Government of India
Ministry of Water Resources River Development & Ganga Rejuvenation Central Water & Power Research Station
Khadakwasla, Pune – 411 024
Issue No.: 02 February 2018
____________________________________________________________________
CWPRS MONTHLY INFORMATION BULLETIN ________________________________________________________________________________
1. ESTIMATES
1.1 Submitted 03
1.2 Awarded 04
2. REPORTS SUBMITTED 05
3. RESEARCH PAPERS
3.1 Submitted 05
3.2 Published 05
4. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES 06
5. LECTURES DELIVERED 06
6. PARTICIPATION IN MEETINGS
6.1 Technical Committees 07
6.2 Other Committees 07
7. TRAINING OF PERSONNELS 07
8. IMPORTANT VISITORS 09
9. NEW APPOINTMENTS / PROMOTIONS / RETIREMENTS 09
10. TRAINING PROGRAMMES ORGANIZED 10
11. OTHER INFORMATION 10
Phones : 24103378 Fax : 2438 1004 Email : [email protected] web: http://cwprs.gov.in
February 2018
2
Summary Information For 2009-2017
Years Jobs Awarded
_____________________
Nos. | Amount (Rs.)
Reports Submitted
Papers Published
Participation in Seminars/ Symposia/ Conferences
Lectures Delivered
Technical Committee Meetings
Training of Personnel
Training Programmes/ Conferences Organized
2009-10 118 14,46,68,747 94 57 39 36 30 59 04
2010-11 159 17,06,34,397 95 94 38 52 23 61 11
2011-12 139 18,56,13,568 116 63 26 45 42 88 08
2012-13 150 22,53,10,859 120 67 44 57 24 55 08
2013-14 152 18,24,51,087 112 63 37 68 21 54 11
2014-15 153 25,69,14,032 113 62 58 47 12 62 09
2015-16 85 13,95,89,971 106 65 51 74 17 120 10
2016-17 111 25,90,34,704 95 90 114 97 23 315 17
STUDIES AWARDED FOR CURRENT YEAR 2017-2018
Till Jan 18 121 27,09,32,582 78 54 48 27 33 710 15
During February -18
11 3,45,62,647 07 04 12 07 04 85 02
Total 132 30,54,95,229 85 58 60 34 37 795 17
Estimate submitted to Client but yet to be awarded
February 2018 17 2,21,11,970 - - - - - - -
CWPRS Information Bulletin February 2018
3
1. ESTIMATES
1.1 Submitted: (17 Nos. totaling to Rs. 2,21,11,970/-)
Sl. No.
Name of Work Sponsoring Agency Division Amount (Rs.)
1 Inspection and determination for providing the remedial measures to stop the seepage at Chandas Wathoda MI Project Dist Amravati, Maharashtra
The Superintending Engineer Urdhav Wardha Sinchan Mandal, Amravato-444603 dist Amaravati
GE 8,01,010
2 Slope stability analysis from chainage 14615 to 15060 m of left bank canal Arjuna Medium Irrigation Project, Ratnagiri
The Executive Engineer Irrigation Project Construction Division Kuvarbat Dist Ratnagiri-416510
GE 7,00,340
3 Mathematical Model Studies in the context of improving capacity utilization of OR-1, OR-2 and Fertilizer Berths in Visakhapatnam Port, Andhra Pradesh
The Chief Engineer Visakhapatnam Port Trust,
PH-I 6,94,554
4 Mathematical model studies for evolving suitable flood management / anti erosion measures along river chenab, Jammu Kashmir
Executive Engineer, Flood Control Division Aknoor, Jammu and Kashmir - 181201
RH 18,78,130
5 Revised estimate for PC based intake discharge (hydrograph) control system of Tapi River model at GERI, Gujarat with Data Acquisition system
Shri. K.A. Keshwani, Chief Engineer and Director Gujarat Engineering Research Institute (GERI), Vadodara
Hyd-Inst 9,59,000
6 Mathematical model studies for proposed intake location of (JSW) in river, Kharsota or Brahamini at Aul and Bilokana
Sarvanandh Singh, General Manager, JSW Steel Ltd., Paradeep Bhavan, Jagathsinghpur - 754142 Odisha
BE 27,25,396
7 Field data collection and analysis for mathematical model studies for siltation at Dhruva Jetty for BARC Trombay, Mumbai
Shri. P.V. Varde, Head Research Reactor Services Bhaba Atomic Research Centre Division Trombay (Mumbai)
CHS 17,73,990
8 Hydraulic Model Studies for Right main canal Head Regular of Polavaram Irrigation Project Andhra Pradesh, 1:20 Scale 2-D Sectional Model
Shri. V.S. Ramesh Babu, Superitending Engineer, PUPHW Circle, Dowleswaram, Andhra Pradesh-533125
SED 61,34,870
9 Mathematical model studies for hydrodynamics and sedimentation for development of fishing harbour at Alvedande, Uttar Kanada, Dist, Karnataka
The Executive Engineer Port Division Baitkal Karwar, Karnataka-581302
PH 10,05,330
10 Mathematical model studies for shoreline changes for proposed development of fishing harbour at Alvedande, Uttara Kannada Dist - Karnataka
The Executive Engineer Port Division Baitkal Karwar, Karnataka-581302
PH 6,02,180
11 Desk and Wave flume studies for the design of training wall / breakwaters for proposed developments of fishing harbour at Alvedande Uttara Kannada Dist - Karnataka
The Executive Engineer Port Division Baitkal Karwar, Karnataka-581302
CHS 7,88,640
12 Mathematical model studies for hydrodynamics and sedimentation for development of fishery harbour at Tadadi., Uttar Kannada, Karnataka
The Executive Engineer Port Division Baithkal, Karwar, Karnataka-581302
PH 10,09,170
CWPRS Information Bulletin February 2018
4
13 Desk and wave flume studies for design of training wall / breakwaters for proposed development fishing harbour at Tadadi Uttar Kannada Dist Karnataka
The Executive Engineer Port Division Baithkal, Karwar, Karnataka-581302
CHS 7,88,640
14 Mathematical model studies for shoreline changes for proposed development of fishing harbour at Tadodi, Uttara Kannada, Karnataka
The Executive Engineer Port Division Baithkal, Karwar, Karnataka-581302
PH-I 6,02,180
15 Mathematical model studies for wave tranquility for development of fishing harbour at Vannalli Uttara, Karnataka
The Executive Engineer Port Division Baithkal, Karwar, Karnataka-581302
PH 6,98,810
16 Mathematical model studies for littoral drift hydrodynamics and sedimentation for development of fishery harbour at vannalli Uttara Kannada - Karnataka
The Executive Engineer Port Division Baithkal, Karwar, Karnataka-581302
PH 8,01,230
17 Testing of in pipe Hydro turbine (per unit) at CWPRS for kirloskar energen Pvt. Ltd., Pune - Maharashtra
Shri Pranva Marathe, Kirloskar Neergen Pvt. Ltd., 13/A Karve Road, Kothrud Pune-411038
HMC 1,48,500
1.2 Awarded: (11 Nos. totaling to Rs. 3,34,32,717/- + Rs. 11,29,930/- for calibration works 11 Nos.)
Sl. No.
Name of Work
Sponsoring Agency Division Amount (Rs.)
1. Dam break analysis and providing inputs for emergency action plan for Konda Pochamma Sagar Reservoir (Kaleswarm Project) near Pamulaparthi village dist. Seddiget - Telengana
Executive Engineer Irrigation and CAD construction Division Kaleswaram Project circle -I Gajwel dist Siddiget, Telengana (502278)
SWH 16,00,000
2. Site visit for inspection of the dam and discussion towards undertaking studies for the rehabilitation of Ujani Dam, Solapur, Maharashtra
The Executive Engineer, Ujani Dam Maintenance division Bhimanagar Taluka Madha Dist. Solapur, Maharashtra- 413212
CT 50,180
3. Estimate for site for inspection of dam and discussion towards undertaking studies for Rehabilitation of Gulab Sagar (Mahan) Dam, Sidhi, Dist. MP
The Chief Engineer water resources department Ganga Basin, Hazurtalsk Rewa District. M.P.- 486001
CT 1,92,640
4. Hydraulic Model studies for spillway Energy dissipater and power intake of Kwar N.E. Project (J.K.) 1:60 scale 3D comprehensive model
Shri. R.K. Gupta, Chief Engineer Kwar Hydroelectric Project Chenab Valley Project J.K.
SED 1,12,55,000
5. Hydraulic Model Studies for spillway of Kwar H.E. Project (JK), 1:50 scale (2-D) Sectional Model
Shri. R.K. Gupta, Chief Engineer Kwar Hydroelectric Project Chenab Valley Project J.K.
SED 59,06,617
6. Hydraulic Model Studies for Reservoir sedimentation of Kwar H.E.Project Kishtwar, J&K
Shri R.K.GUPTA Chief engineer CVPP Ltd 2nd floor, J K PCC building Jammu (180006) J.K.
HAPT 95,43,740
7. Desk and mathematical model studies for flood protection work of Narker Khod in Tehsil Khundian and Dehra in District Kangra, Himachal Pradesh.
Executive Engineer IPH, Division, Dehra Tehsil Khundian and Dehra Dist- Kangra, Himachal pradesh
RH 19,32,280
8. Conducting Bathymetric survey of River Dibang at Gauge and Discharge site, Arunachal Pradesh
Ramesh Kumar, Chief Engineer (Civil) Dibang Multipurpose Project (NHPC) Ltd, Mayu sectro P.O. Roing District: Lower Dibang Valley, Arunachal Pradesh-791102
HI 9,80,420
CWPRS Information Bulletin February 2018
5
9. Revival of Twin Tube Parameters (TTRS) of Madhuban Dam, Govt of Gujarat near Vapi - Gujarat
Executive Engineer, Madhuban, Damanganga Project Gujarat-396240
Hyd Inst 3,57,840
10. Mathematical Model Studies for hydrodynamics and sedimentation analysis form downstream of proposed conventional type of barrage to the mouth of sea near Surat - Gujarat
The City Engineer, Surat Municipal Corporation, Surat Mahanagar Seva Sadan Mugalisara, Surat-395003
MMCE 14,91,000
11 Performance Testing of sample submersible pump sets for Irrigation Department Uttar Pradesh, Lucknow.
Superintending Engineer, Central Equipment and stores procurement circle-II, Irrigation and Water Resources Department ,U. P. Ganga Sinchai Bhawan Telibagh, Lucknow-226029
HMC 1,23,000
2. REPORTS SUBMITTED: (7 Nos.)
S. No. Title Report No Month/Year
1. Mathematical Model studies for surge analysis of Tembhu Irrigation Scheme, Stage-V
5562 02/2018
2. Re-assement of Geotechnical stability after dredging liquefaction studies for deep water breakwaters at Kakinada Port AP
5563 02/2018
3. 2D HMS Sluicing of sediment from reservoir of Kishanganga H.E. Project J&K
5564 02/2018
4 Mathematical Model studies for shoreline changes for long term protection work at Tannir bavi beach Mangalore for ONGC MRPL, Karnataka
5565 02/2018
5 Hydraulic model studies for pump sump on Baidmara weir for Bakaro Steel Plant
5566 02/2018
6 Vibration and Noise measurement for pumps in five pumping stations on Sarvashtra branch canal, Gujarat
5567 02/2018
7 Analysis and Inter-pretations of Dam Instrumentation Data for period Jan-2016 to Dec-2016 for non overflow block-25, Indira Sagar Dam, MP
5568 02/2018
3. RESEARCH PAPERS:
3.1 Submitted: (2 Nos.)
1. Paper Titled “Application of cloud computing in libraries” by Sarvesh Kumar Yadav for possible publication in “ Information communication in digital ERA: Present scenario and future perspectives”. 2. Paper Titled “Recycling of industrial effluent with reference to textile wastewater” by Dr. R. Manivanan for possible publication in “4th International conference on reuse and recycling of materials and their products (ICRM 2018)”.
CWPRS Information Bulletin February 2018
6
3.2 Published: 4 Nos.
1. Paper Titled “Optimization of layout of Semi-Enclosed Basin in Micro Tidal Region to Minimise Siltation for Mega ship by FEM’ by A.A. Purohit, M.M. Vaidya published in 4th International Conference in Ocean Engineering (ICOE-2018) February 2018. 2. Paper Titled “The potential of Borehole Geophysical Logging and Tracer Techniques in Dam Seepage Investigations” by G.A. Panvalkar, N.V. Deshpande published in The Masterbuilder, e book , Vol.20.1., PP: 52-55, January, 2018. 3. Paper Titled” Evolving Fishing Harbour Layout by Wave Tranquility study using Mathematical Model - A case study” by Dr.J.D. Agrawal, H.C. Patil, Sagar Chanda, T. Nagendra published in 4th International Conference in Ocean Engineering (ICOE-2018) February 2018. 4. Paper Titled “Simulation of littoral drift and shoreline changes in high littoral zone at Ennore, East coast of India” by Dr. R. Manivanan, Dr. J.D. Agrawal, T. Nagendra, published in 4th International conference in Ocean Engineering (ICOE-2018) February 2018.
4. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES/ - ( 3 events, 12 participants)
Sl. No. Title Event, Place, Date Name of Officer
1. 4th International Conference on Ocean Engineering (ICOE 2018)
IITM, Chennai 18th -21st February, 2018.
Dr. J.D. Agrawal, Sci-D Shri A.A. Purohit, Sci-D Shri L.R. Ranganath, Sci-D Dr. R. Manivanan, Sci-B Shri V.B. Sharma, Sci-B Shri S.N. Jha, ARO Shri M. Karthikeyan, RA
2. 11th International Conference of ATMS
Pune 06th – 07th February, 2018
Shri P.K Dorle, Sci-B Shri Saurabh Anand, RA
3. Global Procurement Summit 2018
The Lalit Hotel, New Delhi. 08th – 09th February, 2018
Shri B. Suresh Kumar, Sci-C Shri M.S.R Naidu, Sci-B Shri Pratap Singh Solanke, Sci-B
5. LECTURES DELIVERED – (7 events, 05participants)
Sl. No.
Title Event, Place, Date Name of Officer
1. Application of Statistics in Hydrology and water resources
Tuljaram Chaturchand College, Baramathi, Pune 10th February, 2018
Shri R.S. Jagtap, JD
2 Modern Reservoir Sediment Measurement Techniques &Technologies (Hydrographic survey, Bathymetry)
NWA, Pune 01st February, 2018
Shri M.S Bist, Sci-C
3. Spur a tools for protecting banks Zeal College of Engineering, Pune 16th February, 2018
Shri S.A. Burele, Sci-B
CWPRS Information Bulletin February 2018
7
4. River behaviour in response to development and encroachment
NERIWALM, Tezpur, Assam 26th – 27th February, 2018.
Dr. R.G. Patil, Sci-D 5 CWCs guidelines for Morphological Studies
6. Flood protection works in workshop on River Management
7. Coastal Sedimentation First National Workshop on Coastal, IITM Chennai 27th February, 2018
Shri L.R Ranganath, Sci-D
6. PARTICIPATION IN MEETINGS: 6.1 Technical Committee Meetings: (04 Nos.)
Sl. No.
Name of Committee Place and Date Participant(s)
1. Attended the 3rd Bhujal Manthan Programme at Nagpur
Nagpur 16th -17th February, 2018
Dr. (Mrs) V.V. Bhosekar ,Director Shri T. Nagendra, Sci-D Shri Ch. Subba Rao, Sci-B
2. Attended Ground Breaking Ceremony for Navi International Airport by Hon’ble Prime Minister of India
Mumbai 18th February, 2018
Dr. (Mrs) V.V. Bhosekar, Director Shri T. Nagendra, Sci-D Shri A.A. Purohit, Sci-B
3 Attended the meeting of Standing Committee on Water Resources – Examination of Demands for Grants for 2018-19
New Delhi 23rd February, 2018
Dr. (Mrs) V.V. Bhosekar, Director
4. Attended the meeting of erosion reacheds in Neamati Ghat area
Neamati Ghat 28th February, 2018
Dr. (Mrs) V.V. Bhosekar, Director Shri P.S. Kunjeer, Sci-B
6.2 Other Meetings: NIL
7. TRAINING OF PERSONNEL – (12 Trainings and 85 Personnel)
Sl. No.
Title Event, Place, Date Name of Officer
1. Modern Techniques in flow measurement
CWPRS, Pune 06th – 08th February 2018
Shri J.K. Singh, Sci-B Shri M.Z.Qamar Sci-B Shi K.T. More, Sci-B Shri R.R. Bhate Sci-B Shri Prabhakar Chary, Sci-B Mrs. Sushma J. Vyas,Sci-B Mrs. H.R. Khandagale. ARO Mrs R.S. Erande ARO Shri Ajay Singh, ARO Ms. Madhavi Gajare,RA
2. Hydrometry and Management of Hydro- meteorological data (under NHP)
NWA, Pune 05th -09th February 2018
Mrs. Lata Gupta Sci-C Shri Vinesh Katte, Sci-B Shri Sampath Sreekanth, Sci-B Shri P.S. Solanki, Sci-B Mrs. Namita Karki, ARO Mrs. Anuradha, AE
CWPRS Information Bulletin February 2018
8
3 Capacity building programme (CBP) on e-office for users (Level-I)
NIC, New Delhi 26th -28th February, 2018
Shri Yogesh N. Karanjikar, JE Shri N.M. Pol, Supdt A.S. Patil, Steno-I Ms. Sandhya B. Ware, JE Shri B.D. Bhalerao, UDC Mrs.Mini Mohan Kumar, UDC Mrs P.V. Deshpande, UDC Shri Shivraj Dasare, Draftsman-I
4 MIKE 21 flow model FM and spectral Wave
DHI, New Delhi 21st – 23rd February 2018
Shri Meena Banwarilal,Sci-B Shri Amol Jatkar, Sci-B Mrs. Komal Vighe, RA Mrs. Vaibhavi Roy, RA Shri Sagar Chanda, RA
5. Management Development for Group-B and C staff
CWPRS, Pune 21st – 22nd February 2018
Shri Santhosh Kumar Ranga, ARO Shri D.Chunade Amol, ARO Shri J. Shinde Srikanth, ARO Shri V.B Bagade, ARO Mrs. Karki Namita, ARO Ms. S.Varsha Jain, ARO Shri Meshram Asit Premdas, ARO Ms S.H. Kulkarni, ARO Mrs. Komal S. Vighe, RA Shri Khalil Bagwan, RA Shri D. Kokane Vijay, RA Ms.Abha Garg Anand, RA Shri Walke Kapil Gulabrao, RA Shri SAO Shaneel Saurabh, RA Mrs. Archana K. Pund, RA Mrs. Vaibhavi Roy, RA Shri Konde Vaibhav, RA Shri Pingale Sarvesh Dilip, RA Mrs. Uma Gangadharan, Hindi Trans Shri Y.N.Karanjikar, JE Shri Prashant Dhoke, JE Ms. Sandhya Bharat Ware, JE Mrs G Neelam Bhavasar, Steno-I Shri T Vijaya kumar Nair , Steno-I Shitole N.W.,UDC Shri S. Karle Ganesh, LA-II Mrs. S.Sulabha Phadke. Sk-II Shri Sarvesh Kumar Yadav, LIA Shri B Gavand Prashant, LIA Shri D.A.Gawade, LA-II
6. Fish Pass Design NWA, Pune 21st -22nd February, 2018
Shri Y.N Srivastava, Sci-D
7. Flood forecasting using hydro river and mike operations
NWA, Pune 12th – 16th February, 2018
Dr. V.M Prabhakar, Sci-B Shri Srishailam C. , Sci-B Shri P.S. Kunjeer, Sci-B Shri Jitesh N. Vyas, Sci-B Shri N.Vivekanandan, Sci-B Mrs. Snehal Tayade, ARO Ms. Jhuma Rano, ARO Shri A.B. Bharade, RA Mrs. Mansi Mulay, RA
8 State of the art hydrometric data acquisition and transmission
CWC Library Building Auditorium, New Delhi,
Shri S.D.Ranade, Sci-D Shri N.D. Atkekar Sci-D
CWPRS Information Bulletin February 2018
9
network :measurement and modeling
20th – 22nd February, 2018
Shri S.R. Swami, Sci-C Mrs. R.S. Eranade, ARO Shri Prashant Janrao, RA Shri Saurabh Anand, RA Shri Ujjal Chowdhury, RA Shri Rocky, RA
9 Finite element analysis in Geotechnical engineering using PLAXIS2D
Walchand College of Engineering, Sangli, Maharashtra. 20th – 24th February, 2018
Mrs. Tanusree Samanta, Sci-B
10 Integrated Water Management JICA, Japan 21st January -10th February 2018
Dr.Patil R.G., Sci-D
11. Organizational Development for middle and senior level officers
IIM, Ahmedabad 05th – 09th February, 2018
Dr. Prabhat Chandra, Sci-D Shri A.K. Ghosh, Sci-D Dr. J.D. Agrawal, Sci-D Dr. M.R. Bhajantri, Sci-D Mrs. Neena Isaac, Sci-D
12 Indo Australian Marine renewable energy workshop
IITM Chennai 17th February, 2018
Shri Kiran M. Barve, Sci-B
8. IMPORTANT VISITORS: 1. Additional Chief Engineer DVC, Member RMC - CWC and Member Secretary DVRRC visited CWPRS on 02.02.2018. 2. Capt. Subhash Kumar, Marine Advisor and Shri Gharat, Manager (PPD) of JNPT visited CWPRS on 02.02.2018.
9. NEW APPOINTMENTS, PROMOTIONS & RETIREMENTS
Sl. No.
Name of Person Designation Group Division Date
New Entrants
NIL
Promotions
1. Shri S.S. Dongare LDC C Bills 22.02.2018
Retirement
1. Dr. G.R. Tripathy Scientist-C A VT 28.02.2018
2. Shri Y.N. Nikalje L.A-I C PH-II 28.02.2018
Voluntary Retirement
NIL
Repatriation/Transfer
NIL
CWPRS Information Bulletin February 2018
10
Resignation
1. Shri S.M. Mangam MTS C RH 21.02.2018
2. Shri Abhishek Kumar MTS C HU 15.02.2018
Demises
NIL
10. TRAINING PROGRAMMES/ CONFERENCES ORGANIZED: (02 No.)
1. Training course on” Modern Techniques in Flow mesurement “ during 06th – 08th February ,
2018 at CWPRS.
2. Training Course on “ Management development for Group B & C Staff ” during 21st – 22nd
February, 2018 at CWPRS.
11. OTHER INFORMATION: NIL