COMPETITIVENESS AND INNOVATION FRAMEWORK PROGRAMME
ICT Policy Support Programme (ICT PSP)
Towards pan-European recognition of electronic IDs (eIDs)ICT PSP call identifier: ICT-PSP/2007/1ICT PSP Theme/objective identifier: 1.2
Project acronym: STORKProject full title: Secure Identity Across Borders LinkedGrant agreement no.: 224993
D6.5.2 Change of Address - Draft Planning
Deliverable Id : D6.5.2
Deliverable Name : D6.5.2 Change of address - Draft Planning
Status : Final
Dissemination Level : Public
Due date of deliverable : 1st October 2009
Actual submission date : 6th November 2009
Work Package : WP6.5
Organisation name of lead contractor for
this deliverable :PT-AMA
Author(s): PT-MULTICERT
Partner(s) contributing :EE SK, ES MAP, PT AMA, SE VERVA, SI MPA, PT
MULTICERT
Abstract: In order to achieve a true European scale working pilot of the Change of address service, thedevelopments made by the different participating countries need to obey a common planning. In thisdocument we describe the draft planning proposed for the implementation of the Change of addressservice by all the participating parties.
Project co-funded by the European Community under the ICT Policy Support Programme
Copyright by the STORK-eID Consortium
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
2/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 2 of 40
History
Version Date Modification reason Modified by
0.1 First version PT MULTICERT
0.2 28 Oct 2009 Document revised to reflect last changes in theUse Cases.
PT MULTICERT
1.0 3 Nov 2009 Included quality and MS comments. PT MULTICERT
final 6 Nov 2009 Final Quality Check Capgemini
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
3/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 3 of 40
Table of Contents
HISTORY........................................................................................................................................ 2TABLE OF CONTENTS ............................................................................................................... 3LIST OF FIGURES ........................................................................................................................ 5LIST OF TABLES .......................................................................................................................... 6EXECUTIVE SUMMARY ............................................................................................................ 71 INTRODUCTION ................................................................................................................. 8
1.1 SCOPE AND OBJECTIVES .................................................................................................. 81.2 METHODOLOGY............................................................................................................... 81.3 RELATIONS TO INTERNAL STORKENVIRONMENT ........................................................ 81.4 RELATIONS TO EXTERNAL STORKENVIRONMENT ....................................................... 81.5 QUALITY MANAGEMENT................................................................................................. 91.6 RISK MANAGEMENT...................................................................................................... 10
2 SCOPE .................................................................................................................................. 113 TASKS ACCORDING TO THE DESCRIPTION OF WORK (DOW) ......................... 12
3.1 D6.5.1:DETAIL DEFINITION OF THE EUCITIZEN CHANGE OF ADDRESS PROCESS....... 123.2 D6.5.2:SPECIFICATION OF THE ADDRESS CANONICAL DATA MODEL ......................... 123.3 D6.5.3:SPECIFICATION OF THE CHANGE OF ADDRESS SERVICE PROVIDER AND USERINTERFACES................................................................................................................................ 133.4 D6.5.4:TECHNOLOGICAL IMPLEMENTATION OF THE MSSERVICE PROVIDERS ANDUSER INTERFACES...................................................................................................................... 133.5 D6.5.5:TECHNOLOGICAL INTEGRATION WITH THE EIDCOMMON INFRASTRUCTURE. 133.6 D6.5.6:CHANGE OF ADDRESS TESTS............................................................................ 143.7 D6.5.7:RUN REAL LIFE PILOT ....................................................................................... 143.8 D6.5.8:CONSOLIDATE RESULTS AND DRAW CONCLUSIONS ......................................... 14
4 CHANGE CONTROL FROM THE DOW ....................................................................... 165 MEMBER STATE PROJECT MANAGEMENT PLAN ................................................ 17
5.1 IMPLEMENTATION PLANNING FOR CONNECTION TO THE INTEROPERABILITY LAYER .. 175.1.1 WP6HIGH LEVEL MILESTONES ............................................................................... 175.1.2 MEMBER STATE MILESTONE PLANS......................................................................... 18
5.2 TEST PLANNING INCLUDING MS ACCEPTANCE CRITERIA ........................................ 205.2.1 OBJECTIVE ................................................................................................................ 205.2.2 EXPECTED RESULTS .................................................................................................. 205.2.3 ACCEPTANCE CRITERIA ............................................................................................ 215.2.4 NAMING CONVENTIONS............................................................................................ 225.2.5 TEST PLANNING......................................................................................................... 23
5.3 DETAILED WORK BREAKDOWN SCHEDULE ............................................................... 25
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
4/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 4 of 40
5.4 ESTONIA ........................................................................................................................ 255.5 SPAIN............................................................................................................................. 265.6 PORTUGAL ..................................................................................................................... 275.7 SLOVENIA...................................................................................................................... 305.8 SWEDEN......................................................................................................................... 31
6 INTEGRATED PROJECT MANAGEMENT PLAN FOR PILOT ............................... 336.1 INTERNAL PROJECT TASKS ........................................................................................... 336.2 TEST PLANNING INCLUDING ACCEPTANCE CRITERIA............................................... 33
6.2.1 MEMBER STATE INTEGRATION TESTING .................................................................. 336.2.2 STORKINTEGRATION TESTING................................................................................ 34
6.3 GO LIVE PLANNING ..................................................................................................... 346.4 DETAILED WORK BREAKDOWN SCHEDULE ............................................................... 35
7 USERS INVOLVEMENT ................................................................................................... 368 SUPPORT AND ACCESSIBILITY ................................................................................... 379 RISK MANAGEMENT ...................................................................................................... 3810 CONCLUSIONS .................................................................................................................. 40
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
5/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 5 of 40
List of Figures
Figure 1: EE General Planning including WP6.5 - CoA Pilot ...................................................... 25Figure 2: ES System Overview Change of Address ........................................................................ 26Figure 3: ES General Planning including WP6.5 - CoA Pilot ....................................................... 27Figure 4: Information Systems Conceptual Architecture ............................................................... 28Figure 5: PT General Planning including WP6.5 - CoA Pilot ....................................................... 29Figure 6: SI System Overview Change of Address ......................................................................... 30Figure 7: SI General Planning including WP6.5 - CoA Pilot ........................................................ 31Figure 8: SE System Overview Change of Address/PEPS ............................................................. 31Figure 9: SE General Planning including WP6.5 - CoA Pilot ....................................................... 32Figure 10: WP6.5 - CoA Pilot Integrated Planning ....................................................................... 35
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
6/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 6 of 40
List of Tables
Table 1: WP 6.5 Initial tasks from the Dow ................................................................................... 16Table 2: WP 6.5 Change Control from the Dow ............................................................................ 16Table 3: WP 6 High level Milestones ............................................................................................. 17Table 4: Estonia WP6.5 Change of Address Milestones ............................................................. 18Table 5: Spain WP6.5 Change of Address Milestones ................................................................ 18Table 6: Portugal WP6.5 Change of Address Milestones ........................................................... 19Table 7: Slovenia WP6.5 Change of Address Milestones............................................................ 19Table 8: Sweden WP6.5 Change of Address Milestones ............................................................. 19
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
7/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 7 of 40
Executive summary
The main objective of WP6.5 is to provide a change of address service to MS citizens that moveabroad to other member state, testing at the same time, the eID authentication.
To achieve this, several steps and actions need to be taken by each MS, while, at the same time,working in connection with the other partners in the pilot.
This deliverable collects the information of all the participants, individual implementationplanning while at the same time trying to integrate the work in a collaborative way achieving anintegrated planning.
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
8/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 8 of 40
1 Introduction
1.1 Scope and objectives
This document describes, the planning for development, implementation, and testing of theChange of Address pilot, developed, by all participating Member States, as part of the STORKproject.
Each participating country will make the development and implementation of their own nationalsystems to allow the Change of Address operation to be made, in accordance with commonspecifications defined within WP5 (PEPS/MW) and WP6 (large scale pilot).
After the implementation, the next step for each member state will be internal integration: eachcountry has to organize the test phase for the recognition of eID, using their eID for the tests. As areflexion of this, the first step of integration testing is at a local level making this the primarymotivation for organising the test and implementation phases per country.
After the integration phase is compete, the testing phase will proceed collectively on a pan-
European scale.Finally, in coherence with the WP planning, a first trial implementation of Stork WP5 integratedwith WP6.5 STORK Change of Address pilot will begin a testing phase in March 2010 and beoperational by the end of May 2010.
1.2 Methodology
In order to meet the main objective as described in the DoW,
The Change of Address for EU citizens will test the usage of eID authentication tosupport the electronic process of address change of EU Citizens that move abroad to
other Member States
The chosen approach was to try and adapt the complete pilot draft planning to the individualplanning developed by each MS.
After initial consultation with the pilot members the initial individual plannings were createdalong with several general documentation of the STORK project (developed in otherWorkpackages)
Based on the individual planning contributed by each MS, a common generic planning was firstdeveloped and then flattened to show a common timeline, amongst all MS, for the pilotimplementation
1.3 Relations to Internal STORK EnvironmentBeing the technological implementation of a conceptual model developed within the STORKframework, this pilot is closely related with Workpackage 5eID and Common Specifications,as it will test the specifications derived from the work done there.
Also, in trying to create an updated and current technical solution, this pilot will benefit from theresults ofWorkpackage 3eID and Upcoming Technologies.
1.4 Relations to External STORK Environment
This pilot is intimately connected with the current (or planned) internal CoA services available ineach participating MS. The focus of these systems is the national citizen and the national
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
9/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 9 of 40
interaction with other systems. With the developed specification the intended goal is to allow thisprocess to be seen in a pan-European interoperable way.
Considering that this is a pilot, it is limited by the processes and legal/technical constraintscurrently defined in each MS, as such, it can not be viewed as a full roadmap towards animplementation in a third country. The chosen approach details a generic model to achieve this,
but each MS has to identify how to implement the process internally according to its own lawsand expectations.
The work here presented was developed according to the specificities of the participating MS. Inparticular these MS are:
Estonia
Spain
Portugal
Sweden
Slovenia
1.5 Quality Management
In order to know whether the deliverable is correct and achieves its stated purpose, it is necessaryto define the measurement for the success criteria.
Regarding the deliverable, we have defined the criteria shown in the following table.
Acceptance criteria Norm Process Priority
Conform to STORKtemplate
Template issued by QM on 16-09-2009 Check againsttemplate by CapGemini (QM)
High
Language & Spelling English (UK) Review by PT-MULTICERT
High
Deliverable incoordination with allpartners
The deliverable was iteratively developedin coordination with all partners.
Decisions on content were taken usingseveral conference calls as well as e-maildiscussions.
National Planning documents have beenused.
Checked by PT-MULTICERT
High
Consistency withdescription in DoW
Starting with DoW version 1.5 D6.5.1 wasintroduced as additional deliverable.
Requirements were developed usingseveral conference calls as well as e-maildiscussions.
Coordinationamong partnersand review by PT-MULTICERT
High
Contents is fit forpurpose
Requirements were developed usingseveral conference calls as well as e-maildiscussions.
This deliverable is a working documentthat should provide a draft planning only.
Checked by PT-MULTICERT
High
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
10/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 10 of 40
Acceptance criteria Norm Process Priority
Acceptance by allpartners
This deliverable was submitted to thepilots mailing list for reviewing andacceptance by all partners
Coordinationamong partnersand review by PT-MULTICERT
High
Delivered on time Planning for the Work Package
Planned to be delivered in M16.
Checked by PT-MULTICERT
High
Table 1: D6.5.1 deliverable Acceptance Criteria
1.6 Risk Management
For detailed information, see Chapter 9.
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
11/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 11 of 40
2 Scope
The establishment of free circulation of individuals within the European Union and the extensionof its borders generated by the enlargement process has fostered the mobility of citizens.However, citizens that exercise their right to move to another EU country sometimes face a
considerable amount of bureaucracy and time wasting procedures, necessary to inform severalentities of his new address (either in is origin country or others). Besides resulting in anotherobstacle that the citizen has to overcome, this situation usually creates incoherence on the addressdata known to each MS especially when a citizen fails (with or without intention) to notify one ofthem.
Thus, and taking advantage of the increasingly widespread of eID across the European Union, thispilot aims to allow a citizen to notify all the relevant1 MS of his new address through the Internet,to allow the citizen to obtain an Address Declaration and to authenticate him with his eID.
To achieve the pilots goals, a common format for the Address Declaration will be proposed. Thisdeclaration will allow the citizen to easily update his address in other MS. With this approachthere is no transaction coordinator. The transaction is coordinated independently by each CoA
service that initiated the process.Relating to its implementation, this pilot is aimed at testing the interoperability of the CoA serviceon a pan-European scale, and does not try to change anything in the internal processes currently inoperation in each of the participating MS. Thus, this pilot can be viewed as a complementary pan-European service to what already is provided, by each MS, to its citizens
At the same time, although, the objectives, as stated above, are mainly interoperability on a pan-European scale this model can also be considered a base for future implementations of each MSnational processes for the Change of Address operation, but noting that this is out of scope of thispilot.
1 For instance, the MS where the citizen is moving into, the MS that issued the citizens eID, another MSwhere the citizen has worked in the past, etc.
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
12/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 12 of 40
3 Tasks According to the Description of Work (DOW)
The process has two phases:
1. Change of Address Request;
2. Change of Address Confirmation updating the address stored on MS informationsystems and/or on the citizen ID card (if applicable).
The change of address request should be conducted on the Internet using the citizens eID forauthentication while interacting with the services that may become available (these services haveto obey certain rules, related to the citizen authentication and new address registration).
After the change of address is request the new address should be transmitted to a central eIDplatform that is responsible for transmitting this information for all the Member States where thecitizen previously and currently lives.
Each MS should also decide on the scope of the change of address e.g., all National publicagencies will be notified, only one agency is notified (responsible for citizen ID), if non
government bodies (postal operators, service companies, etc)) will also be notified, etc.The following sections detail the work to be done within this work package.
3.1 D6.5.1: Detail definition of the EU Citizen Change of Address Process
D6.5.1.1 Identification of the current MS Change of Address process(es): Documentationof the "as is" process(es) currently established in each MS in order to support thedissemination of the updated addresses by all affected public bodies and of theirintegration with deployed eID (where applicable);
D6.5.1.2 Identification of the MS legal constraints to the Change of Address process:Study of the legal requirements that have to be observed in order to notify all affected
parties of a citizen's change of address using his eID as a means of authentication andwithout compromising his right to privacy;
D6.5.1.3 Specification of the new MS Change of Address process(es): Specification ofthe "to be" process(es) to establish in each MS in order to adequately support thedissemination of the updated addresses by all affected public bodies and the integrationwith eID (within MS boundaries);
D6.5.1.4 Draft specification of the EU Citizen Change of Address process: Draftspecification of the information flows that support the notification of all affected publicbodies (within EU boundaries) as a result of a single change of address request by acitizen (authenticated using his/hers eID). This process description will guide thetechnical implementation of this pilot;
D6.5.1.5 Group discussion and specification review: Discussion of draft specificationwith pilot participants and other interested parties in order to identify possible correctionsto be made.
3.2 D6.5.2: Specification of the Address Canonical Data Model
D6.5.2.1 Assessment of the information needs of each affected MS public body in orderto support the Change of Address process: Documentation of the information (includingformat and data restrictions) each public body is able to generate or needs to receive inorder to support the Change of Address process (including the data needed to verify theauthentication with the citizens eID);
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
13/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 13 of 40
D6.5.2.2 Draft specification of the Address Canonical Data Model: Draft specification ofthe common representation of an "address" information entity, which must be sufficientlyflexible to accommodate all MS needs. This data model is used to exchange addressinformation between participating MS and will be the one integrated in the Common eIDInfrastructure;
D6.5.2.3 Impact analysis of the proposed Address Canonical Data Model: Analyze, indialog with the affected MS public bodies and partners (namely land registration servicesand postal operators), the adequacy of the proposed data model to their needs and tounusual address types (PO Boxes, unnumbered street locations, etc) that might need to beaccommodated;
D6.5.2.4 Group discussion and specification review: Discussion of draft specificationwith pilot participants and other interested parties in order to identify possible correctionsto be made.
3.3 D6.5.3: Specification of the Change of Address Service Provider andUser Interfaces
D6.5.3.1 Assessment of the eID Common Infrastructure integration requirements:Identification of the integration requirements that the Change of Address Service Providerhas to fulfil in order to comply with the eID Common Infrastructure (established in WP5);
D6.5.3.2 Specification of the MS Change of Address User Interface(s): Plan anddocument the user interface(s) (e.g., Portal) that should be made available in order toallow a citizen (authenticated using his/hers eID) to trigger the change of address process;
D6.5.3.3 Draft specification of the Change of Address Service Provider Interface(s):Based on the adopted process (defined in task D6.5.1) and data model (defined in taskD6.5.2), define and document the interface(s) (in WSDL) that the Change of AddressService Providers will make available;
D6.5.3.4 Specification of the MS integration plan: Plan the system integration activities(between Service Provider and public bodies) needed to successfully support the Changeof Address process, in order to ensure that all the relevant MS information systems willbe prepared;
D6.5.3.5 Group discussion and specification review: Discussion of draft specificationwith pilot participants and other interested parties in order to identify possible correctionsto be made.
3.4 D6.5.4: Technological Implementation of the MS Service Providers andUser Interfaces
D6.5.4.1 Technological implementation of the MS Change of Address User Interface(s):Customize the user interface(s) (e.g., Portal) needed to allow a citizen (authenticatedusing his/hers eID) to trigger the change of address process;
D6.5.4.2 Technological implementation of the MS Service Provider(s): Customize eachMS Change of Address Service Provider to ensure its integration with all the relevant MSinformation systems.
3.5 D6.5.5: Technological Integration with the eID Common Infrastructure
D6.5.5.1 Integration of the MS Change of Address Service Provider(s) with the MS
PEPS: Support for cross-border scenarios through the integration of each Change ofAddress Service Provider with the appropriate Pan-European Proxy Service(s);
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
14/40
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
15/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 15 of 40
The description of WP5 includes a proposal for the base principles that should guide thedefinition of the eID Common Specifications. Therefore, and even though these principleswill be subject to discussion and revision during the project, the execution of this pilotwill require the deployment of:
National PEPS (one per MS): Supports task D.5.3, handling all eID communications with
other MS. National IdP (one or more per MS): Supports task D.5.3, handling the authentication of
citizens of the respective MS.
National Change of Address Service Provider (one per MS participating on this pilot):Supports tasks D.6.7.4 D.6.7.7, ensuring the success of the address update processwithin the respective MS.
Change of Address Service Transaction Coordinator (one for all the MS participating inthis WP): Supports tasks D.6.7.4 D.6.7.7, handling the coordination each address updateoperation with the several national service providers involved).
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
16/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 16 of 40
4 Change Control from the DOW
As the pilot start, it was necessary to do some changes to the planning of the tasks for WP6.5. Inthe next table, the initial tasks are described:
Delivery
No (i)
Deliverables Name WP
No.
Nature
(ii)
Dissemination
(iii)
Delivery date
(proj- month)
(iv)
D6.5.1 Specification of the EU Citizen Changeof Address Process
6.5 R P M4
D6.5.2 Specification of the Address CanonicalData Model
6.5 R P M6
D6.5.3 Specification of the Change of AddressUser interface(s)
6.5 R P M7
D6.5.4 MS Integration Plan 6.5 R P M11
D6.5.5 Specification of the Change of AddressService Provider Interface(s)
6.5 R P M13
D6.5.6Technological Implementation of MSChange of Address User Interface(s)
6.5 R P M14
D6.5.7 Test Plan 6.5 R P M15
D6.5.8First technological Implementation ofMS Change of Address ServiceProvider(s)
6.5 R P M17
D6.5.9Final technological Implementation ofMS Change of Address ServiceProvider(s)
6.5 R P M20
Table 1: WP 6.5 Initial tasks from the Dow
In the following table, the modifications made to the tasks for WP 6.5 (as described in Table 1)are described:
Delivery
No (i)
Deliverables Name WP
No.
Delivery date (proj-
month) (iv)
D6.5.1 Pilot 5 Functional Specifications 6.5 M16 Oct 2009
D6.5.2 Pilot 5 Draft Planning 6.5 M16 Oct 2009
D6.5.3 Pilot 5 Detailed Planning 6.5 M23 Apr 2010
D6.5.4 Pilot 5 Progress Report 6.5 M30 Nov 2010
D6.5.5 Pilot 5 Final Report 6.5 M36 May 2011
Table 2: WP 6.5 Change Control from the Dow
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
17/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 17 of 40
5 Member State Project Management Plan
5.1 Implementation planning for connection to the Interoperability layer
5.1.1 WP 6 High level Milestones
The following table represents the milestones agreed across all the pilots at the meeting with allthe pilot leaders in November 2008. An exercise is still required to revisit these high levelmilestones once each Member State has provided their individual plans.
No Key Milestones Start Date Due Date
1 Scope of pilots. High level document, what are we trying to achieve Jan 2009
2 Identify use cases Jan 2009
3 Define use cases Jan 2009
4 Business Model of Pilots. Trust levels, Attributes -> ServiceProvider
Jan 2009
5 Definition of the model that shows interoperability between ServiceProviders, ID Providers for each pilot
Feb 2009
6 Acceptance criteria. Project level for the European Commission.Testing level
Feb 2009 May 2009
7 MS Test Planning- Test Plan and Test Method for WP 6.0, Test plan and Test Cases6.1 . 6.5, Interoperability Test Planning? WP 5.3?
Feb 2009 June 2009
8 Each MS to decide whether to support PEPS and/or MW includingtokens, ID Providers and Attribute Providers May 2009
9 Definition of the interfaces of each SP to the common layerDependency with common specification (WP5) and internal decisionon architecture deployment
July 2009
10 Post go live planning, Evaluation, Communication, Sustainability QTR22009
11 Define minimum position to be able to go operational QTR22009
12 Definition of the user interface for authentication May 200913 Service Modifications to integrate to common layer May 2009 Oct 200914 Connection to the common layer for testing Oct 200915 Individual SP testing against interoperability layer (Testing
Environment) Coordinated at national levelOct 2009 Dec 2009
16 Interoperability Testing at MS Level Coordinated by WP5.3 Dec 2010 Feb 201017
Interoperability Layer Decision -> MS CouncilWP5 will provide atechnical assessment after doing the interoperability testing to theMS Council
Feb 2010
18 Identify and manage risks, Review before going live, MS Decisions March2010
19 Connection of all the services to the production interoperability layer March2010
20 Production Testing, Running the pilot over the Internet, Testingbefore advertising people
March2010
May 2010
21 Pilots live June 2010Table 3: WP 6 High level Milestones
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
18/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 18 of 40
5.1.2 Member State Milestone Plans
5.1.2.1 ESTONIA
Milestone
WP 6.5 Development and Integration 2010-02-08
EE Local Integration PEPS Testing 2010-02-08
EE Integration Testing 2010-03-22
STORK Integration Testing 2010-04-26
Production Environment Migration 2010-05-10
Production Environment Accreditation 2010-05-17
Go Live WP 6.5 EE 2010-05-18Table 4: Estonia WP6.5 Change of Address Milestones
5.1.2.2 SPAIN
Milestone
WP 6.5 Development and Integration 2010-02-01
ES Integration Testing Pilots S-PEPS Testing 2010-03-08
STORK Integration Testing Pilot 2010-04-03
Production Migration 2010-05-17
Production Accreditation 2010-05-30
Production Contingency 2010-05-30
Go Live WP 6.5 ES 2010-05-31
Table 5: Spain WP6.5 Change of Address Milestones
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
19/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 19 of 40
5.1.2.3 PORTUGAL
Milestone
WP 6.5 Development and Integration 2010-03-02
PT Integration Testing Pilot 5 PEPS Testing 2010-04-01
STORK Integration Testing Pilot 5 2010-05-03
Production Installation Pilot 5 2010-05-10
Production Testing PT Pilot 5 PEPS Testing 2010-05-17
Production Testing Stork Pilot 5 PEPS Testing 2010-05-24
Go Live WP 6.5 PT 2010-05-24
Table 6: Portugal WP6.5 Change of Address Milestones
5.1.2.4 SLOVENIA
Milestone
WP 6.5 Development and Integration 2010-03-01
SI Integration Testing Pilots S-PEPS Testing 2010-03-31
STORK Integration Testing Pilot 2010-04-30
Migration to Production 2010-05-14
Production Contingency 2010-05-31
Production Accreditation 2010-05-31
Go Live WP 6.5 SI 2010-05-31
Table 7: Slovenia WP6.5 Change of Address Milestones
5.1.2.5 SWEDEN
Milestone
WP 6.5 Development and Integration 2010-03-08
SE Integration Testing Pilot S-PEPS Testing 2010-04-05
STORK Integration Testing 2010-05-10
Migration to Production 2010-05-10
Production Contingency 2010-05-30
Production Accreditation 2010-05-30
Go Live WP 6.5 SE 2010-05-31
Table 8: Sweden WP6.5 Change of Address Milestones
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
20/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 20 of 40
5.2 Test planning including MS acceptance criteria
5.2.1 Objective
The objective is to test the following test cases for all Member States in the pilot:
TC MS AU1: Authentication with valid eID;
TC MS AU2: Authentication with valid eID without QAA;
TC MS AU3: Authentication with invalid eID;
TC MS AU4: The citizen chooses an invalid MS;
TC_MS_RAD1: The citizen retrieves an Address Declaration with success; TC_MSRAD2: The citizen looses connectivity after Address Declaration request;
TC_MS_UAD1: The citizen updates his address uploading his Address Declaration;
TC MS UAD2: The citizen chooses valid entities of a MS.
TC MS UAD3: The citizen chooses invalid entities of a MS.
TC MS UAD4: The citizen cancels the update address process.
TC MS UAD5: A MS looses connectivity during the update address process.
The test cases need to show the use of different types of credentials and this need to be donewithin the context of the trust model and the agreed trust mappings.
5.2.2 Expected results
After a successful testing period the results, should be consistent amongst all scenarios and the
testing process flawless. For that, the following results need to be attained.
TC MS AU1: Authentication succeeds;
TC MS AU2 : Authentication fails;
TC MS AU3: Authentication fails;
TC MS AU4: Authentication fails;
TC MS RAD1: Download Address Declaration PDF;
TC MS RAD2: Process fails gracefully;
TC MS UAD1: The citizen address is updated;
TC MS UAD2: The citizen address is updated in all selected entities;
TC MS UAD3: The address isnt updated;
TC MS UAD4: The address isnt updated;
TC MS COA6: The address isnt updated;
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
21/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 21 of 40
5.2.3 Acceptance Criteria
MS UC number Acceptance criteria CriteriaCategory
Relevantcriteria?
Priority
All COAUC001 The Citizen must have the ability
to use his\her eID when he\shewants to get the ElectronicAddress Declaration.
Functionality Yes High
All COAUC001 The Citizen must have the abilityto use his\her PID (residenceregistered country he\her wantsthe electronic addressdeclaration).
Functionality Yes High
All COAUC001 The Citizen must have the abilityto access CoA Service portal ofthe MS he wants to get theElectronic Address Declaration
the CoA.
Functionality Yes High
All COAUC001 The Citizen must be notified ofthe success/failure.
Functionality Yes High
All COAUC001 The Citizen must have the abilityto download the ElectronicAddress Declaration.
Functionality Yes High
All COAUC001 The Citizen must have the abilityto cancel the process.
Functionality Yes High
All COAUC001 The entire citizens data must betransmitted over a secure
connection (e.g. HTTPS).
Security Yes High
All COAUC001 A progress bar must be shown tothe Citizen if the request takesmore than a specified time.
Behavior Yes Low
All COAUC001 The process must be aborted if anerror/timeout occurs.
Behavior Yes High
All COAUC002 The Citizen must have the abilityto use his\her eID on the CoAService Portal of the MS he\shewants to upload the ElectronicAddress Declaration
Functionality Yes High
All COAUC002 The Citizen must have the abilityto use his\her PID (of the countryhe\her wants upload theElectronic Address Declaration).
Functionality Yes High
All COAUC002 The Citizen must have the abilityto access CoA Service portal ofthe MS he wants to upload theElectronic Address Declarationthe CoA.
Functionality Yes High
All COAUC002 The Citizen must be notified ofthe success/failure.
Functionality Yes High
All COAUC002 The Citizen must have the abilityto choose the MS entities he\she
Functionality Yes High
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
22/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 22 of 40
MS UC number Acceptance criteria CriteriaCategory
Relevantcriteria?
Priority
wants to notify.
All COAUC002 The Citizen must have the abilityto upload the Electronic Address
Declaration.
Functionality Yes High
All COAUC002 The Citizen must have the abilityto cancel the process.
Functionality Yes High
All COAUC002 The entire citizens data must betransmitted over a secureconnection (e.g. HTTPS).
Security Yes High
All COAUC002 A progress bar must be shown tothe Citizen if the request takesmore than a specified time.
Behavior Yes Low
All COAUC002 The process must be aborted if an
error/timeout occurs.
Behavior Yes High
Table 2: Change of Address acceptance criteria
Legend:
MS member state to which the criteria is applied.TC family the test case generic family (respectively, AUthentication, Retrieve AddressDeclaration and Update Address) to which the criteria is applied
Acceptance criteria a description of the acceptance criteriaCriteria category categorization of the criteria
Relevant criteria? relevance of the criteriaPriority the priority to meet a N acceptance criteria (Low = nice to conform to, Medium =
important to conform to, High = necessary to conform to)5.2.4 Naming Conventions
Test Plan Number format: TP 6.x MS xx
TP = Test Plan
6.x = Pilot number
MS = Member State
xx = Service Provider number (defined by each pilot)
Eg: TP 6.1 AU 01
Test Case Number Format: TC MS x
TC = Test Case
MS = MS
x = Use case type eg Credential Authentication = CA.
Eg TC MS CA
Script Number Format: MS xx 00x
MS = MS
xx = Use case Type eg: Credential Authentication = CA
00x = sequential numbering.
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
23/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 23 of 40
Eg: AU CA 001
5.2.5 Test planning
The test plan presented below is common to all the MS participating in this pilot. At the presentthe following countries are represented:
Estonia
Spain
Portugal
Slovenia
Sweden
In the following table MS A will be the one executing the test plan and the other participants willbe designed MS B, MS C, MS D, MS E.
Test Plan
Scenario
Test Case
No.Test Case Name
MS
Responsible
for running
Script
Scripts
Script No.
QAA
Level
Met
MS A CoAService
TC MSAAU1 Authentication with valid eID MS B
MSA AU1001
Yes
MS CMSA AU1002
Yes
MS DMSA AU1003
Yes
MS EMSA AU1004
Yes
TC MSAAU2
Authentication with valid eIDwithout QAA MS B
MSA AU2001 No
MS CMSA AU2002
No
MS DMSA AU2003
No
MS EMSA AU2004
No
TC MSAAU3
Authentication with invalideID
MS BMSA AU3001
Yes
MS CMSA AU3002
Yes
MS D MSA AU3003 Yes
MS EMSA AU3004
Yes
TC MSAAU4
The citizen chooses an invalidMS
MS BMSA AU4001
Yes
MS CMSA AU4002
Yes
MS DMSA AU4003
Yes
MS EMSA AU4004
Yes
TC MSARAD1 The citizen retrieves anAddress Declaration withMS B MSA RAD1001 Yes
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
24/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 24 of 40
success
MS CMSA RAD1002
Yes
MS DMSA RAD1002
Yes
MS EMSA RAD1004
Yes
TC MSARAD2
The citizen looses connectivityafter Address Declarationrequest
MS BMSA RAD2001
Yes
MS CMSA RAD2002
Yes
MS DMSA RAD2001
Yes
MS EMSA RAD2002
Yes
TC MSAUAD1
The citizen updates hisaddress uploading his AddressDeclaration
MS BMSA UAD1001
Yes
MS CMSA UAD1002
Yes
MS DMSA UAD1003
Yes
MS EMSA UAD1046
Yes
TC MSAUAD2
citizen chooses valid entitiesof a MS
MS BMSA UAD2001
Yes
MS CMSA UAD2002
Yes
MS DMSA UAD2003
Yes
MS EMSA UAD2004
Yes
TC MSAUAD3
The citizen chooses invalidentities of a MS.
MS BMSA UAD3001
Yes
MS CMSA UAD3002
Yes
MS D
MSA UAD3003 Yes
MS EMSA UAD3004
Yes
TC MSAUAD4
citizen cancels the updateaddress process
MS BMSA UAD4001
Yes
MS CMSA UAD4002
Yes
MS DMSA UAD4003
Yes
MS EMSA UAD4
004
Yes
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
25/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 25 of 40
TC MSAUAD5
A MS looses connectivityduring the update addressprocess
MS BMSA UAD5001
Yes
Table 3 TP 6.5 MSA
5.3 Detailed Work breakdown scheduleEach Member State is responsible for developing its own work breakdown schedule for thedelivery of the pilot. This depends on the delivery schedules for each Member State. The goal isto be live in the Production pilots by 1st June 2010.
In this section, a brief description of the work necessary for WP6.5 is described (along with thepresentation of Gantt chart, detailing the work ahead) for all participating member states.
5.4 Estonia
In Estonia the CoA requires that the user has a Estonian Personal Identity Code. This means that
well need a user with a foreign eID, who already lives in Estonia and has obtained the PersonalIdentity Code via face-to-face registration process.
Digital signing of CoA application is required for this pilot. Therefore this pilot will developmechanisms for creating digital signature with foreign ID tokens and makes use of certificatevalidation service provided by STORK.
Figure 1: EE General Planning including WP6.5 - CoA Pilot
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
26/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 26 of 40
5.5 Spain
Internet
ES-PEPS
Gov network
SARA
Citizen
SVDI
Catcert
DB
InternetInternet
ES-PEPSES-PEPS
Gov network
SARA
Gov network
SARA
Citizen
SVDI
Catcert
DB
Figure 2: ES System Overview Change of Address
In Spain the CoA requires that the user has a Spanish fiscal number (NIF), derived from (e)DNIor the foreigners ID, NIE. This means that well need a user with a foreign eID, who already livesin Spain, so also has his NIF. The integration of Stork implies, apart from the integration just asthe other SPs, the verification if the obtained user data with his foreign ID are the same as theregistered ones with his NIF.
CoA has as well a production as a test environment, actually operational, both connected to thecorresponding production and test environments of the tax office, the social security and otherback-end systems.
No special restrictions apply to these systems, as far as changes in the software are concerned.
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
27/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 27 of 40
Id Nombre de tarea
1 Project Stork - ES
2 Dependencies
3 From WP5.2
4 Dummy API
5 Enveloped dummy API
6 Complete common functionalities
7 Development
8 WP5.3 Development
9 Interface with @firma
10 Interface with HSM
11 Interface with SVDI
12 Interface with Catcert
13 WP6.1 Development and integration
14 Integration of PASSI in Stork15 Int egration of PASSI in eGov portal
16 WP6.3 Development and integration
17 Integration of UJI
18 Integration of University 2
19 Integration of University 3
20 Integration of University 4
21 Integration of University 5
22 Integration of University 6
23 Integration of University 7
24 Integration of RedIris
25 WP6.5 Development and integration
26 Integration in CoA application
2 7 E qu ip me nt ve ri fi ca ti on an d u pg ra de
28 Equ ipment i nstal la ti on and con fi gu ra ti on
29 Organise housing
30 Network C onfiguration
31 D et ai le d na ti ona l t es t pl an
32 Get test data (eIDs)
33 WP5 test data
34 WP6.1 test data
35 WP6.3 test data
36 WP6.5 test data
37 C onn ec ti vit y t es ti ng
38 ES Integtration Testing
39 DemoSP - S-PEPS
40 Pilots - S-PEPS
41 DemoSP - @firma
42 Pilots - @firma
43 Stork Integration Testing
44 ES DemoSP - C2 IDP
45 C2 DemoSP - @firma
46 ES pilot a - C2 IDP
47 C2 pilot a - @firma
48 Pro iduct ion connect iv it y test ing
4 9 M ig ra ti on to pr od uc ti on
50 Contingency
51 Ac credit at ion
52 =================================================================
53 ES Milestones
5 4 S pe ci fi c f un ct io na li ti es in te gr at ed
55 Pilot 6.1 integrated
56 Pilot 6.3 integrated
57 Pilot 6.5 integrated
58 M S i nt eg ra tio n t es ts comp le te d
59 Stork in production
15/09
16/11
11/01
01/09
20/01
26/02
19/02
26/01
01/03
31/05
03 ago '09 24 ago '09 14 sep '09 05 oc t '09 26 oc t '09 16 nov '09 07 dic '09 28 dic '09 18 ene '10 08 feb '10 01 mar '10 22 mar '10 12 abr '10 03 may '10 24 may '10 14 jun '10
Figure 3: ES General Planning including WP6.5 - CoA Pilot
5.6 Portugal
The Change of Address Service (CoA) provider will be based on the exiting CoA for Portuguesecitizens. This service will be integrated in the Portuguese Citizen Portal (www.portaldocidadao.pt).
To access the pilot functionalities, the citizen must navigate into the Portuguese Citizen Portal andlogin with his eID (electronic identity credentials accepted by the resident MS). Onceauthenticated, the citizen is then given the chance to obtain an Address Declaration, if his currentaddress is portuguese, or to Update his current address..
The Portuguese PEPS and pilots will interact with its environment according to the followingdiagram.
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
28/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 28 of 40
Internet
Portuguese Attribute
Providers
Portuguese Service
Providers
Portuguese
PEPS
Other/Future
Portuguese
Identity
Providers
Portuguese
Citizen Card
PKI
New System
(To Be implemented in STORK)
Existing System
(Not Changed in STORK)
Existing System(May be Changed in STORK)
CRL
OCSP
Portuguese
Citizen Portal
IST Portal
Change Of
Address
Provider(Address Life Cycle IS)
Portuguese
Interoperability
Platform
Other Attribute
Providers
Other MS
PEPS IdPPT Citizen
Card Applet
Figure 4: Information Systems Conceptual Architecture
The Portuguese PEPS will interact (directly and indirectly) with 5 types of external parties:
1) The Portuguese Identification Provider
2) Portuguese Citizen Card PKI3) Service Providers
a. Portuguese Citizen Portal
b. IST Portal
c. Change of Address Provider.
4) Attribute Providers
a. IdP
5) Other Member-State PEPSs and V-IDPs.
6) Users
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
29/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 29 of 40
ID Task Nam e Duration
2 Dependencies 84 days
3 WP 5.2 84 days
4 Dummy API 0 days
5 Enveloped DummyAPI 0 days
6 Complete Common Functionalities 0 days
7
8 Development 115 days9 WP 5.3 Development 85 days
10 D evel op ment of PT_ PE PS (in cl ud ing Inte rface wi th CC PK I) 5 5 d ays
11 Development of Portuguese IdP 50 days
12 Interface With Portuguese Attribute Privers [out ofscope] 0 days
14 WP 6.1 Development and Integration 100 days
15 Development Pilot Specific functionalities 4 days
1 6 I nt eg ra ti on Po rtu gue se Ci ti zen Po rtal 5 0 d ays
17 WP 6.3 Development and Integration 88 days
18 Development Pilot Specific functionalities 4 days
19 Integration of IST Portal 4 days
20 WP 6.5 Development and Integration 112 days
21 Development Pilot Specific functionalities 66 days
22 TBD 6 days
23 Hardware 69 days
24 Equipment Verification and Specification 5 days
25 Acquis ition 4 days
26 Instalation 20 days
27 Test Hardware 10 days
28 Production Hardware 10 days
29 Housing 59 days
30 Specification 15 days
31 Implem entation 4 days
32
33 Network 9 days
34 Network requirements specification 5 days
35 ISTAMA Implementation 2 days
36 Multicert AMA Implementation 2 days
37
38 Testing 119 days
39 Smoke Testing 10 days
40PT Integration Testing 7 days
41 IdPPEPS testing 22 days
42 Pilot 1 (WP6.3) PEPS testing 15 days
43 Pilot 2 (WP6.5)PEPS Testing 22 days
44 Pilot 3 (WP6.1)PEPS Testing 22 days
45 STORK Integration Testing 59 days
46 PEPSPEPS - STORK Integration Testing 22 days
47 STORK Integration Testing Pilot 1 (WP6.3) 22 days
48 STORK Integration Testing Pilot 2 (WP6.5) 22 days
49 STORK Integration Testing Pilot 3 (WP6.1) 22 days
50
51
52 Production 62 days
53 Production Instalation 52 days
54 IdP+PEPS PT 5 days
55 Pilot 1 (WP6.3) 5 days
56 Pilot 2 (WP6.5) 5 days
57 Pilot 3 (WP6.1) 5 days
58 Production Testing PT 22 days
59 Pilot 1 (WP6.3) PEPS testing 5 days
60 Pilot 2 (WP6.5)PEPS Testing 5 days
61 Pilot 3 (WP6.1)PEPS Testing 5 days
62 Production Testing STORK 22 days
63 Pilot 1 (WP6.3) 5 days
64 Pilot 2 (WP6.5) 5 days
65 Pilot 3 (WP6.1) 5 days
66 Go Live WP 6.3 PT - IST 0 days
67 Go Live WP 6.5 PT 0 days
68 Go Live WP 6.1 PT 0 days
15-09 11-01
15-09 11-01
15-09
16-11
11-01
28-09 05-0305-10 29-01
Multicert, AMA, IST 29-01
Multicert, AMA, IST 11-12
11-12
19-10 05-03
AMA 17-12
AMA 05-03
12-10 10-02
IST 10-12
IST 10-02
28-09 02-03
Multicert 28-12
AMA, Multicert 02-03
01-09 04-12
Multice rt , IST , AMA 0 7- 0 9
AMA 06-11
09-11 04-12
AMA, IST? 20-11
AMA 04-12
31-08 19-11
AMA 18-09
AMA 19-11
05-10 15-10
Mult ic er t, IST, AMA 0 9- 1 0
I ST , AM A 1 3- 10
Multice rt , AMA 1 5- 1 0
23-11 06-05
A MA ,I ST, MU LTI CER T 0 4- 12
01-02 06-04
Multicert, AMA, IST 02-03
IST, Multicert, AMA 12-0 3
Multicert, AMA 01-04
AMA 06-04
15-02 06-05
16-03
IST, Multicert, AMA 13-04
Multicert, AMA 03-05
AMA 06-05
03-03 27-05
03-03 13-05
A MA , Mul ti ce r t, I ST 0 9- 03
IST 20-04
A MA ,M ul ti ce rt 1 0- 05
AMA 13-05
21-04 20-05
IST 27-04
AMA ,M ul ti ce rt 1 7- 05
AMA 20-05
28-04 27-05
IST 04-05
A MA ,M ul ti ce rt 2 4- 05
AMA 27-05
04-05
24-05
27-05
29 06 13 20 2 7 0 3 1 0 1 7 2 4 3 1 07 14 21 28 0 5 1 2 1 9 2 6 0 2 0 9 16 23 30 07 1 4 2 1 2 8 0 4 1 1 1 8 25 01 08 15 2 2 0 1 0 8 1 5 2 2 2 9 05 12 19 26 0 3 1 0 1 7 2 4 3 1 0 7 14 21 28 05 1 2 1 9 2 6
Jul '09 Aug '09 Sep '09 Oct '09 Nov '09 Dec '09 Jan '10 Feb '10 Mar '10 Apr '10 May '10 Jun '10 Jul '10 A '
Figure 5: PT General Planning including WP6.5 - CoA Pilot
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
30/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 30 of 40
5.7 Slovenia
Figure 6: SI System Overview Change of Address
In Slovenia the CoA service requires the personal appearance at the administrative unit of theforeign citizen. That way he receives a Personal Registration Number (PRN; Slovenianabbreviation: EMO). Therefore the use cases implemented will have to be based on thisrequirement.
The existing CoA service is one of the services provided through the portal eSJU for electronicservices of public administration. This CoA service will have to be modernized and rebuilt withthe STORK (pilot 5) requirements. The CoA service in Slovenia is mainly dealing with SlovenianCentral Register of Population CRP.
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
31/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 31 of 40
Figure 7: SI General Planning including WP6.5 - CoA Pilot
5.8 Sweden
For the test and production of the functionalities, the SE-PEPS will interact with its STORKenvironment according to the following diagram:
Figure 8: SE System Overview Change of Address/PEPS
SI
SE
PT
ESEE
PEPS/MW
BIDNor-dea
Telia
SwedishTax
Agency
IDPs
Population
register
SF
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
32/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 32 of 40
When Swedish citizen moves to another Pilot-MS the SE-PEPS will interact with the appropriatepilot partner-PEPS in order to handle the request of identification and revocation control inconnection with the Swedish ID-Providers Nordea, BID and Telia. The response will be handledby the common PEPS functionality according to the WP5 specifications.
When a pilot member citizen moves to Sweden the SE-PEPS will interact with the appropriate
pilot partner-PEPS in order to handle the request of identification and revocation control and tosubmit the response to the Change of address e-service. The response will be handled by thecommon PEPS functionality according to the WP5 specifications.
It has not yet been specified in what way the Swedish Tax Agency with the Population registerwill act as an attribute provider, verifying a citizens present address in Sweden. Within Sweden,people can only change their address if they have a fiscal number / PID (personnummer andsamordningsnummer).
The final specifications of the Change of Address pilot will set the scope for the integrationbetween WP5 and WP6.5.
Figure 9: SE General Planning including WP6.5 - CoA Pilot
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
33/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 33 of 40
6 Integrated Project Management Plan for pilot
6.1 Internal Project Tasks
Task 6.5.1: Detail definition of the EU Citizen Change Of Address Process Task 6.5.2: Specification of the Address Canonical Data Model
Task 6.5.3: Specification of the Change of Address Service Provider and User Interfaces
Task 6.5.4: Technological Implementation of the MS Service Providers and UserInterfaces
Task 6.5.5: Technological Integration with the eID Common Infrastructure
Task 6.5.6: Change of Address Tests
Task 6.5.7: Run Real life pilot
Task 6.5.8: Consolidate results and draw conclusions
6.2 Test Planning including acceptance criteria
During the work developed for the deliverable D6.5.1 Change of Address FunctionalSpecification, it was concluded, by the participating member states, that all should work together,in order to achieve a common basis for a test planning executed similarly in the nationalintegration phase and also afterwards in the pan-European STORK integration phase.
This way we will have comparable and quantifiable results amongst all member states and alsoclear and defined metrics and a common process, allowing for the conclusions of this pilot to bemore clear and defined.
Regarding the definition of acceptance criteria, the same thought process was followed, and asingle set of criteria, based on the common generic approach to the Change of Address process,was defined to be applied to every member state in the same way that the Use Cases, detailing thecommon core of the functional specification for CoA, were developed.
Having this in mind, in the previous chapter a single approach to both the Test Planning and alsoto the Acceptance Criteria was presented. This approach, although implemented separately by allmember states is to be followed by all in the same way, thus being possible to consider it anIntegrated Test Plan and an Integrated Acceptance Criteria. For reference the Integrated Test Plancan be seen detail in section 5.2.5 and the Acceptance Criteria in section 5.2.3.
6.2.1 Member State Integration testing
When the development phase finishes, along with all the necessary unit and system tests and wehave functional systems ready, the source code of the Change of Address service andcorresponding S-PEPS software will be passed to the test environment and compiled in asimulation of the production environment.
Before starting the integration tests, a series of connectivity tests are to be executed, verifying thatall devices communicate with each other.
Test cases should be executed, with IDPs, SPs and APs in test environment conditions. Thesesystems should include test data of the persons whose eID will be used. That means, e.g. validcertificates, revoked certificates, with and without address information, of as many different IDPs,as possible. As this is a test environment, the certificates to use dont have any special restrictionsor limitations and can be generated on the spot. Also any DNI information available for thetesting will bring added value to these simulations.
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
34/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 34 of 40
The first test cases will use the demo-SP delivered by WP5.2; when these are successful, the SPwill be substituted by the real pilots, as developed during the running if the pilot.
At first, full logging of all the systems is enabled. Before ending all tests, the system logging is setto the production values. Afterwards test will be repeated, and last of all a performance test isexecuted, simulating 100 parallel sessions.
A vulnerability analysis should also be executed on the application.
6.2.2 STORK Integration testing
Once the national integration is tested, test cases will be repeated with other countries. Every timea new country is connected to the STORK network, test cases are executed.
6.3 Go Live Planning
At this moment in time, although several things remain unspecified we can already have a roughsketch of the operations and timelines involved in the Go Live planning for the WP6.5 Change of
Address pilot.
As we continue with the development and testing process and also receive some more inputs fromthe other Workpackages currently in definition we will be able to better define this planning andthe schedule for its completion.
At this moment, the following operations are viewed as necessary:
WP6.5 Final developments and related items
Equipment installation and configuration:
1. install and configure the system software (operating system, DBMS, JBoss, Apache)
2. check system logging
3. configure networking (especially the firewall), to allow for remote access to thesystem, as well as web access by users
4. mount the equipment in a rack and connect it
5. check the communications
6. transfer the source code and install Stork
7. check functioning of system
Housing: with the housing provider well have to agree the (contractual) conditions ofinclusion of these 3 servers, where to connect them in their network, rules of the firewall,inclusion in the backup policy, etc.
Network configuration: configure http(s) access from anywhere
WP6.5 Test data: some further efforts will be needed to get enough test data for test aswell as for production environments.
Production connectivity testing
Migration from test environment to production environment
Contingency
Accreditation
Production
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
35/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 35 of 40
6.4 Detailed Work breakdown schedule
In the following figure the Gantt chart representing the integrated planning created from all theindividual member state milestones is shown. This chart is based in the Project ManagementPlanning created by the participating member states to represent the work in their own pilotimplementations.
The dates and milestones shown here define the time intervals for each task and came from ananalysis of the different schedules provided by each country. They try not reducing or changingthe individual planning, rather trying to standardize them in a common chart.
Figure 10: WP6.5 - CoA Pilot Integrated Planning
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
36/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 36 of 40
7 Users involvement
For each member state participating in the pilot implementation and testing, its respectivedevelopment teams will be responsible for the execution of the tests on a national level and also atSTORK level. No users outside of these teams will be contracted, so there is no need for training
and detailed documentation at this moment in time.Regarding dissemination and result presentation, each member state will publish informationregarding the evolution of the pilot in their institutional Internet portals allowing the common userto follow the evolution and status of the pilot. The pilot will also be publicized in the change ofaddress paperwork locations (e.g. municipalities, national registry, etc)
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
37/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 37 of 40
8 Support and accessibility
From the moment the Dummy API is delivered to all partners, theyll need support. First linesupport will be delivered by the test-coordinators organisation. Second line support should beprovided by the organisation that developed this part.
For the integration of the pilots, the second line support should be given by the organisation thatdeveloped the demo-SP.
As the distribution of work for next phase of WP5 hasnt been done yet, these organisations willhave to be assigned along with their respective responsibilities and attributions.
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
38/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 38 of 40
9 Risk management
Nr Threat Consequence(s) Measure(s)
Chance
Impact
Risk
Comments
1 IncompletePEPSImplementationSpecifications
Delay in thepilotimplementation
Usage ofadditionalresources toovercomeproblems causedto the pilot
Monitor the progress ofWP5, participating in themeetings, workshops,conference calls andmailing list discussions
Review WP5 draftdeliverables
M H H PEPSSpecificationswhere deliveredandimplementationis under way.
2 Delay on PEPSReference
Implementation
Delay in thepilot
implementation Usage of
additionalresources toovercomeproblems causedto the pilot
Monitor the progress ofWP5, participating in the
meetings, workshops,conference calls andmailing list discussions
Review WP5 draftdeliverables
If during the project thisrisk becomes moreprobable, the pilot leadershould rearrange theproject plan in order tostart developing thecomponents that are notdependent on WP5 PEPS
reference implementation
M H H A first versionof PEPS
ReferenceImplementationhas beenreleased
3 Small numberof pilot users
A small numberof users (i.e.senders andreceivers of e-deliveries)would make ithard to evaluatethe success ofthe pilot.
Appropriatedissemination activities.
Partners should promotethe CoA pilot inconnection with theirother pilots.
Definition of appropriatesuccess criteria; thesuccess criteria shouldfocus on quality issues.
M M M The MS agreedto publicize theCoA pilot intheir respectivecitizen portalsand publicoffices.
4 Lack ofagreementregarding theWP6.5 usecases andprocess
Delay in thepilotimplementation
Usage ofadditionalresources toovercomeproblems causedto the pilot
Obtain the sign-off of theuse cases and processfrom each participatingMS
If an incompatibility isdetected, the pilot leadershould promote anegotiated solution thatovercomes the problem
L H M The MS agreedon the use casesand process.
5 IncompatibleAddressCanonical DataModel betweenMSs
Potentiallyprevent one ormore MS fromparticipating inthe pilot
Delay in thepilot
Verify if the agreedaddress format issatisfying for all pilotparticipants
If a disagreement is
detected, the pilot leadershould promote a
M H H The MS agreedon an addressformat.
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
39/40
D6.5.2 Change of address - Draft planning 6th November 2009
STORK-eID Consortium Page 39 of 40
implementation Usage of
additionalresources toovercomeproblems caused
to the pilot
negotiated solution thatovercomes the problem
Table 4: Change of Address risk list
Legend:
Threat- Description of a potential danger towards the project.
Consequence - Description of the negative effect the threat can have towards the project.
Measure - Description of the measures that can be taken to prevent a threat from happening or toreduce negative the effects.
Chance - Defines the likelihood of a threat to happen..
Impact- Measure of the negative effect on the project.
Risk- Chance * Impact, representing the priority.
-
8/8/2019 D6.5.2 Change of Address Draft Planning Final 6 November 2009..
40/40
D6.5.2 Change of address - Draft planning 6th November 2009
10Conclusions
The current document tries to define the planning for the implementation of WP6.5 Change ofAddress pilot. It will serve as a rough sketch of the work ahead, but, as indicated in the name it isa Draft Planning and only the best we can create with the current available information.
As such, this document still is a work in progress that will serve as the basis for the next stages inthe pilot, and also serve as the fist draft for the detailed planning to complete during the firsttrimester of 2010.