Transcript of Prospects and Challenges of Zero Head Water Turbine for Small Scale Electricity Generation in...
Prospects and Challenges of Zero Head Water Turbine for Small Scale Electricity Generation in Bangladesh
Supervised By B . D . Rahmatullah
Part Time FacultyUniversity of Asia Pacific
2
Submitted by
Name Registration No.Md. Athaur Rahman Khan 10208013Debasis Chowdhury 10208016Md. Shariar Islam 10208026Antara Chowdhury 10208036
3
Overview
• Introduction• Renewable Energy• Hydropower• Small Hydro• Run of River• Rivers and Bangladesh• Project Design and Calculation• Additional Benefits of River Management
4
Introduction
• In an energy-hungry world people is seeking for energy to meet up for the future crisis. But oil, gas, coal and other recourses will be finished within 40 years. So, renewable energy is the only solution in order to meet up the future crisis.
• Solar, wind, wave, tidal, fuel cell, geothermal etc. are the renewable energy sources. Among them Zero Head Water Turbine for Small Scale Electricity Generation is an new but efficient method.
5
Renewable energy comes from replenished resources as sunlight, wind, rain, tides, waves and geothermal. Renewable energy clean, environment friendly termed as ‘Clean ,Green & Sustainable Energy’.
Renewable Energy
6
1. Solar Energy2. Hydropower3. Wind Power4. Biomass5. Bio-fuel6. Geothermal Energy
Types of Renewable Energy
7
• Hydropower is generated using the mechanical energy of flowing water by forcing it through piping called a penstock, which then turns a generator in order to produce electricity.
• Hydropower is a renewable energy source based on the natural water cycle.
Hydropower
8
Hydropower Technology
Figure: Hydropower Plant
9
Large Hydropower – 100 MW and Above Medium Hydropower- 20 MW to 100 MW Small Hydropower- 1 MW to 20 MW Mini Hydropower- 100 kW to 1 MW Micro Hydropower- 5 kW to 100 kW Pico Hydropower- A few hundred watts up to 5
kW
Hydropower Classification by Size
10
Small HydroCountry Small Hydropower
Definition (MW)Brazil ≤30Canada ≤50China ≤50European Union ≤20India ≤25Norway ≤10Sweden ≤1.5United States 5-100
Source: IPCC 2011 and IJHD 2010.
11
Run of River Hydropower (ROR)
• In Run of River (ROR) Hydropower system electricity production is driven by the natural flow and elevation drop of a river.
• The mechanism of power generation is simple physics. The power comes from the potential energy of water driving a water turbine and generator. The energy extracted from the water depends on the volume and the velocity of River.
12
Power from ROR
P = Power (watt)ρ = Water density (kg/m3) =(1000 kg/m3)Ck= Power coefficient =0.592 (theoretical maximum power available)A = Turbine area ( m2)V = Velocity of water (m/s)
𝑃=12 𝜌 𝐶𝑘 𝐴𝑉
3
13
Power Vs Water Velocity
Figure: Graph showing the relationship between the speed of the river and the power available. The green line shows the power in the river. The red line shows
the power extracted by the turbine.
𝑃=12 𝜌 𝐶𝑘 𝐴𝑉
3
14
Rivers and Bangladesh Bangladesh is a riverine country. 800 rivers including tributaries flow through the
country to cover a length around 24,140 km. Bangladesh is formed by the silt carried by the rivers. Cities and business centers are built on the banks rivers. River plays vital role in Bangladeshis Life.
15
Present Scenario of RiversRiver Name Station Name Date Water Level
(ft.)Maximum
Velocity (m/s)
Gangas-Padma
Baruria Transit 19/07/2012 7.68 3.34
Gangas-Padma
Baruria Transit 02/08/2012 7.64 3.23
Gangas-Padma
Baruria Transit 27/09/2012 6.38 3.16
Brahmaputra-Jamuna
Bahadurabad Transit
10/01/2012 13.40 1.13
Brahmaputra-Jamuna
Bahadurabad Transit
24/01/2012 12.94 1.11
Teesta Dalia 18/06/2012 52.22 1.77
Source Bangladesh Water Development Board.
16
Project Design (Components)
• Permanent Magnet Generator• Undershot Waterwheels Turbine• Turbine Shaft• Bearing Block• V Belt and Pulley• Floats
17
Project Components
Figures:1. PMG2. Water Turbime3. Transmission Shaft4. Pulley5. Bearing Block
1.
2.
3.
4.
5.
5.4.
18
Normal Water flow of River(Normal flow of Gangas-Padma=
3.13 m/s)
Rotate the Undershoot River Turbine
(Area covered by turbine=0.592 m2)
River Turbine rotates the Transmission Shaft.
Generator connected with Shaft by “V Belt” pulley.
Generates Power
Flow Diagram
19
Power Calculation
22 inch
5 inch
Turbine Blade:
Area Covered by Turbine, A = (22×5) inch2
= (0.5588×0.127) m2 [ 1 inch = 0.0254 m] = 0.0710 m2
Power,
= ×1000×0.592×0.0710×3.133
= 644.15 W
ρ = 1000 kg/m3
Ck = 0.592 (theoretical maximum power available)V= 3.13 m/s
𝑃=12 𝜌 𝐶𝑘 𝐴𝑉
3
20
Additional Benefits of River Management
Agriculture Fisheries Environment Tourism Place Water Ways Forestation
21
Thank You