Current state of electricity industry and prospects of ... Ravshan Artykov... · Current state of...
Transcript of Current state of electricity industry and prospects of ... Ravshan Artykov... · Current state of...
STATE JOINT-STOCK COMPANY "UZBEKENERGO"
Current state of electricity industry and prospects of energy system
modernization
Inputs of generating capacities in 1926-1940
1
№ Names of power plants Capacity of units, MW Years of commissioning
1. Bozsu HPP 2+1+1 1926-1936
2. Kadirin HPP 4x3.3 1933
3. Burdzhar HPP 2x3.2 1936
4. Komsomolskaya HPP 2x21 1940
Total HPP 65.6
5. Fergana CHP “Zarya Vostoka”
5.3+3+1.2 1930-1936
6. Katta-Kurgan CHP 3 1936
7. CHP “Chirchiq Electrochemical Plant”
4+2 1938-1939
8. Tashkent CHP 6+6 1939-1940
9. Quvasoy GRES 12 1939
Total TPP 42.5
Total 108.1
HPP construction during the war
2
№ Names of power plants Capacity of units, MW
Date of commissioning
Duration of construction,
mths
1. Aktepin HPP 15.0 Jan 1943 13
2. Akkavak HPP 10.7 Mar 1943 15
3. Kibray HPP 11.2 Sep 1943 18
4. Salar HPP 11.2 Mar 1944 11
5. Lower-Bozsu HPP 10.7 Dec 1944 24
6. Farkhad HPP 2x30+2x33 1948-1949
Total 58.8
Development of power industry based on the construction of large plants
3
№ Names of power plants Capacity, MW Number of units
Years of commissioning
1. Angren TPP 612 8 1957-1962
2. Fergana CHP 420 7 1956-1979
3. Takhiatash TPP 778 9 1961-1990
4. Tashkent TPP 1860 12 1963-1971
5. Navoi TPP 1250 11 1963-1981
6. Syrdarya TPP 3000 10 1972-1981
7. Charvak HPP 600 4 1970-1972
8. Hodzhikent HPP 165 3 1976
9. Gazalkent HPP 120 3 1980-1981
10. Novo-Angren TPP 2100 7 1985-1995
11. Talimarjan TPP 800 1 2005
OJSC
Uzbekugol
with subsidiaries
Council of the company
Board of management of
the company
Enterprises producing
energy-16, of which TPP-
10, including 2-UE and 8
OJSC
Cascades HPP-5 UE,
UE Farkhad HPP
Energosbyt
(subsidiary) Repair and
adjustment
organizations - 5,
including 3-
OJSCs,
1 LLCs and 1 UE
Project organizations -
4 OJSCs
Construction and
assembly organizations
- 7 OJSCs
Logistics enterprises - 2
OJSCs
Enterprise for power
distribution and sales 14
- OJSCs
UP Uzenergosozlash
(performs industry-
wide functions) Other entities-3,
including 1-UP, 2 - LLCs
Electricity transportation
company UP
"Uzelektroset" with 5
zonal branches
Organizational structure of SJSC "Uzbekenergo"
4
Structure of installed capacities of Uzbek power plants
Installed capacity of electric power stations Uzbek (MW), total
including:
12517.2
1. SJSC "Uzbekenergo"
including:
Thermal power plants (TPP)
Hydraulic power plants (HPP)
12038.7
10619.0
1419.7
2. Block-stations 478.5
HPP
11.4%
Block-stations
3.6%
TPP
85.0%
5
THERMAL POWER PLANTS
UE "Tashkent TPP" - capacity 1860
MW
UE "Talimardjan TPP" - capacity
800 MW
OJSC "Angren TPP“ - capacity 484
MW
OJSC "Novo-Angren TPP" - capacity
2100 MW
OJSC "Syrdarya TPP" - 3000 MW
capacity
OJSC "Navoi TPP" - capacity 1250
MW
OJSC "Takhiatash TPP" - capacity
730 MW
OJSC "Ferghana CHP" -
capacity 305 MW
OJSC "Mubarek CHP" -
capacity 60 MW
OJSC "Tashkent CHP" -
capacity 30 MW
6
HYDRO POWER PLANTS
UE "Cascade of Urta-Chirchik HPPs" -
capacity 905.5 MW, consisting of 3 HPPs
UE "Cascade of Kadirin HPPs" -
capacity 44.6 MW, consisting of 4 HPPs
UE "Cascade of Tashkent HPPs“ - capacity 29.0 MW,
consisting of 4 HPPs and 2 branches
UE "Cascade of Lower Bozsu HPPs" -
capacity 50.9 MW, consisting of 5 HPPs
UE "Cascade of Chirchik HPPs" -
capacity 190.7 MW, consisting of 3 HPPs
UE "Farkhad HPP" - capacity 126.0 MW
7
Current state of the Unified Power System
Length of electric networks - 240.5 thousand km Transformer capacity - 40.0 million kVA
Electric networks
8
Газ
93,0%
Уголь
4,8%Мазут
2,0 %
Подземгаз
0,2%
Fuel Consumption Structure
at power plants of the company
9
Electricity consumption by the economy and the public
Население
25,4 %
Коммунально -
битовой сектор
9,3 %
Транспорт
2,9 %строительство
0,5%
Сельское хоз-во
21,8 %Промишлен
ность
40,1 %
10
Transmission lines Territory of servicing, region
Central TLs unite btransmission lines in the territory of
the city of Tashkent, Tashkent, Syrdarya
and Jizzakh regions
Eastern TLs unite transmission lines in the Fergana,
Andijan and Namangan regions
South-Western TLs unite transmission lines in the territory of
Samarkand, Navoi, Bukhara and
Kashkadarya regions
North-Western TLs transmission lines of the Khorezm region
Southern TLs transmission lines of the Surkhandarya
region
Beruni plot
transmission lines of the
Republic of Karakalpakstan
Electricity transportation enterprises of Unitary Enterprise "Uzelektroset"
11
ENTERPRISES ON DISTRIBUTION AND SALE OF ELECTRICITY
ELECTRIC NETWORKS
OJSC "Andijan PP"
OJSC "Bukhara PP"
OJSC "Jizzakh PP"
OJSC "KASHKADARYA PP"
OJSC "Navoi PP"
OJSC "Namangan PP"
OJSC "Samarkand PP"
OJSC "Surkhandarya PP"
OJSC "TashGor PP"
OJSC "Fergana PP"
OJSC "Khorezm PP"
OJSC "Karakalpak PP"
OJSC "Syrdarya PP"
OJSC "Tashkent PP"
12
PROJECT ORGANISATIONS
OJSC "Uzbekgidroenergokurilish"
OJSC "Gidrospetsstroy"
OJSC "Installation Administration
№ 4"
OJSC "Elektrtarmokkurilish"
OJSC "Mahsuselektrtarmokkurilish"
OJSC "Uzkishlokelektrkurilish"
OJSC "Elektrkishlokkurilish"
OJSC "Hydroproject"
OJSC "Teploelektroproekt"
OJSC "Uzenergotaminlash"
OJSC "Energoimpeks"
OJSC "Energotamir"
OJSC "Uzbekenergotamir"
OJSC “ORGRES"
CONSTRUCTION AND INSTALLATION
ORGANISATIONS
REPAIR AND ADJUSTMENT
ORGANISATIONS
LOGISTICS ENTERPRISES
UE "Uzenergonaladka"
UE "Sharq Makhsus Tamir"
LLC «Sharktehenergotamir"
Enterprises and organizations carrying out industry-wide functions
13
Coal mining and auxiliary branches
1. Open-pit mine "Angren"
2. Geological Prospecting Expedition
3. RGTO (Plant for repair of
mining equipment)
1. Kumirkurilish
2. Kumirenergo
3. Belazkumir
4. Alokakumir
OJSC "Shargunkumir"
OJSC "Erostigaz"
LLC JV "Kaolin"
CJSV "Apartak"
STRUCTURE OF OJSC "UZBEKUGOL"
provides technical policy
14
15
Programme of priority development of power industry by 2015
№ Name of energy sector Number of
projects
Commissioned capacity,
length
1 Thermal power plants 15 2639 MW
2 Hydraulic power plants 10 83.45 MW
3 Electric networks
110-500 kV
9 933.4 km, 2099 MVA
4 Distribution electric networks
0.4-35 kV
1 25.1 thous. km, 4057 transformers,
58 substations 35 kV
5 Implementation of AMS
(automated metering system)
4 4.5 million metering points
6 Other 8 production of composite materials, current
transformers, electric meters, LED lamps, synthetic
diesel fuel, modernization of repair organizations
List of investment projects in heat power industry
16
№
Project Name
Commissioned capacity,
MW
Funding sources
1 Construction of combined-cycle plant at the Navoi TPP CCGTU- 478 FRD credits,
2 Implementation of gas turbine technology at the Tashkent
CHP (with CDM component)
GTU- 27 NEDO grant,
3 Expansion of the Talimarjan TPP with the construction of
2 combined-cycle plants
2 х CCGTU- 450 FRD, ADB, JICA
4 Installation of expander generators
at the Syr Darya and Talimardjan TPPs with extension of
220 kV outdoor switchgear at these stations
20
FRD credit
5 Transition of power units № 1-5 of the Novo Angren TPP
to the year-round burning of coal with the modernization
of the "Angren" section (1st stage)
-
Credits from FRD,
Eximbank (PRC)
6 Construction at the Angren TPP of power units with
district heating selection for burning high-ash coal
130-150 PRC credit for the
SCO countries
7 Reconstruction of cooling towers № 1, 2
and 220 kV outdoor switchgear at the Navoi TPP
- Own funds,
8 Full scale modernization of 2 power units of the Syrdarya
TPP
50 FRD credit
Total 1625
List of investment projects in heat power industry
17
№
Project Name
Commissioned
capacity,
MW
Funding sources
1
Construction of combined-cycle plant at the Tashkent
TPP
CCGTU- 370
Foreign investment (CDB )
2 Transition of power units № 6,7 of the Novo Angren
TPP to coal combustion with the construction of the
2nd fuel supply
-
Foreign credit
3 Expansion of the Mubarak CHP with the construction
of the gas turbine plant
GTU-140 Foreign credit
4 Modernization of the Tashkent CHP with the
construction of gas turbines
2х GTU- 27 Foreign credit (JICA),
5 Expansion of the Navoi TPP with the construction of
the 2nd combined-cycle plant
CCGTU-450
Foreign credit (JICA),
Total 1014
№ Names of initiators,
projects Commissioned capacity, MW
Funding sources
I Modernization and reconstruction of 9 HPPs,
including: 75.45
1
UE "Cascade-Urta Chirchik HPPs", modernization of Charvak HPP including replacement of impellers
Increase by 45
FRD
2 UE "Cascade of Chirchik HPPs", HPP-10 Increased reliability
Foreign credit
3
UE "Cascade of Tashkent HPPs", HPP-9, HPP-2B, HPP-UFK-1 and 2
Increase by 10.35
Foreign credit, IDB
4 UE "Farkhad HPP" Increase by
13.0 Own funds
5 UE "Cascade of Kadirin HPPs", HPP-3 Increase by
2.8 Foreign credit
6 UE "Cascade of Lower Bozsu HPPs”, HPP-14 Increase by
4.3 Own funds
Total: 75.45
18
Investment projects on HPP modernization by 2015
19
List of investment projects on development of electrical networks
№
Project Name
Commissioned
capacity, length
Timeframe for
implementation
1 Construction of 220 kV SS "Chapan-Ata"
with 220 kV inputs "SS Sogdiana -
SS Bobur" in the Samarkand region
125 MVA,
2х11.7 km
2012
2 Construction of external power Ustyurt Gas Chemical
Complex (SS and 110 kV Overhead)
20 MVA,
18 km
2012
3 Installation of the 2nd transformer
at 220 kV SS "Keles" in Tashkent
200 MVA 2012
4 Expansion of the energy supply system of investment
projects in the Dehkanabad district of the Kashkadarya
region
2х125 MVA,
2х37 km,
2х16 km (110 kV)
2012-2013
5 Construction of 220 kV overhead line "PS
Uzbekistanskaya-SS Paulgan - SS Fergana" (II chain) in
the Ferghana Valley
136 km 2012-2014
Total 595 MVA,
283.4 km
Volume of work to modernize and upgrade electrical networks 0,4-6-10-35 kV by 2015
Reconstruction New construction
Power lines, total, including:
23 927.0 km 1 207.2 km
overhead 23 640.6 km 1 181.9 km
cable 286.4 km 25.3 km
TS 6-10 kV 3 657 units 400 units
SS 35 kV 43 units 15 units
Cost, million USD 316.7 32.4
20
"Building a solar photovoltaic power plant with 100MW
capacity in Samarkand region"
Investigating opportunities for renewable energy in the
Republic of Uzbekistan
Funding sources
• Preliminary project cost: 310.0 million USD,
including:
- ADB funds - 110.0 million USD
- FRDU loan funds - 130.0 million USD
- SJSC "Uzbekenergo"'s own funds - 26.0 million USD
- Uzbek government's contribution - 44.0 million USD
(in the form of exemption from taxes and customs duties)
Project Location
After a series of studies and terrain analysis, the Samarkand
region khokim in a resolution of July 1 № 151-K allotted for
the construction of PPP a 404 ha plot, including 254 ha in
Pastdargom district and 150 ha in Nurabad district,
respectively.
The plot is 4 km north of the
village SAZAGAN
THANK YOU FOR YOUR ATTENTION
WWW.UZBEKENERGO.UZ