DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In...

28
5,4 NOR Elev GROUND LEVEL Permanent Datum: Elev 2000-120-01-01 API Serial No. Field: Location: Well: Company: NEWFOUNDLAND EXPLORATORY NORTHING: 5,456,519 DEER LAKE OIL & GAS ET AL WESTERN ADVENT DEER LAKE OIL & GAS INC. LOCATION STAN PODULSKY KELLI SASCO DARTN\MOUTH 19 18:40 17-JAN-2001 10:00 16-JAN-2001 44 44 degC 44 @ 44 @ 0.066 NO SAMPLE NO SAMPLE @ @ 5 degC @ 0.162 ohm.m MEASURED 34 s 1068 kg/m3 POLYMER - KCL 75.770 mm 873 m 872 m @ 89.000 mm 873 m 1572 m 1575 m 1584 m TWO 17-JAN-2001 Witnessed By Recorded By Location Unit Number Time Logger On Bottom Time Circulation Stopped Maximum Recorded Temperatures RMF @ MRT RM @ MRT RMC Source RMF RMC @ Measured Temperature RMF @ Measured Temperature RM @ Measured Temperature Source Of Sample PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom Log Interval Schlumberger Depth Depth Driller Run Number Logging Date DRILL FLOOR Drilling Measured From: 2.5 DRILL FLOOR Log Measured From: PROVINCE: NEWFOUNDLAND PROVINCE: EXPLORATORY FIELD: WELL: DEER LAKE OIL & GAS IN COMPANY: DEER LAKE OIL & GAS ET WESTERN ADVENTURE N NORTHING: 5,456,519 EASTING: 482,797 SLIM ACCES LITHO DENSI

Transcript of DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In...

Page 1: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

5,4N

OR

Elev

GR

OU

ND

LEV

EL

Perm

anent Datum

:

Ele v

2000-120-01-01A

PI S

erial No.

Field:

Location:

Well:

Company:

NEWFOUNDLAND

EXPLORATORY

NORTHING: 5,456,519

DEER LAKE OIL & GAS ET AL WESTERN ADVENT

DEER LAKE OIL & GAS INC.

LOCATION

ST

AN

PO

DU

LSK

YK

ELLI S

AS

CO

DA

RT

N\M

OU

TH

1918:40

17-JAN

-200110:00

16-JAN

-200144

44 degC44

@44

@0.066

NO

SA

MP

LEN

O S

AM

PLE

@ @5 degC

@0.162 ohm

.mM

EA

SU

RE

D

34 s1068 kg/m

3P

OLY

ME

R - K

CL

75.770 mm

873 m872 m

@89.000 m

m873 m1572 m1575 m1584 mT

WO

17-JAN

-2001

Witnessed B

yR

ecorded By

LocationU

nit Num

berT

ime

Logger On B

ottomT

ime

Circulation S

topped M

aximum

Recorded T

emperatures

RM

F @

MR

TR

M @

MR

TR

MC

Source R

MF

RM

C @

Measured T

emperature

RM

F @

Measured T

emperature

RM

@ M

easured Tem

peratureS

ource Of S

ample

PH

Fluid Loss

Viscosity

Density

MUD Type F

luid In Hole

Bit S

izeC

asing Schlum

bergerC

asing Driller S

ize @ D

epthT

op Log IntervalB

ottom Log Interval

Schlum

berger Depth

Depth D

rillerR

un Num

berLogging D

ate

DR

ILL FLO

OR

Drilling M

easured From

:

2.5 D

RILL F

LOO

RLog M

easured From

:

PROVINCE:

NE

WF

OU

ND

LA

ND

PR

OV

INC

E: E

XP

LO

RA

TO

RY

FIE

LD

:

WE

LL

:

DE

ER

LA

KE

OIL

& G

AS

INC

OM

PA

NY

:DE

ER

LA

KE

OIL

& G

AS

ET

WE

ST

ER

N A

DV

EN

TU

RE

N

NO

RT

HIN

G: 5,456,519

EA

ST

ING

: 482,797

SL

IM A

CC

ES

LIT

HO

DE

NS

I

Page 2: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

482,797E

AS

TIN

G:

456,519R

TH

ING

:

v.:90 m

v.:

1ST DESCENT: GAUGE RUN ( GR, TELEMETRY)

LOGS RUN TO 1575 M, AS PER CLIENT REQUEST****DRILLER TD NOT REACHED DUE TO FISH IN HOLE AT 1584M ****

REMARKS: RUN NUMBER 1 REMARKS: RUN NUMBER 2OS5: OS5:OS4: OS4:

SLIM BHC SONICOS3: OS3:SLIM DUAL LATEROLOGOS2: OS2:SLIM LITHO DENSITYOS1: OS1:

OTHER SERVICES1 OTHER SERVICES2

ALL INTERPRETATIONS ARE OPINIONS BASED ON INFERENCES FROM ELECTRICAL OR OTHER MEASUREMENTS AND WE CANNOT, AND DO NOT GUARANTEE THE ACCURACY OR CORRECTNESS OF ANY INTERPRETATIONS, AND WE SHALL NOT, EXCEPT IN THE CASE OF GROSS OR WILLFUL NEGLIGENCE ON OUR PART, BE LIABLE OR RESPONSIBLE FOR ANY LOSS, COSTS, DAMAGES OR EXPENSES INCURRED OR SUSTAINED BY ANYONE RESULTING FROM ANY INTERPRETATION MADE BY ANY OF OUR OFFICERS, AGENTS OR EMPLOYEES. THESE INTERPRETATIONS ARE ALSO SUBJECT TO CLAUSE 4 OF OUR GENERAL TERMS AND CONDITIONS AS SET OUT IN OUR CURRENT PRICE SCHEDULE.

Run 1

Run 2

Run 3

Run 4

@@

@ @ @ @

@@

@ @ @ @

Witnessed B

yR

ecorded By

LocationU

nit Num

berT

ime

Logger On B

ottomT

ime

Circulation S

topped M

aximum

Recorded T

emperatures

RM

F @

MR

TR

M @

MR

TR

MC

Source R

MF

RM

C @

Measured T

emperature

RM

F @

Measured T

emperature

RM

@ M

easured Tem

peratureS

ource Of S

ample

PH

Fluid Loss

Viscosity

Density

MUD Type F

luid In Hole

Bit S

izeC

asing Schlum

bergerC

asing Driller S

ize @ D

epthT

op Log IntervalB

ottom Log Interval

Schlum

berger Depth

Depth D

rillerR

un Num

berLogging D

ate

@@

@ @ @ @ 90 mG

.L.

92.5 mK

.B.

92.5 mD

.F.

above Perm

. Datum

m

NC

.

T A

L

O.1

SITY

Page 3: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

RUN 1 RUN 2

CREW 19: MIKE DIGGDON, STEVE BEATON

RIG: LONGYEAR SUPER 50

ALL TOOLS RUN SLICK

4TH DESCENT: DUAL LATEROLOG3RD DESCENT: BHC SONIC2ND DESCENT: LITHO DENSITY, GR1ST DESCENT: GAUGE RUN ( GR, TELEMETRY)

STOP STOPSTART STARTLOGGED INTERVAL LOGGED INTERVALFLUID LEVEL: FLUID LEVEL:

9C0-413PROGRAM VERSION: PROGRAM VERSION:6418567SERVICE ORDER #: SERVICE ORDER #:

RUN 1 RUN 2EQUIPMENT DESCRIPTION

DOWNHOLE EQUIPMENT

4.86SLDT-A SLDH-AGSR-ZSLDC-A

5.41AH-201 AH-201

7.76STGC-B STGH-BSTGC0-ASTGC1-B

8.67LEH-ST LEH-ST

5.41TelStatus

6.77CTEM

7.24Gamma Ray

SURFACE EQUIPMENTWITM (DTS)-A

DOWNHOLE EQUIPMENT

4.86SLDT-A SLDH-AGSR-ZSLDC-A

5.41AH-201 AH-201

7.76STGC-B STGH-BSTGC0-ASTGC1-B

8.67LEH-ST LEH-ST

5.41TelStatus

6.77CTEM

7.24Gamma Ray

SURFACE EQUIPMENTWITM (DTS)-A

Page 4: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

ALL LENGTHS IN METERSMEASUREMENTS RELATIVE TO TOOL ZERO

MAXIMUM STRING DIAMETER 64 MM

0.14BNS-CCS

2.09SPCS-B SPCS-B

TOOL ZERO0.00Tension ACCZ

HV DF

1.65CALI

2.42SS Tool 2.48MS 2.55LS 2.60MS_PEF 2.74LS_PEF

ALL LENGTHS IN METERSMEASUREMENTS RELATIVE TO TOOL ZERO

MAXIMUM STRING DIAMETER 64 MM

0.14BNS-CCS

2.09SPCS-B SPCS-B

TOOL ZERO0.00Tension ACCZ

HV DF

1.65CALI

2.42SS Tool 2.48MS 2.55LS 2.60MS_PEF 2.74LS_PEF

Page 5: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

OP System Version: 9C0-413MCM

SPCS-B unofficial SLDT-A unofficialSTGC-B unofficial

Input DLIS FilesDEFAULT SPCS .005 FN:4 PRODUCER 17-Jan-2001 18:49 1577.9 M 800.4 M

Output DLIS FilesDEFAULT SPCS .018 FN:17 PRODUCER 18-Jan-2001 23:03 1576.9 M 799.3 M

SLDT Bulk Density (RHOB_SLDT)(K/M3)2000 3000

Bit Size (BS)(MM)50 300

Gamma Ray (GR_STGC)(GAPI)0 150

SLDT Pef (PEF_SLDT)(----)0 10

SLDT Density Quality Factor (QRHO_SLDT)(----)0 -0.25

SPCS Caliper (CALI_SPCS)(MM)50 300

Tension (TENS)(N)20000 0

PIP SUMMARY

Time Mark Every 60 S

800

850

--- CD ---

MAIN PASS

Last Reading

Page 6: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

900

950

1000

1050

Page 7: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

1200

1150

1100

Page 8: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

1350

1300

1250

Page 9: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

1550

1500

1450

1400

Page 10: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

Input DLIS FilesDEFAULT SPCS .005 FN:4 PRODUCER 17-Jan-2001 18:49 1577.9 M 800.4 M

Output DLIS FilesDEFAULT SPCS .018 FN:17 PRODUCER 18-Jan-2001 23:03

OP System Version: 9C0-413MCM

SPCS-B unofficial SLDT-A unofficialSTGC-B unofficial

Format: DENS_S2 Vertical Scale: 1:600 Graphics File Created: 18-Jan-2001 23:03

Input DLIS FilesDEFAULT SPCS .005 FN:4 PRODUCER 17-Jan-2001 18:49 1577.9 M 800.4 M

Output DLIS FilesDEFAULT SPCS .018 FN:17 PRODUCER 18-Jan-2001 23:03 1576.9 M 799.3 M

Parameters

DLIS Name Description ValueBHT Bottom Hole Temperature (used in calculations) 44 DEGCBS Bit Size 75.770 MMDFD Drilling Fluid Density 1068.00 K/M3DO Depth Offset -1.0 MFVNA_SLDT SLDT Firmware Version Number - Major 0FVNI_SLDT SLDT Firmware Version Number - Minor 0GCSE Generalized Caliper Selection BSGGRD Geothermal Gradient 0.018227 DC/MGTSE Generalized Temperature Selection LINEAR_ESTIMATEMVNA_SLDT SLDT MAXIS Version Number - Major 10MVNI_SLDT SLDT MAXIS Version Number - Minor 2PP Playback Processing RECOMPUTEPVNA_SLDT SLDT Log Processing Version Number - Major 4PVNI_SLDT SLDT Log Processing Version Number - Minor 21SDHC SLDT Density Hole Correction CALI_SPCSSHT Surface Hole Temperature 12 DEGCSTSO SLDT Temperature Correction Source TMPY_SLDTTD Total Depth 1575 M

SLDT Bulk Density (RHOB_SLDT)(K/M3)2000 3000

Bit Size (BS)(MM)50 300

Gamma Ray (GR_STGC)(GAPI)0 150

SLDT Pef (PEF_SLDT)(----)0 10

SLDT Density Quality Factor (QRHO_SLDT)(----)0 -0.25

SPCS Caliper (CALI_SPCS)(MM)50 300

Tension (TENS)(N)20000 0

PIP SUMMARY

Time Mark Every 60 S

--- TD ---FR -->FR -->

FR -->

MAIN PASS

Page 11: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

OP System Version: 9C0-413MCM

SPCS-B unofficial SLDT-A unofficialSTGC-B unofficial

Bit Size (BS)(MM)50 300

SLDT Density Porosity (DPHI_SLDT)(PU)45 -15

Gamma Ray (GR_STGC)(GAPI)0 150

SLDT Pef (PEF_SLDT)(----)0 10

SLDT Density Quality Factor (QRHO_SLDT)(----)0 -0.25

SPCS Caliper (CALI_SPCS)(MM)50 300

Tension (TENS)(N)20000 0

PIP SUMMARY

Time Mark Every 60 S

800

825

MAIN PASS - SANDSTONE 2650 KG/M3

Page 12: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

850

875

900

Last Reading

--- CD ---

Page 13: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

975

950

925

Page 14: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

1000

1025

Page 15: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

1050

1075

1100

Page 16: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

1175

1150

1125

Page 17: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

1225

1200

Page 18: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

1300

1275

1250

Page 19: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

1375

1350

1325

Page 20: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

1425

1400

Page 21: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

1500

1475

1450

Page 22: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

SLDT Density Porosity (DPHI_SLDT)

SLDT Pef (PEF_SLDT)(----)0 10

SLDT Density Quality Factor (QRHO_SLDT)(----)0 -0.25

SPCS Caliper (CALI_SPCS)

Tension (TENS)(N)20000 0

1575

1550

1525

--- TD ---

FR -->

FR -->

MAIN PASS - SANDSTONE 2650 KG/M3

Page 23: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

OP System Version: 9C0-413MCM

SPCS-B unofficial SLDT-A unofficialSTGC-B unofficial

Input DLIS FilesDEFAULT SPCS .004 FN:3 PRODUCER 17-Jan-2001 18:24 1578.1 M 1508.9 M

Output DLIS FilesDEFAULT SPCS .019 FN:18 PRODUCER 18-Jan-2001 23:11 1577.0 M 1507.8 M

Input DLIS FilesDEFAULT SPCS .005 FN:4 PRODUCER 17-Jan-2001 18:49 1577.9 M 800.4 M

Output DLIS FilesDEFAULT SPCS .018 FN:17 PRODUCER 18-Jan-2001 23:03

OP System Version: 9C0-413MCM

SPCS-B unofficial SLDT-A unofficialSTGC-B unofficial

Format: PORO_S5 Vertical Scale: 1:240 Graphics File Created: 18-Jan-2001 23:03

Parameters

DLIS Name Description ValueBHT Bottom Hole Temperature (used in calculations) 44 DEGCBS Bit Size 75.770 MMDFD Drilling Fluid Density 1068.00 K/M3DO Depth Offset -1.0 MFD Fluid Density 1000 K/M3FVNA_SLDT SLDT Firmware Version Number - Major 0FVNI_SLDT SLDT Firmware Version Number - Minor 0GCSE Generalized Caliper Selection BSGGRD Geothermal Gradient 0.018227 DC/MGTSE Generalized Temperature Selection LINEAR_ESTIMATEMDEN Matrix Density 2650 K/M3MVNA_SLDT SLDT MAXIS Version Number - Major 10MVNI_SLDT SLDT MAXIS Version Number - Minor 2PP Playback Processing RECOMPUTEPVNA_SLDT SLDT Log Processing Version Number - Major 4PVNI_SLDT SLDT Log Processing Version Number - Minor 21SDHC SLDT Density Hole Correction CALI_SPCSSHT Surface Hole Temperature 12 DEGCSTSO SLDT Temperature Correction Source TMPY_SLDTTD Total Depth 1575 M

Bit Size (BS)(MM)50 300

(PU)45 -15

Gamma Ray (GR_STGC)(GAPI)0 150

(MM)50 300

PIP SUMMARY

Time Mark Every 60 S

Bit Size (BS)(MM)50 300

Gamma Ray (GR_STGC)(GAPI)0 150

PIP SUMMARY

Time Mark Every 60 S

Page 24: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

(MM)50 300

SLDT Density Porosity (DPHI_SLDT)(PU)45 -15

SLDT Pef (PEF_SLDT)(----)0 10

SLDT Density Quality Factor (QRHO_SLDT)(----)0 -0.25

SPCS Caliper (CALI_SPCS)(MM)50 300

Tension (TENS)(N)20000 0

1550

1525

REPEAT SECTION -SANDSTONE 2650 KG/M3

Page 25: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

Input DLIS FilesDEFAULT SPCS .004 FN:3 PRODUCER 17-Jan-2001 18:24 1578.1 M 1508.9 M

Output DLIS FilesDEFAULT SPCS .019 FN:18 PRODUCER 18-Jan-2001 23:11

OP System Version: 9C0-413MCM

SPCS-B unofficial SLDT-A unofficialSTGC-B unofficial

Format: PORO_S5 Vertical Scale: 1:240 Graphics File Created: 18-Jan-2001 23:11

Measurement MasterNominal Before After Change Limit Units

Calibration and Check Summary

Parameters

DLIS Name Description ValueBHT Bottom Hole Temperature (used in calculations) 44 DEGCBS Bit Size 75.770 MMDFD Drilling Fluid Density 1068.00 K/M3DO Depth Offset -1.0 MFD Fluid Density 1000 K/M3FVNA_SLDT SLDT Firmware Version Number - Major 0FVNI_SLDT SLDT Firmware Version Number - Minor 0GCSE Generalized Caliper Selection BSGGRD Geothermal Gradient 0.018227 DC/MGTSE Generalized Temperature Selection LINEAR_ESTIMATEMDEN Matrix Density 2650 K/M3MVNA_SLDT SLDT MAXIS Version Number - Major 10MVNI_SLDT SLDT MAXIS Version Number - Minor 2PP Playback Processing RECOMPUTEPVNA_SLDT SLDT Log Processing Version Number - Major 4PVNI_SLDT SLDT Log Processing Version Number - Minor 21SDHC SLDT Density Hole Correction CALI_SPCSSHT Surface Hole Temperature 12 DEGCSTSO SLDT Temperature Correction Source TMPY_SLDTTD Total Depth 1575 M

Bit Size (BS)(MM)50 300

SLDT Density Porosity (DPHI_SLDT)(PU)45 -15

Gamma Ray (GR_STGC)(GAPI)0 150

SLDT Pef (PEF_SLDT)(----)0 10

SLDT Density Quality Factor (QRHO_SLDT)(----)0 -0.25

SPCS Caliper (CALI_SPCS)(MM)50 300

Tension (TENS)(N)20000 0

PIP SUMMARY

Time Mark Every 60 S

1575 REPEAT SECTION -SANDSTONE 2650 KG/M3--- TD ---

FR -->

FR -->

Page 26: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

Slimhole Powered Caliper Sonde - B / Equipment Identification

Primary Equipment:

Auxiliary Equipment:

Gamma Ray (Calibrated) 155.1 N/A 155.1 N/A N/A 15.00 GAPIGamma Ray (Jig - Bkg) 144.9 N/A 144.9 N/A N/A 13.17 GAPI

Before: 17-JAN-2001 16:44 SLIM Telemetry Gamma-ray Cartridge - B Wellsite Calibration - Detector Calibration

SPCS Caliper Large Ring 203.2 N/A 195.6 N/A N/A N/A MMSPCS Caliper Medium Ring 101.6 N/A 102.7 N/A N/A N/A MMSPCS Caliper Small Ring 63.50 N/A N/A N/A N/A N/A MM

Before: Calibration not done Slimhole Powered Caliper Sonde - B Wellsite Calibration - SPCS Caliper Calibration

Measurement MasterNominal Before After Change Limit Units

Slimhole Litho-Density Tool / Equipment Identification

Primary Equipment:SLDT Cartridge SLDC - A 17SLDT Source GSR - Z 1850

Auxiliary Equipment:SLDT Housing SLDH - A 18

Phase

Before

Master

LS Wind 1 Background CPS

150 0 275 0 350 0

Value

260.9

262.2

Phase

Before

Master

LS Wind 2 Background CPS

150 0 275 0 350 0

Value

256.3

260.7

Phase

Before

Master

LS Wind 3 Background CPS

200 0 350 0 400 0

Value

308.9

Master: 17-JAN-2001 16:38 Before: 17-JAN-2001 16:42

Phase

Before

Master

MS Wind 4 Background CPS

(Minimum) 700.0

(Nominal) 1230

(Maximum) 1600

Value

1148

1148

Phase

Before

Master

MS Wind 5 Background CPS

(Minimum) 900.0

(Nominal) 1625

(Maximum) 2200

Value

1491

1504

Phase

Before

Master

MS Wind 6 Background CPS

(Minimum) 550.0

(Nominal) 950.0

(Maximum) 1300

Value

870.0

873.8

Phase

Before

Master

MS Wind 1 Background CPS

(Minimum) 250.0

(Nominal) 490.0

(Maximum) 650.0

Value

436.5

440.9

Phase

Before

Master

MS Wind 2 Background CPS

(Minimum) 400.0

(Nominal) 670.0

(Maximum) 900.0

Value

601.4

608.2

Phase

Before

Master

MS Wind 3 Background CPS

(Minimum) 400.0

(Nominal) 750.0

(Maximum) 1000

Value

694.1

Master: 17-JAN-2001 16:38 Before: 17-JAN-2001 16:42

Phase

Before

Master

SS Wind 4 Background CPS

(Minimum) 700.0

(Nominal) 1050

(Maximum) 1400

Value

910.1

910.9

Phase

Before

Master

SS Wind 5 Background CPS

(Minimum) 850.0

(Nominal) 1250

(Maximum) 1600

Value

1080

1081

Phase

Before

Master

SS Wind 6 Background CPS

(Minimum) 450.0

(Nominal) 650.0

(Maximum) 1000

Value

641.8

638.4

Phase

Before

Master

SS Wind 1 Background CPS

(Minimum) 800.0

(Nominal) 1150

(Maximum) 1600

Value

1025

1028

Phase

Before

Master

SS Wind 2 Background CPS

(Minimum) 1050

(Nominal) 1500

(Maximum) 2000

Value

1386

1388

Phase

Before

Master

SS Wind 3 Background CPS

(Minimum) 900.0

(Nominal) 1300

(Maximum) 1800

1199

Value

1194

SS Background Measurment

Slimhole Litho-Density Tool Wellsite Calibration

701.1

MS Background Measurment

Slimhole Litho-Density Tool Wellsite Calibration

314.6

LS Background Measurment

Slimhole Litho-Density Tool Wellsite Calibration

Page 27: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

Phase LS Wind 4 Water Lo PE BSub CPS Value Phase LS Wind 5 Water Lo PE BSub CPS Value Phase LS Wind 6 Water Lo PE BSub CPS Value

Phase

Master

LS Wind 1 Water Lo PE BSub CPS

(Minimum) 1300

(Nominal) 2000

(Maximum) 2500

Value

2093

Phase

Master

LS Wind 2 Water Lo PE BSub CPS

(Minimum) 1800

(Nominal) 2900

(Maximum) 3300

Value

2832

Phase

Master

LS Wind 3 Water Lo PE BSub CPS

(Minimum) 1250

(Nominal) 2100

(Maximum) 2450

Master: 17-JAN-2001 16:38

Phase

Master

MS Wind 4 Water Hi PE BSub CPS

(Minimum) 4700

(Nominal) 7800

(Maximum) 9200

Value

7000

Phase

Master

MS Wind 5 Water Hi PE BSub CPS

(Minimum) 5250

(Nominal) 9100

(Maximum) 10900

Value

8153

Phase

Master

MS Wind 6 Water Hi PE BSub CPS

(Minimum) 500.0

(Nominal) 1600

(Maximum) 2350

Value

1440

Phase

Master

MS Wind 1 Water Hi PE BSub CPS

(Minimum) 2050

(Nominal) 3500

(Maximum) 4050

Value

3218

Phase

Master

MS Wind 2 Water Hi PE BSub CPS

(Minimum) 6850

(Nominal) 10600

(Maximum) 11850

Value

9644

Phase

Master

MS Wind 3 Water Hi PE BSub CPS

(Minimum) 6000

(Nominal) 9200

(Maximum) 10600

Value

8280

Phase

Master

MS Wind 4 Water Lo PE BSub CPS

(Minimum) 5400

(Nominal) 8800

(Maximum) 10300

Value

7864

Phase

Master

MS Wind 5 Water Lo PE BSub CPS

(Minimum) 6050

(Nominal) 10200

(Maximum) 12100

Value

9145

Phase

Master

MS Wind 6 Water Lo PE BSub CPS

(Minimum) 700.0

(Nominal) 1800

(Maximum) 2650

Value

1642

Phase

Master

MS Wind 1 Water Lo PE BSub CPS

(Minimum) 3050

(Nominal) 4900

(Maximum) 5650

Value

4488

Phase

Master

MS Wind 2 Water Lo PE BSub CPS

(Minimum) 8650

(Nominal) 13300

(Maximum) 14700

Value

12000

Phase

Master

MS Wind 3 Water Lo PE BSub CPS

(Minimum) 6800

(Nominal) 10700

(Maximum) 11950

Master: 17-JAN-2001 16:38

Phase

Master

SS Wind 4 Water Hi PE BSub CPS

(Minimum) 13350

(Nominal) 20100

(Maximum) 22550

Value

18230

Phase

Master

SS Wind 5 Water Hi PE BSub CPS

(Minimum) 11100

(Nominal) 15900

(Maximum) 19200

Value

14220

Phase

Master

SS Wind 6 Water Hi PE BSub CPS

(Minimum) 3650

(Nominal) 5400

(Maximum) 6950

Value

4645

Phase

Master

SS Wind 1 Water Hi PE BSub CPS

(Minimum) 28350

(Nominal) 41700

(Maximum) 46300

Value

36620

Phase

Master

SS Wind 2 Water Hi PE BSub CPS

(Minimum) 25400

(Nominal) 37700

(Maximum) 42100

Value

34530

Phase

Master

SS Wind 3 Water Hi PE BSub CPS

(Minimum) 17850

(Nominal) 26800

(Maximum) 30050

Value

24600

Phase

Master

SS Wind 4 Water Lo PE BSub CPS

(Minimum) 14200

(Nominal) 21200

(Maximum) 23850

Value

19380

Phase

Master

SS Wind 5 Water Lo PE BSub CPS

(Minimum) 11550

(Nominal) 16600

(Maximum) 19850

Value

14880

Phase

Master

SS Wind 6 Water Lo PE BSub CPS

(Minimum) 3800

(Nominal) 5500

(Maximum) 7150

Value

4833

Phase

Master

SS Wind 1 Water Lo PE BSub CPS

(Minimum) 33500

(Nominal) 49100

(Maximum) 54450

Value

43740

Phase

Master

SS Wind 2 Water Lo PE BSub CPS

(Minimum) 27650

(Nominal) 40900

(Maximum) 45600

Value

37770

Phase

Master

SS Wind 3 Water Lo PE BSub CPS

(Minimum) 19100

(Nominal) 28500

(Maximum) 32000

Master: 17-JAN-2001 16:38 Before: 17-JAN-2001 16:42

Phase

Before

Master

SS Cs Resolution Bkg %

(Minimum) 9.000

(Nominal) 12.00

(Maximum) 14.00

Value

12.61

13.00

Phase

Before

Master

MS Cs Resolution Bkg %

(Minimum) 7.500

(Nominal) 10.50

(Maximum) 12.50

Value

9.165

9.187

Phase

Before

Master

LS Cs Resolution Bkg %

(Minimum) 7.500

(Nominal) 10.50

(Maximum) 12.50

Value

8.741

Master: 17-JAN-2001 16:38 Before: 17-JAN-2001 16:42

Phase

Before

Master

LS Wind 4 Background CPS

(Minimum) 350.0

(Nominal) 550.0

(Maximum) 650.0

Value

514.4

516.9

Phase

Before

Master

LS Wind 5 Background CPS

(Minimum) 450.0

(Nominal) 700.0

(Maximum) 800.0

Value

672.7

676.4

Phase

Before

Master

LS Wind 6 Background CPS

(Minimum) 250.0

(Nominal) 375.0

(Maximum) 450.0

Value

363.4

367.1

(Minimum) 150.0

(Nominal) 275.0

(Maximum) 350.0

(Minimum) 150.0

(Nominal) 275.0

(Maximum) 350.0

(Minimum) 200.0

(Nominal) 350.0

(Maximum) 400.0

8.796

Cs Resolution - Background Measurement

Slimhole Litho-Density Tool Wellsite Calibration

Value

26350

SS Bkgd Subtracted Window Countrates

Slimhole Litho-Density Tool Master Calibration

Value

9540

MS Bkgd Subtracted Window Countrates

Slimhole Litho-Density Tool Master Calibration

Value

1985

LS Bkgd Subtracted Window Countrates

Slimhole Litho-Density Tool Master Calibration

Page 28: DEER LAKE OIL & GAS I DEER LAKE OIL & GAS E · PH Fluid Loss Viscosity Density MUD Type Fluid In Hole Bit Size Casing Schlumberger Casing Driller Size @ Depth Top Log Interval Bottom

SLIM Telemetry Gamma-ray Cartridge - B / Equipment Identification

Primary Equipment:STGC Gamma-ray & Accelerometer Cartridge STGC - BSTGC Telemetry Cartridge STGC - A

Auxiliary Equipment:SLIM Electronics Cartridge Housing STGH - B

Before: 17-JAN-2001 16:44

Phase

Before

Gamma Ray Background GAPI

(Minimum) 0

(Nominal) 30.00

(Maximum) 120.0

Value

8.447

Phase

Before

Gamma Ray (Jig - Bkg) GAPI

(Minimum) 131.7

(Nominal) 144.9

(Maximum) 158.0

Value

144.9

Phase

Before

Gamma Ray (Calibrated) GAPI

(Minimum) 140.1

(Nominal) 155.1

(Maximum) 170.1

Value

155.1

Master: 17-JAN-2001 16:38

Phase

Master

LS Housing Wear Meas MM

(Minimum) 62.61

(Nominal) 63.68

(Maximum) 63.83

Value

63.62

Phase

Master

Source Housing Wear Meas MM

(Minimum) 62.61

(Nominal) 63.50

(Maximum) 63.63

Value

63.62

Phase

Master

SS Housing Wear Meas MM

(Minimum) 62.61

(Nominal) 63.68

(Maximum) 63.83

Value

63.68

Phase

Master

MS Housing Wear Meas MM

(Minimum) 62.61

(Nominal) 63.68

(Maximum) 63.83

Master: 17-JAN-2001 16:38

Phase

Master

LS Wind 4 Water Hi PE BSub CPS

(Minimum) 750.0

(Nominal) 1400

(Maximum) 1850

Value

1401

Phase

Master

LS Wind 5 Water Hi PE BSub CPS

(Minimum) 750.0

(Nominal) 1400

(Maximum) 2050

Value

1413

Phase

Master

LS Wind 6 Water Hi PE BSub CPS

(Minimum) 100.0

(Nominal) 200.0

(Maximum) 500.0

Value

192.9

Phase

Master

LS Wind 1 Water Hi PE BSub CPS

(Minimum) 900.0

(Nominal) 1400

(Maximum) 1850

Value

1544

Phase

Master

LS Wind 2 Water Hi PE BSub CPS

(Minimum) 1550

(Nominal) 2400

(Maximum) 2900

Value

2483

Phase

Master

LS Wind 3 Water Hi PE BSub CPS

(Minimum) 1100

(Nominal) 1900

(Maximum) 2250

Value

1861

Phase

Master

LS Wind 4 Water Lo PE BSub CPS

(Minimum) 850.0

(Nominal) 1600

(Maximum) 2050

Value

1508

Phase

Master

LS Wind 5 Water Lo PE BSub CPS

(Minimum) 800.0

(Nominal) 1600

(Maximum) 2100

Value

1506

Phase

Master

LS Wind 6 Water Lo PE BSub CPS

(Minimum) 100.0

(Nominal) 200.0

(Maximum) 500.0

Value

196.4

Value

63.66

Housing Diameter Wear Measurement

Slimhole Litho-Density Tool Master Calibration

Detector Calibration

SLIM Telemetry Gamma-ray Cartridge - B Wellsite Calibration

SLIM ACCESSLITHO DENSITY

COMPANY:

WELL:

FIELD:

PROVINCE:

DEER LAKE OIL & GAS INC. BOTTOM LOG INTERVAL 1572 m

SCHLUMBERGER DEPTH 1575 m

DEPTH DRILLER 1584 m

KELLY BUSHING 92.5 m

DRILL FLOOR 92.5 m

GROUND LEVEL 90 m

EXPLORATORY

NEWFOUNDLAND

DEER LAKE OIL & GAS ET AL WESTERN ADVENTURE NO.1