DBCP-31 TC Report

31
Report by the Technical Coordinator Champika Gallage [email protected] [email protected]

Transcript of DBCP-31 TC Report

Page 1: DBCP-31 TC Report

Report by the Technical Coordinator

Champika Gallage

[email protected]@jcommops.org

Page 2: DBCP-31 TC Report

TECHNICAL COORDINATOR TASKS

• Familiarizing with JCOMMOPS database and tools• Familiarizing with DBCP community , platforms, operators and

networks• Travelling to meet with various DBCP Members, Action Groups,

and Teams• Review database design, metadata loading and reporting on

new JCOMMOPS website• Collecting, and preparing metadata to ingest to the new

JCOMMOPS database• Maintaining metadata in the JCOMMOPS database• Producing monthly maps and GTS timeliness reports• Provide user assistance

19-23 October 2015 2DBCP – 31, Geneva, Switzerland

Page 3: DBCP-31 TC Report

TECHNICAL COORDINATOR TASKS• Assisting Panel members with technical and programmatic

issues• Updating and maintaining DBCP and OceanSITES websites• Maintaining mailing lists, contact details and user groups

on DBCP, JCOMMOPS, and OceanSITES websites• Monitoring the Quality-Control Relay traffic• Tracking all buoy deployments, and mooring

maintenance/installations• Preparing for and attending meetings• Preparing meeting reports and documents • Other adhoc tasks

19-23 October 2015 3DBCP – 31, Geneva, Switzerland

Page 4: DBCP-31 TC Report

DBCP – JCOMMOPS

• Office move to a new location in February 2015• Co-located in IFREMER, Brest, France• Total of six full time staff in JCOMMOPS Office• Three technical coordinators, IT Engineer, Coordinator, Science

& Communication, Web developer (contract ending Nov 2015)

DBCP – 31, Geneva, Switzerland19-23 October 2015 4

Page 5: DBCP-31 TC Report

NETWORK STATUS

19-23 October 2015 DBCP – 31, Geneva, Switzerland 5

Page 6: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 6

NETWORK STATUS

19-23 October 2015

Sept-1

4

Oct-14

Nov-14

Dec-14

Jan-15

Feb-15

Mar-15

Apr-15

May-15

Jun-15Jul-1

5

Aug-150

200

400

600

800

1000

1200

1400

1600

Number of Active Platforms (Sep 2014 - Aug 2015)

Drifting Buoys Moored Buoys Fixed Platforms 1250

Page 7: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 7

NETWORK STATUS

19-23 October 2015

Page 8: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 8

CONTRIBUTING COUNTRIES – DRIFTING BUOY PROGRAM

19-23 October 2015

Page 9: DBCP-31 TC Report

NETWORK STATUS

Variable Any Air P P Tend SST Air T Hum Wind

DirWind

Speed Sub/T SSS Sub/Sal Sub/Cur

Drifting Buoys 1555 850 597 1453 57 6 6 3 19 256 14 0

Moored Buoys 415 249 215 364 318 161 310 310 114 54 105 16

Fixed Platforms 102 90 90 9 89 83 92 64 3 0 0 1

19-23 October 2015 DBCP – 31, Geneva, Switzerland 9

• Amongst the drifting buoys, moored buoys and fixed platforms reporting on the GTS in BUOY (or BUFR) format, above listed variables were measured in August 2015.

• Wave measurement information was not available due to a data decoding error in the data received from Meteo-France. Since this report was submitted, wave data is available starting form October.

Page 10: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 10

WAVE OBSERVATIONS

19-23 October 2015

Page 11: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 11

NETWORK STATUS

19-23 October 2015

06/20

01

11/20

01

04/20

02

09/20

02

02/20

03

07/20

03

12/20

03

05/20

04

10/20

04

03/20

05

08/20

05

01/20

06

06/20

06

11/20

06

04/20

07

09/20

07

02/20

08

07/20

08

12/20

08

05/20

09

10/20

09

03/20

10

08/20

10

01/20

11

06/20

11

11/20

11

04/20

12

09/20

12

02/20

13

07/20

13

12/20

13

05/20

14

10/20

14

03/20

15

08/20

150

500

1000

1500

2000Number of operational buoys reporting on the GTS (monthly until August

2015)

DRIFTERS BAROMETER DRIFTERS MOORINGS

Num

ber o

f Buo

ys

415

1555

850

2012-13 2013-14 2014-15

Average number of Drifting Buoys 1168 1340 1504

% of barometer buoys 40% 50% 54%

Average number of Moored buoys 453 406 407

% of barometer buoys - - 59%

Page 12: DBCP-31 TC Report

12

TAO ARRAY

• Data availability of TAO array has improved.

• TAO array is now at targeted 80% data availability.

Sept-14

Oct-14

Nov-14

Dec-14

Jan-1

5

Feb-15

Mar-15

Apr-15

May-1

5

Jun-1

5Ju

l-15

Aug-15

0

10

20

30

40

50

60

70

80

90

100

TAO Data Availability by Month

% a

vaila

bilit

y

As per information received from NDBC

• TAO array reporting data on the GTS in BUFR format under headers

• “IOBF08 KWNB” for all TAO stations with a nominal position east of 180 and

• “IOBG08 KWNB” for all TAO stations with a nominal position on or west of 180.

Page 13: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 13

TSUNAMETER BUOYS

19-23 October 2015

0

10

20

30

40

50

60

70

80

90

% data availability Goal 80%

% d

ata

avai

labi

lity

As per information received from NDBC

GTS Header Country Status Plan

SZAU01 AMMC Australia OK – decoded at M-F

SZNZ01 NZKL New Zealand OK – same dataformat than for AMMC Should be decoded soon

SZBM45 RJTD Japan CREX but different structure than AMMC Should probably be decoded

SZ% RJTD Japan Unknown dataformat (not CREX?) Feedback should be sent to JMA

SZ% BABJ China CREX but different structure than AMMC Should probably be decoded

SZ% KWNB USA Unknown dataformat (not CREX?) Feedback should be sent to NOAA

SZ% EUMS EUMETSAT OK – decoded at M-F

SZ% WMKK Malaysia OK – slightly different from AMMC but… Should be decoded soon

Page 14: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 14

SOUTH OCEAN BUOY PROGRAM (SOBP)

• SOBP, as part of the DBCP Implementation Strategy, aims to have 300 operational drifting buoys with barometers distributed across the Seas south of 40oS.

• During August 2015, there were 244 drifters in the Southern Ocean and 221 (90%) of these were barometer drifters

• Little progress has been made compared to the August 2014 number which was 216.

• There were a total of 117 drifting buoys deployed in the Southern Ocean during the last intersessional period

• DBCP members should continue to look for deployment opportunities in this region.

19-23 October 2015

Page 15: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 15

SOUTH OCEAN BUOY PROGRAM (SOBP)

19-23 October 2015

Page 16: DBCP-31 TC Report

SOUTH OCEAN BUOY PROGRAM (SOBP)

Country

Buoys Purches

ed or deployments

Additional

(Baro)Upgrades   Total Comment

Australia (ABOM)

5 1 6 Deployed 4 more buoys from USA

Brazil 0 0 0 Deployed 2 buoys from USA

Chile 0 0 0 Deployed 2 buoys from USA

France 8 8 Deployed 8 more buoys from USA

New Zealand

0 0 0 Deployed 23 buoys from USA

South Africa

0 0 0 Deployed 14 buoys from USA

UK 1 0 1

USA 99 0 99

Unknown 3 0 3

Total 108 9 117

DBCP – 31, Geneva, Switzerland 16

Drifting buoy deployment location in South of 400S during August 2014 -July 2015

Page 17: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 17

SOBP DELPOYMENT PLANS FOR 2015/16

19-23 October 2015

Country Planned # of deployments

Additional (Baro)Upgrades   Total Comment

USA (AOML) 15 0 15 15 SVPB’s will be deployed east of NZ, from the R/V Kaharoa

USA (AOML) 30 0 30 30 SVPB’s will be deployed at approx. 55S,155W, from the R/V Araon.

Australia (ABOM) 5 4 9 It is possible that some additional ABOM baro upgrades (deployed out of Cape Town by SAWS and La Reunion by Meteo France) may also be deployed south of 40S

France 15 00 15 South of Indian Ocean New Zealand 00 10 10 5 SVPBs will be deployed for AOMLUSA (AOML) 05 00 05 Deploy by NZUSA (AOML) 17 00 17 Deploy by South AfricaBrazil 0 14 14 The drifters will be deployed at each

crossing of navy vessel through Drake

Total 87 28 115

Page 18: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 18

BUFR MIGRATION - (DRIFTING BUOYS)

91%

7%

2%

Drifting buoys reporting in BUFR and TAC - August 2015

BUFR & TAC BUFR only TAC only

In August 2015

• 98% reporting in BUFR

• 2% reporting in TAC only

• 91% provide the data in TAC and BUFR

19-23 October 2015

Page 19: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 19

BUFR MIGRATION - (DRIFTING BUOYS)

CCCC Provider TTAAiiBUFR

Template

Number of

buoysRemark

CWAO Joubeh IOBX02 Non validated 53

CWAO Joubeh IOBX05 Non validated 22

KARS CLS America IOBX02 Non validated 1064 Wrong WMO Ids in TM315009

KARS CLS America IOBX07 Non validated 16 Wrong WMO Ids in TM315009

KARS CLS America IOBX12 Non validated 2 Wrong WMO Ids in TM315009

KARS CLS America IOBX13 Non validated 3 Wrong WMO Ids in TM315009

KWBC Pacific Gyre IOBX06 TM315009 11

KWNB NDBC IOBX01 Non validated 44

LFPW Meteo-France IOB[A-L]01 TM315009 253

LFVW CLS Toulouse IOBX02 Non validated 8 Wrong WMO Ids in TM315009

LFVW CLS Toulouse IOBX13 Non validated 2 Wrong WMO Ids in TM315009

RJTD JMA IOBC01 Non validated 5

VHHH HKO IOBC01 TM315009 1

Total 148419-23 October 2015

Page 20: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 20

BUFR MIGRATION - (MOORED BUOYS)

19-23 October 2015

25%

5%

70%

Moored buoys reporting in BUFR and TAC - August 2015

BUFR & TAC

BUFR onlyTAC only

In August 2015

• 5% reporting in BUFR

• 70% reporting in TAC only

• 25% provide the data in TAC and BUFR

Page 21: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 21

BUFR MIGRATION - (MOORED BUOYS)

CCCC Data Provider TTAAiiBUFR

Template

Number of

buoysRemark

CWAO Joubeh IOBX02 Non validated 2

DEMS IMD 0 15 buoys reporting in FM18 only

EDZW BSH/DWD ISSXnn TM308009 9 From a FM13 to BUFR conversion?EGRR Met Office ISS[A/D]nn TM308009 17 From a FM13 to BUFR conversion?EIDB Met Eireann IOBA21 TM315008 4 FM18 BUOY in parallelKARS CLS America IOBX08 Non validated 30 Wrong WMO Ids in TM315008?KPML NOAA/PMEL IOB[B/C]18 TM315008 2

KWNB NDBC IOB[F/G]08 TM315008 50

KWNB NDBC ISS… TM308009 194 From a FM13 to BUFR conversion?LEMM AEMET IOBX[01-20] Non validated 13 No TAC reports in parallelLFPW Meteo-France ISS[D/E]nn TM308009 3 From a FM13 to BUFR conversionLFPW Meteo-France 0 19 buoys reporting in FM18 only

LFVW CLS Toulouse IOBX01 Non validated 1 Wrong WMO Ids in TM315008?LFVW CLS Toulouse IOBX03 Non validated 4 Wrong WMO Ids in TM315008?LFVW CLS Toulouse IOBX11 Non validated 10 Wrong WMO Ids in TM315008?LGAT HCMR/HNMS IOBD01 Non validated 1 No TAC reports in parallelLPMG IPMA 0 2 buoys reporting in FM18 only

RKSL KMA 0 11 buoys reporting in FM18 only

Total 34019-23 October 2015

Page 22: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland

NETWORK/SERVICE CHANGE NOTIFICATIONS  

• Global Telecommunication System• WMO METNO MESSAGEShttp://www.wmo.int/pages/prog/www/ois/Operational_Information/VolumeA/ExplanationOfMetno.htm• WWW Operational Newsletterhttp://www.wmo.int/pages/prog/www/ois/Operational_Information/Newsletters/current_news_en.html• JCOMM notificationshttp://www.jcomm.info/index.php?option=com_content&view=article&id=318:tao-gts-headers&catid=27&Itemid=2• Apart from the above NOAA has their own notification system http://www.nws.noaa.gov/om/notif.htm

2219-23 October 2015

Page 23: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 23

PERFORMANCE INDICATORS FOR THE DBCP NETWORKS

• JCOMMOPS, OSMC, OOPC, IOC, WMO meeting in April 2014 on indicators/metrics– JCOMMOPS: Network oriented metrics

• Provide an accurate and homogeneous status of observing networks and of the integrated system

• Design Key Performance Indicators– Harmonized semantic– Specific and clear algorithms– Clear interpretation scales

• Guide implementation

19-23 October 2015

Page 24: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 24

CATEGORIES

19-23 October 2015

INDICATOR CATEGORY EXAMPLES

IMPLEMENTATION STATUSactivity, intensity, density, sustainability, multidisciplinary nature

● Number Active PTF / Target, or active lines, etc● Number of yearly Deployments / Target● Number boxes occupied / Target● Number ECV/EOVs observed

DATA DELIVERY efficiency, volume, quality, timeliness

● Number Obs available GTS/GDACs / Target (RT)● Number Delayed Mode Obs available / Target (eligible)● Number Obs meeting the timeliness requirements / Target● Number black listed units

INTERNATIONAL COOPERATION ● Number of participating countries, distribution of platform/country ● (Number of new countries per year)● Degree of coordination for planning ● Number intl meeting/year (working groups, task teams)● Infrastructure support (e.g. JCOMMOPS office) ● Number pilot projects● NB donor programs● JCOMM cooperation (joint depl. opp.)

DATA UPTAKE ● Number of papers / year● Number of operational centers assimilating● Data policy (free unrestricted, on authorization)● Data access (discovery, web interfaces, etc, GTS only)

INSTRUMENTATIONplatforms, sensors, telecoms.

● Reliability / Target● Dep. Failure rate● Market diversity, competitiveness

OPERATIONS ● Ship time (opportunity, institutional, charters, civil society)● Number PMOs

SYNERGIES ● links and synergies to other JCOMM OCG components (SOOP ship deploying units, doing met. obs., GO-SHIP CTDs used for Argo QC, etc)

● Panels sharing a TC ● Joint meetings

Page 25: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 25

PERFORMANCE INDICATORS FOR THE DBCP NETWORKS

• suggested approach is to,(1) group the networks which DBCP oversees by function and/or

region and (2) establish Key Performance Indicators(KPI) in the 6 categoriesSuggested catogaries are; – Global Surface Drifting Buoy Network– Global Tropical Moored Buoy Network– National/coastal moored buoy Networks– Arctic Buoy Networks– Antarctic Buoy Networks– Global Tsunami buoy Network

19-23 October 2015

Page 26: DBCP-31 TC Report

26

Green Amber RedNetwork data availability (All networks) ? ? ? Drifting BuoysNumber of active drifting buoys (outside of near equatorial band and high latitudes, say10 ºN to 60 ºN and 10 ºS to 60 ºS)

≥ 1,250

< 1,250

Density: % number of 5 x 5 degree boxes outside of near equatorial band and high latitudes occupied ≥ 90% 75% to 90%, < 75%

Median lifetime of operating drifters outside of near equatorial band and high latitudes ≥ 300 150 to 300

days < 150

Global Tropical Moored Buoy Network % of the target number of moorings that are active ≥ 90% 75% to 90%, < 75%% of active moorings delivering data in real-time to GTS ≥ 90% 80% to 90% < 80%, % of active number of (active?) moorings for which their metadata have been submitted to ≥ 90% 75% to 90%, < 75%

National/coastal Moored Buoy NetworksNumber of active moored buoys operating and delivering real-time data to GTS ≥ 300 200 to 300 < 200% of active moored buoys for which their metadata have been submitted to JCOMMOPS ≥ 90% 75% to 90%, < 75%

Number of countries operating moored buoys ? ? ?Arctic Buoy Network (250km X 250km) Number of active drifting buoys ? ? ?Density: % number of 250km boxes occupied ≥ 90% 75% to 90%, < 75%% of active buoys delivering data in real-time to GTS ≥ 90% 80% to 90% < 80%, Antarctic Buoy Network (500km X 500km) Number of active drifting buoys ? ? ?Density: % number of 500km boxes occupied ≥ 90% 75% to 90%, < 75%% of active buoys delivering data in real-time to GTS ≥ 90% 80% to 90% < 80%, Global Tsunami Buoy NetworkNumber of active tsunami buoys operating and % of these delivering real-time sea-level data to GTS ≥ 80% 40% to 80% < 40%,

% of active tsunami buoys for which their metadata have been submitted to JCOMMOPS ≥ 90% 75% to 90%, < 75%

Number of countries operating tsunami buoys and the % of them delivering sea-level data to GTS ? ? ?

PERFORMANCE INDICATORS - EXAMPLES

Page 27: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 27

WMO ID ALLOCATION

• Follow the guidelines for WMO ID allocation • 7 digit IDs can only be used with BUFR format and TAC requires

5 digit IDs• Moving from 5 digit to 7 digits avoids reuse of WMO IDS• Avoid recycle of IDs where ever possible• If IDs recycle cannot be avoided, do not reuse them before 3

months of its previous use (as per WMO ID allocation rule)

• JCOMMOPS metadata management plan for WMO IDs in reuse

e.g. 46532_099

19-23 October 2015

01 January 2015 A1bwnnn_1nne.g. 46532_100

A1bwnnn_0nn

Page 28: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 28

WMO ID ALLOCATIONWMO IDS for Drifting Buoys

Current Practice Proposal

TAC only A1bwnnn

5 digit IDsReuse as needed (e.g 46529)

Avoid reuse of IDs whenever and wherever possible Follow WMO guidelines when reusing the IDs

TAC & BUFR A1bw((00)nnn(e.g. 46529 4600529)5 digit IDs for TAC reportingadd “00” to convert the ID to a 7 digit for BUFR reporting (

Do not reuse the 7 digit IDS ??

BUFR only A1bwnnnnn = A1bw00nnn

Add “00” to convert the currently allocated ID to a 7 digit

Use only 7 digit numbers with nnnnn ≥ 1000 for all new deployments reporting only in BUFR formate.g. 4601529

19-23 October 2015

Page 29: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 29

WMO ID ALLOCATION

https://www.wmo.int/pages/prog/amp/mmop/wmo-number-rules.html

19-23 October 2015

TAC BUFR

A1bwnnn41532

A1bwnnnnnA1bw00nnn4100532

nn = 014101532

Page 30: DBCP-31 TC Report

DBCP – 31, Geneva, Switzerland 30

FUTURE PRIORITIES

• Moored buoy metadata ingestion to new JCOMMOPS database• Continue working with JCOMMOPS colleagues on new website • Continue to work with Iridium VAR’s to obtain drifter, mooring,

and float information.• Link with IABP to get a metadata feed to JCOMMOPS (similar

to AOML feed)• Ensure loading procedures (e.g Tsunameter data) are accurate.

Work with OSMC and/or MeteoFrance to • Continue to update Meteorologists Cookbook• Other products and services as requested by the community

19-23 October 2015

Page 31: DBCP-31 TC Report

Thank you!

www.dbcp.jcommops.org

Champika [email protected]@jcommops.org

19-23 October 2015 DBCP – 31, Geneva, Switzerland 31