CV's__Komkrit_Choompol 2016(Update)

13
CURRICULUM VITAE MR.KOMKRIT CHOOMPOL (KINGMONGKUT’S UNIVERSITY OF TECHNOLOGY NORTH BANGKOK) (BACHELOR OF INDUSTRIAL TECHNOLOGY IN WELDING TECHNOLOGY) (WELDING ENGINEER) COMMUNICATION ADDRESS Street Sungkasantisok Road. City/ Province 64/192 Katumray Nongjok, Bangkok, 10530 Country Thailand Phone Number (+66(0)8 14351033) E-mail [email protected] PERSONAL PROFILE ID Card 3 4201 00062 37 8 Passport No. P865993 Date of Birth 23 October 1980 Age Place of Birth Sex Height/Weight 36 Years Loei Province Male 166 cm /73kgs Nationality/ Religion Thai/Buddhism Marital Status Single Heath Strong Qualification Bachelor of Industrial Technology in Welding Technology (Welding Engineer) TECHNICAL QUALIFICATION • CSWIP 3.1 (CSWIP No. 35467/2) • PCN RI (PCN No. 314776) • Offshore Survival (TBOSIET) • ASNT Level II : PT, MT, RT, UT, PAUT (SNT-TC-1A) Training Couse Tropical Basis Offshore Safety Induction & Emergency Training (T- BOSIET) TC&S Program Behaviors Based Safety (BBS) Certificate Scheme for Welding and Inspection Personnel (CSWIP) Personnel Certification in Non-Destructive Testing (PCN) The American Society For Nondestructive Testing (ASNT) Pre-Startup Safety Review (PSSR) Page 1 of 13

Transcript of CV's__Komkrit_Choompol 2016(Update)

Page 1: CV's__Komkrit_Choompol 2016(Update)

CURRICULUM VITAEMR.KOMKRIT CHOOMPOL

(KINGMONGKUT’S UNIVERSITY OF TECHNOLOGY NORTH BANGKOK)(BACHELOR OF INDUSTRIAL TECHNOLOGY IN WELDING TECHNOLOGY)

(WELDING ENGINEER)

COMMUNICATION ADDRESS Street Sungkasantisok Road.City/Province 64/192 Katumray Nongjok, Bangkok, 10530Country ThailandPhone Number (+66(0)8 14351033)E-mail [email protected]

PERSONAL PROFILEID Card 3 4201 00062 37 8Passport No. P865993Date of Birth 23 October 1980AgePlace of BirthSexHeight/Weight

36 YearsLoei ProvinceMale166 cm /73kgs

Nationality/Religion Thai/BuddhismMarital Status SingleHeath StrongQualification Bachelor of Industrial Technology in Welding Technology (Welding

Engineer)

TECHNICAL QUALIFICATION• CSWIP 3.1 (CSWIP No. 35467/2)• PCN RI (PCN No. 314776)• Offshore Survival (TBOSIET)• ASNT Level II : PT, MT, RT, UT, PAUT (SNT-TC-1A)

Training Couse Tropical Basis Offshore Safety Induction & Emergency Training (T-BOSIET) TC&S Program Behaviors Based Safety (BBS) Certificate Scheme for Welding and Inspection Personnel (CSWIP) Personnel Certification in Non-Destructive Testing (PCN) The American Society For Nondestructive Testing (ASNT) Pre-Startup Safety Review (PSSR)

CAREER OBJECTIVE Seeking for a challenging and growth-oriented profession in Structural, Piping, Boiler, and Pressure Vessels

inspector or engineer, where I can utilizes my technical background for the benefit of the Organization.

BRIEF EXPERIENCE SUMMARYPage 1 of 9

Page 2: CV's__Komkrit_Choompol 2016(Update)

QA/QC & Welding Inspector and Engineer (Structural, Piping, Boiler, Pressure Vessels, Module, Platform) with more than 14 year’s involvement in all aspects of fabrication, construction and erection for oil & gas and mining industries. Skilled in use of international codes and standards such as ASTM, ASME/ANSI, AWS, API, ANZI/AS, BSI, DIN, PTS, TOTAL, EEMUA and JIS etc. Recognized as a resourceful, hardworking professional with exceptional attention to detail and good written and communication skills. An acknowledged team player with project lead experience. Proficient in MS Office (Excel and Word).

PROFESSIONAL EXPERIENCE SUMMERY Proficient supervision and inspection the Contractor’s/Sub-Contractor’s ,and providing a support services to

the Client’s during the executing of:-o Piping Fabrication and Installation.o Piping Hot Tap.o Piping installation Helicoid for repair conductor.o Pressure Vessels & Boiler Fabrication and Installation.o Blasting and Painting (Coating).o Structure Steel Fabrication, Assembly and Erection.o Module Fabrication and Erection.o Platform Fabrication.

To ensure that all works are complying with contractual terms and conditions, as well as specifications, applicable regulations, etc.

Proficient using international codes and standards such as ASME, AWS, AS, and ASTM etc. Experienced in reviewing ITP for fabrication. Experienced in reviewing WPS&PQR and WPQ for fabrication and erection. Experienced in reviewing PWHT procedure for fabrication. Experienced in reviewing NDT procedure for fabrication and erection accordance with code & spec. requires. Experienced in reviewing Repair procedure for fabrication. Experienced in reviewing a construction procedure in accordance with client specification requires. Experienced in performing receiving material inspection and review mill certificate of material in accordance

with client specification require before release to fabrication. Experienced in performing all fabrication & installation of piping, boiler and pressure vessel. Experienced in all fabrication & erection module and steel structure. Experienced in reviewing test-packs (implying the system punch-lists NDT clear), mechanical clearance,

hydrostatic/pneumatic testing. Experience in reviewed MDR complete before submit to Client for approve. Experienced in training to contractor about QA/QC requirement in accordance with company specification

requires. Experience in shutdown platform at Offshore (Gulf of Thailand) in accordance with work schedule plan and

company specification requirement. Experience in shutdown refinery plant at Onshore in accordance with work schedule plan and company

specification requirement.

CAREER HISTORY

COMPANY CHEVRON THAILAND EXPLORATION AND PRODUCTION (CTEP)Supporting Facilities Engineering Team. (Offshore Gulf of Thailand)

Page 2 of 9

Page 3: CV's__Komkrit_Choompol 2016(Update)

SUBCONTRACTOR COMPANY Experteam (Thailand) Co,. Ltd. (EXPT) and PAE Thailand Co,. Ltd.

PRINCIPAL PRODUCT Structure Erection and Installation piping & Assembly Completion work.

POSITON QC INSPECTOR (Representative)

DURATION(1 Jan 2016) UP TO (Present) Erawan Asset

(1 Nov 2013) UP TO (31 Dec 2015) B8/32 AssetRESPONSIBILITIES INCLUDED:

Coordinate and supervision/inspection for subcontractor at offshore (Gulf of Thailand) regarding structural, piping such as repair pipe riser, deck extension, addition pipe support, installation flow line, repair pipe conductor etc. and modification work at the platform according with Chevron specification, code & standard and maintaining quality & progress shall be completed as per the work schedule plan of Chevron.

− Supporting FE (Facilities Engineering) team regarding quality including NDT in accordance with Chevron specification requires.

− Reviewed and approve ITP for fabrication and installation.

− Material received ASTM A572 GR.50, API5L GR.X52, A106 Gr.B, A312TP316/316L including reviewed mill certificate and all documentation attach.

− Witness PQR and reviewed all document support according to specification & code standard requires.

− Review WPS&PQR according specification & code standard require.

− Witness welder test (WQT) as per contractor request such as GTAW, SMAW, FCAW, SAW welding processed.

− Review & Approval Welder Performance Qualification (WPQ) certificate.

− Monitoring preheat, welding parameter, fit-up, welding, welding, consumable etc.

− Witness welding repair in accordance with repair procedure.

− Review & Witness PWHT (Post Weld Heat Treatment).

− Witnessed hot tapping work according to approve procedure.

− Witnessed repair conductor by Helicoid according to approve procedure.

− Witnessed repair water boiler with high steam header pipes according to repair procedure.

− Witnessed repair pipe exhaust and silencer of booster compressor.

− Interpret RT film and Review & Approve all NDE report.

− Witness hydrostatic test from subcontractor request.

− Witness surface preparation & DFT painting include document support.

− PSSR (Pre Startup Safety Review) before hand to Production team.

Page 3 of 9

Page 4: CV's__Komkrit_Choompol 2016(Update)

− Review & Approve MDR document completion.

− Prepare presentation for training employer such as WPS, Torque bolt, Hydro test, Preparation joint fit up, Welding consumable, etc.

− Reviewed CPAR before submit to Chevron systems.

− Monitor welder reject rate according to Chevron requirement.

− Monitor and controlled NDT request from FE Construction and AI team.

COMPANY ALLSEAS LIMITED.(THAILAND)

PROJECT Wheatstone Upstream Project. (Subsea Flowlines and Pipelines)

SUBCONTRACTOR COMPANY Clough (Thailand) Co,. Ltd. (CTL)

PRINCIPAL PRODUCT Subsea Steel Structure Fabrication & Assembly Completion work.

POSITON QC INSPECTOR

DURATION (1 Arp, 2013) UP TO (31 Oct 2013)RESPONSIBILITIES INCLUDED:

Supervised & Inspection in fabrication subsea steel structure work on projects from the development stage to completion and maintain supporting document review in accordance with Chevron (Australia) specification requirement.

− ITP require inspection for fabrication & assembly subsea steel structure.− Material received ASTM A572 GR.50 & API5L GR.X52 including reviewed mill

certificate and all documentation attach.− Witness welder test (WQT) requirement process MMAW & FCAW.− Review & Approval of Welder Performance Qualification (WPQ)− Monitoring preheat, welding parameter and Inspection fit-up, welding, welding

consumable etc.− Witness welding repair in accordance with procedure.(If any)− Witness final dimension check after completion fabricated subsea steel structure.− Interpret RT film and Review & Approve all NDE report.− Monitoring NDE according NDE request from subcontractor.− Witness surface preparation & DFT painting include document support.− Review & Approve MDR document completion.

COMPANY RCR TOMLINSON LIMITED. (THAILAND)

PROJECTFMG T155 SOLOMON PROJECT – ORE PROCESS FACILITIES.JOB 552 (FIRE TAIL) & JOB558 (KING VALLEY) RECLAIM CHAMBER MODULE. (AUSTRALIA)

SUBCONTRACTOR COMPANY Sriracha Construction Public Co,. Ltd. (SCC)

PRINCIPAL PRODUCT Steel Structure Fabrication & Assembly Completion work.

POSITON QA/QC INSPECTOR

DURATION (1 Jun, 2012) UP TO (31 Mar, 201)RESPONSIBILITIES INCLUDED:

Supervised & Inspection in fabrication and erection steel structure work on projects from the development stage to completion and maintain supporting document review in accordance with client specification requirement.

− ITP requires inspection for fabrication & assembly steel structure module.

Page 4 of 9

Page 5: CV's__Komkrit_Choompol 2016(Update)

− Material received SM490A & A53-B (ERW) including reviewed mill certificate and all documentation attach.

− Witness welder test (WQT) requirement process FCAW, SAW, MMAW, and GTAW.− Review & Approval of Welder Performance Qualification (WPQ)− Monitoring & Inspection fit-up, welding, welding consumable etc.− Witness final dimension check fabricated and erected steel structure completion.− Witness surface preparation & DFT painting.− Final inspection assembly steel structure completion before release to site.− Review & approve all NDE report.− Review & Approve MDR document completion.

COMPANY TUV NORD LIMITED. (THAILAND)

PROJECT PTTEP ARTHIT & BONGKOT BUNDLED PHASES PROJECT

CLIENT Thai Nippon Steel Engineering and Construction Corp.,Ltd (TNS)

PRINCIPAL PRODUCT

Fabrication platform work.

POSITON INSPECTION ENGINEER

DURATION (1 Jan, 2012) UP TO (31 May, 2012)RESPONSIBILITIES INCLUDED:

Inspections in fabrication equipment (pressure vessel & pump) works on projects from the development stage to completion and maintain supporting document review in accordance with client specification requirement.

− ITP require inspection for fabrication equipment (Jacket & Deck).− Witness welder qualification test (WQT) requirement process FCAW&SAW in

accordance with WPS&PQR approve.− Inspection receiving material and review mill certificate of material such as

API2HGr.50, A572Gr.50 & 60, and API5LGr.B etc. in according specification require.− Inspection according to ITP require such as fit up, visual inspection, and final

inspection etc.− Witness final dimension check for fabricated completion.− Witness installation sling and shackle before load out platform.− Witness surface preparation & DFT painting.− Review all NDE report.− Review MDR document completion.

COMPANY PUNJ LLOYD GROUP. (THAILAND)

PROJECT PLATFROM COMPRESSION FACILITIES PROJECT (Offshore Gulf of Thailand).

SUBCONTRACTOR COMPANY Thanaphum Service & Construction Co.,Ltd (TSC)

PRINCIPAL PRODUCT Fabrication & Erection Piping work.

POSITON QA/QC OFFICER.

DURATION (13 Dec, 2010) UP TO (12 Dec, 2011)RESPONSIBILITIES INCLUDED:

Supervised & Inspection in fabrication and installation piping work on projects from the development stage to completion and maintain supporting document in accordance with client specification requirement.

− ITP require inspection for fabrication and installation piping work.− Inspection receiving material and review mill certificate of material such as

A106Gr.B. A105, A234WPB, A333Gr.3 & 6, A312TP304/304L, A312TP316/316L, and A790 etc. in according specification require.

Page 5 of 9

Page 6: CV's__Komkrit_Choompol 2016(Update)

− Review WPS&PQR and WPQ.− Witness welder qualification test (WQT) requirement process MMAW and GTAW.− Monitoring & Inspection fit-up, welding, PWHT, welding consumable etc.− Interpret RT film.− Investigate & Execution weld repair.− Review all NDE report and review piping package before release to hydro test.− Witness hydrostatic test pipe spools.− Witness surface preparation & DFT check of painting.− Final inspection pipe spools before release to site.− Line check & Punch list according to P&ID drawing each line piping system.− Review MDR document completion.

COMPANY SIEMENS LIMITED. (THAILAND)

PROJECT THAI GROWTH PROJECT.SUBCONTRACTOR COMPANY Italthai Engineering Company Limited (ITE)

PRINCIPAL PRODUCT Water Treatment Construction work.

POSITON MECHANICAL & WELDING INSPECTOR.

DURATION (19 Jul, 2010) UP TO (11 Dec, 2010)RESPONSIBILITIES INCLUDED:

Supervised & Inspection of Sub-Contractors for all Piping system, Structural steel Control on field works and pressure vessels fabrication on project and maintain supporting document included proposed each procedure necessary to implement in accordance with client specification requirement.

− ITP require inspection for fabrication, installation, erection a piping, pressure vessels, structure work.

− Review WPS&PQR and WPQ.− Witness welder qualification test (WQT) requirement process MMAW and GTAW.− Monitoring & Inspection fit-up , welding, welding consumable etc.− Interpret RT film.− Investigate & Execution weld repair.− Review all NDE report and review piping & pressure vessels package before release

to hydro test.− Witness hydrostatic test piping system & pressure vessels.− Witness surface preparation & DFT check of painting.− Final inspection pipe spools & pressure vessels before release to site.− Line check & Punch list according to P&ID drawing each line piping system.− Review MDR document completion.

COMPANY THAI NIPPON STEEL ENGINEERING AND CONSTRUCTION Corp.,Ltd. (THAILAND)

PROJECT Host Tie-ins and Modification Works Phase 4 development.(Offshore Myanmar)

CLIENT CARIGALI / PC MYANMAR (HONG KONG) LIMITED.(PCML)PRINCIPAL PRODUCT

Fabrication Platform work.

POSITON QA/QC SUPERVISOR.

DURATION (1 Oct, 2009) UP TO (16 Jul ,2010)RESPONSIBILITIES INCLUDED:

Inspection in fabrication for jacket platform and installation piping at offshore work on projects from the development stage to completion and maintain supporting document in accordance with client specification requirement.

− ITP require inspection for fabrication, installation a jacket structure, and piping work.− Inspection receiving material and review mill certificate of material such as API2H

Page 6 of 9

Page 7: CV's__Komkrit_Choompol 2016(Update)

Gr.50, A572Gr.50 & 60, API5LGr.B, A106Gr.B, A312TP304/304L, A312TP316/316L, and A790 in according specification require.

− Review WPQ (Welder performance qualification).− Witness welder qualification test (WQT) requirement process MMAW and GTAW.− Inspection fit-up, welding, PWHT, welding consumable etc.− Interpret RT film.− Investigate & Execution weld repair.− Review all NDE report and review piping package before release to hydro test.− Witness hydrostatic test piping system.− Line check & Punch list according to P&ID drawing each line piping system.− Review MDR document completion.

COMPANY STP&I PUBIC COMPANY LIMITED. (THAILAND)

PROJECT- WOODSIDE STICK BUILT PROJECT- WOODSIDE LNG PLUTO PROJECT

CLIENT FWW. Foster Wreeler / Warley PrasonsPRINCIPAL PRODUCT Fabrication & Erection Module work.

POSITON QA/QC & WELDING ENGINEER.

DURATION (16 Feb, 2008) UP TO (30 Sep, 2009)RESPONSIBILITIES INCLUDED:

Inspection & management in shop fabrication for piping and quality control progress and maintained supporting documentation included proposed each procedure necessary to implement in accordance with client specification requirement.

− ITP require inspection for shop fabrication a piping work.− Review WPS&PQR and WPQ.− Witness welder qualification test (WQT) requirement process MMAW and GTAW.− Estimate welding consumable and carries out the PR (Purchase Request)− Monitoring & Inspection fit-up , welding, PWHT, welding consumable etc.− Interpret RT film.− Investigate & Execution weld repair.− Control NDE backlog.− Review all NDE report and review piping package before release to hydro test &site.− Witness hydrostatic test piping spools.− Final inspection pipe spools before release to site.− Review MDR document completion.

COMPANY GETABEC ENERGY LIMITED. (THAILAND)

PROJECT

AUXILARY BOILER 50 TONS PROJECT. AUXILARY BOILER 70 TONS PROJECT. TOL METHYL ESTER AND FATTY ALCOHOL PROJECT. SIAM FIBRE CEMENT (EI 0558) PROJECT.

CLIENT

THAI SHINRYO (THAILAND) LTD. SHEDDEN UHDE (THAILAND) LTD. GTABEC ENGINEERING LTD.

PRINCIPAL PRODUCT Fabrication Boiler & Pressure Vessels work.

POSITON WELDING ENGINEER

DURATION (18 Sep, 2006) UP TO (14 Feb, 2008)

Page 7 of 9

Page 8: CV's__Komkrit_Choompol 2016(Update)

RESPONSIBILITIES INCLUDED:

Inspection & management in shop fabrication for boiler & pressure vessels and quality control in accordance with code & standard and client specification require and maintained supporting documentation included proposed each procedure necessary to implement in accordance with client specification requirement.

− Preparation ITP inspection for boiler & pressure vessels fabrication work.− Preparation & Review WPS&PQR and WPQ.− Witness welder qualification test (WQT) requirement process MMAW, GTAW,

GMAW, FCAW, SAW etc.− Monitoring & Inspection fit-up , welding, PWHT, welding consumable etc.− Preparation requesting NDE for boiler & pressure vessels.− Interpret RT film.− Investigate & Execution weld repair.− Review all NDE report and review package before release to hydro test.− Witness hydrostatic test piping spools.− Final inspection pipe spools before release to site.− Review MDR document completion.

COMPANY THAI ROTARY ENGINEERING LIMITED. (THAILAND)

PROJECT

KAENG KHOI 2 POWER PLANT PROJECT. FABRICATION VESSEL KNOCKOUT DRUM PROJECT. GAS LIQUID COALESCER PROJECT HFU PREFILTER & L/L COALESCER FOR PTT CHEM PROJECT. REL-SHOP FABRICATION FOR HIN LEONG PROJECT PROJECT. INSTALLLATION OF ADDITIONAL PIPE SUPPORTS FOR 370-R1. REPAIR OF NOZZLE No. TD (DRAIN).H-1375 MEMBRANE

PREHEATER PROJECT. SUPPLY AND FABRICATION OF FLARE KO.V-971 PROJECT.

CLIENT

ALSTOM POWER. PTTEP. PALL UOP LLC. PTTAR.

PRINCIPAL PRODUCT Fabrication Pressure Vessels & Storage Tank work.

POSITON QA/QC ENGINEER

DURATION (1 Jun, 2003) UP TO (16 Sep, 2006)RESPONSIBILITIES INCLUDED:

Inspection in shop fabrication for pressure vessels & heat exchanger and quality control in accordance with code & standard and client specification require and preparation supporting documentation.

− Preparation ITP inspection for pressure vessels & heat exchanger fabrication work.− Preparation & Review WPS&PQR and WPQ.− Witness welder qualification test (WQT) requirement process MMAW, GTAW, etc.− Monitoring & Inspection fit-up , welding, PWHT, welding consumable etc.− Preparation requesting NDE for boiler & pressure vessels.− Interpret RT film.− Investigate & Execution weld repair.− Review all NDE report and review package before release to hydro test.− Witness hydrostatic test pressure vessels & heat exchanger.− Final inspection pressure vessels & heat exchanger before release to site.− Review MDR document completion.

Page 8 of 9

Page 9: CV's__Komkrit_Choompol 2016(Update)

REFFERANCE PERSONALS

1. Mr. Shuan Holding(RCR Tomlinson Company / Fabrication Superintendent)E-mail: [email protected]: 0860493670

2. Mr. Nattawut Rutchaisit(Thai Rotary Engineering Public Company /QA/QC Manager)E-mail: [email protected]: 0819333228

3. Mr. Narusbes Rodthaisong(Origin Company/Welding Inspector)E-mail: [email protected]: 0866047579

4. Mr. Amrin I(STP&I Pubic Company / QA/QC Manager)E-mail: [email protected]: 0819269625

5. Mr. Weerapong Nethibut(Foster Wheeler International Company/Welding Supervisor)E-mail: [email protected]: 0852784655

6. Mr. Jarun Luankaew(Chiyoda-JGC Joint Venture Company/QC Inspector)E-mail: [email protected]: 0843126532

7. Mr. Thana Srisaknok(Chevron Company / QC Coordinator)E-Mail: [email protected]: 0817208688

Page 9 of 9