Delivering 20:20 vision when optimizing pumping systems · Event: Pacific Northwest TAG Meeting...
Transcript of Delivering 20:20 vision when optimizing pumping systems · Event: Pacific Northwest TAG Meeting...
www.riventa.com+ 44 (0)1872 260005
Delivering 20:20 vision when optimizing pumping systemsHow we make hidden costs more visible
Presenter: Steve Barrett (Co-Founder)United Kingdom
Event: Pacific Northwest TAG
Meeting Date: 13th November 2019
www.riventa.com+ 44 (0)1872 260005
Business BackgroundMeasuring pump performance for over 10 years
History• Established in 2006 (first installation still operating)
• Water and wastewater specialists
• Developed thermodynamic measurement technology
• Employ 16 full-time employees
• Delivered 200+ projects in 10 countries
Today• Launching new Digital Pump Efficiency Monitor• New business model enabled by new technology
RIVENTA KOREA
RIVENTA UK
RIVENTA USA
www.riventa.com+ 44 (0)1872 260005
Making Assets PerformPrecision efficiency measurement of rotating machines
Centrifugal Pumps
Reduce Energy
Optimize Maintenance
Improve Resilience Fans Blowers Turbines
No Flow Meter
< 1% Accuracy
ISO 5198
www.riventa.com+ 44 (0)1872 260005
What is 20:20 Vision?How we work with you to optimize your pumping systems
= 20:20 optimization: 20% overall cost reduction + 20% of your largest assets
Reduce Operational Energy Costs• Clear focus on largest energy
consuming stations
• Reduce total energy cost by 5% to 15%
Optimise Maintenance Planning
• Track pump deterioration
• Invest in pump refurbishment when
payback is certain
• Reduce total energy cost by 5% to 15%
Working with:
www.riventa.com+ 44 (0)1872 260005
NEW: Digital Pump Efficiency MonitoringFlexible delivery of 20:20 optimization
We measure on-site pump efficiency and flow rate using thermodynamic technology in order to:
1. Identify Pumps that need refurbishment
2. Deliver energy-savings in water distribution3. Maximise resilience through preventative maintenance
www.riventa.com+ 44 (0)1872 260005
Pump Efficiency Monitoring System
• Robust ‘digital’ measurement technology• 1-hour installation per pump• Accuracy better than 1%• Up to 5 years battery life• Encrypted wireless comms• Up to 10 years useful life• ISO17025 certified accuracy traceable to
international metrology standards
Digitalization built on engineering principles
© RIVENTA 2019 – Commercial in Confidence
www.riventa.com+ 44 (0)1872 260005
Efficiency Monitoring BenefitsEmpowering your staff to optimize your pumping system
• Track pump performance and plan maintenance
• Accurate pump efficiency in real-time
• Benchmarking site performance (current vs best-practice)
• Real-time optimum pumping combination for any demand
• Accurate data for targeting future pump investment
• Integrate with SCADA and/or HydraNet platform
An information-driven approach to pumping systems
www.riventa.com+ 44 (0)1872 260005
20:20 Vision in Pumping
Focus on 20% of your largest pumps
Target 20% in total cost reduction
Working with you to optimize your pumping systems
CAPEX - Maintenance Optimization[Audit and Implementation]
› Predictive maintenance & planning
› Invest in refurbishment when payback certain
› Reduce total energy cost by 5% to 15%
OPEX - Operational Optimization [Audit and Implementation]
› Pump scheduling to meet demand at least cost
› Network performance and resilience
› Reduce total energy cost by 5% to 15%
www.riventa.com+ 44 (0)1872 260005
Thank youSteve Barrett (Co-Founder)[email protected]+44 7798 780950United Kingdom