Cv for Bui Nguyen Pho - Envir Engineer (19.12.2016)

16
Form CV for Environmental Engineer - Bui Nguyen Pho Page 1 CURRICULUM VITAE (CV) Position Title & No. Environmental Specialist Name of Firm Nippon Koei Viet Nam Name of Expert Bui Nguyen Pho Date of Birth 08-6-1981 Citizenship Vietnamese Email/ Phone [email protected]/ 0968989098 Education: Master`s Degree of Environmental Science and Sustainable Development - Viet Nam National University, 2012 Bachelor`s Degree of Environmental Science - Hanoi University of Science, 2008 Bachelor`s Degree of Mathematics and Physics - Hung Yen Teachers Training College, 2002. Certificate for Safety, Health and Environment (EHS) includes: ISO14001:2015, OHSAS18001, Training for Safety and Environmental protection: 2014, 2015, 2016 Training for presentation skills: 2010 Employment Record Relevant to the Assignment Period Employing organization & title/position, contact information for references Country Summary of Activities performed relevant to the Assignment June 2015 - Present NKV (Nippon Koei Vietnam) - APAVE, A2Z join venture Environmental/ HSE Specialist. Vietnam Environmental Specialist: Reviewing EIA, EMP, EPC report. Supervising environmental protection works. Review and Approve Environmental reports. Guide contractors to setup environment treatment items. Supervising the implementation of environmental monitoring during project construction. Identify safety hazards and propose preventive measures. March 2014 - June 2015 Oriental Consultants Co., Ltd - TEDI, APECO, ITST joint venture Environmental/ HSE Specialist. Vietnam Environmental Specialist: Reviewing Environmental reports. Supervising environmental protection works. Guide contractors to setup environment protection items. Supervising the implementation of environmental monitoring during project implementation. July 2009 - March 2014 Environmental Consultancy Center - Transport Engineering Design Inc Environmental specialist Vietnam Environmental specialist: Environmental condition survey and monitoring. Investigation and consultation Socio- Economic condition in the project area. Establish, writing Environmental Impact Assessment (EIA), Environmental Management Plan (EMP) and EPC report. June 2008 July 2009 Petrovietnam Petrochemical and Textile Fiber Joint Stock Company Environmental engineer Vietnam Supervising environmental protection works. Reviewing Environmental reports. Guide contractors to setup environment protection items. Supervising the implementation of environmental monitoring during project implementation. Investigation and consultation Socio- Economic condition in the project area. Establish, writing Environmental Impact Assessment (EIA), Environmental Management Plan (EMP) and EPC report.

Transcript of Cv for Bui Nguyen Pho - Envir Engineer (19.12.2016)

Form CV for Environmental Engineer - Bui Nguyen Pho

Page 1

CURRICULUM VITAE (CV)

Position Title & No. Environmental Specialist

Name of Firm Nippon Koei Viet Nam

Name of Expert Bui Nguyen Pho

Date of Birth 08-6-1981

Citizenship Vietnamese

Email/ Phone [email protected]/ 0968989098

Education:

Master`s Degree of Environmental Science and Sustainable Development - Viet Nam National University, 2012

Bachelor`s Degree of Environmental Science - Hanoi University of Science, 2008

Bachelor`s Degree of Mathematics and Physics - Hung Yen Teachers Training College, 2002.

Certificate for Safety, Health and Environment (EHS) includes: ISO14001:2015, OHSAS18001,…

Training for Safety and Environmental protection: 2014, 2015, 2016

Training for presentation skills: 2010

Employment Record Relevant to the Assignment

Period Employing organization & title/position,

contact information for references

Country Summary of Activities performed

relevant to the Assignment

June 2015 -

Present

NKV (Nippon Koei Vietnam) - APAVE,

A2Z join venture

Environmental/ HSE Specialist.

Vietnam

Environmental Specialist: Reviewing

EIA, EMP, EPC report.

Supervising environmental protection

works.

Review and Approve Environmental

reports.

Guide contractors to setup environment

treatment items.

Supervising the implementation of

environmental monitoring during project

construction.

Identify safety hazards and propose

preventive measures.

March 2014

- June 2015

Oriental Consultants Co., Ltd - TEDI,

APECO, ITST joint venture

Environmental/ HSE Specialist.

Vietnam

Environmental Specialist: Reviewing

Environmental reports.

Supervising environmental protection

works.

Guide contractors to setup environment

protection items.

Supervising the implementation of

environmental monitoring during project

implementation.

July 2009 -

March 2014

Environmental Consultancy Center -

Transport Engineering Design Inc

Environmental specialist

Vietnam

Environmental specialist: Environmental

condition survey and monitoring.

Investigation and consultation Socio-

Economic condition in the project area.

Establish, writing Environmental Impact

Assessment (EIA), Environmental

Management Plan (EMP) and EPC report.

June 2008 –

July 2009

Petrovietnam Petrochemical and Textile

Fiber Joint Stock Company

Environmental engineer

Vietnam

Supervising environmental protection

works. Reviewing Environmental reports.

Guide contractors to setup environment

protection items.

Supervising the implementation of

environmental monitoring during project

implementation.

Investigation and consultation Socio-

Economic condition in the project area.

Establish, writing Environmental Impact

Assessment (EIA), Environmental

Management Plan (EMP) and EPC report.

Form CV for Environmental Engineer - Bui Nguyen Pho

Page 2

Membership in Professional Associations & Publications:

Viet Nam Association for Conservation of Nature and Environment (VACNE),

Vietnam Bridge and Road Association

Language Skills:

Speaking Reading Writing

Vietnamese Mother Tongue Mother Tongue Mother Tongue

English Good Good Good

Adequacy for the Assignment

Detailed Tasks Assigned on Consultant’s Team of Experts

Inspection of the works according to the Environmental Impact Assesment, Environmental Management

Program, Regulations of Viet Nam and Other Organization such as: JICA, ADB, WORLD BANK;

Record the daily activities, Environment and Socio-Economic condition survey;

Communicate with the Client and contractor for environmental protection regulation during construction;

Coordinate with project owners to report to agencies and complete environmental procedures of projects;

Review and Approve Environmental reports of contractor;

Periodically patrol on Safety and environmental, Report the inspection result to the Resident Engineer, Clients;

Summarize the monthly accomplishment and report to Resident Engineer;

Writing Environmental reports (EIA, EMP, EPC…, monthly report, semi - monthly and annual… reports).

Work/ Assignments that Best Illustrates Capability to Handle the Assigned Tasks Reference to Prior

(1) Name of Assignment or project : Ca Pass Road Tunnel Construction Project- NH1A, Phu Yen and Khanh

Hoa Provinces in the form of BOT and BT

Year: June 2015 - present (17 months)

Location : Phu Yen and Khanh Hoa Provinces, Vietnam

Client : Deo Ca Investment Joint Stock Company/ Funded by BOT and BT

- Main project features: Total length of project is 13.4km; in which: Ca Pass tunnel length 3.9km. Co Ma

tunnel length 0.5km and Approach road and bridges on route 9.0Km. Tunnel: 02 single tubes (one way traffic

on each tube) at 30m distance. Each tube has two lanes of 10.9m wide, covering 02 lanes of carriageway

2x3.5m + 2 safety strips + 1.0m + 2 service ways 2x1.18m. Road: Embankment width Bn=24m. Pavement

width Bm=22.5m, including: 4 lanes carriageway x 3.75m + median strip width 1.5m + shoulder width

2x0.5m + emergency lane 2x2.5m. Bridge deck: Bdeck = 24m and divided into two one-way sections. Design

speed: 80km/h.

Position held : Environmental Specialist

Activities performed: Reviewing Environmental reports, Supervising environmental protection works.

Review and Approve Environmental reports. Coordinate with project owners to report agencies (monthly,

semi-annual reports. Guide contractors to setup environment treatment items, Supervising the implementation

of environmental monitoring during project implementation, Identify safety hazards and propose preventive

measures….

- Communicate with the Client for environmental protection regulation during constrution.

- Reviewing Environmental Impact Assessment, Environmental Management Plan reports of the project and

Environmental reports of contractors. Review and Approve Environmental reports of Contractors.

Supervising environmental protection works (including solid waste, hazardous waste, disposal, periodical

environment monitoring ...) and environmental protection compliance of contractors.

- Recommended and guideline for contractors to implement measures to minimize the environmental impact

of the construction (the mitigation of environmental impacts such as noise, dust, vibration, water, soil....).

- Guide contractors to setup environment treatment items (ventilation and dust filter in the tunnel, sewage

disposal systems and wastewater treatment, sludge collection system, the storage areas for solid waste,

household waste and hazardous waste) and monitoring the operation of items related to environmental.

- Supervising the implementation of environmental monitoring during project implementation. Coordinate with

project owners to report agencies (monthly, semi-annual reports) and complete environmental procedures

(water extraction permits, discharge permits, environmental periodic reporting...) in the construction process.

- Identify safety hazards and environmental impacts and propose preventive measures. Periodic Safety,

Environmental and fire prevention Patrol in the construction process of the project, periodic EHS reports

Form CV for Environmental Engineer - Bui Nguyen Pho

Page 3

(2) Name of Assignment or project: National Highway No. 5 and Thanh Tri Bridge Interchange Project/ JICA

Year : March 2014 - June 2015 (16 months)

Location : Ha Noi, Vietnam

Client : Thang Long PMU - MOT/ Funded by JICA

Main project features: The project includes components: (i) Build up the ramps for going up and down at

the intersection between Thanh Tri Bridge and National highway No.5; (ii) Expanding the overpass of NH5

from 4 into 6 lanes; (iii) Implementing relocation of 2km of railway.

Position held : Environmental Specialist

Activities performed: Reviewing Environmental reports, Supervising environmental protection works.

Review and Approve Environmental reports. Coordinate with project owners to report agencies (monthly,

semi-annual reports). Guide contractors to setup environment treatment items, Supervising the

implementation of environmental monitoring during project implementation, Identify safety hazards and

propose measures to minimize unsafety issues.

- Review environmental impact assessment report, environmental management plan of the project. Supervise

and inspect the environmental compliance of contractors. Proposed solutions to minimize environmental

pollution during construction; Supervising, monitoring the environmental condition in the construction stage

of the project.

- Coordinate with project owners to report to agencies and complete environmental procedures during

construction of the project. Implement environmental procedures according to policy of environmental and

safety of regulations.

- Guide contractors to setup environment treatment items (wastewater treatment systems, sludge collection

system, the storage areas for solid waste, household waste and hazardous waste) and monitoring the operation

of items related to environmental protection.

- Recommended and guideline for contractors to implement measures to minimize the environmental impact

of the construction process (the mitigation of environmental impacts such as noise, dust, vibration, water, soil,

traffic accidents....).

- Responsible for weekly reporting to the project manager. Cooperating with Japanese experts for site

inspection.

- Supervising sub-contractor on periodic environmental monitoring and propagation of HIV/AIDS prevention.

- Identify risks and the impacts on the environment and propose measures to prevent, minimize with the aim to

ensure safety and environmental protection in the construction process of the project.

(3) Name of Assignment or project : National Highway No. 1 Expansion Through Quang Ngai Province Project

Year: January 2014 – March 2014

Location: Quang Ngai Province , Vietnam

Client: Quang Ngai Department of Transportation

Main project features: Project will enhance the pavement of NH No.1 from Km1027+000 - Km1063 +877;

expand from Km1092 +000 - Km1110+000 and adjust from Km1110+000- Km1125 +000..

Position held: Environmental Expert

Activities performed: Research, review and exalted additional pavement problems affect on the residential

areas along roadsides. Studying problems of erosion, deposition in the horizontal position sewer lines. Provide

mitigation measures and reasonable compensation.

(4) Name of Assignment or project: National Highway No.1 Expansion Through Ha Tinh Province

Year : December 2013

Location: Ha Tinh Province

Client: Ha Tinh Department of Transportation

Main project features: Expansion National Highway 1 Construction from Km517+950 – Km556+000.

Position held : Environmental Expert

Activities performed: Establish EIA report.

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition

survey), Investigation and survey the socio-economic condition in Project area.

- Establish Environmental Impact Assessment (EIA) report.

- Submit and complete the EIA report to the authority agencies.

Form CV for Environmental Engineer - Bui Nguyen Pho

Page 4

(5) Name of Assignment or project: Construction of Viaduct Section Mai Dich – South Thang Long /JICA

Year : October 2013 – December 2013

Location : Ha Noi

Client : PMU Thang Long/ Funded by JICA

Main project features: Total length of project is 6.1km, cross section B = 24m, Design speed: 120km/h..

Position held : Environmental Expert

Activities performed : Investigate and study environmental and socio-economic condition in the residence

area of the Project. Establish Social Impact Assessment (SIA) and Resettlement Action Plan (RAP) report.

(6) Name of Assignment or project: Viet Tri and Ninh Phuc Port Improvement - Northern Delta Transport

Development Project

Year: May 2013 – October 2013

Location: Phu Tho and Ninh Binh province

Client: Waterways PMU/ Funded by World Bank

Main project features : Strengthening the capacity to receive and transport in the port area of Viet Tri and

Ninh Phuc through Dredging of the port, upgrade infrastructure sector as wharves, warehouses construction,

roads to the port ...

Position held: Environmental Specialist

Activities performed: Supervise and inspect the environmental compliance of contractors.

- Supervising and monitoring the environmental condition (dust PM10, TSS, Noise, Viberation, Underground

water, water, soil…condition survey) in the construction stage of the project.

- Submit and complete reports to the authority agencies.

- Proposed solutions to minimize environmental pollution during construction.

(7) Name of Assignment or project: Subproject component of NH39-1 rehabilitation, Trieu Duong – Hung Ha

section (Km42+714 - Km64+000) and 3 bridges on alignment include Nai, Dong Tu and Go belong to

Component C of Vietnam Road Asset Management Project

Year: May 2013

Location: Hung Yen, Thai Binh Provinces.

Client: Project Management Unit 3, Ministry of Transport/ Funded by Asian Development Bank (ADB)

Main project features: The project is implemented aiming at following objectives: Improvement of

efficiency of Northern transport service; Reduction of traffic accident and Enhancement of institutional

framework and finance for sustainable maintenance activity of Vietnam’s road network.

- This Project has total length of around 20.18km spread on 12 communes/towns, Broad-bed = 12m according

to class III of highway, the sections go through the residential areas are applied the urban road standards with

designed velocity Vtk = 80km/hr (for section passing residential areas,Vtk=60km/hr)

Position held: Environmental Specialist

Activities performed: Establish Environmental Impact Assessment (EIA) and Environmental Management

Plan (EMP) report.

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition

survey), Investigation and survey the socio-economic condition in Project area.

- Establish Environmental Impact Assessment (EIA) report. Submit and complete the EIA report to agencies.

- Establish Environmental Management Plan (EMP) report.

- Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB)

(8) Name of Assignment or project: Sub-Project of NH38 Improvement, Section from Quan Goi - Yen Lenh

(Km33+963-km52+716) and 2 Bridges including Sat Bridge and Bun Bridge belonging to Component C,

Vietnam Road Asset Management.

Year: April 2013 - May 2013

Location: Hai Duong, Hung Yen, Thai Binh, Ha Giang, Nghe An, Tuyen Quang and Bac Ninh Provinces.

Client: No.2 Project Management Unit, Ministry of Transport/ Funded by World Bank

Main project features: The project is implemented aiming at following objectives: Improvement of

efficiency of Northern transport service; Reduction of traffic accident and Enhancement of institutional

Form CV for Environmental Engineer - Bui Nguyen Pho

Page 5

framework and finance for sustainable maintenance activity of Vietnam’s road network. The main objective

of the project is to enhance traffic capacity of the NH38.

- The project shall be studied in investment in: Improving of NH38 Quan Goi - Yen Lenh section with a total

length of about 29.5km, of which: Construction of bypass sections with a total length of about 15.8km;

Keeping the existing NH38 of about 5.5km (Km38+325 to Km43+760); Repaving NH38 pavement for

Km33+963 - Km38+400; Km43+600 - 47+600 sections with a total length of about 8.2km; Construction of 13

at-grade intersections; Construction of 06 new bridges with each bridge’s length < 200m; Drainage system and

traffic safety.

Position held: Environmental Specialist

Activities performed: Establish Environmental Impact Assessment (EIA) and Environmental Management

Plan (EMP) report.

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition

survey), Investigation and survey the socio-economic condition in Project area.

- Establish Environmental Impact Assessment (EIA) report. Submit and complete the EIA report to agencies.

Establish Environmental Management Plan (EMP) report.

- Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB)

(9) Name of Assignment or project: NH5 - Section from Ha Noi – Hai Duong (Km11+000 – Km93+000),

belonging Vietnam Road Asset Management.

Year: April 2013

Location: Hai Duong, Hung Yen, Thai Binh, Ha Giang, Nghe An, Tuyen Quang and Bac Ninh Provinces.

Client: No.2 Project Management Unit, Ministry of Transport/ Funded by World Bank

Main project features: The subproject will be implemented in thirty-eight communes of the ten districts of

Ha Noi City, Hung Yen Province, Hai Duong Province and Hai Phong City. The routine maintenance and

emergency repair activities of subproject include managing and maintaining the pavement, bridges, electrical

system, taking care the tree and shrub in the separator, protecting the road corridor, emergency repairing the

drainage system, slope protection, auxiliary works.

Position held: Environmental Specialist

Activities performed: Establish Environmental Protection Commitment (EPC) report.

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition

survey), Investigation and survey the socio-economic condition in Project area.

- Establish Environmental Impact Assessment (EIA) report. Submit and complete the EIA report to agencies.

- Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB)

(10) Name of Assignment or project: NH.39 section from Vo Hoi – Diem Dien (Km91+000 - Km107+522),

belonging to Component C, Vietnam Road Asset Management.

Year: March 2013 - April 2013

Location: Thai Binh Province.

Client: No.2 Project Management Unit, Ministry of Transport/ Funded by World Bank

Main project features: The Project locates in 2 districts of Dong Hung and Thai Thuy, Thai Binh province.

The Project has total length of around 13.21km, basically it follows existing NH39 route including:

Improvement of 10,190m road, starting from Km91+000 (NH39 station) and ending at Km107+519.05

(NH39 station). New construction of 3.020m in sections of Km91+700 - Km92+100, Km93+300 -

Km94+400, Km95+000 - Km95+320, Km97+100 - Km97+700, Km99+350 - Km99+700 and Km100+150

- Km100+400 for standard local relocations. Improvement of 02 intersections at Km98+576 (crossing road

to Thuy Lien) and Km107+519.05 (Ngoai Trinh crossroads)

Position held: Environmental Specialist

Activities performed: Establish Environmental Impact Assessment (EIA) and Environmental Management

Plan (EMP) report.

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition

survey), Investigation and survey the socio-economic condition in Project area.

- Establish Environmental Impact Assessment (EIA) report. Submit and complete the EIA report to agencies.

- Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB)

Form CV for Environmental Engineer - Bui Nguyen Pho

Page 6

(11) Name of Assignment or project: QL2: Ham Yen – Ha Giang (Km175-Km283) belonging Vietnam Road

Asset Management.

Year: Fabruary 2013 – March 2013

Location: Ha Giang Provinces.

Client: No.2 Project Management Unit, Ministry of Transport/ Funded by World Bank

Main project features: Project categories include: Maintenance, repair and upgrade NH2, Ham Yen – Ha

Giang section.

Position held: Environmental Specialist

Activities performed: Establish Environmental Impact Assessment (EIA) and Environmental Management

Plan (EMP) report.

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition

survey), Investigation and survey the socio-economic condition in Project area.

- Establish Environmental Impact Assessment (EIA) report. Submit and complete the EIA report to agencies.

- Reports according to Framework for Safety Policy, Social and Environmental of Asian Develope Bank (ADB)

(12) Name of Assignment or project: Bien Hoa – Vung Tau Expressway.

Year: November 2012 – Fabruary 2013

Location : Dong Nai and Bien Hoa – Vung Tau provinces

Client : Bien Hoa – Vung Tau Express Way Joinstock Company

Main project features: Total length is 78km, cross section 25.5÷27.5m, Design speed V=120km/h.

Position held : Environmental Specialist

Activities performed: Establish Environmental Impact Assessment (EIA) and RAP report.

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition

survey), Investigation and survey the socio-economic condition in Project area.

- Establish Environmental Impact Assessment (EIA) report. Submit and complete the EIA report to agencies.

- Establish Master Plan on Compensation, Support and Resettlement (RAP report).

(13) Name of Assignment or project : Connecting Road between Ha Noi – Hai Phong Expressway and Ninh Binh

- Cau Gie Expressway

Year: September 2012 - October 2012

Location: Hung Yen and Ha Nam province

Client: No.1 PMU, MOT.

Main project features: The total length of project is 47km; cross section B=25m and V=80km/h.

Position held : Environmental Specialist

Activities performed: Surveying Dumping sites, consult the affected objects. Writing EIA report

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition

survey), Investigation and survey the socio-economic condition in Project area.

- Establish Environmental Impact Assessment (EIA) report.

- Submit and complete reports to the authority agencies.

(14) Name of Assignment or project: Cao Lanh Bridge Construction Investment Project

Year: May 2012 – August 2012

Location: Dong Thap Province

Client: Cuu Long Corporation for Investment Development and Project Management of Infrastructure (Cuu

Long CIPM)/ Funded by Asian Develope Bank (ADB)

Main project features: The total length of the project is 7.8km (Cao Lanh Bridge has the length of 2.1km);

cross section B=24.5m and Design speed: V=80km/h.

Position held : Environmental Specialist

Activities performed: Establish Environmental Impact Assessment (EIA) report.

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition

survey), Investigation and survey the socio-economic condition in Project area.

- Establish Environmental Impact Assessment (EIA) report. Submit and complete the report to the agencies.

Form CV for Environmental Engineer - Bui Nguyen Pho

Page 7

(15) Name of Assignment or project: Chua Boc - Pham Ngoc Thach flyover bridge project

Year: March 2012 – April 2012

Location: Ha Noi city

Client: Hanoi Department of Communication and Transportation

Main project features: The total length of Bridge is 592m; cross section B=12m and Design speed:

V=30km/h. Approach road has 314m in length.

Position held : Environmental Specialist

Activities performed: Survey and setting out for resettlement plan.

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition

survey), Investigation and survey the socio-economic condition in Project area.

- Establish EIA report. Submit and complete the EIA report to authority agencies.

(16) Name of Assignment or project: Investment projects to expand and improve the Lang – Hoa Lac expressway

Year: October 2010 – February 2012

Location: Ha Noi city

Client: Thang Long PMU, MOT

Main project features: The total length of project is 28.3km and Design speed: V=120km/h.

Position held: Environmental Specialist

Activities performed: Establish Environmental monitoring report;

- Supervising and Monitoring environmental condition in the construction stage of project. Writing

Environmental Monitoring and Supervising Report during construction and operation process of the project.

- Reviewing Environmental Impact Assessment, Environmental Management Plan reports of the project and

Environmental reports the contractors. Supervising environmental protection works (including solid waste,

hazardous waste, disposal, periodical environment monitoring ...) and environmental protection compliance of

contractors; Recommended and guideline for contractors to implement measures to minimize the environmental

impact of the construction process (the mitigation of environmental impacts such as noise, dust, vibration, ....);

Supervising the implementation of environmental monitoring during project implementation. Coordinate with

project owners to report agencies and complete environmental procedures (water extraction permits, discharge

permits, environmental periodic reporting...) in the construction process.

- Identify safety hazards and environmental impacts and propose preventive measures. Periodic Safety,

Environmental and fire prevention Patrol in the construction process of the project, periodic EHS reports.

- Implement environmental procedures according to policy of authority agencies.

(17) Name of Assignment or project: Ninh Binh – Thanh Hoa Expressway.

Year: December 2011 – February 2012

Location: Ninh Binh and Thanh Hoa provinces

Client : PMU No.1, MOT.

Main project features: Total length is 127km, cross section 35m, Design speed V=120km/h

Position held : Environmental Specialist

Activities performed: Survey and setting out for resettlement plan. Establish Environmental Impact

Assessment (EIA) report.

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition

survey), Investigation and survey the socio-economic condition in Project area.

- Establish Environmental Impact Assessment (EIA) report. Submit and complete the EIA report to authority.

(18) Name of Assignment or project: Ben Luc – Hiep Phuoc component project (Belonging to the Ho Chi Minh

City Ring Road Project No.4)

Year: November 2011 – December 2011

Location: Long An province and Ho Chi Minh city.

Client : PMU My Thuan.

Main project features: Total length is 34.7km, cross section 35m, Design speed V=120km/h, 6 - 8 lanes.

Form CV for Environmental Engineer - Bui Nguyen Pho

Page 8

Position held : Environmental Specialist

Activities performed: Establish Environmental Impact Assessment (EIA) report.

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition

survey), Investigation and survey the socio-economic condition in Project area.

- Establish Environmental Impact Assessment (EIA) report. Submit and complete the EIA report.

(19) Name of Assignment or project: Component projects/ Southern of Hau River road project.

Year: May 2011 – August 2011

Location: Hau Giang and Soc Trang Province.

Client : PMU My Thuan.

Main project features: Total length is 15.45km, Plain level is 4, speed design Vtk=60km/h.

Position held : Environmental Specialist

Activities performed: Establish Environmental Impact Assessment (EIA) report

- Environmental survey (dust: PM10, TSS, Noise, Viberation, Underground water, water, soil…condition

survey), Investigation and survey the socio-economic condition in Project area.

- Establish Environmental Impact Assessment report. Submit and complete the EIA report to the agencies.

(20) Name of Assignment or project: Dinh Vu Polyester manufacturing Plant

Year: June 2008 – June 2009

Location: Hai An province – Hai Phong city

Client: Petrovietnam Petrochemical and Textile Fiber Joint Stock Company

Main project features: Building internal roads 1,860m length; building office, factories, power stations,

storage, installation structures, machinery and equipment. Building electrical systems, lighting, drainage

systems, landscaping, trees, hills and scenery. Building auxiliary systems: wastewater treatment facilities,

drinking water, cooling water, gas stations, chemical grade, heat, heating systems, fire protection systems.

Commissioning, project test run. Operating project official

Position held: Environmental Engineer

Activities performed:

- Implementation of records, procedures, legislation on environment under the provisions of the EIA report and

other legal provisions involved. Monitoring environmental compliances by the contractor.

- Develop plans / measures to the authorities and approval in accordance with law; develop procedures / plans

for the approval of leaders to manage and apply to environment Safety and fire prevention work of the

factories .

- Monitoring operation of wastewater treatment facilities in the plant. Monitoring environmental protection

work of the units in the plant.

- Management of waste generated at the factory (emissions, noise, vibration, waste water, hazardous waste,

solid waste, domestic waste, ...); implementation of environmental monitoring plan periodically; prepare

documents and environmental reports during project operation.

- Study and propose solutions to limit waste generation, collection methods, waste treatment and solutions

together with environmental protection works during officially put into operation of factory to ensure

compliance with the provisions the legislation on environmental protection.

Form CV for Environmental Engineer - Bui Nguyen Pho

Page 9

Expert’s Contact Information:

Certification:

I, the undersigned, certify to the best of my knowledge and belief that

(i) This CV correctly describes my qualifications and experience

(ii) I am not a current employee of the Executing or the Implementing Agency

(iii) In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of the inputs

specified for me in Form TECH 6 provided team mobilization takes place within the validity of this proposal.

(iv) I was not part of the team who wrote the terms of reference for this consulting services assignment

(v) I am not currently debarred by a multilateral development bank

I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged.

Date: 19/December/2016

[Signature of Expert or authorized representative of the firm] Day/Month/Year

Form CV for Environmental Engineer - Bui Nguyen Pho

Page 10

Form CV for Environmental Engineer - Bui Nguyen Pho

Page 11

Form CV for Environmental Engineer - Bui Nguyen Pho

Page 1

Form CV for Environmental Engineer - Bui Nguyen Pho

Page 2

Form CV for Environmental Engineer - Bui Nguyen Pho

Page 3

Form CV for Environmental Engineer - Bui Nguyen Pho

Page 4

Form CV for Environmental Engineer - Bui Nguyen Pho

Page 5