DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES PRESENTATION BY P.N.RAM, CE/C/V,...

13
DEDICATED FREIGHT CORRIDOR CONSTRUCTION & MAINTENANCE PRACTICES PRESENTATION BY P.N.RAM, CE/C/V, SOUTH CENTRAL RAILWAY,SECUNDERABAD

Transcript of DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES PRESENTATION BY P.N.RAM, CE/C/V,...

Page 1: DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES PRESENTATION BY P.N.RAM, CE/C/V, SOUTH CENTRAL RAILWAY,SECUNDERABAD.

DEDICATED FREIGHT CORRIDOR –

CONSTRUCTION & MAINTENANCE PRACTICES

PRESENTATION

BY

P.N.RAM, CE/C/V,SOUTH CENTRAL RAILWAY,SECUNDERABAD

Page 2: DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES PRESENTATION BY P.N.RAM, CE/C/V, SOUTH CENTRAL RAILWAY,SECUNDERABAD.

What is dedicated freight corridor?

A dedicated freight corridor is expected to be

the proposed new track exclusively reserved for running of freight trains

at a speed of about 100 Kmph with increased axle load and train load. mostly along the golden quadrilateral i.e.

high traffic density routes.

Page 3: DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES PRESENTATION BY P.N.RAM, CE/C/V, SOUTH CENTRAL RAILWAY,SECUNDERABAD.

Need for Dedicated Freight Corridor To cope up with the increased freight traffic due to

growth of economy as a whole. To off load the high density routes, mostly golden

quadrilaterals. To increase the average speed of freight trains from

25 Kmph to about 50 Kmph. To run wider freight stock with improved pay load/tare

weight ratio from existing 2.4 to 3.0 and above. To allow heavier axle load for increased loading. To increase the moving dimension for wider freight

stocks for increased train load.

Page 4: DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES PRESENTATION BY P.N.RAM, CE/C/V, SOUTH CENTRAL RAILWAY,SECUNDERABAD.

Growth of freight traffic on Indian Railways over the years

Years Freight Traffic (MT) Growth (MT) Avg. annual growth (MT)

1950-51 73.20 -- --

1960-61 119.80 46.60 4.66

1970-71 167.90 48.10 4.81

1980-81 195.90 28.00 2.80

1990-91 318.40 122.50 12.25

1999-00 456.42 138.02 13.80

2000-01 473.50 17.08 17.08

2001-02 492.50 19.00 19.00

2002-03 518.74 26.24 26.24

2003-04 557.39 38.65 38.65

2004-05 585.35 27.96 27.96

2005-06 668.00 82.65 82.65

2006-07 726.00(Target) 58.00 58.00

Page 5: DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES PRESENTATION BY P.N.RAM, CE/C/V, SOUTH CENTRAL RAILWAY,SECUNDERABAD.

INDIAN FREIGHT STOCK – PAY LOAD/TARE WEIGHT RATIO

Type of Wagon

Tare Weight

Pay Load PL/TW Ratio with CC+2

PL/TW Ratio with CC+8

BOX 25.6 55.7 2.25 2.48

BOXN 22.6 58.7 2.68 2.95

BOXN-HA 23.17 58.81 2.62 2.88

BCN 25.5 55.8 2.26 2.50

BCNA 24.5 56.7 2.40 2.64

BCX 29.3 52.0 1.84 2.05

Page 6: DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES PRESENTATION BY P.N.RAM, CE/C/V, SOUTH CENTRAL RAILWAY,SECUNDERABAD.

UTILIZATION OF WAGONS ON INDIAN RAILWAY

Year Wagon Km. Per wagon per day

Remarks

1950-51 62.3 Wagon utilization on other Railways is as follows:-

French Railway – 73.4

German Railway – 70.6

Japanese Railway – 258.4

1980-81 73.4

1990-91 110.5

1999-00 177.4

2000-01 179.0

2001-02 191.6

2002-03 204.6

2003-04 187.3

Page 7: DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES PRESENTATION BY P.N.RAM, CE/C/V, SOUTH CENTRAL RAILWAY,SECUNDERABAD.

Railway Budget 2006-07 –

Initiative for improving freight loading Additional load of 4 to 8 tones per wagon adds 100MT

loading capacity and revenue of Rs.5,000 Crores. During 2005-06 loading target increased from 635MT

to 668MT. Pay load/tare weight ratio to improve to better than 3:1

and thereafter around 4:1. Permission to run private containers. Introduction of double stack container train. Development of wagon leasing market. Introduction of 25T axle load trains. Validity of brake power certificate for CC rakes

increased from 6,000 to 7,500 Km.

Page 8: DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES PRESENTATION BY P.N.RAM, CE/C/V, SOUTH CENTRAL RAILWAY,SECUNDERABAD.

Railway Budget 2006-07

Dedicated Freight Corridor Project Following dedicated freight corridor project

included in the budget:Western Corridor: JNPT – Vadodara-

Ahmedabad – Palanpur – Jaipur – Rewari -Thuglakabad.

Eastern Corridor: Ludhiana – Ambala – Seharampur – Khurja – Allahabad - Son nagar.

Page 9: DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES PRESENTATION BY P.N.RAM, CE/C/V, SOUTH CENTRAL RAILWAY,SECUNDERABAD.

Standard of constructionLikely standard of construction for dedicated freight

corridor is as follows:- Axle load – 30T (Bridges may be designed for 40T). Speed potential – 100 KMPH. Ruling gradient – not steeper than 1 in 150. Track structure – 72Kg. (90 UTS) Rails, PSC

sleepers with 1660/KM, Ballast cushion 350mm. Loop length – 1.5Km to 2.00Km. Block Section – 30Km to 40Km. Signalling and Interlocking – CTC with Electronic

Interlocking, GPS based Cab Signalling.

Page 10: DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES PRESENTATION BY P.N.RAM, CE/C/V, SOUTH CENTRAL RAILWAY,SECUNDERABAD.

Construction aspects Agency for Construction:- Railway or SPV. Design – Consultant. Checking of design – Consultant. Execution – Composite Contract. Quality Control – Consultant. P.Way Material – Part of the Contract. Laying and Linking – Mechanized system. Welding of rail joints – Mobile Flash Butt

Plant.

Page 11: DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES PRESENTATION BY P.N.RAM, CE/C/V, SOUTH CENTRAL RAILWAY,SECUNDERABAD.

Maintenance of freight corridor

Periodical maintenance - Contract Inspections and Maintenance

Organization – Under SPV. quality checks – Consultant. Disaster management – Separate wing

under SPV.

Page 12: DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES PRESENTATION BY P.N.RAM, CE/C/V, SOUTH CENTRAL RAILWAY,SECUNDERABAD.

Conclusion

Freight corridor has to be constructed with improved standards.

Detailed study on each aspect has to be done before laying the standards.

Modern construction practices to be adopted for improving quality.

Maintenance Organization has to be set up for better maintenance.

Page 13: DEDICATED FREIGHT CORRIDOR – CONSTRUCTION & MAINTENANCE PRACTICES PRESENTATION BY P.N.RAM, CE/C/V, SOUTH CENTRAL RAILWAY,SECUNDERABAD.

Thank You