Chapter 2: Positioning the subject
ct5308 Breakwaters and Closure Dams
H.J. Verhagen
Faculty of Civil Engineering and GeosciencesSection Hydraulic Engineering
March 28, 2012 3
Breakwaters and Closure dams
• Comparable items:• similar materials• similar execution methods
• Differences:• load difference (wave action vs. currents)• life time
March 28, 2012 4
Characteristic values
Type of structure H/Δdn
Sandy beachGravel beachRock slopeBerm breakwater(Stable) rubble mound breakwatercaisson
>50020-5006-203-61-4<1
March 28, 2012 7
Sometimes vertical wall is only option
Cardiff Barrage14 m tidal range(situation at high water
March 28, 2012 17
closures named after materials used
• stacking up willow mattresses (opzinken)
• sand closure• clay or boulder clay closure• stone dam closure (rock closure)• caisson closure
March 28, 2012 29
Historical closures
• Rhine damming (Wijk bij Duurstede)• Sloe closure (pakwerk)• Hindeburgdam