CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.

16
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013

Transcript of CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.

Page 1: CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.

CSC Endcap Muon Port Card

and Muon Sorter Upgrade Status

May 2013

Page 2: CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.

2

MPC Upgrade Requirements

■ Be able to deliver all 18 trigger primitives from the EMU peripheral crate to the upgraded Sector Processor■ Preserve sorting capabilities of the Muon Port Card■ Preserve 3 old 1.6Gbps optical links to the existing CSCTF

Page 3: CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.

3

Upgrade Developments n Use existing Muon Port Card main board - TMB interface remains unchanged (2 LCTs per TMB @ 80MHz) - 3 “old” optical links are still available n Original design (2004) was based on Xilinx Virtex-E XCV600E FPGA

n New prototype (2012) is based on Xilinx Spartan-6 FPGA - Inexpensive FPGA ($280 for the fastest speed grade XC6SLX150T-3FFG900C device) - 8 embedded GTP serializers - 3.2Gbps/channel data rate - Modest power consumption

(~1A Vccint; <1A GTPs)

- Pluggable 12-channel

optical transmitter

Page 4: CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.

4

New Spartan-6 Mezzanine

Top Bottom

Pluggable optical transmitter

Page 5: CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.

5

Optical Transmitter

n SNAP12 and Avago AFBR-810 are pluggable 12-channel devicesn Both use the same 10x10 low profile circuit, but pin assignment is different (Avago is intended for higher data rate)■ uTCA SP12 uses Avago AFBR820 receiver

SNAP12 transmitter Avago AFBR-810

Page 6: CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.

6

Old and New Mezzanines Installed

Page 7: CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.

Optical Tests at Rice, 2012-2013

7

n Three MPC boards with the new mezzanines

n SP10 prototype

n Test software is available, various PRBS and random

patterns

n Random patterns from MPC FIFO to SP10 FIFO under

slow VME control: 10K iterations (510 frames each);

no errors, all boards

n PRBS tests OK, BER<10-13

MPC SP10 CCB

Page 8: CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.

Latency Measurements

8

■ Present MPC-to-SP system at CMS: 580 ns - TLK2501 Transmitter (1.6Gbps - 80MHz) ~23 ns - 100 m optical MMF fiber ~500 ns - TLK2501 Receiver (1.6Gbps - 80MHz) ~57 ns

■ New system (prototypes): 589 ns - Spartan-6 GTP Transmitter (3.2Gbps – 160MHz) ~20 ns (without Tx buffer, measured) - 100 m optical MMF fiber ~500 ns - Virtex-6 GTX receiver (3.2Gbps – 160MHz) ~69 ns (without Rx buffer, estimate)

Page 9: CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.

Other Measurements

9

■ Power consumption: - Spartan-6 FPGA ~1A Vccint (1.2V) ~0.15A Vccaux+Vcco (3.3V) ~ 0.8A GTPs (1.2V) - 3 MIC69501 voltage regulators on a mezzanine board passed reactor irradiation test at TAMU in 2011 - MPC (main board + Spartan-6 mezzanine) <4A @ 3.3V

Page 10: CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.

Optical Fibers for P.5

10

● Trunk cable with 4 connectorized cords (similar to one proposed for the DT upgrade). Each cord has 12 fibers. Need 36 cables for 60 peripheral crates, one spare cord per crate.

● Cable sample was successfully tested at UF in April 2013 ● Purchase order has been placed through CERN in April 2013

Page 11: CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.

Irradiation Tests of the FPGA (1)

11

■ 66 MeV proton accelerator at Crocker Nuclear Laboratory, UC Davis ■ Wide range of beam fluxes typically from 104 to 109 p/cm2 /s

Page 12: CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.

Irradiation Tests of the FPGA (2)

12

■ Irradiated with 1 kRad at a rate of ~1 Rad/sec (convenient to detect SEU) ● 75 Single Event Upsets (SEU): ● 5 to 15 seconds between SEU ● Average dose to get an error ~13 Rad. With the accumulated fluence of 3*1011 protons/cm2, the cross section of SEU is 75 / 3x1011 = 2.5x10-9 cm2 . ● Assuming 10-year fluence of ~1011 neutrons per cm2 [1] at full LHC design luminosity, the worst case SEU rate would be 2.5x10-9 cm2 x 1011 neutrons/cm2 / 5x107 sec = 5x10-6, or 1 SEU in ~ 55 hours per device [1] http://cmsdoc.cern.ch/~huu/tut1.pdf

■ Irradiated with 30 kRad at a rate 80 Rad/sec (10 years of LHC exposure in the ME1/1 area with a safety factor 3) ● Many upsets ● FPGA survived the test■ Irradiated with 100 kRad at a rate of 360 Rad/sec ● Many upsets ● FPGA survived the test■ Irradiated with ~300 Rad at a rate of ~1 Rad/sec again (repeat of first test) ● 50 SEU in 5 minutes ● Average dose to get an error ~6 Rad, ~2 times higher than in test 1 ● FPGA is fully functional

Page 13: CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.

Irradiation Tests of the EPROM

13

■ Irradiated with 1 MeV equivalent fluence at ~10.5*1012 n/cm2 at the TAMU cyclotron in April 2013 ■ Equivalent to ~30kRad, or 30 years of LHC exposure in ME1/1 area■ Device was read back; not a single bit change, as expected

XCF32P PROM

Page 14: CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.

14

What Needs to Be Done in 2013-14

■ Implement new data format MPC-to-SP - ready for MPC, but not tested with the uTCA SP

■ Need to set up a test stand at Rice: Track Finder VME crate (exists) - MPC (special slot) - SP05 (to be able to check three old optical links) - CCB - TTCvi/vx New uTCA crate (exists) - controller (need to be purchased) - AMC13 card (one, currently at UF) - SP12 (from UF) Software to run uTCA

■ Will need similar test stand at bld.904 at CERN by summer 2014

Page 15: CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.

15

PCB and Parts

■ Mezzanine board: 10-layer PCB Optical transmitter board: 4-layer PCB

■ Xilinx FPGA and EPROM are readily available from stock Optical transmitter: single source (Avago), several weeks delivery other parts not a concern

Page 16: CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.

16

Muon Sorter Upgrade

■ Upgraded mezzanine board provides direct optical link to the interim calorimeter trigger