Average Demand MW Average Generation 14.22 MW Last Plant Trip21/05/2012
01:39 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,037.1 52,477.1 55,881.7 33,072.1 27,972.7
Peak Load(KW) 3,565 3,579 3,250 7,698 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 66,165 54,925 66,463 153,881 0
Capacity Factor 76.58% 63.57% 76.92% 76.42% 0.00%
Load Factor 77.98% 74.14% 85.21% 83.64% #DIV/0!
Today's Running Hrs 23.8 20.7 24 23.9 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 2 0 0 0
Stopage time due to
external reason0 0 0 0 0
Unschedule
maintenance + Trip
Downtime Hrs.
0.2 1.3 0 0.1 24
Engine Avilability 99.17% 94.58% 100.00% 99.58% 0.00%
No of Tripping for
internal reason1 0 0 1 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Cyl 8/A dev Nil NilNormal stop for Ht temp
hi hNil
Un-schedule
Maintenance
Pcc ball valve change and
spark plug gap adjustLub oil filter change Nil Nil Nil
Schedule Maintenance Nil 1000 RH maintanance Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 49355.5ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 55110.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
318.4 RHs
1000 RH Maintnance after
979.3 RHS
1000 RH maintenance after
228.3 RHs
2000 RH maintenance After
589 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp highLube oil temp. High. Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA., Ht outlet
flexible pipe water leakage.
Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
341,434 14,226 0 218.22 OK OK
Prepared By Acknowledged by
Md.Amir Hamza Md. Masud Alam
Sr. Shift Engineer Sr. Shift Leader
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 02 June- 2012
DAY COVERED: 01 June - 2012
SUMMARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/G
ENERATOR
PERFORMANCEREPORT
Remarks : Plant didn't trip yesterday.
Loadshed : Fresh-1,2=25 min.Mtc-1,2,3=20 min.
-
7/31/2019 Daily Report_of June 2012
2/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
3/72
-
7/31/2019 Daily Report_of June 2012
4/72
Average Demand MW Average Generation 15.80 MW Last Plant Trip21/05/2012
01:39 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,061.1 52,501.1 55,905.7 33,095.7 27,972.7
Peak Load(KW) 3,375 3,367 3,320 8,020 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 72,788 70,516 70,618 165,469 0
Capacity Factor 84.25% 81.62% 81.73% 82.18% 0.00%
Load Factor 89.86% 87.26% 88.63% 87.42% #DIV/0!
Today's Running Hrs 24 24 24 23.6 0
Standby Downtime Hrs. 0 0 0 0 0Schedule Maintenance
Hrs.0 2 0 0 0
Stopage time due to
external reason0 0 0 0 0
Unschedule
maintenance + Trip
Downtime Hrs.
0 0 0 0.4 24
Engine Avilability 100.00% 100.00% 100.00% 98.33% 0.00%
No of Tripping for
internal reason0 0 0 1 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Nil Nil Nil control air press low Nil
Un-schedule
MaintenanceNil Nil Nil Nil Nil
Schedule Maintenance Nil Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 49355.5ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 55110.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
294.4 RHs
1000 RH Maintnance after
955.3 RHS
1000 RH maintenance after
204.3 RHs
2000 RH maintenance After
565.4 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp highLube oil temp. High. Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA., Ht outlet
flexible pipe water leakage.
Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
379,391 15,808 0 204.80 OK OK
Prepared By Acknowledged by
Md.Amir Hamza Md. Masud Alam
Sr. Shift Engineer Sr. Shift Leader
SUMMARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/
GENERATOR
PERFORMANCEREPO
RT
Remarks : Plant didn't trip yesterday.
Loadshed :L-1= 9 min due to Earth fault.L-2=5 min due to E4 trip load management active.L-5=3 min due to Everest E-1 trip.Fresh-1=43min,Fresh-2=53 min due to Fresh -4 ball mil l running time.
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 03 June- 2012
DAY COVERED: 02 June - 2012
-
7/31/2019 Daily Report_of June 2012
5/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
6/72
-
7/31/2019 Daily Report_of June 2012
7/72
Average Demand MW Average Generation 15.80 MW Last Plant Trip03/06/2012
05:09 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,084.7 52,524.7 55,929.4 33,117.9 27,972.7
Peak Load(KW) 3,370 3,365 3,270 7,685 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 74,918 71,372 71,222 161,034 0
Capacity Factor 86.71% 82.61% 82.43% 79.97% 0.00%
Load Factor 94.20% 89.87% 91.90% 94.39% #DIV/0!
Today's Running Hrs 23.6 23.6 23.7 22.2 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 2 0 0 0
Stopage time due to
external reason0 0 0 0 0
Unschedule
maintenance + Trip
Downtime Hrs.
0.4 0.4 0.3 1.8 24
Engine Avilability 98.33% 98.33% 98.75% 92.50% 0.00%
No of Tripping for
internal reason1 2 2 2 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Plant trip. Plant trip, Exht. Temp. highcyl.6/A
Plant trip ,cyl dev 4/B Plant trip, cyl.dev 2/A. Nil
Un-schedule
MaintenanceNil Nil
Replace clean pcc ball
valve cyl 4/B
Replace clean pcc ball
valve cyl. 2/A, 10/B,
Replace old spark plug cyl.
2/A, 3/B, 7/B, Ex
Nil
Schedule Maintenance Nil Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 49355.5ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 55110.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
270.8 RHs
1000 RH Maintnance after
931.7 RHS
1000 RH maintenance after
180.6 RHs
2000 RH maintenance After
543.2 RHs
1000RH maintenance after
882.1 RH
Present Problem &ActionWinding temp high & Ltwater temp high Lube oil temp. High. Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA., Ht outletflexible pipe water leakage.
Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
378,546 15,773 0 205.10 OK OK
Prepared By Acknowledged by
Sk Mainuddin Md. Masud Alam
Asst. Shift Engineer Sr. Shift Leader
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 04 June- 2012
DAY COVERED: 03 June - 2012
SU
MMARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/GE
NERATOR
PERFORMANCEREPORT
Remarks : Plant trip at 5:09pm due to Everest Power Plant trip (Earth fault) yesterday. Down time- 0:28 min.
Loadshed :L-1=29 min due to plant trip. L-2=29 min due to plant trip. L-3=28 min due to plant trip, L-5=29 min due to plant trip .Fresh-1=3:36 min, due to (EPGCL E-3 trip, EPGCL E-1 trip, After plant trip), Fresh-2=3.41 min due to (EPGCL E-3 trip, EPGCL E-1 trip, After plant trip),
Fresh-3=-3.42 min due to (EPGCL E-3 tripe, EPGCL E-1 trip, After plant trip).
-
7/31/2019 Daily Report_of June 2012
8/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
9/72
-
7/31/2019 Daily Report_of June 2012
10/72
Average Demand MW Average Generation 16.100 MW Last Plant Trip03/06/2012
05:09 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,108.6 52,548.7 55,953.4 33,141.9 27,972.7
Peak Load(KW) 3,600 3,456 3,474 7,772 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 72,289 70,917 71,397 171,805 0
Capacity Factor 83.67% 82.08% 82.64% 85.32% 0.00%
Load Factor 84.02% 85.50% 85.63% 92.11% #DIV/0!
Today's Running Hrs 23.9 24 24 24 0
Standby Downtime Hrs.0 0 0 0 0
Schedule Maintenance
Hrs.0 0 0 0 0
Stopage time due to
external reason0 0 0 0 0
Unschedule
maintenance + Trip
Downtime Hrs.
0.1 0 0 0 24
Engine Avilability 99.58% 100.00% 100.00% 100.00% 0.00%
No of Tripping for
internal reason1 0 0 0 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Exht. Temp. cyl. Dev. 7/A. Nil Nil Nil Nil
Un-schedule
Maintenance
Replace clean pcc ball
valve cyl. 7/A & spark plug
gap adjust cyl. 5/A, 7/A,
8/A.
Nil Nil Nil Nil
Schedule Maintenance Nil Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 49355.5ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 55110.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
246.9 RHs
1000 RH Maintnance after
907.7 RHS
1000 RH maintenance after
156.6 RHs
2000 RH maintenance After
519.2 RHs
1000RH maintenance after
882.1 RH
Present Problem &Action
Winding temp high & Ltwater temp high
Lube oil temp. High. Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA., Ht outletflexible pipe water leakage.
Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
386,408 16,100 0 250.69 OK OK
Prepared By Acknowledged by
Md. Mohiuddin Sohag Md. Masud Alam
Sr. Shift Leader Sr. Shift Leader
SU
MMARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/GE
NERATOR
PERFORMANCEREPORT
Remarks : Plant didn't trip yesterday.
Loadshed :L-1=4:15hr due to earth fault Fresh cement control room side HT cabal Insolator Problem , L-5=25 min due to Engine-1 trip .Fresh-2=0:49 min. due to EPGCL E-1 trip, Fresh-3=4:54hr. due to Fresh cement control room side HT cabal insolator problem. MTC-
1,2,3&4=0:35min. due to Engine -1 trip.
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 05 June- 2012
DAY COVERED: 04 June - 2012
-
7/31/2019 Daily Report_of June 2012
11/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
12/72
-
7/31/2019 Daily Report_of June 2012
13/72
Average Demand MW Average Generation 16.318 MW Last Plant Trip05/06/2012
08:28 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,131.9 52,572.3 55,977.2 33,165.4 27,972.7
Peak Load(KW) 3,676 3,497 3,434 7,819 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 71,475 74,365 71,675 174,119 0
Capacity Factor 82.73% 86.07% 82.96% 86.47% 0.00%
Load Factor 83.45% 90.11% 87.70% 94.76% #DIV/0!
Today's Running Hrs 23.3 23.6 23.8 23.5 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 0 0 0 0
Stopage time due to
external reason0 0 0 0 0
Unschedule
maintenance + Trip
Downtime Hrs.
0.7 0.4 0.2 0.5 24
Engine Avilability 97.08% 98.33% 99.17% 97.92% 0.00%
No of Tripping for
internal reason2 1 0 0 0
No of Tripping for
external reason1 1 1 1 0
Cause Of Triping Exht. Temp. cyl. Dev. 4/A.&6/A, Plant trip.
Plant trip, Exht. Temp. cyl.High 6/A.
Plant trip Plant trip. Nil
Un-schedule
Maintenance
Replace clean pcc ball
valve cyl. 4/A, 6/A &
Replace old spark plug cyl.
6/A,
Nil Nil Nil Nil
Schedule Maintenance Nil Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 49355.5ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 55110.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
223.6 RHs
1000 RH Maintnance after
884.1 RHS
1000 RH maintenance after
132.8 RHs
2000 RH maintenance After
495.7 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp high Lube oil temp. High. Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA., Ht outletflexible pipe water leakage.
Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
391,634 16,318 0 243.06 OK OK
Prepared By Acknowledged by
Md. Mohiuddin Sohag Md. Masud Alam
Sr. Shift Leader Sr. Shift Leader
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 06 June- 2012
DAY COVERED: 05 June - 2012
SUMM
ARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/GE
NERATOR
PERFORMANCEREPORT
Remarks : Plant trip at 8:28pm due to Everest Power buscupler trip for over current yesterday. Down time= 0:13min.
Loadshed :L-1=0:24min. due to plant trip, L-2=0:24min. Due to plant trip, L-3=0:21min. Due to plant trip, L-5=35 min due to Engine-1 trip &plant trip, Fresh-1=3:00hr. due to EPGCL E-1maint. & plant trip, Fresh-2=3:00hr. due toEPGCL E-1 maint. & plant trip, Fresh-3=0:20min. due to plant
trip., MTC-1=1:03hr. due to E-1 trip &plant trip, MTC-2=2:57hr.due to Plant trip & E-1 trip, MTC-3=4:29hr. due to E-1 trip, plant trip & EPGCL E-1
maint., MTC-4= 5:45hr. due to E-1 trip, plant trip & EPGCL E-1 maint.
-
7/31/2019 Daily Report_of June 2012
14/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
15/72
-
7/31/2019 Daily Report_of June 2012
16/72
Average Demand MW Average Generation 16.318 MW Last Plant Trip06/06/2012
12:52 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,155.3 52,596.0 56,001.1 33,187.1 27,972.7
Peak Load(KW) 3,549 3,388 3,399 7,809 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 73,705 70,589 72,181 157,133 0
Capacity Factor 85.31% 81.70% 83.54% 78.04% 0.00%
Load Factor 88.75% 87.91% 88.85% 92.73% #DIV/0!
Today's Running Hrs 23.4 23.7 23.9 21.7 0
Standby Downtime Hrs. 0 0 0 0 0Schedule Maintenance
Hrs.0 0 0 0 0
Stopage time due to
external reason0 0 0 0 0
Unschedule
maintenance + Trip
Downtime Hrs.
0.6 0.3 0.1 2.3 24
Engine Avilability 97.50% 98.75% 99.58% 90.42% 0.00%
No of Tripping for
internal reason2 0 0 2 0
No of Tripping for
external reason1 1 1 1 0
Cause Of TripingExht. Temp. cyl. Dev. 9/A,
Plant trip.Plant trip, Plant trip
Plant trip.& exh. Temp. deb.Cyl- 3/A, 4/A.
Nil
Un-schedule
Maintenance
Replace clean pcc ball
valve cyl. 9/A & Replace
old spark plug cyl. 9/A,
Nil Nil
Replace clean pcc ball
valve cyl - 3/A, 4/A, 9/B,
10/B & HT lead interchange
cyl - 4/A to 3/A & 3/A to 5/A.
Nil
Schedule Maintenance Nil Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 49355.5ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 55110.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
200.2 RHs
1000 RH Maintnance after
860.4 RHS
1000 RH maintenance after
108.9 RHs
2000 RH maintenance After
474.0 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp highLube oil temp. High. Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA., Ht outlet
flexible pipe water leakage.
Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total PowerProduction
Average Productionper Hr.
33 kV Export Total SteamProduction
Status of Start AirCompressor
Status of Boiler
373,608 15,567 0 197.59 OK OK
Prepared By Acknowledged by
Promod Sutradhar Md. Masud Alam
Shift Leader Sr. Shift Leader
SUMMARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/GEN
ERATOR
PERFORMANCEREPORT
Remarks : Plant trip at 12:52 PM due to all engine over voltage & MTC OHL rod fall yesterday. Down time= 0:14min.
Loadshed :L-1 = 15 min. due to plant trip, L-2 = 23 min. Due to plant trip, L-3 = 36 min. Due to plant trip, L-5 = 27 min due to Engine-4 trip &plant trip, Fresh - 3 = 30 min due to EPGCL E-2 trip, Fresh-4= 1:06hr. due plant trip. MTC - 1 = 1:02 Hr; MTC - 2 = 1:04 Hr, MTC - 4 = 1:11 Hr.
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 07 June- 2012
DAY COVERED: 06 June - 2012
-
7/31/2019 Daily Report_of June 2012
17/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
18/72
-
7/31/2019 Daily Report_of June 2012
19/72
Average Demand MW Average Generation 16.061 MW Last Plant Trip06/06/2012
12:52 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,179.3 52,619.1 56,025.1 33,210.6 27,972.7
Peak Load(KW) 3,691 3,499 3,560 7,884 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 72,800 70,061 73,189 169,416 0
Capacity Factor 84.26% 81.09% 84.71% 84.14% 0.00%
Load Factor 82.18% 86.68% 85.66% 91.44% #DIV/0!
Today's Running Hrs 24 23.1 24 23.5 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 0 0 0 0
opage me ue o0 0 0 0 0
Unschedule
maintenance + Tri0 0.9 0 0.5 24
Engine Avilability 100.00% 96.25% 100.00% 97.92% 0.00%
No of Tripping for
internal reason0 1 0 1 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Nil Woodward 723 Major Alarm Nil Exht. temp. cyl. dev. 4/A. Nil
Un-scheduleMaintenance
Nil Nil Nil Replace old spark plug cyl -4/A, & Orifish clean.
Nil
Schedule Maintenance Nil Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 49355.5ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 55110.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
176.2 RHs
1000 RH Maintnance after
837.3 RHS
1000 RH maintenance after
84.9 RHs
2000 RH maintenance After
450.5 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp highLube oil temp. High. Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA., Ht outlet
flexible pipe water leakage.
Alternator 3-phase shorted.
Previous Problem &
Action Nil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA. Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
385,466 16,061 0 219.97 OK OK
Prepared By Acknowledged by
Md. Mohiuddin Sohag Md. Masud Alam
Sr. Shift Leader Sr. Shift Leader
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 08 June- 2012
DAY COVERED: 07 June - 2012
SUMMARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE
/GENERATOR
PERFORMANCEREP
ORT
Remarks : Plant didn't trip yesterday.
Loadshed : L-5 = 0:04 min. due to Engine-4 trip, Fresh-3 =0:55 min due to E-4 & EPGCL E-2 trip, MTC-1=0:20min.due to E-4 trip, MTC-2=1:06hr.due to E-4 & EPGCL E-2 trip, MTC-3=0:20min. Due to E-4 trip, MTC-4=1:10hr. Due to E-4 & EPGCL E-2 trip.
-
7/31/2019 Daily Report_of June 2012
20/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
21/72
-
7/31/2019 Daily Report_of June 2012
22/72
Average Demand MW Average Generation 16.061 MW Last Plant Trip06/06/2012
12:52 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,203.3 52,643.1 56,049.1 33,234.6 27,972.7
Peak Load(KW) 3,559 3,437 3,382 7,631 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 72,468 70,738 71,882 173,765 0
Capacity Factor 83.88% 81.87% 83.20% 86.30% 0.00%
Load Factor 84.84% 85.76% 88.56% 94.88% #DIV/0!
Today's Running Hrs 24 24 24 24 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 0 0 0 0
Stopage time due to0 0 0 0 0
Unschedule
maintenance + Tri0 0 0 0 24
Engine Avilability 100.00% 100.00% 100.00% 100.00% 0.00%
No of Tripping for0 0 0 0 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Nil Nil Nil Nil Nil
Un-scheduleMaintenance
Nil Nil Nil Nil Nil
Schedule Maintenance Nil Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 49355.5ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 55110.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
152.2 RHs
1000 RH Maintnance after
813.3 RHS
1000 RH maintenance after
60.9 RHs
2000 RH maintenance After
426.5 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp highLube oil temp. High. Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA., Ht outlet
flexible pipe water leakage.
Alternator 3-phase shorted.
Previous Problem &
Action Nil Nil NilT.C RPM A/B -Bank shown
wrong in SCADA. Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
388,853 16,202 0 221.66 OK OK
Prepared By Acknowledged by
Promod Sutradhar Md. Masud Alam
Shift Leader Sr. Shift Leader
SUMMARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE
/GENERATOR
PERFORMANCEREP
ORT
Remarks : Plant didn't trip yesterday.
Loadshe : Fresh - 3 = 31 min. due to Everest E - 2 trip.
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 09 June- 2012
DAY COVERED: 08 June - 2012
-
7/31/2019 Daily Report_of June 2012
23/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
24/72
-
7/31/2019 Daily Report_of June 2012
25/72
Average Demand MW Average Generation 16.061 MW Last Plant Trip06/06/2012
12:52 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,227.3 52,667.1 56,073.1 33,258.6 27,972.7
Peak Load(KW) 3,498 3,111 3,295 7,612 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 75,172 68,624 73,006 180,444 0
Capacity Factor 87.00% 79.43% 84.50% 89.61% 0.00%
Load Factor 89.54% 91.91% 92.32% 98.77% #DIV/0!
Today's Running Hrs 24 24 24 24 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 0 0 0 0
opage me ue o0 0 0 0 0
Unschedule
maintenance + Tri0 0 0 0 24
Engine Avilability 100.00% 100.00% 100.00% 100.00% 0.00%
No of Tripping for
internal reason0 0 0 0 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Nil Nil Nil Nil Nil
Un-scheduleMaintenance
Nil Nil Nil Nil Nil
Schedule MaintenanceCentrifugal filter clean
complete
Centrifugal filter clean
complete
Centrifugal filter clean
complete
Centrifugal filter clean
completeNil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 49355.5ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 55110.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
128.2 RHs
1000 RH Maintnance after
789.3 RHS
1000 RH maintenance after
36.9 RHs
2000 RH maintenance After
402.5 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp highLube oil temp. High. Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA., Ht outlet
flexible pipe water leakage.
Alternator 3-phase shorted.
Previous Problem &Action
Nil Nil Nil T.C RPM A/B -Bank shownwrong in SCADA.
Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
397,246 16,552 0 222.59 OK OK
Prepared By Acknowledged by
Promod Sutradhar Md. Masud Alam
Shift Leader Sr. Shift Leader
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 10 June- 2012
DAY COVERED: 09 June - 2012
SUMMARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/
GENERATOR
PERFORMANCEREPORT
Remarks : Plant didn't trip yesterday.
Loadshe : Nil
-
7/31/2019 Daily Report_of June 2012
26/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
27/72
-
7/31/2019 Daily Report_of June 2012
28/72
Average Demand MW Average Generation 16.061 MW Last Plant Trip06/06/2012
12:52 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,250.9 52,691.1 56,096.7 33,282.6 27,972.7
Peak Load(KW) 3,468 3,454 3,419 7,767 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 75,368 72,588 72,455 182,382 0
Capacity Factor 87.23% 84.01% 83.86% 90.58% 0.00%
Load Factor 92.09% 87.57% 89.80% 97.84% #DIV/0!
Today's Running Hrs 23.6 24 23.6 24 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 0 0 0 0
opage me ue o0 0 0 0 0
Unschedule
maintenance + Tri0.4 0 0.4 0 24
Engine Avilability 98.33% 100.00% 98.33% 100.00% 0.00%
No of Tripping for
internal reason1 0 1 0 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Exh. Temp. dev. Cyl - 6/A Nil Exh. Temp. dev. Cyl - 2/B Nil Nil
Un-scheduleMaintenance
Replace PCC ball valve of
cyl - 6/A & spark plug gap
adjust of cyl - 6/A, 9/A.
Nil
Replace PCC ball valve of
cyl - 2/B & spark plug gap
adjust of cyl - 3/A, 2/b, 4/B.
Nil Nil
Schedule MaintenanceOil bath filter mud collection
complete
Oil bath filter mut collection
complete
Oil bath filter mut collection
complete
Oil bath filter mut collection
completeNil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 49355.5ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 55110.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
104.6 RHs
1000 RH Maintnance after
765.3 RHS
1000 RH maintenance after
13.3 RHs
2000 RH maintenance After
378.5 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp highLube oil temp. High. Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA., Ht outlet
flexible pipe water leakage.
Alternator 3-phase shorted.
Previous Problem &
Action Nil Nil NilT.C RPM A/B -Bank shown
wrong in SCADA. Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
402,793 16,783 0 220.71 OK OK
Prepared By Acknowledged by
Promod Sutradhar Md. Masud Alam
Shift Leader Sr. Shift Leader
SUMMARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE
/GENERATOR
PERFORMANCEREP
ORT
Remarks : Plant didn't trip yesterday.
Loadshe : MTC - 1 = 40 min due to E - 1 trip, MTC - 2 = 33 min due to E - 1 trip, MTC - 3 = 35 min due to E - 1 trip, MTC - 4 =
40 min due to E - 1 trip.
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 11 June- 2012
DAY COVERED: 10 June - 2012
-
7/31/2019 Daily Report_of June 2012
29/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
30/72
-
7/31/2019 Daily Report_of June 2012
31/72
Average Demand MW Average Generation 16.061 MW Last Plant Trip06/06/2012
12:52 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,274.9 52,714.7 56,120.4 33,306.6 27,972.7
Peak Load(KW) 3,543 3,397 3,345 7,877 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 76,809 70,821 70,979 180,707 0
Capacity Factor 88.90% 81.97% 82.15% 89.74% 0.00%
Load Factor 90.33% 88.34% 89.53% 95.59% #DIV/0!
Today's Running Hrs 24 23.6 23.7 24 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 0 0 0 0
Stopage time due to
external reason0 0 0 0 0
nsc e u e
maintenance + Trip 0 0.4 0.3 0 24
Engine Avilability 100.00% 98.33% 98.75% 100.00% 0.00%
No of Tripping for
internal reason0 1 2 0 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Nil Exh. Temp. dev. Cyl - 4/A. Exh. Temp. dev. Cyl - 8/A,6/B.
Nil Nil
Un-schedule
MaintenanceNil
Replace PCC ball valve of
cyl - 4/A & spark plug
replace old cyl. - 4/A, 6/A..
( R.H - 52711 )
Replace PCC ball valve of
cyl - 8/A, 6/B.Nil Nil
Schedule Maintenance Nil Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 49355.5ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 55110.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
80.6 RHs
1000 RH Maintnance after
741.7 RHS
1000 RH maintenance over
10.4 RHs
2000 RH maintenance After
354.5 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp highLube oil temp. High. Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA., Ht outlet
flexible pipe water leakage.
Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
399,316 16,638 0 231.14 OK OK
Prepared By Acknowledged by
Promod Sutradhar Md. Masud Alam
Shift Leader Sr. Shift Leader
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 12 June- 2012
DAY COVERED: 11 June - 2012
SUM
MARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/GENERATOR
PERFORMANCEREPORT
Remarks : Plant didn't trip yesterday.
Loadshe : L - 5 = 4:03 Hr. due to MTC belt conveyer maintenance.
-
7/31/2019 Daily Report_of June 2012
32/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
33/72
-
7/31/2019 Daily Report_of June 2012
34/72
Average Demand 15.76 MW Average Generation 15.76 MW Last Plant Trip06/06/2012
12:52 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,298.9 52,738.7 56,142.3 33,330.6 27,972.7
Peak Load(KW) 3,520 3,271 3,225 7,764 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 72,674 70,794 63,467 171,258 0
Capacity Factor 84.11% 81.94% 73.46% 85.05% 0.00%
Load Factor 86.03% 90.18% 89.86% 91.91% #DIV/0!
Today's Running Hrs 24 24 21.9 24 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 0 2.1 0 0
Stopage time due to
external reason0 0 0 0 0
Unschedule
maintenance + Trip
Downtime Hrs.
0 0 0 0 24
Engine Avilability 100.00% 100.00% 100.00% 100.00% 0.00%
No of Tripping for
internal reason0 0 0 0 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Nil Nil Nil Nil Nil
Un-schedule
MaintenanceNil Nil Nil Nil Nil
Schedule Maintenance Nil Nil 1000hr maint. Done. Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 49355.5ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 56122.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
56.6 RHs
1000 RH Maintnance after
717.7 RHS
1000 RH maintenance after
979.7 RHs
2000 RH maintenance After
330.5 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp highLube oil temp. High. Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA., Ht outlet
flexible pipe water leakage.
Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
378,193 15,758 0 236.53 OK OK
Prepared By Acknowledged by
M.A Motaleb Md. Masud Alam
Shift Leader Sr. Shift Leader
SUMM
ARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/GENE
RATOR
PERFORMANCEREPORT
Remarks : Plant didn't trip yesterday.
Loadshe : Nil
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 13 June- 2012
DAY COVERED: 12 June - 2012
-
7/31/2019 Daily Report_of June 2012
35/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
36/72
-
7/31/2019 Daily Report_of June 2012
37/72
Average Demand 15.30 MW Average Generation 15.30 MW Last Plant Trip06/06/2012
12:52 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,322.9 52,762.7 56,165.7 33,354.6 27,972.7
Peak Load(KW) 3,320 3,380 3,250 7,822 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 70,064 68,770 64,666 171,258 0
Capacity Factor 81.09% 79.59% 74.84% 85.05% 0.00%
Load Factor 87.93% 84.78% 84.31% 91.23% #DIV/0!
Today's Running Hrs 24 24 23.6 24 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 0 0 0 0
Stopage time due to
external reason0 0 0 0 0
Unschedule
maintenance + Trip
Downtime Hrs.
0 0 0.4 0 24
Engine Avilability 100.00% 100.00% 98.33% 100.00% 0.00%
No of Tripping for
internal reason0 0 4 0 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Nil Nil Cyl 9/B,1/A,9/B dev Nil Nil
Un-schedule
MaintenanceNil Nil Pcc ball valve change Nil Nil
Schedule Maintenance Nil Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 49355.5ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 56122.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
32.6 RHs
1000 RH Maintnance after
693.7 RHS
1000 RH maintenance after
956.1 RHs
2000 RH maintenance After
306.5 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp highLube oil temp. High. Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA., Ht outlet
flexible pipe water leakage.
Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
374,758 15,615 0 233.97 OK OK
Prepared By Acknowledged by
Md.Amir Hamza Md. Masud Alam
Sr.Shift Engineer Sr. Shift Leader
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 14 June- 2012
DAY COVERED: 13 June - 2012
SUM
MARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/GENERATOR
PERFORMANCEREPORT
Remarks : Plant didn't trip yesterday.
Loadshed :L-1,5=4 min,L-2=1.40 min due to L-4 OHL cable connection.
-
7/31/2019 Daily Report_of June 2012
38/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
39/72
-
7/31/2019 Daily Report_of June 2012
40/72
Average Demand 15.17 MW Average Generation 15.17 MW Last Plant Trip06/06/2012
12:52 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,345.6 52,786.7 56,189.7 33,375.2 27,972.7
Peak Load(KW) 3,380 3,375 3,214 7,764 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 69,737 71,566 73,442 149,219 0
Capacity Factor 80.71% 82.83% 85.00% 74.11% 0.00%
Load Factor 90.89% 88.35% 95.21% 93.30% #DIV/0!
Today's Running Hrs 22.7 24 24 20.6 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 0 0 0 0
Stopage time due to
external reason0 0 0 0 0
Unschedule
maintenance + Trip
Downtime Hrs.
1.3 0 0 3.4 24
Engine Avilability 94.58% 100.00% 100.00% 85.83% 0.00%
No of Tripping for
internal reason1 0 0 1 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Cyi dev 1B Nil Nil Cyi dev 9A Nil
Un-schedule
MaintenanceNil Nil Nil
New S/P replace to cyl
8A,9A,1B,2B. 9A pcc valve
change. 4A,6B tappet
chacked. HT flexible pipe
chaned (from E5)
Nil
Schedule Maintenance1000hr maint done, All pcc
clean & S/P regap.Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 50324.0 ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 56122.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
978.4 RHs
1000 RH Maintnance after
669.7 RHS
1000 RH maintenance after
932.1 RHs
2000 RH maintenance After
285.9 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp highLube oil temp. High. Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA., Ht outlet
flexible pipe water leakage.
Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
363,964 15,165 0 217.04 OK OK
Prepared By Acknowledged by
M.A Motaleb Md. Masud Alam
Shift Leader Sr. Shift Leader
SUM
MARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/GENE
RATOR
PERFORMANCEREPORT
Remarks : Plant didn't trip yesterday.
Loadshed :L-5=4 min due to E4 trip, MTC-all mills 3:30min due to E4 maint.
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 15 June- 2012
DAY COVERED: 14 June - 2012
-
7/31/2019 Daily Report_of June 2012
41/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
42/72
-
7/31/2019 Daily Report_of June 2012
43/72
Average Demand 16.6 MW Average Generation 16.6 MW Last Plant Trip06/06/2012
12:52 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,369.2 52,810.7 56,213.7 33,399.2 27,972.7
Peak Load(KW) 3,325 3,315 3,270 7,866 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 74,263 74,704 73,538 176,068 0
Capacity Factor 85.95% 86.46% 85.11% 87.44% 0.00%
Load Factor 94.64% 93.90% 93.70% 93.26% #DIV/0!
Today's Running Hrs 23.6 24 24 24 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 0 0 0 0
Stopage time due to
external reason0 0 0 0 0
Unschedule
maintenance + Trip
Downtime Hrs.
0.4 0 0 0 24
Engine Avilability 98.33% 100.00% 100.00% 100.00% 0.00%
No of Tripping for
internal reason1 0 0 0 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Cyl dev 7A Nil Nil Nil Nil
Un-schedule
Maintenance
Cyl 7A pcc change & s/p
regap.Nil Nil Nil Nil
Schedule Maintenance Nil Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 50324.0 ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 56122.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
954.8 RHs
1000 RH Maintnance after
645.7 RHS
1000 RH maintenance after
908.1 RHs
2000 RH maintenance After
261.9 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp highLube oil temp. High. Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA., Ht outlet
flexible pipe water leakage.
Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
398,573 16,607 0 242.76 OK OK
Prepared By Acknowledged by
M.A Motaleb Md. Masud Alam
Shift Leader Sr. Shift Leader
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 16 June- 2012
DAY COVERED: 15 June - 2012
S
UMMARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/GEN
ERATOR
PERFORMANCEREPORT
Remarks : Plant didn't trip yesterday.
Loadshed :L-5 17min due to E1 trip & engine over load. Fresh-04 starting delay 1hr20min for everest E2 maint. Two ball
mills of MTC- 8hr15min due to Engine ove load.
-
7/31/2019 Daily Report_of June 2012
44/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
45/72
-
7/31/2019 Daily Report_of June 2012
46/72
Average Demand 16.93 MW Average Generation 16.93 MW Last Plant Trip06/06/2012
12:52 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,393.2 52,834.7 56,237.4 33,423.2 27,972.7
Peak Load(KW) 3,320 3,325 3,265 7,727 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 77,015 77,673 71,570 180,247 0
Capacity Factor 89.14% 89.90% 82.84% 89.51% 0.00%
Load Factor 96.66% 97.33% 92.49% 97.20% #DIV/0!
Today's Running Hrs 24 24 23.7 24 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 0 0 0 0
Stopage time due to
external reason0 0 0 0 0
Unschedule
maintenance + Trip
Downtime Hrs.
0 0 0.3 0 24
Engine Avilability 100.00% 100.00% 98.75% 100.00% 0.00%
No of Tripping for
internal reason0 0 2 0 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Nil Nil Cyl 6/A,4/B dev Nil Nil
Un-schedule
MaintenanceNil Nil
Pcc ball valve change and
Ht lead chaange.(old)Nil Nil
Schedule Maintenance Nil Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 50324.0 ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 56122.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
930.8 RHs
1000 RH Maintnance after
621.7 RHS
1000 RH maintenance after
884.4 RHs
2000 RH maintenance After
237.9 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp highLube oil temp. High. Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA., Ht outlet
flexible pipe water leakage.
Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
406,505 16,938 0 247.15 OK OK
Prepared By Acknowledged by
Md.Amir Hamza Md. Masud Alam
Sr.Shift Engineer Sr. Shift Leader
SUM
MARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/GENE
RATOR
PERFORMANCEREPORT
Remarks : Plant didn't trip yesterday.
Loadshed :Nil
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 17 June- 2012
DAY COVERED: 16 June - 2012
-
7/31/2019 Daily Report_of June 2012
47/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
48/72
-
7/31/2019 Daily Report_of June 2012
49/72
Average Demand 16.96 MW Average Generation 16.96 MW Last Plant Trip06/06/2012
12:52 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,417.2 52,858.7 56,261.4 33,447.2 27,972.7
Peak Load(KW) 3,317 3,312 3,215 7,738 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 76,460 75,513 74,230 180,871 0
Capacity Factor 88.50% 87.40% 85.91% 89.82% 0.00%
Load Factor 96.05% 95.00% 96.20% 97.39% #DIV/0!
Today's Running Hrs 24 24 24 24 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 0 0 0 0
Stopage time due to
external reason0 0 0 0 0
Unschedule
maintenance + Trip
Downtime Hrs.
0 0 0 0 24
Engine Avilability 100.00% 100.00% 100.00% 100.00% 0.00%
No of Tripping for
internal reason0 0 0 0 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Nil Nil Nil Nil Nil
Un-schedule
MaintenanceNil Nil Nil Nil Nil
Schedule Maintenance Nil Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 50324.0 ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 56122.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
906.8 RHs
1000 RH Maintnance after
597.7 RHS
1000 RH maintenance after
860.4 RHs
2000 RH maintenance After
213.9 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp highLube oil temp. High Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA., Ht outlet
flexible pipe water leakage.
Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
407,074 16,961 0 243.04 OK OK
Prepared By Acknowledged by
Md. Amir Hamza Md. Masud Alam
Sr.Shift Engineer Sr. Shift Leader
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 18 June- 2012
DAY COVERED: 17 June - 2012
SUMMARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/GENE
RATOR
PERFORMANCEREPORT
Remarks : Plant didn't trip yesterday.
Loadshed :Fresh 4=3.20 min due to Everest Island mode.
-
7/31/2019 Daily Report_of June 2012
50/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
51/72
-
7/31/2019 Daily Report_of June 2012
52/72
Average Demand 16.90 MW Average Generation 16.90 MW Last Plant Trip06/06/2012
12:52 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,441.2 52,882.7 56,285.2 33,471.2 27,972.7
Peak Load(KW) 3,315 3,319 3,220 7,731 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 77,037 75,509 72,294 180,808 0
Capacity Factor 89.16% 87.39% 83.67% 89.79% 0.00%
Load Factor 96.83% 94.79% 94.33% 97.45% #DIV/0!
Today's Running Hrs 24 24 23.8 24 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 0 0 0 0
Stopage time due to
external reason0 0 0 0 0
Unschedule
maintenance + Trip
Downtime Hrs.
0 0 0.2 0 24
Engine Avilability 100.00% 100.00% 99.17% 100.00% 0.00%
No of Tripping for
internal reason0 0 1 0 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Nil Nil Cyl 6/A dev Nil Nil
Un-schedule
MaintenanceNil Nil
Pcc ball valve change and
spark plug gap adjustNil Nil
Schedule Maintenance Nil Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 50324.0 ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 56122.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
882.8 RHs
1000 RH Maintnance after
573.7 RHS
1000 RH maintenance after
836.6 RHs
2000 RH maintenance After
189.9 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp highLube oil temp. High Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA., Ht outlet
flexible pipe water leakage.
Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
405,648 16,902 0 240.39 OK OK
Prepared By Acknowledged by
Md. Amir Hamza Md. Masud Alam
Sr.Shift Engineer Sr. Shift Leader
SU
MMARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/GENE
RATOR
PERFORMANCEREPORT
Remarks : Plant didn't trip yesterday.
Loadshed :Fresh 3=1.18 min due to Everest E-3 trip. L-5=12 min due to uppl E-3 trip.
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 19 June- 2012
DAY COVERED: 18 June - 2012
-
7/31/2019 Daily Report_of June 2012
53/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
54/72
-
7/31/2019 Daily Report_of June 2012
55/72
Average Demand 16.21 MW Average Generation 16.21 MW Last Plant Trip06/06/2012
12:52 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,465.2 52,905.9 56,309.2 33,495.2 27,972.7
Peak Load(KW) 3,331 3,321 3,225 7,773 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 74,209 66,580 72,282 176,038 0
Capacity Factor 85.89% 77.06% 83.66% 87.42% 0.00%
Load Factor 92.83% 86.41% 93.39% 94.36% #DIV/0!
Today's Running Hrs 24 23.2 24 24 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 0 0 0 0
Stopage time due to
external reason0 0 0 0 0
Unschedule
maintenance + Trip
Downtime Hrs.
0 0.8 0 0 24
Engine Avilability 100.00% 96.67% 100.00% 100.00% 0.00%
No of Tripping for
internal reason0 2 0 0 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Nil Cyl 8/A,3/B dev Nil Nil Nil
Un-schedule
MaintenanceNil
Pcc ball valve change 3/B
cyl. and spark plug
change(old) cyl.3/B,6/B.
Nil Nil Nil
Schedule Maintenance Nil Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 50324.0 ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 56122.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
858.8 RHs
1000 RH Maintnance after
550.5 RHS
1000 RH maintenance after
812.6 RHs
2000 RH maintenance After
165.9 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp highLube oil temp. High Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA., Ht outlet
flexible pipe water leakage.
Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
389,109 16,213 0 230.31 OK OK
Prepared By Acknowledged by
Md. Amir Hamza Md. Masud Alam
Sr. Shift Engineer Sr. Shift Leader
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 20 June- 2012
DAY COVERED: 19 June - 2012
SUM
MARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/GENE
RATOR
PERFORMANCEREPORT
Remarks : Plant didn't trip yesterday.
Loadshed :L-2=30 min due to lighting arrestor connected.
-
7/31/2019 Daily Report_of June 2012
56/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
57/72
-
7/31/2019 Daily Report_of June 2012
58/72
Average Demand 16.792 MW Average Generation 16.792 MW Last Plant Trip06/06/2012
12:52 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,489.2 52,929.2 56,333.2 33,519.2 27,972.7
Peak Load(KW) 3,442 3,425 3,435 7,791 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 77,214 71,079 73,864 180,841 0
Capacity Factor 89.37% 82.27% 85.49% 89.81% 0.00%
Load Factor 93.47% 89.07% 89.60% 96.71% #DIV/0!
Today's Running Hrs 24 23.3 24 24 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 0 0 0 0
Stopage time due to
external reason0 0 0 0 0
Unschedule
maintenance + Trip
Downtime Hrs.
0 0.7 0 0 24
Engine Avilability 100.00% 97.08% 100.00% 100.00% 0.00%
No of Tripping for
internal reason0 0 0 0 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Nil Nil Nil Nil Nil
Un-schedule
MaintenanceNil Nil Nil Nil Nil
Schedule Maintenance Nil Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 50324.0 ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 56122.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
834.8 RHs
1000 RH Maintnance after
527.2 RHS
1000 RH maintenance after
788.6 RHs
2000 RH maintenance After
141.9 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp highLube oil temp. High Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA..Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
402,998 16,792 0 227.32 OK OK
Prepared By Acknowledged by
Md. Mohiuddin Sohag Md. Masud Alam
Sr. Shift Leader Sr. Shift Leader
S
UMMARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/GEN
ERATOR
PERFORMANCEREPORT
Remarks : Plant didn't trip yesterday.
Loadshed : No loadshed yesterday.
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 21 June- 2012
DAY COVERED: 20 June - 2012
-
7/31/2019 Daily Report_of June 2012
59/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
60/72
-
7/31/2019 Daily Report_of June 2012
61/72
Average Demand MW Average Generation 17.005 MW Last Plant Trip06/06/2012
12:52 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,513.2 52,953.2 56,357.2 33,543.2 27,972.7
Peak Load(KW) 3,510 3,450 3,350 8,202 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 77,845 74,885 74,065 181,324 0
Capacity Factor 90.10% 86.67% 85.72% 90.05% 0.00%
Load Factor 92.41% 90.44% 92.12% 92.11% #DIV/0!
Today's Running Hrs 24 24 24 24 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 0 0 0 0
Stopage time due to
external reason0 0 0 0 0
Unschedule
maintenance + Trip
Downtime Hrs.
0 0 0 0 24
Engine Avilability 100.00% 100.00% 100.00% 100.00% 0.00%
No of Tripping for
internal reason0 0 0 0 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Nil Nil Nil Nil Nil
Un-schedule
MaintenanceNil Nil Nil Nil Nil
Schedule Maintenance Nil Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 50324.0 ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 56122.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
810.8 RHs
1000 RH Maintnance after
503.2 RHS
1000 RH maintenance after
764.6 RHs
2000 RH maintenance After
117.9 RHs
1000RH maintenance after
882.1 RH
Present Problem &Action
Winding temp high & Ltwater temp high
Lube oil temp. High Lt water temp high T.C RPM A/B -Bank shownwrong in SCADA..
Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
408,119 17,005 0 236.35 OK OK
Prepared By Acknowledged by
Md. Mohiuddin Sohag Md. Masud Alam
Sr. Shift Leader Sr. Shift Leader
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 22 June- 2012
DAY COVERED: 21 June - 2012
SUMMARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/GENERATOR
PERFORMANCEREPORT
Remarks : Plant didn't trip yesterday.
Loadshed : Fresh-3=4:19hr. , MTC-1=4:43hr., MTC-2=4:46hr., MTC-3=4:40hr., MTC-4=4:48hr. Due to EPGCL Engin- 1 & 2 trip
yesterday.
-
7/31/2019 Daily Report_of June 2012
62/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
63/72
-
7/31/2019 Daily Report_of June 2012
64/72
Average Demand 17.057 MW Average Generation 17.057 MW Last Plant Trip06/06/2012
12:52 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,537.2 52,977.2 56,381.2 33,567.2 27,972.7
Peak Load(KW) 3,478 3,473 3,331 7,895 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 77,800 76,915 73,905 180,738 0
Capacity Factor 90.05% 89.02% 85.54% 89.76% 0.00%
Load Factor 93.20% 92.28% 92.45% 95.39% #DIV/0!
Today's Running Hrs 24 24 24 24 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 0 0 0 0
Stopage time due to
external reason0 0 0 0 0
Unschedule
maintenance + Trip
Downtime Hrs.
0 0 0 0 24
Engine Avilability 100.00% 100.00% 100.00% 100.00% 0.00%
No of Tripping for
internal reason0 0 0 0 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Nil Nil Nil Nil Nil
Un-schedule
MaintenanceNil Nil Nil Nil Nil
Schedule Maintenance Nil Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 50324.0 ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 56122.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
786.8 RHs
1000 RH Maintnance after
479.2 RHS
1000 RH maintenance after
740.6 RHs
2000 RH maintenance After
93.9 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp highLube oil temp. High Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA..Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
409,358 17,057 0 235.36 OK OK
Prepared By Acknowledged by
Md. Mohiuddin Sohag Md. Masud Alam
Sr. Shift Leader Sr. Shift Leader
S
UMMARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/GEN
ERATOR
PERFORMANCEREPORT
Remarks : Plant didn't trip yesterday.
Loadshed : No loadshed yesterday.
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 23 June- 2012
DAY COVERED: 22 June - 2012
-
7/31/2019 Daily Report_of June 2012
65/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
66/72
-
7/31/2019 Daily Report_of June 2012
67/72
Average Demand MW Average Generation 17.097 MW Last Plant Trip06/06/2012
12:52 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)Total Running Hrs 50,561.2 53,001.2 56,405.2 33,591.2 27,972.7
Peak Load(KW) 3,517 3,457 3,324 7,855 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 77,960 77,065 74,065 181,230 0
Capacity Factor 90.23% 89.20% 85.72% 90.00% 0.00%
Load Factor 92.36% 92.89% 92.84% 96.13% #DIV/0!
Today's Running Hrs 24 24 24 24 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule Maintenance
Hrs.0 0 0 0 0
Stopage time due to
external reason0 0 0 0 0
Unschedule
maintenance + Trip
Downtime Hrs.
0 0 0 0 24
Engine Avilability 100.00% 100.00% 100.00% 100.00% 0.00%
No of Tripping for
internal reason0 0 0 0 0
No of Tripping for
external reason0 0 0 0 0
Cause Of Triping Nil Nil Nil Nil Nil
Un-schedule
MaintenanceNil Nil Nil Nil Nil
Schedule Maintenance Nil Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 50324.0 ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 56122.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
762.8 RHs
1000 RH Maintnance after
455.2 RHS
1000 RH maintenance after
716.6 RHs
2000 RH maintenance After
69.9 RHs
1000RH maintenance after
882.1 RH
Present Problem &
Action
Winding temp high & Lt
water temp highLube oil temp. High Lt water temp high
T.C RPM A/B -Bank shown
wrong in SCADA..Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
410,320 17,097 0 243.74 OK OK
Prepared By Acknowledged by
Md. Mohiuddin Sohag Md. Masud Alam
Sr. Shift Leader Sr. Shift Leader
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 24 June- 2012
DAY COVERED: 23 June - 2012
SUMMARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/GEN
ERATOR
PERFORMANCEREPORT
Remarks : Plant didn't trip yesterday.
Loadshed : Fresh-3= 2:56hr.due to EPGCL Engine-3 problem yesterday.
-
7/31/2019 Daily Report_of June 2012
68/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
69/72
-
7/31/2019 Daily Report_of June 2012
70/72
Average Demand MW Average Generation 17.097 MW Last Plant Trip06/06/2012
12:52 pm
ParticularsEngine No-1
(10316)
Engine No-2
(10314)
Engine No-3
(10315)
Engine No-4
(17045)
Engine No-5
(17052)
Total Running Hrs 50,583.9 53,024.5 56,427.7 33,613.8 27,972.7
Peak Load(KW) 3,426 3,423 3,261 7,924 0
Capacity, kWh 86,400 86,400 86,400 201,360 201,360
To days production 63,005 63,458 58,749 144,102 0
Capacity Factor 72.92% 73.45% 68.00% 71.56% 0.00%
Load Factor 81.01% 79.57% 80.07% 80.47% #DIV/0!
Today's Running Hrs 22.7 23.3 22.5 22.6 0
Standby Downtime Hrs. 0 0 0 0 0
Schedule MaintenanceHrs.
0 0 0 0 0
Stopage time due to
external reason0 0 0 0 0
Unschedule
maintenance + Trip
Downtime Hrs.
1.3 0.7 1.5 1.4 24
Engine Avilability 94.58% 97.08% 93.75% 94.17% 0.00%
No of Tripping for
internal reason0 1 5 0 0
No of Tripping for
external reason3 3 3 3 0
Cause Of Triping Plant tripCyl. Dev. - 8/A ( low load ) &
plant trip
Cyl. Dev. - 1/B, 9/B & plant
trip Plant trip. Nil
Un-schedule
MaintenanceNil Nil
Replace PCC ball valve, old
S/P replace & orific clean of
cyl. - 9/B. Plant trip.
Nil Nil
Schedule Maintenance Nil Nil Nil Nil Nil
Last maintenance
Carried Out
1000 RH Maintenance
carried out at 50324.0 ERH
1000 RH Maintenance
carried out at 52458.0 ERH
1000 Hr Maintenance
carried out at 56122.0ERH
1000 Hr Maintenance
carried out at 32658.2 ERH
2000 Hr Maintenance
carried out at 27854.8 ERH
Next Schedule
Maintenance Type
1000 RH Maintenance after
740.1 RHs
1000 RH Maintnance after
431.9 RHS
1000 RH maintenance after
694.1 RHs
2000 RH maintenance After
47.3 RHs
1000RH maintenance after
882.1 RH
Present Problem &ActionWinding temp high & Ltwater temp high Lube oil temp. High Lt water temp high T.C RPM A/B -Bank shownwrong in SCADA.. Alternator 3-phase shorted.
Previous Problem &
ActionNil Nil Nil
T.C RPM A/B -Bank shown
wrong in SCADA.Nil
Total Power
Production
Average Production
per Hr.33 kV Export
Total Steam
Production
Status of Start Air
CompressorStatus of Boiler
329,314 13,721 0 183.34 OK OK
Prepared By Acknowledged by
Promod Sutradhar Md. Masud Alam
Shift Leader Sr. Shift Leader
SUM
MARY
ENGINE / GENERATOR PERFORMANCE REPORT
ENGINE/GEN
ERATOR
PERFORMANCEREPORT
Remarks : Plant trip at - 8:04 AM due to Everest plant trip that time plant trip ( D.T - 16 min ). Plant trip at - 8:01 PM due to
Everest plant trip that time plant trip ( D.T - 14 min ). Plant trip at - 1:32 AM due to Everest plant trip that time plant trip ( D.T -
12 min ).
Loadshed : Feeder - 1 = 51 min. ( P.S.D ), Feeder -2 = 52 min.( P.S.D ), Feeder - 3 = 1:29 Hr. ( P.S.D ) & OHL ( L - 4 mint. ),
Feeder - 5 = 1:24 Hr. ( P.S.D ) & E - 3 trip, Fresh - 3 = 4:39 Hr.( P.S.D), Fresh - 4 = 9:09 Hr ( P.S.D ) & Everest E - 3 trip, MTC - 1
= 4:39 Hr ( P.S.D ); MTC - 2 = 4:00 Hr ( P.S.D ), MTC - 3 = 1:46 Hr. ( P.S.D ), MTC - 4 = 3:43 Hr. ( P.S.D ).
MANAGEMENT INFORMATION SYSTEM
Daily Performance Report
DATE OF PREPERATION: 25 June- 2012
DAY COVERED: 24 June - 2012
-
7/31/2019 Daily Report_of June 2012
71/72
UPPL-1 UPPL-1
-
7/31/2019 Daily Report_of June 2012
72/72