTBF BCC explains the linkages between budget reforms, good governanceand Pakistans Poverty Reduction Strategy Paper.
2.3 The calendar in the MTBF BCC shows the schedule of activities for preparing theMTBF. This dovetails with the regular budget process although there are additional
steps specifically relating to establishing ceilings and undertaking Sector Reviews
ahead of detailed budget preparation.
2.4 Extensive guidelines have been provided for the DDOs and the budget-preparingofficers. Besides increasing the budget dimension from single year to multi year, the
focus of the budget preparation under MTBF is also to move away from incremental
line item budgeting and increase the output-orientation for both current and
development budgets.
2.5 Separate forms have been prepared for the current and development budgets. Softcopies of the MTBF BCC and forms are also available on MTBF website.
2.6 In the future, the MTBF BCC could be used as the basis of developing acomprehensive manual.MTBF BCC implementation activities
2.7 MoPW stands well sensitised about the MTBF reforms as a result of the budgetingand planning exercise (involving all Provinces) that took place in September and
October 2004.
2.8 The initial MTBF estimates in MoPW have been prepared. Once refined they wouldform good basis for holding negotiations for the budget ceilings.
2.9 With the issuance of the MTBF BCC, implementation activities under the Project inthe two pilot ministries are in an intensive phase.
2.10 Activities in MoH were instigated by holding an initial briefing including apresentation by the Project Coordinator on MTBF reforms. This was held on 2 and 4
December 2004 and was attended by most of the senior staff in the Ministry of
Health. Joint Secretary Administration and Deputy Director General (Planning and
Development) chaired the meeting. The latter person has been nominated as the
Focal Person for MTBF in Ministry of Health.
-
7/27/2019 Department for International.pdf
7/14
Pakistan MTBF
Quarterly Report October December 2004
QR MTBFOct_Dec04_20Oct04ver3.1.doc Page 7 of 14
Final 3.1
17 January 2005 PricewaterhouseCoopers LLP
2.11 This briefing was followed by a detailed 4 day MTBF training workshop for all thebudget preparing officers and DDOs in the Ministry of Health from all over
Pakistan. This focused on operational aspects of MTBF. During the workshops the
participants were informed about the MTBF concepts, MTBF BCC, steps involvedin preparation of MTBF and what is expected of them in coming months. This was
followed by a practical exercise that helped them in putting theory into practice.
More than 100 participants attended the workshop. The workshop has been well
received and the feedback is positive (Annex 1).
2.12 Following the workshops, the MTBF forms for the current budget included in theBCC were modified. Specific forms were developed for hospitals, MCH centres,
dispensaries, drugs control administration, establishments. These have been
communicated to all the spending units.
2.13 The MTBF Project Team is now carrying out follow-up (visits and phone calls) withall of the spending units in MoH and providing hands on support to the budget
preparing officers and DDOs involved in preparation of MTBF estimates.
Establishment of ceilings
2.14 The MTBF Project Team is actively providing support to the Budget CeilingCommittee. The fourth meeting of the Budget Ceiling Committee was held on 23
December 2004 under the chairmanship of Joint Secretary, Budget Wing. Various
options and scenarios were discussed. During this meeting MoF also provided
MoPW with preliminary indicative MTBF ceilings for 2005-08 to which they
reacted positively. However, these will need to be firmed up once the baselines
estimates are available and Sector Review exercise is complete.
2.15 MoH has been invited for the fifth meeting of the Budget Ceiling Committee, whichhas been fixed for 12 January 2004. It is estimated that indicative ceilings will be
finalised and communicated in January 2005.
Financial Management capacity in line ministries
2.16 An oracle-based application called FMA has been developed primarily for MoHwhich will address the financial management needs of the spending units.
2.17 The FMA implementation plan is firstly to refine and test the application and then toreplicate. It is currently being refined based on live experiences from PakistanInstitute of Management Sciences (PIMS) which is a large health facility. It is
expected that refinements will end in the second week of January 2005. After that
live data will be fed into the system.
2.18 The MTBF training workshops held in MoH (14-16 December 2004) helped inbuilding capacity of the budget preparing officers and the DDOs. The MTBF
Project Team is now actively providing hands on support to the spending units.
-
7/27/2019 Department for International.pdf
8/14
Pakistan MTBF
Quarterly Report October December 2004
QR MTBFOct_Dec04_20Oct04ver3.1.doc Page 8 of 14
Final 3.1
17 January 2005 PricewaterhouseCoopers LLP
Logistics and coordination
2.19 An MTBF Cell has been created in Ministry of Health, furnished the by MTBFProject. Two full time financial analysts (Azfar Shahzad and Dawood Ahmed)
stationed in the MTBF Cell are providing support. Anam Hussein has also joinedShezad Sarfraz providing support to MoPW.
2.20 In MoPW, the Director Planning and Director Financial Management have beentransferred. This has resulted in certain delays in refining the planning exercise that
was carried out in September and October 2004.
2.21 Initial procurement of hardware for Pilot Ministries is complete.2.22 An interactive website (www.mtbfpakistan.gov.pk) has been developed. It has been
hosted by Ministry of Finance and has linkages with Ministry of Finance official
website (www.finance.gov.pk).
2.23 MTBF Project Team and MoF have maintained close coordination with TAMA whoprovided logistical support to MTBF in holding the MoH MTBF workshops (14-17
December 2004).
2.24 Besides the above, four different technical assistance requests have been submittedto TAMA through Ministry of Finance. MTBF Project Team provided support in
preparing the Terms of Reference. The four technical assistance request are:
Sector Reviews for MoH and MoPW; Comprehensive Training Strategy for Financial Management; Funds and expenditure tracking study Budget Execution Training
2.25 The frequently asked questions (FAQs) have been drafted. They are presently withthe MTBF Secretariat for final review and publication. The Strategy Paper, the
output from the Study Tour, will be published along with the FAQs.
Sector Reviews
2.26 Sector Reviews are an important part of the MTBF, providing the opportunity tomove away from incremental budgeting and to ensure that budgets are effective in
implementing policy. Paul Harnett (international expert on PEM and Sector
Reviews) visited the project in November 2004. He reviewed the preliminary results
of the medium term planning and budgeting exercise in MoPW and also assisted in
finalising the ToR for the Sector Reviews.
2.27 Keeping in view time constraints, the Sector Review has been divided into twostages a rapid review and a detailed review. The plan is to feed the results of the
-
7/27/2019 Department for International.pdf
9/14
Pakistan MTBF
Quarterly Report October December 2004
QR MTBFOct_Dec04_20Oct04ver3.1.doc Page 9 of 14
Final 3.1
17 January 2005 PricewaterhouseCoopers LLP
rapid review into the budgeting process for 2005-06. The detailed review will be
completed by May 2004.
2.28 TAMA is providing consultancy support in carrying out the Sector Review for MoHand MoPW. First draft of the MoPW review has been received.2.29 The estimates of the medium term planning and budgeting exercise in MoPW have
been consolidated. These need refining.
Working group staff in line ministries
2.30 In MoPW there have been some changes to the Sector Review Team. Abdul Ghaffar(Director Planning) has been replaced by Malik Qasim Khan. Iqbal Ahmed
(Director Financial Management) has been posted as Director General Monitoring
and Statistics. The post of Director (Financial Management) is currently vacant.
2.31 Keeping in view the complexity and number of the spending units, MoH has taken amore proactive approach by establishing an MTBF Coordination Committee under
the chairmanship of Joint Secretary (Administration). Other members include
Deputy Director General (Planning and Development), Deputy Secretary (Budget),
Section Officer (Budget), Section Officer (Planning and Development) and the
MTBF Project Coordinator. The group meets on regular basis to monitor progress.
Deputy Director General (Planning and Development has been nominated as the
Focal Person).
Other activities
2.32 During the month of December 2004, the project team was invited to participate inthe PRSP costing workshop organised by TAMA. The objective of the workshop
was to discuss the results of the initial findings of the study.
2.33 Mehmood Akhtar visited London in November 2004. The objective of the visit wasfor Mehmood Akhtar to learn about how multiyear budgeting works in the UK and
how spending reviews have been conducted. He was accompanied by the Project
Coordinator. As an introduction, Mehmood Akhtar met with PwC experts on UK
government structures and recent financial management reforms. Meetings were
then held with the Department of Health and the Department of Education and
Skills with staff centrally involved in the two yearly spending review processes. Ingovernment, Mehmood Akhtar also met with Peter McDermott in Her Majesty's
Treasury.
2.34 Other meetings were held with consultants (Andrew Bird and Carolyn Stanforth)who had wide ranging experience of public expenditure management reforms and
MTEF development in other countries including Uganda, Newly Independent
States, Sri Lanka and Bangladesh. Mehmood Akhtar also met with John Roberts,
ODI, to discuss international country experience with output-oriented budgeting.
-
7/27/2019 Department for International.pdf
10/14
Pakistan MTBF
Quarterly Report October December 2004
QR MTBFOct_Dec04_20Oct04ver3.1.doc Page 10 of 14
Final 3.1
17 January 2005 PricewaterhouseCoopers LLP
2.35 An MTBF Forum was held on 22 and 23 October 2004 in Lahore by PunjabResource Management Programme (PRMP) sponsored by ADB. On PRMPs
invitation, the Project Coordinator delivered presentation on the international
experiences on MTBF and the progress of the MTBF project at the federal level;
2.36 The MTBF Project Team is also providing guidance and support to the TAMAConsultants in the funds tracking and expenditure study being led by the Budget
Wing.
2.37 In order to enhance overall support to the spending units, a mechanism for postingquestions has been created on the MTBF website. All questions and queries can now
be posted on the website. Once posted they will be forwarded to all the MTBF
Project Team members for reply. The target reply time is twenty four hours.
3 Work Programme January March 20053.1 The Work Plan at Annex 2 sets out progress to date and the expected timing of
activities during the next period.
MTBF BCC Implementation
3.2 The MTBF Project Teams work during the next quarter will focus on implementingthe activities set out in the MTBF BCC. This will include the work of the MTBF
cell providing ongoing support to DDOs and budget preparing officers.
Sector Reviews3.3 The MTBF Project Team will be actively involved in assisting the TAMA
consultants for the Sector Review process. Initial draft for MoPW has already been
received where as work on the MoH Sector Review still needs to be done.
Logistics and coordination
3.4 MTBF Project Team will remain in close contact with the TAMA team for overallcoordination.
3.5 The website will be updated as and when new developments take place.Establishment of ceilings
3.6 The MTBF Project Team will continue providing assistance and support to theBudget Wing (MoF) and Pilot Ministries in finalising the budget ceilings. It is
hoped that the budget ceilings will be finalised in January 2005.
Financial management capacity in line ministries
3.7 The FMA is initially being piloted in the Pakistan Institute of Medical Sciences.Once that is complete and successful it will be rolled out to other spending units in
MoH. A detailed plan will be prepared for roll-out.
-
7/27/2019 Department for International.pdf
11/14
Pakistan MTBF
Quarterly Report October December 2004
QR MTBFOct_Dec04_20Oct04ver3.1.doc Page 11 of 14
Final 3.1
17 January 2005 PricewaterhouseCoopers LLP
3.8 Holding of MTBF workshops have resulted in building capacity of DDOs andbudget preparing officers in the Ministry of Health. This is being followed by visits
to the spending units and providing on-job support.
-
7/27/2019 Department for International.pdf
12/14
Pakistan MTBF
Quarterly Report October December 2004
QR MTBFOct_Dec04_20Oct04ver3.1.doc Page 12 of 14
Final 3.1
17 January 2005 PricewaterhouseCoopers LLP
Annex 1 Work Plan
-
7/27/2019 Department for International.pdf
13/14
Pakistan MTBF
Quarterly Report October December 2004
QR MTBFOct_Dec04_20Oct04ver3.1.doc Page 13 of 14
Final 3.1
17 January 2005 PricewaterhouseCoopers LLP
Annex 2 Feedback - MTBF Workshop (MoH), December 2004
-
7/27/2019 Department for International.pdf
14/14
2004 PricewaterhouseCoopers LLP. All rights reserved. "PricewaterhouseCoopers" refers to the
PricewaterhouseCoopers LLP (a limited liability partnership in the United Kingdom) or, as the context requires, other
member firms of PricewaterhouseCoopers International Limited, each of which is a separate and independent legal
entity."