CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete;...

48
CROSSTOWN LRT

Transcript of CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete;...

Page 1: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

CROSSTOWN LRT

Page 2: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

WHO IS METROLINX?

PLAN BUILD OPERATE

Page 3: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

THE NEXT REGIONAL TRANSPORTATION PLAN

TheNextRTP

Metrolinx is currently in the process of updating the Regional Transportation Plan (RTP). The Draft Plan (2041) outlines how governments and transit agencies can work together to continue building an integrated transportation system to support a high quality of life, a prosperous and competitive economy, and a protected environment in our region. As the provincial agency mandated with improving the coordination and integration of all modes of transportation in the GTHA, Metrolinx has developed the Draft Plan for review in consultation with partners, stakeholders and the public.

Page 4: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

LEARN MORE, GET INVOLVED

Metrolinx has just released its Draft 2041 Regional Plan which outlines how people and goods will move across our great region.

Curious about what’s in the Draft 2041 Plan?

You can review and comment on the plan at metrolinx.com/theplan and join us for one of our roundtable discussions, where you can share your views on the future of regional mobility.

Other ways to stay engaged:• Visit metrolinxengage.com• Read our blog, The Link• Follow us on social media

Page 5: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Continuing TTC rollout in 2017

Page 6: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

What Are We Building – a New Modern LRT

• 15 underground stations and 10 surface stops – 9 km below ground and 10 km above ground

• A maintenance and storage facility• A 19-kilometre route separated from regular traffic• Transit communications system • Links to 54 bus routes, three subway stations, GO Transit, and a new UP Express

station

Page 7: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Safety First – Our #1 Priority

We train and direct staff to:• Always have a site specific safety plan and site specific emergency plan.• Ensure pre-work hazard assessments are complete and understood.• Ensure job hazards analyses are complete and understood. • Do everything possible to protect themselves, co-workers, and members of the

public.• Stop work if the safety of themselves, co-workers and members of the public cannot

be assured.• Identify and report unsafe behaviour and coach each other to make improvements.• Be prepared and equipped to work safely.

Page 8: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Metrolinx Design Excellence Principles

1. A strong conceptual narrative vision across the system

2. Design that elevates the quality of the passenger Experience

3. Civic scale, materiality and quality

4. Clarity and simplicity of architectural expression through integrated design of all systems and elements

5. Responsiveness to contextual, local and future conditions

Page 9: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Environment & SustainabilityDuring Construction• Programs to minimize impact on wildlife,

watercourses and trees• Reduce impact to community through the

management of dust, noise and vibration • Sustainable construction practices, including

targeting 75% waste diversion from landfills; and off-site beneficial reuse of excess soil.

Project Design Sustainability• Toronto Green Standard project wide• LEED Certification at EMSF• Bike parking • Dedicated pedestrian routes• High Solar Reflectance Index paving• Green roofs• Energy efficiency – LED lighting, heat

recovery systems

• Water use conservation/efficiency• Fritted glazing (minimize bird collisions)• Shielded exterior lighting (prevent off-

site light trespass)• Landscaping – use of native, drought-

tolerant plants and trees• Sheltered waiting areas

Page 10: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

The Crosstown: 2017 Construction Milestones

• Year of the Dig – 1 million tons to be excavated in 2017

• Start excavating main station boxes

• Shoring & utility relocations at interchange stations – Cedarvale, Eglinton, Kennedy

• Track work – pour concrete base and first track installation

• Maintenance & Storage Facility buildings enclosed

• New Photography Bridge construction

• Mount Dennis foundation complete; Kodak Building moved back

• Mount Dennis Pedestrian/LRT Tunnel Connection

10

Page 11: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

EMSF: View from Main Access Road

Page 12: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

EMSF: Main Access Road

Page 13: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

EMSF: Inside Maintenance Building

Page 14: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

EMSF: What to Expect in 2017/2018

Year Quarter Construction Activity / Closure

2017Q4(Oct-Dec)

• Completion of Maintenance Building slab on grade• 2nd Floor concrete slab• Internal Wall Construction• M&E Rough In• Backup Operations Control Centre Foundations• Yard Bridge Construction

2018

Q1 (Jan-March)

• Backup Operations Control Centre Structure and Cladding• Industrial Equipment Installations• Finishes (Drywall, Wall & Floor Tiling) Commence

Q2(April-June)

• Industrial Equipment Installations• Finishes (Paint, Flooring)• M&E Finishes

Q3(July-Sept)

• M&E and Systems Commissioning• Deficiencies

Q4(Oct-Dec)

• Building Occupancy• Vehicle Delivery

Page 15: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

EMSF: Masonary Work in VCIF*

*Vehicle Cleaning & Inspection Facility (VCIF)

Page 16: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

EMSF: Yard Bridge Construction

Page 17: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

LRT: Track Installation

Page 18: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Track Installation: What to expect in 2017/2018

Year Construction Activity / Closure

2017 • Installation of Ballasted track and Special Track work • Production of Continuous Welded Rail through Flash butt Welding process• Thermite Welding Activities• Installation of the first meter of track in the VCIF Building

2018

• Installation of the maintenance tracks in the Building (Pedestal track, Embedded Track..)

• Installation of Gas Switch Heaters• Installation of Point Machines • Substantial Completion of Delivery Area 1 ( Loop around the Maintenance

and VCIF Building to enable delivery and storage of first trains)

Page 19: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Track Installation: Maintenance Storage Building

Direct Fixation Inspection/Cleaning TrackDirect Fixation Track takes its name after the system used to fix the rail to the concrete platform

Direct Fixation Track

*This will be the first meter of Track to be installed in the building

Page 20: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Ballasted & Special Trackwork Installation

Page 21: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Track Installation: Welding

• Rails will be supplied to the EMSF site in short length between 18 to 24 meters. • The welded rails will be joined by one of the following methods:

• Thermite • Flashbutt

Page 22: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Welding: Thermite Process

• This process consists of igniting a mix of high energy materials that produce a metallic slag that is poured between the working pieces of metal to form a join.

Page 23: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Welding: Flashbutt Process

• Flash butt welding with a portable welding machine pulls the rail together with large copper electrodes to transmit the current to the rail

• The rail is heated at high temperature to a point the ends get extremely hot and very soft and pliable

Page 24: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Mount Dennis Station Aerial

Page 25: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Mount Dennis Station: Main Entrance

Page 26: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Mount Dennis Station: Secondary Entrance

Page 27: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Mount Dennis Station: Third Entrance

Page 28: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Mount Dennis Station: Bus Loop

Page 29: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Eglinton Avenue @ Mount Dennis Station

Page 30: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Mount Dennis: What to expect in 2017/2018

Year Quarter Construction Activity / Closure

2017 Q4(Oct-Dec)

• Curtain wall construction for station box • Abatement and demolition commence for interior

renovations to the former Kodak structure

2018

Q1 (Jan-March)

• Main Entrance foundation and tail tracks concrete works completed.

• Photography Drive Bridge Girders placed over Eglinton Ave• Bus Terminal Foundations commence

Q2(April-June)

• Keelesdale Road works completed• Photography Drive Bridge completed• Bus Terminal Structural Steel erection

Q3(July-Sept)

• Interior finishes for former Kodak Building, Bus Terminal, Main Entrance and Station Box

Q4(Oct-Dec)

• Final linkage of tail tracks to station box in Rail Corridor.• Commencement of communication cable pull in ECLRT

tunnels and pedestrian tunnel finishes.

Page 31: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Mount Dennis: Photography Drive Bridge

North Abutment Photography Bridge Piles

Page 32: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Mount Dennis Station: Building 9 Foundations & Move

A

B

C

Photo A – Kodak FoundationsPhoto B – Cutting former Kodak for MovePhoto C – Duct Bank at Kodak

Page 33: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Mount Dennis: Ongoing Works

Forming South wall of Station Box Foundation Slab Conduit at Main Entrance

Page 34: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Railway Corridor: GO Platform

Page 35: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Railway Corridor: UP Platform

Page 36: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Railway Corridor: What to expect in 2017/2018

Phase Construction Activity

Phase Three •Excavation of the east side of the rail corridor•Installation of two LRT and pedestrian tunnels•Backfilling the east side of the rail corridor

Phase Four • Relocation of GO Transit & CP Rail Tracks from west side of corridor to east side of corridor.

Phase Five •Excavation of the west side of the rail corridor•Installation of two LRT and pedestrian tunnels, and access stairs for GO/UP Express Platforms

•Backfilling the west side of the rail corridor•Construction of a new GO Transit bridge, modification to the existing GO Transit bridge

•Construction of UP Express & GO platforms

Page 37: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

W4 W3 W2 CP

Center Wall

West Wall East Wall

PHASE FOUR:Diverted GO Transit & CP Tracks

EGLINTON AVE – Existing UP Express, GO Transit, & CP Bridges

Current Track Alignments

Page 38: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Railway Corridor : LRT & Pedestrian Tunnel

EB LRT TUNNEL

PEDESTRIAN TUNNEL

Page 39: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Community Benefits

The Community Benefits Program aims to ensure people from historically disadvantaged communities and equity-seeking groups are positively impacted by the Eglinton Crosstown LRT Project.

Program will be divided into streams:1. Employment, Training and Workforce Development2. Social Enterprises and Social Procurement3. Investment (Community Improvements)

39

Page 40: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Community Benefits: Employment

CTS is an equal opportunity and inclusive employer and we are building relationships with local workforce agencies who work with individuals facing barriers to employment.

We also organize job fairs, offer resume review tips and provide pre-orientation details to help improve job matches and support applications to CTS.

Page 41: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Community Benefits: Business Spend

CTS procurement policy includes a commitment to maximizing procurement and supplier opportunities for social enterprises and local businesses.

Social enterprises• Partnership with the Steps Initiative to produce community murals• Printing with Eva’s Phoenix Print Shop (employs homeless youth)• Partnership with Building Up to wash storefront windows along Eglinton

Local businesses• Maintain list of local businesses on Eglinton that produce materials required

for Project• Support local businesses with increased access to CTS Procurement

Page 42: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Community Benefits: Investment

CTS Builds Communities is a program where CTS demonstrates care and stewardship over the neighbourhoods of EglintonAvenue.

• Sorted food donations at Dorset Park Food Bank (near Kennedy Station) after Thanksgiving with CTS staff in October 2016.

• Incorporation of students from Marc Garneau C.I. (near future Science Centre station) in mentorship opportunity at Habitat for Humanity GTA Build with CTS staff in November 2016.

• Holiday Giving Program done in support of New Circles Community Services (near future O’Connor stop), CTS staff sponsored 7 families in December 2016.

• Organized a 3-part Women in Construction series in partnership with the YWCA Toronto (near Kennedy Station) to empower and provide mentorship to more than 20 Eglinton-area girls in March 2017.

Page 43: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Business Support

Marketing Communications and Advertising Strategy Overview• Based on feedback obtained from focus groups with businesses and the seven local BIAs, the

Crosstown Business Support strategy campaign will be implemented in three stages:

• Phase 1 (2017-2018):• Improve the on-the-ground experience around construction sites for patrons visiting Eglinton.

• Phase 2 (2018-2019):• Roll-out of hyper-local marketing and advertising campaigns each quarter with specific tools

and tactics that are targeted for each unique business community and are tied into an over-arching “Shop Local” campaign for all of Eglinton.

• Phase 3 (2019-2021): • Roll-out of over-arching “Shop Local” campaign for all of Eglinton that establishes Eglinton as

a destination place in Toronto.

Page 44: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Business Signage

Page 45: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Parking Support

Green P directional signage

Business support parking pamphlet

Page 46: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Business Support

Current Strategies:• Window washing and street cleaning for businesses in close proximity

to station sites.• Directional postcards for businesses to handout to patrons and help

them navigate the construction sites to their business.

Upcoming Strategies: • New and engaging, promotional signage highlighting business and

communities along the corridor.• The development of the hyper-local marketing and advertising

campaigns in collaboration with Metrolinx and the seven local BIAs.• Ongoing monthly meetings with the seven local BIAs to discuss

marketing initiatives and explore opportunities for collaboration.

Page 47: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

Stay up to date

Page 48: CROSSTOWN LRT€¦ · • New Photography Bridge construction • Mount Dennis foundation complete; Kodak Building moved back • Mount Dennis Pedestrian/LRT Tunnel Connection 10:

416-782-8118 or 416-482-741124 hours/7days a week

www.thecrosstown.ca

[email protected]

facebook.com/thecrosstown

twitter.com/crosstownTO

instagram.com/eglinton_crosstown

Crosstown West Office1848 Eglinton Ave W (at Dufferin)Crosstown East Office660 Eglinton Ave E (at Bayview)

Stay in Touch