Important Dates For CAST and CREW - DEFY DATE TITLE DESCRIPTION CAST AND CREW
NEEDED
13 / 12 / 15 Location scout Take pictures at the possible location for the shoot this includes pics of the surrounding areas. Address - (Bring Camera)The Yard,42a Nelson Road,Ilkley,LS29 8HN
Just CHARLES VERFUERTH
14 / 12 / 15 Contact the Location Owner Contact the owner of the shop we are filming in email [email protected]
Just CHARLES VERFUERTH
17 / 12 /15 Pick up equipment Pick up all the equipment needed from C8B equipment needed:2 x Sony DSLRSTEDICam 2 x TripodBoom Mic and Pole
CHARLES VERFUERTHNICOLA GALVIN
18 / 12 / 15 Pick up Keys Pick up keys for the location at roy’s house in Mention @ 6pm
CHARLES VERFUERTH
21 / 12 / 15 First Shoot First Shoot in JD Cycles all props needed (see prop list) 9 am - 12 pm
CHARLES VERFUERTHNICOLA GALVIN DANIEL MAKIN
23 / 12 /15 Review footage Review footage from the first shoot (check we have everything) and back up all files to hard drive and computer.
CHARLES VERFUERTH
2 / 12 / 15 Prop Creation Spray Paint blue plastic gun black need to by black matt plastic spray paint.
CHARLES VERFUERTH
12 / 12 /15 Partial edit Do a partial edit on the footage from the protagonist shoot to give ideas for extras on the second shoot.
CHARLES VERFUERTH
12 / 01 / 16 Pick up equipment Pick up all the equipment needed from C8B equipment needed:2 x Sony DSLRSTEDICam 2 x TripodBoom Mic and Pole
CHARLES VERFUERTH
DATE
![Page 2: DEFY Schedule](https://reader031.fdocuments.in/reader031/viewer/2022030217/588742a31a28ab5a628b4fff/html5/thumbnails/2.jpg)
14 / 01 / 16 2nd Shoot Second shoot in JD Cycles Man with gun all props are on location already.
CHARLES VERFUERTHNICOLA GALVIN
15 / 01 / 16 Review footage Review footage from the first shoot (check we have everything) and back up all files to hard drive and computer.
CHARLES VERFUERTH
29 / 01 / 16 Start Full Edit Start the edit on the footage filmed across the two days of shooting.
CHARLES VERFUERTH
02 / 02 / 16 Start Opening Sequence Start to put together the moving map on the opening sequence on after effects (all clips need on google drive)
CHARLES VERFUERTH
10 / 02 / 16 Reshoot the 2nd shoot. Reshoot the 2nd shoot of the antagonist in the middle of the day as light in the building should be better
CHARLES VERFUERTHNICOLA GALVIN
12 / 02 /16 Edit the final footage Finish the edit on the reshoot.
CHARLES VERFUERTH
TITLE DESCRIPTION CAST AND CREW NEEDED