MUNICIPALIDAD PROVINCIAL DE SANDIA GERENCIA DE DESARROLLO LOCAL SANDIA CRONOGRAMA DE EJECUCION FISICO FINANCIERO PROYECTO: CONST.DEFENSA RIBEREÑA RIO SANDIA Y REFORZ. DE ESTRIBOS COSTO DIRECTO : S/. 37,642.60 PERIODO DE EJECUCIÓ 45 DÍAS CALENDARIO No PARTIDAS MES 1 MES S/. 800.00 P S/. 800.0 P S/. % 2.13 % - 1 MOVILIZACION Y DESMIVILIZACION E S/. E S/. DE EQUIPO % - % - S/. 538.53 P S/. 538.53 P S/. % 1.43 % - 2 ALMACEN DE OBRA E S/. E S/. % - % - S/. 500.00 P S/. P S/. 500.00 % - % 1.33 3 CARTEL DE OBRA E S/. E S/. % - % - S/. 68.00 P S/. 68.00 P S/. % 0.18 % - 4 TRAZO,NIVELACION Y REPLANTEO E S/. E S/. % - % - S/. 25.50 P S/. 25.50 P S/. % 0.07 % - 5 CONTROL TOPOGRAFICO DE OBRA E S/. E S/. % - % - S/. 1235.05 P S/. 25.0 P S/. 15.75 % 0.07 % 0.04 6 ENCAUZAMIENTO Y LIMPIEZA DEL CAUCE E S/. E S/. % - % - S/. 243.60 P S/. 3166.32 P S/. 4221.76 % 8.41 % 11.22 7 CONSTRUCCION DE CAMINO DE ACCESO E S/. E S/. % - % - S/. 2279.70 P S/. 2279.7 P S/. % 6.06 % - 8 DESVIO PROVISIONAL DEL RIO E S/. E S/. % - % - S/. 3423.00 P S/. 2100.84 P S/. 3,151.26 % 5.58 % 8.37 9 DEMOLICION DE DEFENSA RIB. EXISTENTE E S/. E S/. % - % - S/. 1315.53 P S/. 2100.84 P S/. 3,151.26 % 5.58 % 8.37 10 CONFORMACION DE PRISMA Y/O E S/. E S/. PREPARACION DE PLATAFORMA % - % - S/. 169.78 P S/. 169.8 P S/. % 0.45 % - 10 EXCAVACIONN DE UÑA E S/. E S/. % - % - S/. 6390.38 P S/. 9785.4 P S/. 14,678.06 % 26.00 % 38.99 11 SELECCIÓN Y ACOPIO DE ROCA SUELTA E S/. E S/. % - % - S/. 1203.84 P S/. 1756.8 P S/. 2,635.20 % 4.67 % 7.00 12 ACOMODO DE ROCA E S/. E S/. % - % - S/. 11925.33 P S/. 9785.4 P S/. 11,925.33 % 26.00 % 31.6804 13 CONCRETO EN MUROS DE CONTENSION DE E S/. E S/. F'C=175 KG/CM² +30% P.G. % - % - S/. 2167.52 P S/. 9785.4 P S/. 2,167.52 % 26.00 % 5.76 14 ENCOFRADO Y DESENCOFRADO E S/. E S/. PARA MUROS RECTOS. % - % - S/. 1903.71 P S/. 9785.4 P S/. 1,903.71 % 26.00 % 5.0573 13 CONCRETO F'C=250 KG/CM2 E S/. E S/. CON PRESENCIA DE AGUA % - % - S/. 151.11 P S/. 9785.4 P S/. 151.11 % 26.00 % 0.40 14 ENCOFRADO Y DESENCOFRADO E S/. E S/. PARA MUROS RECTOS. % - % - S/. 3302.02 P S/. 9785.4 P S/. 3,302.02 % 26.00 % 8.77 14 FLETE TERRESTRE E S/. E S/. % - % - AVANCE MENSUAL PROGRAMADO S/. 71,743.57 ### % S/. 47,802.98 ### % EJECUTADO S/. - 0.00 % S/. - 0.00 % AVANCE ACUMULADO PROGRAMADO S/. 71,743.57 ### % S/. 119,546.55 ### % EJECUTADO S/. - % S/. - 0.00 % PROGRAMADO : P EJECUTADO : E

Transcript of CRONOG.DE DEFENSA RIO CHICHANACO.xls

Page 1: CRONOG.DE DEFENSA RIO CHICHANACO.xls

MUNICIPALIDAD PROVINCIAL DE SANDIA GERENCIA DE DESARROLLO LOCAL SANDIA

CRONOGRAMA DE EJECUCION FISICO FINANCIEROPROYECTO: CONST.DEFENSA RIBEREÑA RIO SANDIA Y REFORZ. DE ESTRIBOS

COSTO DIRECTO : S/. 37,642.60 PERIODO DE EJECUCIÓ45 DÍAS CALENDARIONo PARTIDAS MES 1 MES 2

S/. 800.00 P S/. 800.0 P S/.

% 2.13 % -

1 MOVILIZACION Y DESMIVILIZACION E S/. E S/.

DE EQUIPO % - % -

S/. 538.53 P S/. 538.53 P S/.

% 1.43 % -

2 ALMACEN DE OBRA E S/. E S/.

% - % -

S/. 500.00 P S/. P S/. 500.00

% - % 1.33

3 CARTEL DE OBRA E S/. E S/.

% - % -

S/. 68.00 P S/. 68.00 P S/.

% 0.18 % -

4 TRAZO,NIVELACION Y REPLANTEO E S/. E S/.

% - % -

S/. 25.50 P S/. 25.50 P S/.

% 0.07 % -

5 CONTROL TOPOGRAFICO DE OBRA E S/. E S/.

% - % -

S/. 1235.05 P S/. 25.0 P S/. 15.75

% 0.07 % 0.04

6 ENCAUZAMIENTO Y LIMPIEZA DEL CAUCE E S/. E S/.

% - % -

S/. 243.60 P S/. 3166.32 P S/. 4221.76

% 8.41 % 11.22

7 CONSTRUCCION DE CAMINO DE ACCESO E S/. E S/.

% - % -

S/. 2279.70 P S/. 2279.7 P S/.

% 6.06 % -

8 DESVIO PROVISIONAL DEL RIO E S/. E S/.

% - % -

S/. 3423.00 P S/. 2100.84 P S/. 3,151.26

% 5.58 % 8.37

9 DEMOLICION DE DEFENSA RIB. EXISTENTE E S/. E S/.

% - % -

S/. 1315.53 P S/. 2100.84 P S/. 3,151.26

% 5.58 % 8.37

10 CONFORMACION DE PRISMA Y/O E S/. E S/.

PREPARACION DE PLATAFORMA % - % -

S/. 169.78 P S/. 169.8 P S/.

% 0.45 % -

10 EXCAVACIONN DE UÑA E S/. E S/.

% - % -

S/. 6390.38 P S/. 9785.4 P S/. 14,678.06

% 26.00 % 38.99

11 SELECCIÓN Y ACOPIO DE ROCA SUELTA E S/. E S/.

% - % -

S/. 1203.84 P S/. 1756.8 P S/. 2,635.20

% 4.67 % 7.00

12 ACOMODO DE ROCA E S/. E S/.

% - % -

S/. 11925.33 P S/. 9785.4 P S/. 11,925.33

% 26.00 % 31.6804

13 CONCRETO EN MUROS DE CONTENSION DE E S/. E S/.

F'C=175 KG/CM² +30% P.G. % - % -

S/. 2167.52 P S/. 9785.4 P S/. 2,167.52

% 26.00 % 5.76

14 ENCOFRADO Y DESENCOFRADO E S/. E S/.

PARA MUROS RECTOS. % - % -

S/. 1903.71 P S/. 9785.4 P S/. 1,903.71

% 26.00 % 5.0573

13 CONCRETO F'C=250 KG/CM2 E S/. E S/.

CON PRESENCIA DE AGUA % - % -

S/. 151.11 P S/. 9785.4 P S/. 151.11

% 26.00 % 0.40

14 ENCOFRADO Y DESENCOFRADO E S/. E S/.

PARA MUROS RECTOS. % - % -

S/. 3302.02 P S/. 9785.4 P S/. 3,302.02

% 26.00 % 8.77

14 FLETE TERRESTRE E S/. E S/.

% - % -

AVANCE MENSUAL PROGRAMADO S/. 71,743.57 ### % S/. 47,802.98 ### %

EJECUTADO S/. - 0.00 % S/. - 0.00 %

AVANCE ACUMULADO PROGRAMADO S/. 71,743.57 ### % S/. 119,546.55 ### %

EJECUTADO S/. - % S/. - 0.00 %PROGRAMADO : P