Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance
-
Upload
bsamarketing -
Category
Engineering
-
view
1.895 -
download
0
Transcript of Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance
![Page 1: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/1.jpg)
Partnershipfor
Performance
![Page 2: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/2.jpg)
• Two manufacturing sites
• Liverpool • Denholm Rees &
O’Donnell
• Stoke-on-Trent• C E Edwards Engineering
Our UK Operations
![Page 3: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/3.jpg)
“Working Together for Success.”
Group History
• Denholm Rees & O’Donnell established 1931 as a precision engineering company
• Historical manufacturing partnerships with Blue chip OEM’s since 1965
• Supplier to the Valve & Pump industry since 1970’s
• Global supplier to the Oil & Gas industry since early 1980’s
• Acquired C E Edwards Ltd in 1995 as part of Denholms strategic growth plan
![Page 4: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/4.jpg)
“Working Together for Success.”
Recent History
• 2001 - New Senior Management Team• 2002 – New business strategies introduced• 2003 – Invested into World Class Manufacturing
through Cranfield University• 2004 – Identified the need to reinvest in plant &
equipment within the group to stay ahead of market competition
• 2005 - New management control system ‘M1’ purchased and installed
• To date our investments in both plant & equipment have totalled over €10m across both sites and are planned to continue into the future
![Page 5: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/5.jpg)
“Working Together for Success.”
How has this been achieved?
• Management integrated across the whole business
• Best working practices introduced between sites
• Cellular Manufacturing Concepts• Open book philosophy with all staff• Bonus and Profit sharing at all levels• Commitment to continuous improvement
through staff development • Empowerment of complete workforce
![Page 6: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/6.jpg)
“Working Together for Success.”
What has this achieved?
• Consolidated focus of business goals• Improved communication• Increased capacity• Standardisation of systems, processes and
equipment• Improved efficiencies & costs• Improved Customer satisfaction throughout • Staff culture change
![Page 7: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/7.jpg)
“Working Together for Success.”
Where are we going?
• Developing Existing and new Partner relationships to satisfy all needs
• Identifying and Developing New Markets Together
• More regular Client Interface• Developing Long Term Agreements (LTA’s) as
a positive partnership• Continuous improvement in cost reduction,
quality and delivery to the benefit of all• Continuing to Invest in new plant and
equipment to completely satisfy clients future requirements
![Page 8: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/8.jpg)
• Table: 1600mm x 2000mm – 20T
• X – 5000mm• Y – 2000mm• Z – 800mm• W – 1500mm• B – 360 ° in 0.001 increments• U – 125mm• Spindle Ø125mm
Sacem MSMG-125Horizontal Boring and
Milling6 Axis CNC- Heidenhain TNC
430 Control
![Page 9: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/9.jpg)
Sacem MSMG-125 Horizontal Boring / Milling
6 Axis CNC - Heidenhain TNC 430 Control
![Page 10: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/10.jpg)
40 International Taper Angle HeadHead Size = 99 mmBore Size = 100 mm (4”) Bore
![Page 11: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/11.jpg)
50 International Taper Angle HeadHead Size = 149 mmBore Size = 150 mm (6”) Bore
![Page 12: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/12.jpg)
![Page 13: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/13.jpg)
![Page 14: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/14.jpg)
![Page 15: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/15.jpg)
![Page 16: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/16.jpg)
![Page 17: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/17.jpg)
![Page 18: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/18.jpg)
Pump Shaft Cell
• Pump Shaft manufacturing for over 40 years• €3m investment since 2005• Complete CNC Production solutions• Special and Conventional solutions• State of the art quality inspection
procedures• Preferred Supplier to the Industry• NDT Partnerships with local suppliers
![Page 19: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/19.jpg)
2 x Doosan Puma 700LY Turning CentresMax Ø = Ø850mmLength =3200mm
2 x Doosan Puma 3100XLY Turning CentresMax Ø = Ø420mmLength =2000mm
![Page 20: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/20.jpg)
• Full milling capabilities• Shorter Lead times
• ISO 50 Power Tooling• Less operations
Turning centre benefits
![Page 21: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/21.jpg)
Pump shaft precision turn & keyway manufacture in single operation
![Page 22: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/22.jpg)
ROBBI - 3620 CNC Grinding Machine
Max Ø = Ø355Length = 2000mm
![Page 23: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/23.jpg)
Conventional Machinery
![Page 24: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/24.jpg)
Examples of Pump Shafts
![Page 25: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/25.jpg)
Latest inspection technology
![Page 26: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/26.jpg)
Some examples of other productswe have manufactured
Volute Cases
Impellers
![Page 27: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/27.jpg)
Split & Solid Bearing Housings
Machined from Solid
![Page 28: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/28.jpg)
“Working Together for Success.”
Single Volute Cases
Inner Cases
More conventional machined pump parts
![Page 29: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/29.jpg)
![Page 30: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/30.jpg)
Quality is our game
![Page 31: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/31.jpg)
CMM Inspection of large components
![Page 32: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/32.jpg)
![Page 33: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/33.jpg)
How do we meet your requirements ?
• Proven Infrastructure• ECi M1 ERP Software
ECi M1 is a complete enterprise resource planning (ERP) system that provides total automation of financials, inventory, production, sales/quoting, and production planning. The software is designed for small to midsized firms who manufacture via repetitive, make-to-stock, make-to-order, engineer-to-order processes. We have worked closely with M1 over the past 8 years to develop our own tailor made package which best suits both ourselves and our customers needsThe system can allow for linking directly to your host to allow a clear view of your current orders.
![Page 34: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/34.jpg)
Engineering Capacity
• We have an excellent engineering department with many years experience
• We have long established disciplines in our Quality System which has driven our team to ensure that all aspects of the job are well detailed at the planning stage and consideration is given to both the tooling and inspection requirements of the component
• All parts undergo an extensive contract review before the part is released for manufacture, our engineers will communicate with your own engineers to ensure the best practices are worked to and any known traits are handed over from your own experience
• Our M1 system allows for us to initiate and record any engineering change requests which may occur through quality issues or possible design change to help reduce manufacturing costs for the future
![Page 35: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/35.jpg)
Change request screen shot
![Page 36: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/36.jpg)
M1 Shop Load Explorer
Shop loading & Scheduling• Our M1 system allows us real time visibility of what
capacity we have in any department
![Page 37: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/37.jpg)
M1 Scheduling Screen
Shop loading & Scheduling• M1 further allows us to drill down to each machine
and see is loading
![Page 38: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/38.jpg)
Job Analysis Screen• Individual jobs can hen be broken down further
to allow for individual processes to be monitored
![Page 39: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/39.jpg)
Stock Holding
• We can review your components to see what the most economical batch sizes are for manufacture
• We look to see whether parts may be best part manufactured thus allowing them to be modified into more than one component
• Based on our findings we can make provision for holding these parts on stock at our expense
• This can not only reduce cost and lead time but will allow for quick delivery of spares items for aftermarket sales
![Page 40: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/40.jpg)
Quality
• Denholm’s currently holds ISO 9001:2008 certification and works to controlled documents and procedures within that system
• To support that we have a dedicated inspection team of highly skilled Quality Engineers
• They are equipped with the latest forms of inspection equipment and gauges
• We currently have a large CMM with a 3.5m table which will allow us measure your shafts in one position, as a back up to that we also have Faro gauges which are portable and may be taken to the job for checking features on or around the component whilst at or on the machine thus reducing the need to take large components out of the machine to inspect critical features
![Page 41: Denholm Rees & O'Donnell + C E Edwards - Partnership for Performance](https://reader034.fdocuments.in/reader034/viewer/2022052117/588456041a28ab903b8b5f23/html5/thumbnails/41.jpg)
Partnership for performance
Thank you for your attention