SKILLSEstimatingBudgetingProcurement SpecificationConstruction SupervisionProject ManagementPiping SystemsMechanical SystemsBilingual in English & French
KEVIN ITOUPROJECT COORDINATOR
PROJECT COORDINATORShell, Gabon | 2010 - 2017
Planned, coordinated and monitored various plantupgrades, engineering & construction projects fromplanning to closeout, according to schedule, specificationsand budget; oversaw engineering consultants, reviewedengineering deliverables and initiate appropriatecorrective actionsPrepared and submitted construction budget estimateson MS Excel for each project, developed an intermediateunderstanding of the estimating process and completed acost estimate and bid package for the construction of amedical clinic
PROFESSIONAL EXPERIENCE
HIGHLIGHTS OF QUALIFICATIONS
Over 5 years of experience as a project coordinator in theoil & gas industry specializing in upgrades of productionfacilities, piping and mechanical equipment integrityremediationLed and coordinated portfolio projects from design toconstruction for projects ranging from CAD$0.1 M toCAD$3 MProven ability to develop project execution strategies andplans, cost estimates, schedules and investment proposalsComprehensive knowledge of building construction costestimating, cost control and change managementprocessesEngineer in Training (#35420) with APEGS and registrationunder review with APEGA (#248111), Certified ProjectManagement Professional (PMP) (#4186822)Proficient in using MS Project, Primavera, MS Word, MSExcel, MS PowerPoint and AutoCAD
FIELD CONSTRUCTION COORDINATOR
Assala Energy,Gabon | 2017 - 2018
Gabon Assala Energy is an oil exploration and productioncompany, supported by the Carlyle group, investing in mid-life and mature assets increasing production and extendingfield life cycles :https://www.assalaenergy.com/assalagabon/
Directed the field construction activities for capital projects, non-routine maintenance projects and MOC projectsExecuted various piping construction activities related tointegrity repairs and production optimization, contributing to aproduction increase of 1000 bbl./day
EDUCATION HISTORY
ALGONQUIN COLLEGEOttawa,ON|2018
Site EvaluationProject Management Planning Construction EstimatingScheduling and PlanningContracts Management & TenderingCost ControlConstruction Safety
FRANÇOIS RABELAIS UNIVERSITYTours, France | 2007
Basic and applied mechanicsSystem designMechanical behaviour of materialsModellingControl of the systems
Graduate Certificate: Construction ProjectManagement
Bachelor’s and Master's Degree inEngineering: Manufacturing Engineering-Mechanical Technologies & Systems
BOW VALLEY COLLEGECalgary,AB|2019Corporate Readiness Training Program
Initiation to Canadian Workplace cultureWorkplace CommunicationEssential Skills Assessment
Developed construction schedules, set milestones andmonitored daily progress, with Primavera P6 and MSProject and developed schedule basis referencedocuments for each projectOrganized budgeting, scheduling, contract negotiations,and execution of repairs of a 900K barrels meteringsystem, restored its functionalities from 10% to 90% andobtained the system certification by third-party assessorsand government bodiesCollaborated with Contracting and Procurement team todevelop contracts and negotiate revisions, changes andadditions to contractual agreements with engineeringfirms, consultants, clients, suppliers and subcontractorsCoordinated with procurement the purchase of projectmaterials, pipes, valves, instrumentation and control bulkitems, improved project delivery by fast-tracking materielprocurement, achieved shutdown scope readiness 6weeks ahead of the due dateSupported the project manager during the revampingproject of an oil export terminal of 900 barrel/day, led theprocurement and construction aspects of coordinationand took over from project manager towards the end, forthe remaining scopeConceived and implemented Quality Control Plan,commissioning plan, with quality and construction andoperation engineers, completed hold points, reviewed,compiled a project completion dossier for the handover toOperations & MaintenanceMonitored progress, issued monthly reports and quarterlypresentation to stakeholders such as Governmentrepresentatives to maintain adherence to theirrequirementsPromoted construction site work safety, provided supportto field issues during construction and proposedmitigation plan, achieved over 3000 man-hours withoutincident
RELIABILITY ENGINEER & MAINTENANCE SCHEDULERExterran, Gabon | 2008 - 2010
Developed schedules and procedures for the preventivemaintenance program for a new oil plant facility: 25Kbarrel oil per day, 30 pieces of equipment (11 gas engines, 2generators, 4 compressors)Successfully implemented and uploaded schedules andprocedures in the preventive maintenance program(CMMS) for the plant equipment, trained 10 end users andobtained system approval from the end customer
ADDITIONAL WORK EXPERIENCE
CERTIFICATIONS
Engineer in Training (EIT) (#35420), APEGS EIT application ongoing, APEGA (#248111) Project Management Professional (PMP)(#4186822)Standard First Aid CPR/AED Level C, RedCross (#100638118)
TECHNICAL SUPPORT REPRESENTATIVEADT Canada Security Services | 10/2018-04/2019
APPLICATION ENGINEER INTERNSignature Technologies, Inc | 03/2007-08/2007Dallas, USA
Calgary , Canada