Cvl-25 Plate Load Test 3-1-2015
Transcript of Cvl-25 Plate Load Test 3-1-2015
![Page 1: Cvl-25 Plate Load Test 3-1-2015](https://reader031.fdocuments.in/reader031/viewer/2022021216/577c7b8e1a28abe05497f2c2/html5/thumbnails/1.jpg)
8/16/2019 Cvl-25 Plate Load Test 3-1-2015
http://slidepdf.com/reader/full/cvl-25-plate-load-test-3-1-2015 1/2
M e c h a n i c a l
E l e c t r i c a l
A r c h i t e c t u r a l / c i v i l
C i v i l
INSPECTION REQUEST
PROJECT: AFFORDABLE HOUSING AT DIYAR MUHARRAQ
CONSULTANT: MSCEB
Attn: Mr. Joji Tho!"# Proj$%t M!n!&$r
IR Ref. No.
Date :
Previou IR
Ref No.:
Date
Re!uete" In#ection Date: J!n'!r( )# *+,-. Re!uete" In#ection Ti$e: %:++ AM%%%%%
&ocation ' Detail of Area / (or) to *e
In#ecte":
P/!t$ Lo!0 T$"t
P1H2-# P1H22# P1H23
Ref. Dra+in, No: G1SP1,+*
Service chec)e" *-
the Contractor Structural:%%%%%%%..
Electrical:%%%%%%%..
Draina,e:%%%%%%%..
AC:%%%%%%%%.
0or Main Contractor1
Note:1) We confirm that the above- mentioned works shall be fully ready for inspection on the date and time indicated above.
2) We also understand and agree that we stand solely and fully responsible for the accuracy and correctness of the works
as per the approved drawings and this approval does not absolve us of our contractual obligations and proper
supervision of works.
Na$e: Jo$/ Uri!rt$%%%%%%%%%%%%%%%%.. Si,ne": %%%%%%%%%%%..
Co$nt" 4( MSCEB
Stat u
A##rove" A##rove" a Note" Not A##rove"
Stat u
A##rove" A##rove" a Note" Not A##rove"
Stat u
A##rove" A##rove" a Note" Not A##rove"
Si,ne" : %%%%%%%%%%%%%%%..0or MSCEB Date : %%%%%%%%%%%
Receive" *- Contractor:%%%%%%%%%%%%. Date:%%%%%%%%%.
C5L6IR6*-
J!n. 7# *+,-
C5L6IR6*)
D$%. 7,# *+,)
![Page 2: Cvl-25 Plate Load Test 3-1-2015](https://reader031.fdocuments.in/reader031/viewer/2022021216/577c7b8e1a28abe05497f2c2/html5/thumbnails/2.jpg)
8/16/2019 Cvl-25 Plate Load Test 3-1-2015
http://slidepdf.com/reader/full/cvl-25-plate-load-test-3-1-2015 2/2