Cvl-25 Plate Load Test 3-1-2015

2
   M   e   c    h   a   n    i   c   a    l    E    l   e   c    t   r    i   c   a    l    A   r   c    h    i    t   e   c    t   u   r   a    l    /   c    i   v    i    l    C    i   v    i    l  INSPECTION REQUEST  PROJECT: AFFORDABLE HOUSING A T DIYAR MUHARRAQ CONSULTANT: MSCEB  Attn: Mr. Joji Tho!"# Proj$%t M!n!&$r  IR Ref. No. Date : Previou IR Ref No.: Date  Re!uete" In#ection Date: J!n'!r( )# *+,-. Re!uete" In#ection Ti$e: %:++ AM%%%%% &ocation ' Detail of Area / (or) to *e In#ecte":  P/!t$ Lo!0 T$"t  P1H2-# P1H22# P1H23  Ref. Dra+in, No: G1SP1,+*  Service chec)e" *- the Contractor Structural:%%%%%%%.. Electrical:%%%%%%%.. Draina,e:%%%%%%%.. AC:%%%%%%%%.  0or Main Contractor1  Note: 1) We confirm that the above- mentioned w orks shall be fully ready for inspection on the date and time indicated above . 2) We also understand and agree that we stand solely and fully responsible for the accuracy and correctness of the works as per the approved drawin gs and this approval doe s not absolve us of our contractu al obligatio ns and proper  supervision of works.   Na$e: Jo$/ Uri!rt$%%%%%%%%%%%%%%%%.. Si,ne": %%%%%%%%%%%..  Co$nt" 4( MSCEB Stat u A##rove" A##rove" a Note" Not A##rove" Stat u A##rove" A##rove" a Note" Not A##rove" Stat u A##rove" A##rove" a Note" Not A##rove" Si,ne" : %%%%%%%%%%%%%%%.. 0or MSCEB Date : %%%%%%%%%%% Receive" *- Contractor:%%%%%%%%%%%%. Date:%%%%%%%%%. C5L6IR6*- J!n. 7# *+,- C5L6IR6*) D$%. 7,# *+,)

Transcript of Cvl-25 Plate Load Test 3-1-2015

Page 1: Cvl-25 Plate Load Test 3-1-2015

8/16/2019 Cvl-25 Plate Load Test 3-1-2015

http://slidepdf.com/reader/full/cvl-25-plate-load-test-3-1-2015 1/2

   M  e  c   h  a  n   i  c  a   l

   E   l  e  c   t  r   i  c  a   l

   A  r  c   h   i   t  e  c   t  u  r  a   l   /  c   i  v   i   l

   C   i  v   i   l

 

INSPECTION REQUEST

  PROJECT: AFFORDABLE HOUSING AT DIYAR MUHARRAQ

CONSULTANT: MSCEB

  Attn: Mr. Joji Tho!"# Proj$%t M!n!&$r 

IR Ref. No.

Date :

Previou IR 

Ref No.:

Date

  Re!uete" In#ection Date: J!n'!r( )# *+,-. Re!uete" In#ection Ti$e: %:++ AM%%%%%

&ocation ' Detail of Area / (or) to *e

In#ecte":

 P/!t$ Lo!0 T$"t

  P1H2-# P1H22# P1H23 

Ref. Dra+in, No: G1SP1,+*

 

Service chec)e" *-

the Contractor Structural:%%%%%%%..

Electrical:%%%%%%%..

Draina,e:%%%%%%%..

AC:%%%%%%%%.

 0or Main Contractor1

 Note:1) We confirm that the above- mentioned works shall be fully ready for inspection on the date and time indicated above.

2) We also understand and agree that we stand solely and fully responsible for the accuracy and correctness of the works

as per the approved drawings and this approval does not absolve us of our contractual obligations and proper 

 supervision of works.

   Na$e: Jo$/ Uri!rt$%%%%%%%%%%%%%%%%.. Si,ne": %%%%%%%%%%%.. 

Co$nt" 4( MSCEB

Stat u

A##rove" A##rove" a Note" Not A##rove"

Stat u

A##rove" A##rove" a Note" Not A##rove"

Stat u

A##rove" A##rove" a Note" Not A##rove"

Si,ne" : %%%%%%%%%%%%%%%..0or MSCEB Date : %%%%%%%%%%%

Receive" *- Contractor:%%%%%%%%%%%%. Date:%%%%%%%%%.

C5L6IR6*-

J!n. 7# *+,-

C5L6IR6*)

D$%. 7,# *+,)

Page 2: Cvl-25 Plate Load Test 3-1-2015

8/16/2019 Cvl-25 Plate Load Test 3-1-2015

http://slidepdf.com/reader/full/cvl-25-plate-load-test-3-1-2015 2/2