August 2011
Towards Future Proof
Data Centers
Deerns Data Center Consultancy
Infrastructure Green & Upgrade Scan Services
Deerns consulting engineers
Deerns Consulting Engineers � Multidisciplinary engineering company:
Energy & Sustainability, MEP, Building Science, Master planning, R&D
� Founded in 1928 � Over 500 employees worldwide: Netherlands,
UK, Germany, France,Spain, USA, UAE, China � Over $65 million revenue � International client base � Specialized in energy efficient design of
critical operational facilities like: o Airports o Data Centers o Hospitals o Level 4 bio hazard labs and Clean Rooms
Deerns’ Proven references last 5 years
Total White Space Area: > 100,000 m2
Total IT power: > 350 MW
� Total White Space Area: > 2,300,000 ft2 world wide
� Total IT power: > 670 MW
� Experience: > 500 man-years of datacenter working experience
� Personnel: > 60 datacenter M&E specialist and consultants
What We Do…
� Maximize Energy Efficiency
� Assure Uninterrupted Availability
� Mitigate Risk (Tier levels 1, 2, 3, 4)
� Support diverse configurations (racks, suites, cages, containers, “special projects”)
� Ensure scalability of facility
Innovative design of new & operational
(hot) upgrades of existing data centers to:
Service Offerings
� Overall datacenter design � Green Scan (Energy Efficiency) � High level design and specification, SLA development � Single Point of Failure (SPOF)/Availability analysis � Site selections � Risk assessments � Innovative Cooling Solution development � Tier Level audits � Facility construction liaison & management (PM)
Working in partnership with our customers
to ensure tangible results
Services for New Data Centers
What we deliver…bottom line:
Highest ROI
Optimized Phased Investment
Short Ramp-Up-Time
Reduced OPEX
Minimum Risk
Greenest Data Center
� Total Investment: Ð 10%
� Cooling Energy Costs: Ð 80%
� Total Energy Costs: Ð 30%
Optimized Proven Technologies
Short Phased Scalable Growth
Supports Highest Levels of Redundancy & Survivability
Implementable Anywhere in the World
Average PUE as low as 1.12
Sustainability through enhanced Data Center Value Proposition
Green Cooling for Data Centers©
Phased Investment
80 % Reduction of Cooling Energy
Save $ 1,750,000 p.a. on 25,000 sq.ft. Data Center (5 MW)
Highly Adaptable
Standardized Proven Technology
GC-DC©
GC-DC© Free Cooling Cell: How it Works
Case study ROI for the GC-DC©
25,000 ft2, 200W/ft2
TIER III DX CRAC GC-DC©
Investment $ 33,750,000 $ 30,500,000
DC IT Power 5 MW 5 MW
Cooling Power (% IT Power)
Average per year 50%
2.5 MW 10%
0.5 MW
Cooling Energy Consumption per Year 21.9 GWh 4.4 GWh
Cooling Energy Costs $100K/GWh $ 2,190,000
$100K/GWh $ 440,000
Saving per year $ 1,750,000 /annum
80 %