Mujeeb ur Rehman Senior Planning Engineer
Gender: Male l DOB: November 25, 1983 l Marital Status: Married
Nationality: Pakistani l Current Location: Riyadh, Saudi Arabia l Mobile: +966563781902
Email: [email protected]
Page 1 of 3
Career Summary
Certification, Membership & Trainings
• Certificate in Primavera P6 Integrated Project Management System
• Training in Project Cost Management SCHEMA International UAE
• Certified in ISO 9001:2008 QMS Foundation Training Course SGS Inspection Services Saudi Arabia Ltd. Saudi Arabia
Education
• Bachelor of Technology Mechanical Engineering Preston University of Pakistan
Work Experiences
Senior Planning Engineer at Arabian BEMCO Contracting Co Limited, July, 2011 to present
Project: Conversion of Simple Cycle gas Turbine to Combined Cycle Units at PP10 Power Plant
Contract Value: $ 1.4 Bil l ion
Scope: Engineering, Procurement, Construction Testing & Commissioning to add a net output of 1280 MW CCPP to the existing 2200 MW OCPP by installing ten Steam Turbines and forty HRSG including all support facil ities and balance of plant
(BOP).
Total Experience: 9+ Years Role Wise
• Project Planning and Control Function 5 Years • Project Execution/Management 4 Years • Assistant / Trainee 1 Years
Sector Wise • Energy Sector 8 Years • Production 1 Years Location Wise
• Gulf Region 8 Years • Pakistan 1+ Years Tools & Techniques • Primavera_P6
• MS Project_2014 • MS Office_2014 • Auto CAD
Specialties • Project Planning & Scheduling
• Project Reporting & Monitoring • Coordination • Workload distribution
• Team Building • Site Management • Claim Digger • Performance Measurement Techniques
Location: Riyadh, Saudi Arabia
Client: Saudi Electricity Company (SEC), KSA
Mujeeb ur Rehman Senior Planning Engineer
Gender: Male l DOB: November 25, 1983 l Marital Status: Married
Nationality: Pakistani l Current Location: Riyadh, Saudi Arabia l Mobile: +966563781902
Email: [email protected]
Page 2 of 3
Responsibilities include but not limited to the following:
Performed Planning & Control functions including performance measurement, change control , schedule development,
forecasting, reporting and analysis by util izing the following elements of Project controls:
Integrating work scope for assigned entities into project planning & control tools.
Utilized project control tools and systems including Primavera P6.
Independently prepared required reports, charts and graphs.
Monitored and reported project performance against the baseline in compliance with EVMS.
Variance analysis and reporting.
Monthly report and specialized reports including labor and non-labor work-off curves and special reports.
Developed and maintained schedules (i.e. identifying and defining activities, sequencing activities, resource loading
activities, defining durations, developing work breakdown structure (WBS) and status schedule. Forecast by util izing appropriate historical data and applying known factors in order to develop fiscal estimates. Util izing
Organizational and teamwork skil ls required to effectively multi -task and work effectively with peers, managers, and
customers both within and external to the organization and company.
Planning Engineer at Arabian BEMCO Contracting Co. Limited, August, 2008 to June, 2011
Project: Construction of Simple Cycle Power Plant PP10
Contract Value: $2.9 Bil l ion
Scope: Engineering, Procurement, Supply and Deliver all Materials and Equipment to work site, Construct / Install, Test & Commission 32 GE frame 7EA gas turbine units along with required Balance of Plant systems, including fuel oil unloading, treatment, storage and forwarding systems and required civil work to support production of 1788.44 MW power for SEC-
COA.
Responsibilities include but not limited to the following:
Develop EPC schedule in Primavera (P6) for a facil ity in l ight of design drawings / specifications / minutes of meeting etc.
Creating & assigning Work Breakdown Structure (WBS) to project time schedule activities in Primavera
Resource loading on EPC schedule in Primavera and conducting earned value
Manipulating the progress data in Primavera and developing progress cur ves (discipline wise and overall).
Keeping update management of company with upcoming, delayed and not completed works.
Preparation of critical path (CPM) of project
Preparation of progress reports for project management.
Raise concern for slippage of del iverables from target delivery dates.
Coordinate with site engineers for construction activities & look ahead schedules and adjust schedule logic, if required.
Keep site engineers update on budgeted quantities / man hours and productivity rates.
Coordinate with material engineer for up-to-date material / equipment deliveries.
Preparing / extracting schedule for different systems / facil ities as per requirement of management.
Planning Engineer at Arabian BEMCO Contracting Co. Limited, September, 2006 to July, 2008
Project 1: Riyadh Power Plant 9 Extension Block C&D Including 132kV substation # 8159
Location: Riyadh, Saudi Arabia Client: Saudi Electricity Company (SEC), KSA
Mujeeb ur Rehman Senior Planning Engineer
Gender: Male l DOB: November 25, 1983 l Marital Status: Married
Nationality: Pakistani l Current Location: Riyadh, Saudi Arabia l Mobile: +966563781902
Email: [email protected]
Page 3 of 3
Scope: Engineering, Procurement, Supply and Deliver all Materials and Equipment to work site, Construct / Install, Test & Commission 20 GE frame 7EA gas turbine units along with required Balance of Plant systems, including Sub-station #8159 to support production of 1200 MW power for SEC-COA.
Contract Value: $ 688 Mill ion
Project 2: Riyadh Power Plant 9 Extension F
Scope: Engineering, Procurement, Supply and Deliver all Materials and Equipment to work site, Construct / Install, Test & Commission 12 GE frame 7EA gas turbine units along with required Balance of Plant systems, to support production of 666
MW power for SEC-COA.
Contract Value: $ 653 Mill ion
Responsibilities include but not limited to the following:
Collect actual progress data from site and update EPC schedule in Primavera.
Collecting progress data from Primavera and maintain progress curves (discipline wise and overall)
Preparing presentations for meetings with Client / Consultant
Preparing daily & monthly progress reports for submission to Client / Consultant
Coordinate with site engineers for construction activities & look ahead schedules
Develop and maintain material tracking list (all disciplines) for scope of work
Raise concern for slippage of materials / equipment from ta rget delivery dates
Assistant Mechanical Engineer (Trainee) at Millat Equipment Ltd. September 2005 to August 2006
Scope: Manufacturer of spare parts of auto machinery
Responsibilities include but not limited to the following:
Maintain production quantity and quality.
Review & implement production work schedule.
Coordinate with other departments for smooth production.
Familiarization with auto machinery such as Mill ing, Hobbing, Broaching, Gear shaper, Tooth rounding etc.
Location: Riyadh, Saudi Arabia Client: Saudi Electricity Company (SEC), KSA
Location: Riyadh, Saudi Arabia Client: Saudi Electricity Company (SEC), KSA
Location: Lahore, Pakistan