Customer Interconnection Tool (CIT)
Contractor Training
September 2017
Slide 1
![Page 2: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/2.jpg)
Agenda
Welcome (Team Introductions)
Overview of the Customer Interconnection Tool (CIT)
Navigation
Live Demo
Contractor Account Registration
CIT Q&A
Slide 2
![Page 3: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/3.jpg)
Welcome
Slide 3
![Page 4: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/4.jpg)
What is the Customer Interconnection Tool (CIT)?
A new web-based tool to submit interconnection applications – Initial launch will handle Customer Self-Supply (CSS) applications only
Software solution provider: GridUnity
Launch date: September 27, 2017
Slide 4
![Page 5: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/5.jpg)
Benefits of CIT
Automates and streamlines the interconnection application process
Eliminates the need for physical paper
Improves the customer experience – Better transparency
– Guides the user through the application process
– Uses customer-friendly terminology
– Proactive, timely communication
Error checking and auto-calculations
Automatically generates the final agreement and allows for electronic signature through DocuSign
Slide 5
![Page 6: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/6.jpg)
Email Communications Action Communication Recipients
Application Type Selected Thank you for starting your application Customer Contractor
System Components Entered Thank you for updating your application Customer Contractor
Application submitted to Utility Project ID #: Application has been submitted Customer Contractor
Application Reviewed for Completeness
Application Complete and moving to Initial Technical Review (ITR) -or-Application Incomplete and moving to Customer Action Required (CAR)
Customer Contractor
Application Passed ITR Conditional Approval Customer Contractor
Application Did Not Pass ITR Notice of Supplemental Review Required -or-Application Incomplete and moving to CAR
Customer Contractor
Conditional Approval Your Customer Grid Supply system has been conditionally approved Customer Contractor
Validation Packet Received We have received your validation packet Customer Contractor
Validation Requirements Your Project has successfully complete all validation requirements Customer Contractor
Execution Executed agreement copy or PTO Customer Third Party (if applicable) PTO Only- Contractor
Slide 6
![Page 7: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/7.jpg)
Sample Communication
Slide 7
![Page 8: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/8.jpg)
-
-
SUBMIT APPLICATION
UTILITY REVIEWS/
CONDITIONAL APPROVAL
COMPLETENESS REVIEW
ANY/ALL TECHNICAL REVIEWS
OTHER REVIEWS/ UPGRADES
VALIDATION SUBMITTAL
STAKEHOLDER &
SYSTEM COMPONENTS
INSTALLATION
VALIDATION REVIEW
INSPECTION
AGREEMENT EXECUTION
with E SIGNATURES
PERMISSION TO OPERATE
CONTRACTOR / CUSTOMER
Legend
METER CHANGE
CUSTOMER E SIGNATURE
SIG
N-I
N
UTILITY PROCESSOR
UTILITY ENGINEER
Overview of CIT Workflow
Slide 8
![Page 9: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/9.jpg)
Navigating the CIT Tool
Slide 9
![Page 10: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/10.jpg)
Accessing the Site URL: https://forms.hawaiianelectric.com
Register using the email sent to you or via the
instructions in the grey folder.
Slide 10
![Page 11: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/11.jpg)
Slide 11
![Page 12: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/12.jpg)
Navigation Breadcrumbs
Light purple tabs are completed The tab a user Tan t abs indicate pages. currently has open is the next steps.
You may return to any of these dark purple. pages by clicking on the
breadcrumb.
Asterisk * indicates a required field
Click the for more details
Slide 12
![Page 13: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/13.jpg)
Document Uploads
Requests for document uploads will display a button requesting a document be attached:
Select Attach Document Locate file on your hard drive and select Once the Upload button below appears, click the button to complete the upload process:
Successfully completed document upload:
Slide 13
![Page 14: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/14.jpg)
Application List View
Use the search icon to find a record
Add filters in the upper left corner
The settings button can be expanded to add more filters
Click anywhere along the application listing to open the application
Click on ●●● to access additional user actions: – Withdraw Application
– Revisions
Use to export the Application List to an Excel spreadsheet
Slide 14
![Page 15: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/15.jpg)
Project Summary Page
Slide 15
![Page 16: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/16.jpg)
Application Status
Slide 16
![Page 17: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/17.jpg)
Re Submittal Revision VS
Utility initiated requests for corrections/missing items discovered during the project completeness review.
Resubmittals may happen only during the CAR to RC Completeness Review phase
Queue Position will be affected.
• Revisions are consideredcustomer/contractorinitiated changes.– Revisions are accepted
between Notice of ConditionalApproval and Validationsubmittal.
– Revisions may be accepted asa result of an incompletevalidation
• Queue Position may beaffected.
Slide 17
![Page 18: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/18.jpg)
Demonstration
Overview of end-to-end contractor experience.
– Create Application
– Submit Application
– Submit Validation
– Submit Revision
– Request Withdrawal
Slide 18
![Page 19: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/19.jpg)
Login
Slide 19
![Page 20: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/20.jpg)
Starting a New Application
Slide 20
![Page 21: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/21.jpg)
Slide 21
![Page 22: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/22.jpg)
Slide 22
![Page 23: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/23.jpg)
Meter Number 9 digits with leading zero’s
0 0 0 _ _ _ _ _ _MPX
Company Prefix
Zip code must match meter number
Information auto-filled
TMK must be 13 digits ending with zero’s (i.e. 1xxxxxxxx0000)
Meter Number 9 digits with leading zero’s
Slide 23
![Page 24: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/24.jpg)
This email address will be
used for the DocuSign process and should be the
address for the signing property
owner.
Slide 24
![Page 25: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/25.jpg)
Grant of Authorization Form
Authorization form needs to be signed by the customer
Form has same authorization and acknowledgement information as the current DER application submittal form
Slide 25
![Page 26: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/26.jpg)
ESS = Energy Storage System
Types of Operation: – Digital Control Battery Backup
– Digital Control Export (Coincident with PV)
– Digital Control Export (Non-Coincident with PV)
– Uncontrolled Export (Coincident with PV)
Slide 26
![Page 27: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/27.jpg)
If the Mounting Location is not immediately adjacent to the utility meter, please specify
Slide 27
![Page 28: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/28.jpg)
Inverters by string and type
Micro Inverter:
String Inverter:
Slide 28
![Page 29: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/29.jpg)
PV Panels are connected to the corresponding inverter string
Multiple strings of PV panels may be added to the same inverter string
Total panel quantity and panel size are listed for inverter string
Slide 29
![Page 30: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/30.jpg)
Information entered manually
Energy storage is connected to the corresponding inverter string
Auto-calculated Total Proposed Storage Size
Total Proposed System Size can be manually overwritten depending on the system configuration
Slide 30
![Page 31: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/31.jpg)
Required if the system is ≥ 30kW
Slide 31
![Page 32: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/32.jpg)
Maximum and Minimum Site Loads without generation required for systems ≥ 30kW
Maximum Generating Capacity should be equal to Total Proposed System Size
Program Size = system size without ESS
Slide 32
![Page 33: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/33.jpg)
Error Messages
Fields marked in RED mean corrections are required.
Example: In this case, the AC Disconnect information needs to be filled in.
Slide 33
![Page 34: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/34.jpg)
Review the entire application before submitting Navigate through the past progress steps to make changes To save changes, click ‘Save and Continue’ at each progress step To update the Application Summary, ‘Save and Continue’ at the step right before the Application Summary
Slide 34
![Page 35: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/35.jpg)
Confirmation Page and Email
Slide 35
![Page 36: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/36.jpg)
Application Review Process
Slide 36
![Page 37: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/37.jpg)
Completeness Review Results
Pass – application proceeds to Initial Technical Review (ITR)
Status:
Fail/Incomplete - corrections must be addressed before the application can move on to ITR
Status: — To make a correction, follow the instructions in the email attachment.
You will need to log into CIT to perform the corrections.
Pass with minor corrections - an email will be sent with an attached list of corrections.
Status: – These changes can be made when all reviews are complete.
Submit corrections through the Revision process.
Slide 37
![Page 38: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/38.jpg)
Completeness Review Incomplete Email
Slide 38
![Page 39: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/39.jpg)
Slide 39
![Page 40: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/40.jpg)
Completeness Review Passed with Minor
Corrections Email
Slide 40
![Page 41: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/41.jpg)
Completeness Review Passed Email
Slide 41
![Page 42: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/42.jpg)
Technical Reviews
An email will be sent with the result of the Initial Technical Review (ITR) and will state if a Supplemental Review (SR) is necessary.
If a Supplemental Review is necessary, the result of that review will be emailed.
The application will be conditionally approved when all technical reviews are passed. At this time, you have permission to install.
Load Tap Changer (LTC) circuit upgrade requirement is determined as a part of conditional approval.
Slide 42
![Page 43: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/43.jpg)
Initial Technical Review Failed Email
Slide 43
![Page 44: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/44.jpg)
Conditional Approval Email
Slide 44
![Page 45: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/45.jpg)
Load Tap Changer (LTC) Requirement
LTC letter attached
Slide 45
![Page 46: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/46.jpg)
Revisions
Slide 46
![Page 47: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/47.jpg)
Revision Types
Change of Contractor Revision
If your customer is changing contractors, submit a new application in CIT
At Completeness Review, the utility will work with the customer to confirm their choice of contractor and withdraw the other application
Change to System Component(s) Revision
Prior to submitting the Validation
Slide 47
![Page 48: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/48.jpg)
How to start a Revision
Navigate to Application List and click the User Actions to submit a revision
Select ‘Start a new revision’ from Project Summary page
Address
Customer
Slide 48
![Page 49: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/49.jpg)
How to submit a Revision
Navigate through the progress steps to change desired fields
Click ‘Save and Continue’ on the bottom of each revised step and on the ‘Additional Information & Drawings’ page
Changes will be shown in red on the ‘Review Changes’ page
Slide 49
![Page 50: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/50.jpg)
Validation
Slide 50
![Page 51: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/51.jpg)
Submitting the Validation
Click on the hyperlink for ‘Start Project Validation’ on the Project Summary Page to start the Validation submittal
You may enter parts of the Validation, click ‘Save and Continue’, and come back to submit the entire packet at a later time
Slide 51
![Page 52: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/52.jpg)
Validation Requirements
If installed project varies at all from online application information, a revision will be required prior to submitting for validation. Once revision is approved, validation may proceed.
If no changes have been made to the last submittal and project installed matches application data exactly the requirements on the next page apply.
Slide 52
![Page 53: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/53.jpg)
Slide 53
![Page 54: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/54.jpg)
Slide 54
![Page 55: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/55.jpg)
Slide 55
![Page 56: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/56.jpg)
Slide 56
![Page 57: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/57.jpg)
Slide 57
![Page 58: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/58.jpg)
Slide 58
![Page 59: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/59.jpg)
Slide 59
![Page 60: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/60.jpg)
Load Tap Changer (LTC) Payment
Slide 60
![Page 61: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/61.jpg)
Slide 61
![Page 62: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/62.jpg)
Validation Requirements
Same requirements as the current CSS Validation Procedure.
You have the option to upload photos individually or as a set.
Ensure what you submit in the Validation Packet matches the application. If changes were made, submit a Revision before the Validation.
Slide 62
![Page 63: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/63.jpg)
Validation Received Email
Slide 63
![Page 64: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/64.jpg)
Inspection
Company-specific requirements
We will perform our inspection when the validation review is completed.
Track when the inspection is completed on the project summary page:
Slide 64
![Page 65: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/65.jpg)
DocuSign Process Overview
After the project passes inspection, an email from DocuSign will be sent to the Property Owner and System Owner (if applicable)
Slide 65
LEGEND
CONTRACTOR
UTILITY
PROPERTY / SYSTEM OWNER
![Page 66: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/66.jpg)
Permission to Operate
After meter is changed out & the Agreement is fully executed, the PTO Email will be sent from CIT.
Emails to signing parties (property owner & system owner) will also receive attachment with signed
Slide 66
agreement.
![Page 67: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/67.jpg)
Withdraw an Application
Navigate to the Application Listing
Or through the Project Summary page
Address
Customer
Slide 67
![Page 68: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/68.jpg)
Withdraw Application
Slide 68
![Page 69: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/69.jpg)
Contractor Account Registration
Slide 69
![Page 70: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/70.jpg)
Setting up your account
Pre-registration email sent Tuesday, Sept. 19
Your company account must be verified and activated prior to using the tool
Slide 70
![Page 71: Customer Interconnection Tool Contractor Training · 9/27/2017 · Slide 2 . Welcome Slide 3 . What is the Customer Interconnection Tool (CIT)? A . ... TMK must be 13 digits ending](https://reader033.fdocuments.in/reader033/viewer/2022051908/5ffcd5ed9525ab0de211eb9b/html5/thumbnails/71.jpg)
Contractor Verification Process Company name must match the licensed business name found in the DCCA’s (Department of Commerce and Consumer Affairs (BREG website)) records Company-specific email ([email protected]) Designated Company Point of Contact (one per company) Provide a list of current employees who will need access to CIT – We will call the Point of Contact to verify the company’s
representatives
Pre-registration on Tuesday, 09/19/17 – Also available at the end of today’s training
Regular registration online – set up Point of Contact account, which serves as the main account for your company