Daily Report_of June 2012

download Daily Report_of June 2012

of 72

Transcript of Daily Report_of June 2012

  • 7/31/2019 Daily Report_of June 2012

    1/72

    Average Demand MW Average Generation 14.22 MW Last Plant Trip21/05/2012

    01:39 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,037.1 52,477.1 55,881.7 33,072.1 27,972.7

    Peak Load(KW) 3,565 3,579 3,250 7,698 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 66,165 54,925 66,463 153,881 0

    Capacity Factor 76.58% 63.57% 76.92% 76.42% 0.00%

    Load Factor 77.98% 74.14% 85.21% 83.64% #DIV/0!

    Today's Running Hrs 23.8 20.7 24 23.9 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 2 0 0 0

    Stopage time due to

    external reason0 0 0 0 0

    Unschedule

    maintenance + Trip

    Downtime Hrs.

    0.2 1.3 0 0.1 24

    Engine Avilability 99.17% 94.58% 100.00% 99.58% 0.00%

    No of Tripping for

    internal reason1 0 0 1 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Cyl 8/A dev Nil NilNormal stop for Ht temp

    hi hNil

    Un-schedule

    Maintenance

    Pcc ball valve change and

    spark plug gap adjustLub oil filter change Nil Nil Nil

    Schedule Maintenance Nil 1000 RH maintanance Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 49355.5ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 55110.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    318.4 RHs

    1000 RH Maintnance after

    979.3 RHS

    1000 RH maintenance after

    228.3 RHs

    2000 RH maintenance After

    589 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp highLube oil temp. High. Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA., Ht outlet

    flexible pipe water leakage.

    Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    341,434 14,226 0 218.22 OK OK

    Prepared By Acknowledged by

    Md.Amir Hamza Md. Masud Alam

    Sr. Shift Engineer Sr. Shift Leader

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 02 June- 2012

    DAY COVERED: 01 June - 2012

    SUMMARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/G

    ENERATOR

    PERFORMANCEREPORT

    Remarks : Plant didn't trip yesterday.

    Loadshed : Fresh-1,2=25 min.Mtc-1,2,3=20 min.

  • 7/31/2019 Daily Report_of June 2012

    2/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    3/72

  • 7/31/2019 Daily Report_of June 2012

    4/72

    Average Demand MW Average Generation 15.80 MW Last Plant Trip21/05/2012

    01:39 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,061.1 52,501.1 55,905.7 33,095.7 27,972.7

    Peak Load(KW) 3,375 3,367 3,320 8,020 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 72,788 70,516 70,618 165,469 0

    Capacity Factor 84.25% 81.62% 81.73% 82.18% 0.00%

    Load Factor 89.86% 87.26% 88.63% 87.42% #DIV/0!

    Today's Running Hrs 24 24 24 23.6 0

    Standby Downtime Hrs. 0 0 0 0 0Schedule Maintenance

    Hrs.0 2 0 0 0

    Stopage time due to

    external reason0 0 0 0 0

    Unschedule

    maintenance + Trip

    Downtime Hrs.

    0 0 0 0.4 24

    Engine Avilability 100.00% 100.00% 100.00% 98.33% 0.00%

    No of Tripping for

    internal reason0 0 0 1 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Nil Nil Nil control air press low Nil

    Un-schedule

    MaintenanceNil Nil Nil Nil Nil

    Schedule Maintenance Nil Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 49355.5ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 55110.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    294.4 RHs

    1000 RH Maintnance after

    955.3 RHS

    1000 RH maintenance after

    204.3 RHs

    2000 RH maintenance After

    565.4 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp highLube oil temp. High. Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA., Ht outlet

    flexible pipe water leakage.

    Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    379,391 15,808 0 204.80 OK OK

    Prepared By Acknowledged by

    Md.Amir Hamza Md. Masud Alam

    Sr. Shift Engineer Sr. Shift Leader

    SUMMARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/

    GENERATOR

    PERFORMANCEREPO

    RT

    Remarks : Plant didn't trip yesterday.

    Loadshed :L-1= 9 min due to Earth fault.L-2=5 min due to E4 trip load management active.L-5=3 min due to Everest E-1 trip.Fresh-1=43min,Fresh-2=53 min due to Fresh -4 ball mil l running time.

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 03 June- 2012

    DAY COVERED: 02 June - 2012

  • 7/31/2019 Daily Report_of June 2012

    5/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    6/72

  • 7/31/2019 Daily Report_of June 2012

    7/72

    Average Demand MW Average Generation 15.80 MW Last Plant Trip03/06/2012

    05:09 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,084.7 52,524.7 55,929.4 33,117.9 27,972.7

    Peak Load(KW) 3,370 3,365 3,270 7,685 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 74,918 71,372 71,222 161,034 0

    Capacity Factor 86.71% 82.61% 82.43% 79.97% 0.00%

    Load Factor 94.20% 89.87% 91.90% 94.39% #DIV/0!

    Today's Running Hrs 23.6 23.6 23.7 22.2 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 2 0 0 0

    Stopage time due to

    external reason0 0 0 0 0

    Unschedule

    maintenance + Trip

    Downtime Hrs.

    0.4 0.4 0.3 1.8 24

    Engine Avilability 98.33% 98.33% 98.75% 92.50% 0.00%

    No of Tripping for

    internal reason1 2 2 2 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Plant trip. Plant trip, Exht. Temp. highcyl.6/A

    Plant trip ,cyl dev 4/B Plant trip, cyl.dev 2/A. Nil

    Un-schedule

    MaintenanceNil Nil

    Replace clean pcc ball

    valve cyl 4/B

    Replace clean pcc ball

    valve cyl. 2/A, 10/B,

    Replace old spark plug cyl.

    2/A, 3/B, 7/B, Ex

    Nil

    Schedule Maintenance Nil Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 49355.5ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 55110.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    270.8 RHs

    1000 RH Maintnance after

    931.7 RHS

    1000 RH maintenance after

    180.6 RHs

    2000 RH maintenance After

    543.2 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &ActionWinding temp high & Ltwater temp high Lube oil temp. High. Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA., Ht outletflexible pipe water leakage.

    Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    378,546 15,773 0 205.10 OK OK

    Prepared By Acknowledged by

    Sk Mainuddin Md. Masud Alam

    Asst. Shift Engineer Sr. Shift Leader

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 04 June- 2012

    DAY COVERED: 03 June - 2012

    SU

    MMARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/GE

    NERATOR

    PERFORMANCEREPORT

    Remarks : Plant trip at 5:09pm due to Everest Power Plant trip (Earth fault) yesterday. Down time- 0:28 min.

    Loadshed :L-1=29 min due to plant trip. L-2=29 min due to plant trip. L-3=28 min due to plant trip, L-5=29 min due to plant trip .Fresh-1=3:36 min, due to (EPGCL E-3 trip, EPGCL E-1 trip, After plant trip), Fresh-2=3.41 min due to (EPGCL E-3 trip, EPGCL E-1 trip, After plant trip),

    Fresh-3=-3.42 min due to (EPGCL E-3 tripe, EPGCL E-1 trip, After plant trip).

  • 7/31/2019 Daily Report_of June 2012

    8/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    9/72

  • 7/31/2019 Daily Report_of June 2012

    10/72

    Average Demand MW Average Generation 16.100 MW Last Plant Trip03/06/2012

    05:09 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,108.6 52,548.7 55,953.4 33,141.9 27,972.7

    Peak Load(KW) 3,600 3,456 3,474 7,772 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 72,289 70,917 71,397 171,805 0

    Capacity Factor 83.67% 82.08% 82.64% 85.32% 0.00%

    Load Factor 84.02% 85.50% 85.63% 92.11% #DIV/0!

    Today's Running Hrs 23.9 24 24 24 0

    Standby Downtime Hrs.0 0 0 0 0

    Schedule Maintenance

    Hrs.0 0 0 0 0

    Stopage time due to

    external reason0 0 0 0 0

    Unschedule

    maintenance + Trip

    Downtime Hrs.

    0.1 0 0 0 24

    Engine Avilability 99.58% 100.00% 100.00% 100.00% 0.00%

    No of Tripping for

    internal reason1 0 0 0 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Exht. Temp. cyl. Dev. 7/A. Nil Nil Nil Nil

    Un-schedule

    Maintenance

    Replace clean pcc ball

    valve cyl. 7/A & spark plug

    gap adjust cyl. 5/A, 7/A,

    8/A.

    Nil Nil Nil Nil

    Schedule Maintenance Nil Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 49355.5ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 55110.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    246.9 RHs

    1000 RH Maintnance after

    907.7 RHS

    1000 RH maintenance after

    156.6 RHs

    2000 RH maintenance After

    519.2 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &Action

    Winding temp high & Ltwater temp high

    Lube oil temp. High. Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA., Ht outletflexible pipe water leakage.

    Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    386,408 16,100 0 250.69 OK OK

    Prepared By Acknowledged by

    Md. Mohiuddin Sohag Md. Masud Alam

    Sr. Shift Leader Sr. Shift Leader

    SU

    MMARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/GE

    NERATOR

    PERFORMANCEREPORT

    Remarks : Plant didn't trip yesterday.

    Loadshed :L-1=4:15hr due to earth fault Fresh cement control room side HT cabal Insolator Problem , L-5=25 min due to Engine-1 trip .Fresh-2=0:49 min. due to EPGCL E-1 trip, Fresh-3=4:54hr. due to Fresh cement control room side HT cabal insolator problem. MTC-

    1,2,3&4=0:35min. due to Engine -1 trip.

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 05 June- 2012

    DAY COVERED: 04 June - 2012

  • 7/31/2019 Daily Report_of June 2012

    11/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    12/72

  • 7/31/2019 Daily Report_of June 2012

    13/72

    Average Demand MW Average Generation 16.318 MW Last Plant Trip05/06/2012

    08:28 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,131.9 52,572.3 55,977.2 33,165.4 27,972.7

    Peak Load(KW) 3,676 3,497 3,434 7,819 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 71,475 74,365 71,675 174,119 0

    Capacity Factor 82.73% 86.07% 82.96% 86.47% 0.00%

    Load Factor 83.45% 90.11% 87.70% 94.76% #DIV/0!

    Today's Running Hrs 23.3 23.6 23.8 23.5 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 0 0 0 0

    Stopage time due to

    external reason0 0 0 0 0

    Unschedule

    maintenance + Trip

    Downtime Hrs.

    0.7 0.4 0.2 0.5 24

    Engine Avilability 97.08% 98.33% 99.17% 97.92% 0.00%

    No of Tripping for

    internal reason2 1 0 0 0

    No of Tripping for

    external reason1 1 1 1 0

    Cause Of Triping Exht. Temp. cyl. Dev. 4/A.&6/A, Plant trip.

    Plant trip, Exht. Temp. cyl.High 6/A.

    Plant trip Plant trip. Nil

    Un-schedule

    Maintenance

    Replace clean pcc ball

    valve cyl. 4/A, 6/A &

    Replace old spark plug cyl.

    6/A,

    Nil Nil Nil Nil

    Schedule Maintenance Nil Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 49355.5ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 55110.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    223.6 RHs

    1000 RH Maintnance after

    884.1 RHS

    1000 RH maintenance after

    132.8 RHs

    2000 RH maintenance After

    495.7 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp high Lube oil temp. High. Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA., Ht outletflexible pipe water leakage.

    Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    391,634 16,318 0 243.06 OK OK

    Prepared By Acknowledged by

    Md. Mohiuddin Sohag Md. Masud Alam

    Sr. Shift Leader Sr. Shift Leader

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 06 June- 2012

    DAY COVERED: 05 June - 2012

    SUMM

    ARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/GE

    NERATOR

    PERFORMANCEREPORT

    Remarks : Plant trip at 8:28pm due to Everest Power buscupler trip for over current yesterday. Down time= 0:13min.

    Loadshed :L-1=0:24min. due to plant trip, L-2=0:24min. Due to plant trip, L-3=0:21min. Due to plant trip, L-5=35 min due to Engine-1 trip &plant trip, Fresh-1=3:00hr. due to EPGCL E-1maint. & plant trip, Fresh-2=3:00hr. due toEPGCL E-1 maint. & plant trip, Fresh-3=0:20min. due to plant

    trip., MTC-1=1:03hr. due to E-1 trip &plant trip, MTC-2=2:57hr.due to Plant trip & E-1 trip, MTC-3=4:29hr. due to E-1 trip, plant trip & EPGCL E-1

    maint., MTC-4= 5:45hr. due to E-1 trip, plant trip & EPGCL E-1 maint.

  • 7/31/2019 Daily Report_of June 2012

    14/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    15/72

  • 7/31/2019 Daily Report_of June 2012

    16/72

    Average Demand MW Average Generation 16.318 MW Last Plant Trip06/06/2012

    12:52 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,155.3 52,596.0 56,001.1 33,187.1 27,972.7

    Peak Load(KW) 3,549 3,388 3,399 7,809 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 73,705 70,589 72,181 157,133 0

    Capacity Factor 85.31% 81.70% 83.54% 78.04% 0.00%

    Load Factor 88.75% 87.91% 88.85% 92.73% #DIV/0!

    Today's Running Hrs 23.4 23.7 23.9 21.7 0

    Standby Downtime Hrs. 0 0 0 0 0Schedule Maintenance

    Hrs.0 0 0 0 0

    Stopage time due to

    external reason0 0 0 0 0

    Unschedule

    maintenance + Trip

    Downtime Hrs.

    0.6 0.3 0.1 2.3 24

    Engine Avilability 97.50% 98.75% 99.58% 90.42% 0.00%

    No of Tripping for

    internal reason2 0 0 2 0

    No of Tripping for

    external reason1 1 1 1 0

    Cause Of TripingExht. Temp. cyl. Dev. 9/A,

    Plant trip.Plant trip, Plant trip

    Plant trip.& exh. Temp. deb.Cyl- 3/A, 4/A.

    Nil

    Un-schedule

    Maintenance

    Replace clean pcc ball

    valve cyl. 9/A & Replace

    old spark plug cyl. 9/A,

    Nil Nil

    Replace clean pcc ball

    valve cyl - 3/A, 4/A, 9/B,

    10/B & HT lead interchange

    cyl - 4/A to 3/A & 3/A to 5/A.

    Nil

    Schedule Maintenance Nil Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 49355.5ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 55110.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    200.2 RHs

    1000 RH Maintnance after

    860.4 RHS

    1000 RH maintenance after

    108.9 RHs

    2000 RH maintenance After

    474.0 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp highLube oil temp. High. Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA., Ht outlet

    flexible pipe water leakage.

    Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total PowerProduction

    Average Productionper Hr.

    33 kV Export Total SteamProduction

    Status of Start AirCompressor

    Status of Boiler

    373,608 15,567 0 197.59 OK OK

    Prepared By Acknowledged by

    Promod Sutradhar Md. Masud Alam

    Shift Leader Sr. Shift Leader

    SUMMARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/GEN

    ERATOR

    PERFORMANCEREPORT

    Remarks : Plant trip at 12:52 PM due to all engine over voltage & MTC OHL rod fall yesterday. Down time= 0:14min.

    Loadshed :L-1 = 15 min. due to plant trip, L-2 = 23 min. Due to plant trip, L-3 = 36 min. Due to plant trip, L-5 = 27 min due to Engine-4 trip &plant trip, Fresh - 3 = 30 min due to EPGCL E-2 trip, Fresh-4= 1:06hr. due plant trip. MTC - 1 = 1:02 Hr; MTC - 2 = 1:04 Hr, MTC - 4 = 1:11 Hr.

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 07 June- 2012

    DAY COVERED: 06 June - 2012

  • 7/31/2019 Daily Report_of June 2012

    17/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    18/72

  • 7/31/2019 Daily Report_of June 2012

    19/72

    Average Demand MW Average Generation 16.061 MW Last Plant Trip06/06/2012

    12:52 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,179.3 52,619.1 56,025.1 33,210.6 27,972.7

    Peak Load(KW) 3,691 3,499 3,560 7,884 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 72,800 70,061 73,189 169,416 0

    Capacity Factor 84.26% 81.09% 84.71% 84.14% 0.00%

    Load Factor 82.18% 86.68% 85.66% 91.44% #DIV/0!

    Today's Running Hrs 24 23.1 24 23.5 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 0 0 0 0

    opage me ue o0 0 0 0 0

    Unschedule

    maintenance + Tri0 0.9 0 0.5 24

    Engine Avilability 100.00% 96.25% 100.00% 97.92% 0.00%

    No of Tripping for

    internal reason0 1 0 1 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Nil Woodward 723 Major Alarm Nil Exht. temp. cyl. dev. 4/A. Nil

    Un-scheduleMaintenance

    Nil Nil Nil Replace old spark plug cyl -4/A, & Orifish clean.

    Nil

    Schedule Maintenance Nil Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 49355.5ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 55110.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    176.2 RHs

    1000 RH Maintnance after

    837.3 RHS

    1000 RH maintenance after

    84.9 RHs

    2000 RH maintenance After

    450.5 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp highLube oil temp. High. Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA., Ht outlet

    flexible pipe water leakage.

    Alternator 3-phase shorted.

    Previous Problem &

    Action Nil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA. Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    385,466 16,061 0 219.97 OK OK

    Prepared By Acknowledged by

    Md. Mohiuddin Sohag Md. Masud Alam

    Sr. Shift Leader Sr. Shift Leader

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 08 June- 2012

    DAY COVERED: 07 June - 2012

    SUMMARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE

    /GENERATOR

    PERFORMANCEREP

    ORT

    Remarks : Plant didn't trip yesterday.

    Loadshed : L-5 = 0:04 min. due to Engine-4 trip, Fresh-3 =0:55 min due to E-4 & EPGCL E-2 trip, MTC-1=0:20min.due to E-4 trip, MTC-2=1:06hr.due to E-4 & EPGCL E-2 trip, MTC-3=0:20min. Due to E-4 trip, MTC-4=1:10hr. Due to E-4 & EPGCL E-2 trip.

  • 7/31/2019 Daily Report_of June 2012

    20/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    21/72

  • 7/31/2019 Daily Report_of June 2012

    22/72

    Average Demand MW Average Generation 16.061 MW Last Plant Trip06/06/2012

    12:52 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,203.3 52,643.1 56,049.1 33,234.6 27,972.7

    Peak Load(KW) 3,559 3,437 3,382 7,631 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 72,468 70,738 71,882 173,765 0

    Capacity Factor 83.88% 81.87% 83.20% 86.30% 0.00%

    Load Factor 84.84% 85.76% 88.56% 94.88% #DIV/0!

    Today's Running Hrs 24 24 24 24 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 0 0 0 0

    Stopage time due to0 0 0 0 0

    Unschedule

    maintenance + Tri0 0 0 0 24

    Engine Avilability 100.00% 100.00% 100.00% 100.00% 0.00%

    No of Tripping for0 0 0 0 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Nil Nil Nil Nil Nil

    Un-scheduleMaintenance

    Nil Nil Nil Nil Nil

    Schedule Maintenance Nil Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 49355.5ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 55110.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    152.2 RHs

    1000 RH Maintnance after

    813.3 RHS

    1000 RH maintenance after

    60.9 RHs

    2000 RH maintenance After

    426.5 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp highLube oil temp. High. Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA., Ht outlet

    flexible pipe water leakage.

    Alternator 3-phase shorted.

    Previous Problem &

    Action Nil Nil NilT.C RPM A/B -Bank shown

    wrong in SCADA. Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    388,853 16,202 0 221.66 OK OK

    Prepared By Acknowledged by

    Promod Sutradhar Md. Masud Alam

    Shift Leader Sr. Shift Leader

    SUMMARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE

    /GENERATOR

    PERFORMANCEREP

    ORT

    Remarks : Plant didn't trip yesterday.

    Loadshe : Fresh - 3 = 31 min. due to Everest E - 2 trip.

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 09 June- 2012

    DAY COVERED: 08 June - 2012

  • 7/31/2019 Daily Report_of June 2012

    23/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    24/72

  • 7/31/2019 Daily Report_of June 2012

    25/72

    Average Demand MW Average Generation 16.061 MW Last Plant Trip06/06/2012

    12:52 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,227.3 52,667.1 56,073.1 33,258.6 27,972.7

    Peak Load(KW) 3,498 3,111 3,295 7,612 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 75,172 68,624 73,006 180,444 0

    Capacity Factor 87.00% 79.43% 84.50% 89.61% 0.00%

    Load Factor 89.54% 91.91% 92.32% 98.77% #DIV/0!

    Today's Running Hrs 24 24 24 24 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 0 0 0 0

    opage me ue o0 0 0 0 0

    Unschedule

    maintenance + Tri0 0 0 0 24

    Engine Avilability 100.00% 100.00% 100.00% 100.00% 0.00%

    No of Tripping for

    internal reason0 0 0 0 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Nil Nil Nil Nil Nil

    Un-scheduleMaintenance

    Nil Nil Nil Nil Nil

    Schedule MaintenanceCentrifugal filter clean

    complete

    Centrifugal filter clean

    complete

    Centrifugal filter clean

    complete

    Centrifugal filter clean

    completeNil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 49355.5ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 55110.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    128.2 RHs

    1000 RH Maintnance after

    789.3 RHS

    1000 RH maintenance after

    36.9 RHs

    2000 RH maintenance After

    402.5 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp highLube oil temp. High. Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA., Ht outlet

    flexible pipe water leakage.

    Alternator 3-phase shorted.

    Previous Problem &Action

    Nil Nil Nil T.C RPM A/B -Bank shownwrong in SCADA.

    Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    397,246 16,552 0 222.59 OK OK

    Prepared By Acknowledged by

    Promod Sutradhar Md. Masud Alam

    Shift Leader Sr. Shift Leader

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 10 June- 2012

    DAY COVERED: 09 June - 2012

    SUMMARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/

    GENERATOR

    PERFORMANCEREPORT

    Remarks : Plant didn't trip yesterday.

    Loadshe : Nil

  • 7/31/2019 Daily Report_of June 2012

    26/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    27/72

  • 7/31/2019 Daily Report_of June 2012

    28/72

    Average Demand MW Average Generation 16.061 MW Last Plant Trip06/06/2012

    12:52 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,250.9 52,691.1 56,096.7 33,282.6 27,972.7

    Peak Load(KW) 3,468 3,454 3,419 7,767 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 75,368 72,588 72,455 182,382 0

    Capacity Factor 87.23% 84.01% 83.86% 90.58% 0.00%

    Load Factor 92.09% 87.57% 89.80% 97.84% #DIV/0!

    Today's Running Hrs 23.6 24 23.6 24 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 0 0 0 0

    opage me ue o0 0 0 0 0

    Unschedule

    maintenance + Tri0.4 0 0.4 0 24

    Engine Avilability 98.33% 100.00% 98.33% 100.00% 0.00%

    No of Tripping for

    internal reason1 0 1 0 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Exh. Temp. dev. Cyl - 6/A Nil Exh. Temp. dev. Cyl - 2/B Nil Nil

    Un-scheduleMaintenance

    Replace PCC ball valve of

    cyl - 6/A & spark plug gap

    adjust of cyl - 6/A, 9/A.

    Nil

    Replace PCC ball valve of

    cyl - 2/B & spark plug gap

    adjust of cyl - 3/A, 2/b, 4/B.

    Nil Nil

    Schedule MaintenanceOil bath filter mud collection

    complete

    Oil bath filter mut collection

    complete

    Oil bath filter mut collection

    complete

    Oil bath filter mut collection

    completeNil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 49355.5ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 55110.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    104.6 RHs

    1000 RH Maintnance after

    765.3 RHS

    1000 RH maintenance after

    13.3 RHs

    2000 RH maintenance After

    378.5 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp highLube oil temp. High. Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA., Ht outlet

    flexible pipe water leakage.

    Alternator 3-phase shorted.

    Previous Problem &

    Action Nil Nil NilT.C RPM A/B -Bank shown

    wrong in SCADA. Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    402,793 16,783 0 220.71 OK OK

    Prepared By Acknowledged by

    Promod Sutradhar Md. Masud Alam

    Shift Leader Sr. Shift Leader

    SUMMARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE

    /GENERATOR

    PERFORMANCEREP

    ORT

    Remarks : Plant didn't trip yesterday.

    Loadshe : MTC - 1 = 40 min due to E - 1 trip, MTC - 2 = 33 min due to E - 1 trip, MTC - 3 = 35 min due to E - 1 trip, MTC - 4 =

    40 min due to E - 1 trip.

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 11 June- 2012

    DAY COVERED: 10 June - 2012

  • 7/31/2019 Daily Report_of June 2012

    29/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    30/72

  • 7/31/2019 Daily Report_of June 2012

    31/72

    Average Demand MW Average Generation 16.061 MW Last Plant Trip06/06/2012

    12:52 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,274.9 52,714.7 56,120.4 33,306.6 27,972.7

    Peak Load(KW) 3,543 3,397 3,345 7,877 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 76,809 70,821 70,979 180,707 0

    Capacity Factor 88.90% 81.97% 82.15% 89.74% 0.00%

    Load Factor 90.33% 88.34% 89.53% 95.59% #DIV/0!

    Today's Running Hrs 24 23.6 23.7 24 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 0 0 0 0

    Stopage time due to

    external reason0 0 0 0 0

    nsc e u e

    maintenance + Trip 0 0.4 0.3 0 24

    Engine Avilability 100.00% 98.33% 98.75% 100.00% 0.00%

    No of Tripping for

    internal reason0 1 2 0 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Nil Exh. Temp. dev. Cyl - 4/A. Exh. Temp. dev. Cyl - 8/A,6/B.

    Nil Nil

    Un-schedule

    MaintenanceNil

    Replace PCC ball valve of

    cyl - 4/A & spark plug

    replace old cyl. - 4/A, 6/A..

    ( R.H - 52711 )

    Replace PCC ball valve of

    cyl - 8/A, 6/B.Nil Nil

    Schedule Maintenance Nil Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 49355.5ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 55110.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    80.6 RHs

    1000 RH Maintnance after

    741.7 RHS

    1000 RH maintenance over

    10.4 RHs

    2000 RH maintenance After

    354.5 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp highLube oil temp. High. Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA., Ht outlet

    flexible pipe water leakage.

    Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    399,316 16,638 0 231.14 OK OK

    Prepared By Acknowledged by

    Promod Sutradhar Md. Masud Alam

    Shift Leader Sr. Shift Leader

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 12 June- 2012

    DAY COVERED: 11 June - 2012

    SUM

    MARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/GENERATOR

    PERFORMANCEREPORT

    Remarks : Plant didn't trip yesterday.

    Loadshe : L - 5 = 4:03 Hr. due to MTC belt conveyer maintenance.

  • 7/31/2019 Daily Report_of June 2012

    32/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    33/72

  • 7/31/2019 Daily Report_of June 2012

    34/72

    Average Demand 15.76 MW Average Generation 15.76 MW Last Plant Trip06/06/2012

    12:52 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,298.9 52,738.7 56,142.3 33,330.6 27,972.7

    Peak Load(KW) 3,520 3,271 3,225 7,764 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 72,674 70,794 63,467 171,258 0

    Capacity Factor 84.11% 81.94% 73.46% 85.05% 0.00%

    Load Factor 86.03% 90.18% 89.86% 91.91% #DIV/0!

    Today's Running Hrs 24 24 21.9 24 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 0 2.1 0 0

    Stopage time due to

    external reason0 0 0 0 0

    Unschedule

    maintenance + Trip

    Downtime Hrs.

    0 0 0 0 24

    Engine Avilability 100.00% 100.00% 100.00% 100.00% 0.00%

    No of Tripping for

    internal reason0 0 0 0 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Nil Nil Nil Nil Nil

    Un-schedule

    MaintenanceNil Nil Nil Nil Nil

    Schedule Maintenance Nil Nil 1000hr maint. Done. Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 49355.5ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 56122.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    56.6 RHs

    1000 RH Maintnance after

    717.7 RHS

    1000 RH maintenance after

    979.7 RHs

    2000 RH maintenance After

    330.5 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp highLube oil temp. High. Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA., Ht outlet

    flexible pipe water leakage.

    Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    378,193 15,758 0 236.53 OK OK

    Prepared By Acknowledged by

    M.A Motaleb Md. Masud Alam

    Shift Leader Sr. Shift Leader

    SUMM

    ARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/GENE

    RATOR

    PERFORMANCEREPORT

    Remarks : Plant didn't trip yesterday.

    Loadshe : Nil

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 13 June- 2012

    DAY COVERED: 12 June - 2012

  • 7/31/2019 Daily Report_of June 2012

    35/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    36/72

  • 7/31/2019 Daily Report_of June 2012

    37/72

    Average Demand 15.30 MW Average Generation 15.30 MW Last Plant Trip06/06/2012

    12:52 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,322.9 52,762.7 56,165.7 33,354.6 27,972.7

    Peak Load(KW) 3,320 3,380 3,250 7,822 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 70,064 68,770 64,666 171,258 0

    Capacity Factor 81.09% 79.59% 74.84% 85.05% 0.00%

    Load Factor 87.93% 84.78% 84.31% 91.23% #DIV/0!

    Today's Running Hrs 24 24 23.6 24 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 0 0 0 0

    Stopage time due to

    external reason0 0 0 0 0

    Unschedule

    maintenance + Trip

    Downtime Hrs.

    0 0 0.4 0 24

    Engine Avilability 100.00% 100.00% 98.33% 100.00% 0.00%

    No of Tripping for

    internal reason0 0 4 0 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Nil Nil Cyl 9/B,1/A,9/B dev Nil Nil

    Un-schedule

    MaintenanceNil Nil Pcc ball valve change Nil Nil

    Schedule Maintenance Nil Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 49355.5ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 56122.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    32.6 RHs

    1000 RH Maintnance after

    693.7 RHS

    1000 RH maintenance after

    956.1 RHs

    2000 RH maintenance After

    306.5 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp highLube oil temp. High. Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA., Ht outlet

    flexible pipe water leakage.

    Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    374,758 15,615 0 233.97 OK OK

    Prepared By Acknowledged by

    Md.Amir Hamza Md. Masud Alam

    Sr.Shift Engineer Sr. Shift Leader

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 14 June- 2012

    DAY COVERED: 13 June - 2012

    SUM

    MARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/GENERATOR

    PERFORMANCEREPORT

    Remarks : Plant didn't trip yesterday.

    Loadshed :L-1,5=4 min,L-2=1.40 min due to L-4 OHL cable connection.

  • 7/31/2019 Daily Report_of June 2012

    38/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    39/72

  • 7/31/2019 Daily Report_of June 2012

    40/72

    Average Demand 15.17 MW Average Generation 15.17 MW Last Plant Trip06/06/2012

    12:52 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,345.6 52,786.7 56,189.7 33,375.2 27,972.7

    Peak Load(KW) 3,380 3,375 3,214 7,764 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 69,737 71,566 73,442 149,219 0

    Capacity Factor 80.71% 82.83% 85.00% 74.11% 0.00%

    Load Factor 90.89% 88.35% 95.21% 93.30% #DIV/0!

    Today's Running Hrs 22.7 24 24 20.6 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 0 0 0 0

    Stopage time due to

    external reason0 0 0 0 0

    Unschedule

    maintenance + Trip

    Downtime Hrs.

    1.3 0 0 3.4 24

    Engine Avilability 94.58% 100.00% 100.00% 85.83% 0.00%

    No of Tripping for

    internal reason1 0 0 1 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Cyi dev 1B Nil Nil Cyi dev 9A Nil

    Un-schedule

    MaintenanceNil Nil Nil

    New S/P replace to cyl

    8A,9A,1B,2B. 9A pcc valve

    change. 4A,6B tappet

    chacked. HT flexible pipe

    chaned (from E5)

    Nil

    Schedule Maintenance1000hr maint done, All pcc

    clean & S/P regap.Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 50324.0 ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 56122.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    978.4 RHs

    1000 RH Maintnance after

    669.7 RHS

    1000 RH maintenance after

    932.1 RHs

    2000 RH maintenance After

    285.9 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp highLube oil temp. High. Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA., Ht outlet

    flexible pipe water leakage.

    Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    363,964 15,165 0 217.04 OK OK

    Prepared By Acknowledged by

    M.A Motaleb Md. Masud Alam

    Shift Leader Sr. Shift Leader

    SUM

    MARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/GENE

    RATOR

    PERFORMANCEREPORT

    Remarks : Plant didn't trip yesterday.

    Loadshed :L-5=4 min due to E4 trip, MTC-all mills 3:30min due to E4 maint.

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 15 June- 2012

    DAY COVERED: 14 June - 2012

  • 7/31/2019 Daily Report_of June 2012

    41/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    42/72

  • 7/31/2019 Daily Report_of June 2012

    43/72

    Average Demand 16.6 MW Average Generation 16.6 MW Last Plant Trip06/06/2012

    12:52 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,369.2 52,810.7 56,213.7 33,399.2 27,972.7

    Peak Load(KW) 3,325 3,315 3,270 7,866 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 74,263 74,704 73,538 176,068 0

    Capacity Factor 85.95% 86.46% 85.11% 87.44% 0.00%

    Load Factor 94.64% 93.90% 93.70% 93.26% #DIV/0!

    Today's Running Hrs 23.6 24 24 24 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 0 0 0 0

    Stopage time due to

    external reason0 0 0 0 0

    Unschedule

    maintenance + Trip

    Downtime Hrs.

    0.4 0 0 0 24

    Engine Avilability 98.33% 100.00% 100.00% 100.00% 0.00%

    No of Tripping for

    internal reason1 0 0 0 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Cyl dev 7A Nil Nil Nil Nil

    Un-schedule

    Maintenance

    Cyl 7A pcc change & s/p

    regap.Nil Nil Nil Nil

    Schedule Maintenance Nil Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 50324.0 ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 56122.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    954.8 RHs

    1000 RH Maintnance after

    645.7 RHS

    1000 RH maintenance after

    908.1 RHs

    2000 RH maintenance After

    261.9 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp highLube oil temp. High. Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA., Ht outlet

    flexible pipe water leakage.

    Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    398,573 16,607 0 242.76 OK OK

    Prepared By Acknowledged by

    M.A Motaleb Md. Masud Alam

    Shift Leader Sr. Shift Leader

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 16 June- 2012

    DAY COVERED: 15 June - 2012

    S

    UMMARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/GEN

    ERATOR

    PERFORMANCEREPORT

    Remarks : Plant didn't trip yesterday.

    Loadshed :L-5 17min due to E1 trip & engine over load. Fresh-04 starting delay 1hr20min for everest E2 maint. Two ball

    mills of MTC- 8hr15min due to Engine ove load.

  • 7/31/2019 Daily Report_of June 2012

    44/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    45/72

  • 7/31/2019 Daily Report_of June 2012

    46/72

    Average Demand 16.93 MW Average Generation 16.93 MW Last Plant Trip06/06/2012

    12:52 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,393.2 52,834.7 56,237.4 33,423.2 27,972.7

    Peak Load(KW) 3,320 3,325 3,265 7,727 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 77,015 77,673 71,570 180,247 0

    Capacity Factor 89.14% 89.90% 82.84% 89.51% 0.00%

    Load Factor 96.66% 97.33% 92.49% 97.20% #DIV/0!

    Today's Running Hrs 24 24 23.7 24 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 0 0 0 0

    Stopage time due to

    external reason0 0 0 0 0

    Unschedule

    maintenance + Trip

    Downtime Hrs.

    0 0 0.3 0 24

    Engine Avilability 100.00% 100.00% 98.75% 100.00% 0.00%

    No of Tripping for

    internal reason0 0 2 0 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Nil Nil Cyl 6/A,4/B dev Nil Nil

    Un-schedule

    MaintenanceNil Nil

    Pcc ball valve change and

    Ht lead chaange.(old)Nil Nil

    Schedule Maintenance Nil Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 50324.0 ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 56122.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    930.8 RHs

    1000 RH Maintnance after

    621.7 RHS

    1000 RH maintenance after

    884.4 RHs

    2000 RH maintenance After

    237.9 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp highLube oil temp. High. Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA., Ht outlet

    flexible pipe water leakage.

    Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    406,505 16,938 0 247.15 OK OK

    Prepared By Acknowledged by

    Md.Amir Hamza Md. Masud Alam

    Sr.Shift Engineer Sr. Shift Leader

    SUM

    MARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/GENE

    RATOR

    PERFORMANCEREPORT

    Remarks : Plant didn't trip yesterday.

    Loadshed :Nil

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 17 June- 2012

    DAY COVERED: 16 June - 2012

  • 7/31/2019 Daily Report_of June 2012

    47/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    48/72

  • 7/31/2019 Daily Report_of June 2012

    49/72

    Average Demand 16.96 MW Average Generation 16.96 MW Last Plant Trip06/06/2012

    12:52 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,417.2 52,858.7 56,261.4 33,447.2 27,972.7

    Peak Load(KW) 3,317 3,312 3,215 7,738 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 76,460 75,513 74,230 180,871 0

    Capacity Factor 88.50% 87.40% 85.91% 89.82% 0.00%

    Load Factor 96.05% 95.00% 96.20% 97.39% #DIV/0!

    Today's Running Hrs 24 24 24 24 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 0 0 0 0

    Stopage time due to

    external reason0 0 0 0 0

    Unschedule

    maintenance + Trip

    Downtime Hrs.

    0 0 0 0 24

    Engine Avilability 100.00% 100.00% 100.00% 100.00% 0.00%

    No of Tripping for

    internal reason0 0 0 0 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Nil Nil Nil Nil Nil

    Un-schedule

    MaintenanceNil Nil Nil Nil Nil

    Schedule Maintenance Nil Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 50324.0 ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 56122.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    906.8 RHs

    1000 RH Maintnance after

    597.7 RHS

    1000 RH maintenance after

    860.4 RHs

    2000 RH maintenance After

    213.9 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp highLube oil temp. High Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA., Ht outlet

    flexible pipe water leakage.

    Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    407,074 16,961 0 243.04 OK OK

    Prepared By Acknowledged by

    Md. Amir Hamza Md. Masud Alam

    Sr.Shift Engineer Sr. Shift Leader

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 18 June- 2012

    DAY COVERED: 17 June - 2012

    SUMMARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/GENE

    RATOR

    PERFORMANCEREPORT

    Remarks : Plant didn't trip yesterday.

    Loadshed :Fresh 4=3.20 min due to Everest Island mode.

  • 7/31/2019 Daily Report_of June 2012

    50/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    51/72

  • 7/31/2019 Daily Report_of June 2012

    52/72

    Average Demand 16.90 MW Average Generation 16.90 MW Last Plant Trip06/06/2012

    12:52 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,441.2 52,882.7 56,285.2 33,471.2 27,972.7

    Peak Load(KW) 3,315 3,319 3,220 7,731 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 77,037 75,509 72,294 180,808 0

    Capacity Factor 89.16% 87.39% 83.67% 89.79% 0.00%

    Load Factor 96.83% 94.79% 94.33% 97.45% #DIV/0!

    Today's Running Hrs 24 24 23.8 24 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 0 0 0 0

    Stopage time due to

    external reason0 0 0 0 0

    Unschedule

    maintenance + Trip

    Downtime Hrs.

    0 0 0.2 0 24

    Engine Avilability 100.00% 100.00% 99.17% 100.00% 0.00%

    No of Tripping for

    internal reason0 0 1 0 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Nil Nil Cyl 6/A dev Nil Nil

    Un-schedule

    MaintenanceNil Nil

    Pcc ball valve change and

    spark plug gap adjustNil Nil

    Schedule Maintenance Nil Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 50324.0 ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 56122.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    882.8 RHs

    1000 RH Maintnance after

    573.7 RHS

    1000 RH maintenance after

    836.6 RHs

    2000 RH maintenance After

    189.9 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp highLube oil temp. High Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA., Ht outlet

    flexible pipe water leakage.

    Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    405,648 16,902 0 240.39 OK OK

    Prepared By Acknowledged by

    Md. Amir Hamza Md. Masud Alam

    Sr.Shift Engineer Sr. Shift Leader

    SU

    MMARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/GENE

    RATOR

    PERFORMANCEREPORT

    Remarks : Plant didn't trip yesterday.

    Loadshed :Fresh 3=1.18 min due to Everest E-3 trip. L-5=12 min due to uppl E-3 trip.

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 19 June- 2012

    DAY COVERED: 18 June - 2012

  • 7/31/2019 Daily Report_of June 2012

    53/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    54/72

  • 7/31/2019 Daily Report_of June 2012

    55/72

    Average Demand 16.21 MW Average Generation 16.21 MW Last Plant Trip06/06/2012

    12:52 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,465.2 52,905.9 56,309.2 33,495.2 27,972.7

    Peak Load(KW) 3,331 3,321 3,225 7,773 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 74,209 66,580 72,282 176,038 0

    Capacity Factor 85.89% 77.06% 83.66% 87.42% 0.00%

    Load Factor 92.83% 86.41% 93.39% 94.36% #DIV/0!

    Today's Running Hrs 24 23.2 24 24 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 0 0 0 0

    Stopage time due to

    external reason0 0 0 0 0

    Unschedule

    maintenance + Trip

    Downtime Hrs.

    0 0.8 0 0 24

    Engine Avilability 100.00% 96.67% 100.00% 100.00% 0.00%

    No of Tripping for

    internal reason0 2 0 0 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Nil Cyl 8/A,3/B dev Nil Nil Nil

    Un-schedule

    MaintenanceNil

    Pcc ball valve change 3/B

    cyl. and spark plug

    change(old) cyl.3/B,6/B.

    Nil Nil Nil

    Schedule Maintenance Nil Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 50324.0 ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 56122.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    858.8 RHs

    1000 RH Maintnance after

    550.5 RHS

    1000 RH maintenance after

    812.6 RHs

    2000 RH maintenance After

    165.9 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp highLube oil temp. High Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA., Ht outlet

    flexible pipe water leakage.

    Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    389,109 16,213 0 230.31 OK OK

    Prepared By Acknowledged by

    Md. Amir Hamza Md. Masud Alam

    Sr. Shift Engineer Sr. Shift Leader

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 20 June- 2012

    DAY COVERED: 19 June - 2012

    SUM

    MARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/GENE

    RATOR

    PERFORMANCEREPORT

    Remarks : Plant didn't trip yesterday.

    Loadshed :L-2=30 min due to lighting arrestor connected.

  • 7/31/2019 Daily Report_of June 2012

    56/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    57/72

  • 7/31/2019 Daily Report_of June 2012

    58/72

    Average Demand 16.792 MW Average Generation 16.792 MW Last Plant Trip06/06/2012

    12:52 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,489.2 52,929.2 56,333.2 33,519.2 27,972.7

    Peak Load(KW) 3,442 3,425 3,435 7,791 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 77,214 71,079 73,864 180,841 0

    Capacity Factor 89.37% 82.27% 85.49% 89.81% 0.00%

    Load Factor 93.47% 89.07% 89.60% 96.71% #DIV/0!

    Today's Running Hrs 24 23.3 24 24 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 0 0 0 0

    Stopage time due to

    external reason0 0 0 0 0

    Unschedule

    maintenance + Trip

    Downtime Hrs.

    0 0.7 0 0 24

    Engine Avilability 100.00% 97.08% 100.00% 100.00% 0.00%

    No of Tripping for

    internal reason0 0 0 0 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Nil Nil Nil Nil Nil

    Un-schedule

    MaintenanceNil Nil Nil Nil Nil

    Schedule Maintenance Nil Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 50324.0 ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 56122.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    834.8 RHs

    1000 RH Maintnance after

    527.2 RHS

    1000 RH maintenance after

    788.6 RHs

    2000 RH maintenance After

    141.9 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp highLube oil temp. High Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA..Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    402,998 16,792 0 227.32 OK OK

    Prepared By Acknowledged by

    Md. Mohiuddin Sohag Md. Masud Alam

    Sr. Shift Leader Sr. Shift Leader

    S

    UMMARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/GEN

    ERATOR

    PERFORMANCEREPORT

    Remarks : Plant didn't trip yesterday.

    Loadshed : No loadshed yesterday.

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 21 June- 2012

    DAY COVERED: 20 June - 2012

  • 7/31/2019 Daily Report_of June 2012

    59/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    60/72

  • 7/31/2019 Daily Report_of June 2012

    61/72

    Average Demand MW Average Generation 17.005 MW Last Plant Trip06/06/2012

    12:52 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,513.2 52,953.2 56,357.2 33,543.2 27,972.7

    Peak Load(KW) 3,510 3,450 3,350 8,202 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 77,845 74,885 74,065 181,324 0

    Capacity Factor 90.10% 86.67% 85.72% 90.05% 0.00%

    Load Factor 92.41% 90.44% 92.12% 92.11% #DIV/0!

    Today's Running Hrs 24 24 24 24 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 0 0 0 0

    Stopage time due to

    external reason0 0 0 0 0

    Unschedule

    maintenance + Trip

    Downtime Hrs.

    0 0 0 0 24

    Engine Avilability 100.00% 100.00% 100.00% 100.00% 0.00%

    No of Tripping for

    internal reason0 0 0 0 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Nil Nil Nil Nil Nil

    Un-schedule

    MaintenanceNil Nil Nil Nil Nil

    Schedule Maintenance Nil Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 50324.0 ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 56122.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    810.8 RHs

    1000 RH Maintnance after

    503.2 RHS

    1000 RH maintenance after

    764.6 RHs

    2000 RH maintenance After

    117.9 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &Action

    Winding temp high & Ltwater temp high

    Lube oil temp. High Lt water temp high T.C RPM A/B -Bank shownwrong in SCADA..

    Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    408,119 17,005 0 236.35 OK OK

    Prepared By Acknowledged by

    Md. Mohiuddin Sohag Md. Masud Alam

    Sr. Shift Leader Sr. Shift Leader

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 22 June- 2012

    DAY COVERED: 21 June - 2012

    SUMMARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/GENERATOR

    PERFORMANCEREPORT

    Remarks : Plant didn't trip yesterday.

    Loadshed : Fresh-3=4:19hr. , MTC-1=4:43hr., MTC-2=4:46hr., MTC-3=4:40hr., MTC-4=4:48hr. Due to EPGCL Engin- 1 & 2 trip

    yesterday.

  • 7/31/2019 Daily Report_of June 2012

    62/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    63/72

  • 7/31/2019 Daily Report_of June 2012

    64/72

    Average Demand 17.057 MW Average Generation 17.057 MW Last Plant Trip06/06/2012

    12:52 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,537.2 52,977.2 56,381.2 33,567.2 27,972.7

    Peak Load(KW) 3,478 3,473 3,331 7,895 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 77,800 76,915 73,905 180,738 0

    Capacity Factor 90.05% 89.02% 85.54% 89.76% 0.00%

    Load Factor 93.20% 92.28% 92.45% 95.39% #DIV/0!

    Today's Running Hrs 24 24 24 24 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 0 0 0 0

    Stopage time due to

    external reason0 0 0 0 0

    Unschedule

    maintenance + Trip

    Downtime Hrs.

    0 0 0 0 24

    Engine Avilability 100.00% 100.00% 100.00% 100.00% 0.00%

    No of Tripping for

    internal reason0 0 0 0 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Nil Nil Nil Nil Nil

    Un-schedule

    MaintenanceNil Nil Nil Nil Nil

    Schedule Maintenance Nil Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 50324.0 ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 56122.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    786.8 RHs

    1000 RH Maintnance after

    479.2 RHS

    1000 RH maintenance after

    740.6 RHs

    2000 RH maintenance After

    93.9 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp highLube oil temp. High Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA..Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    409,358 17,057 0 235.36 OK OK

    Prepared By Acknowledged by

    Md. Mohiuddin Sohag Md. Masud Alam

    Sr. Shift Leader Sr. Shift Leader

    S

    UMMARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/GEN

    ERATOR

    PERFORMANCEREPORT

    Remarks : Plant didn't trip yesterday.

    Loadshed : No loadshed yesterday.

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 23 June- 2012

    DAY COVERED: 22 June - 2012

  • 7/31/2019 Daily Report_of June 2012

    65/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    66/72

  • 7/31/2019 Daily Report_of June 2012

    67/72

    Average Demand MW Average Generation 17.097 MW Last Plant Trip06/06/2012

    12:52 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)Total Running Hrs 50,561.2 53,001.2 56,405.2 33,591.2 27,972.7

    Peak Load(KW) 3,517 3,457 3,324 7,855 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 77,960 77,065 74,065 181,230 0

    Capacity Factor 90.23% 89.20% 85.72% 90.00% 0.00%

    Load Factor 92.36% 92.89% 92.84% 96.13% #DIV/0!

    Today's Running Hrs 24 24 24 24 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule Maintenance

    Hrs.0 0 0 0 0

    Stopage time due to

    external reason0 0 0 0 0

    Unschedule

    maintenance + Trip

    Downtime Hrs.

    0 0 0 0 24

    Engine Avilability 100.00% 100.00% 100.00% 100.00% 0.00%

    No of Tripping for

    internal reason0 0 0 0 0

    No of Tripping for

    external reason0 0 0 0 0

    Cause Of Triping Nil Nil Nil Nil Nil

    Un-schedule

    MaintenanceNil Nil Nil Nil Nil

    Schedule Maintenance Nil Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 50324.0 ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 56122.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    762.8 RHs

    1000 RH Maintnance after

    455.2 RHS

    1000 RH maintenance after

    716.6 RHs

    2000 RH maintenance After

    69.9 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &

    Action

    Winding temp high & Lt

    water temp highLube oil temp. High Lt water temp high

    T.C RPM A/B -Bank shown

    wrong in SCADA..Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    410,320 17,097 0 243.74 OK OK

    Prepared By Acknowledged by

    Md. Mohiuddin Sohag Md. Masud Alam

    Sr. Shift Leader Sr. Shift Leader

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 24 June- 2012

    DAY COVERED: 23 June - 2012

    SUMMARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/GEN

    ERATOR

    PERFORMANCEREPORT

    Remarks : Plant didn't trip yesterday.

    Loadshed : Fresh-3= 2:56hr.due to EPGCL Engine-3 problem yesterday.

  • 7/31/2019 Daily Report_of June 2012

    68/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    69/72

  • 7/31/2019 Daily Report_of June 2012

    70/72

    Average Demand MW Average Generation 17.097 MW Last Plant Trip06/06/2012

    12:52 pm

    ParticularsEngine No-1

    (10316)

    Engine No-2

    (10314)

    Engine No-3

    (10315)

    Engine No-4

    (17045)

    Engine No-5

    (17052)

    Total Running Hrs 50,583.9 53,024.5 56,427.7 33,613.8 27,972.7

    Peak Load(KW) 3,426 3,423 3,261 7,924 0

    Capacity, kWh 86,400 86,400 86,400 201,360 201,360

    To days production 63,005 63,458 58,749 144,102 0

    Capacity Factor 72.92% 73.45% 68.00% 71.56% 0.00%

    Load Factor 81.01% 79.57% 80.07% 80.47% #DIV/0!

    Today's Running Hrs 22.7 23.3 22.5 22.6 0

    Standby Downtime Hrs. 0 0 0 0 0

    Schedule MaintenanceHrs.

    0 0 0 0 0

    Stopage time due to

    external reason0 0 0 0 0

    Unschedule

    maintenance + Trip

    Downtime Hrs.

    1.3 0.7 1.5 1.4 24

    Engine Avilability 94.58% 97.08% 93.75% 94.17% 0.00%

    No of Tripping for

    internal reason0 1 5 0 0

    No of Tripping for

    external reason3 3 3 3 0

    Cause Of Triping Plant tripCyl. Dev. - 8/A ( low load ) &

    plant trip

    Cyl. Dev. - 1/B, 9/B & plant

    trip Plant trip. Nil

    Un-schedule

    MaintenanceNil Nil

    Replace PCC ball valve, old

    S/P replace & orific clean of

    cyl. - 9/B. Plant trip.

    Nil Nil

    Schedule Maintenance Nil Nil Nil Nil Nil

    Last maintenance

    Carried Out

    1000 RH Maintenance

    carried out at 50324.0 ERH

    1000 RH Maintenance

    carried out at 52458.0 ERH

    1000 Hr Maintenance

    carried out at 56122.0ERH

    1000 Hr Maintenance

    carried out at 32658.2 ERH

    2000 Hr Maintenance

    carried out at 27854.8 ERH

    Next Schedule

    Maintenance Type

    1000 RH Maintenance after

    740.1 RHs

    1000 RH Maintnance after

    431.9 RHS

    1000 RH maintenance after

    694.1 RHs

    2000 RH maintenance After

    47.3 RHs

    1000RH maintenance after

    882.1 RH

    Present Problem &ActionWinding temp high & Ltwater temp high Lube oil temp. High Lt water temp high T.C RPM A/B -Bank shownwrong in SCADA.. Alternator 3-phase shorted.

    Previous Problem &

    ActionNil Nil Nil

    T.C RPM A/B -Bank shown

    wrong in SCADA.Nil

    Total Power

    Production

    Average Production

    per Hr.33 kV Export

    Total Steam

    Production

    Status of Start Air

    CompressorStatus of Boiler

    329,314 13,721 0 183.34 OK OK

    Prepared By Acknowledged by

    Promod Sutradhar Md. Masud Alam

    Shift Leader Sr. Shift Leader

    SUM

    MARY

    ENGINE / GENERATOR PERFORMANCE REPORT

    ENGINE/GEN

    ERATOR

    PERFORMANCEREPORT

    Remarks : Plant trip at - 8:04 AM due to Everest plant trip that time plant trip ( D.T - 16 min ). Plant trip at - 8:01 PM due to

    Everest plant trip that time plant trip ( D.T - 14 min ). Plant trip at - 1:32 AM due to Everest plant trip that time plant trip ( D.T -

    12 min ).

    Loadshed : Feeder - 1 = 51 min. ( P.S.D ), Feeder -2 = 52 min.( P.S.D ), Feeder - 3 = 1:29 Hr. ( P.S.D ) & OHL ( L - 4 mint. ),

    Feeder - 5 = 1:24 Hr. ( P.S.D ) & E - 3 trip, Fresh - 3 = 4:39 Hr.( P.S.D), Fresh - 4 = 9:09 Hr ( P.S.D ) & Everest E - 3 trip, MTC - 1

    = 4:39 Hr ( P.S.D ); MTC - 2 = 4:00 Hr ( P.S.D ), MTC - 3 = 1:46 Hr. ( P.S.D ), MTC - 4 = 3:43 Hr. ( P.S.D ).

    MANAGEMENT INFORMATION SYSTEM

    Daily Performance Report

    DATE OF PREPERATION: 25 June- 2012

    DAY COVERED: 24 June - 2012

  • 7/31/2019 Daily Report_of June 2012

    71/72

    UPPL-1 UPPL-1

  • 7/31/2019 Daily Report_of June 2012

    72/72