CRL Technical Concept Design Report - Appendix B and C
Transcript of CRL Technical Concept Design Report - Appendix B and C
-
7/29/2019 CRL Technical Concept Design Report - Appendix B and C
1/14
Appendix BStation Location Drawings
-
7/29/2019 CRL Technical Concept Design Report - Appendix B and C
2/14
Appendix BStation Location Drawings
-
7/29/2019 CRL Technical Concept Design Report - Appendix B and C
3/14
0 5m10m 20m 50m
N
PREPARED FORJOB No.
SCALE @ A1 1:
SCALE @ A3 1 :
1 : 1250
City Rail Link - Indicative Britomart Station Concept
Auckland Transport LOCATION PLAN212005
Plan
LOCATION PLAN
2500
REVIS01.06.12 Concept Design Submission
20.06.12 Concept Design Submission
17.07.12 Concept Design Submission
-
7/29/2019 CRL Technical Concept Design Report - Appendix B and C
4/14
0 5m 10m 20m
3
5
24 1
1
TYLER STREET
GALWAY STREET
CPO/ TICKET HALL
BRIDGE OVER CONCOURSE LEVELCONCOURSEWESTERN EXIT
TV
3900
4375
5225
VOID
VOID
CANOPY ABOVE
CANOPY ABOVE
CANOPY ABOVE
EXTENT OF STATIONBELOW
TBC
QUAY STREET
CUSTOMS STREET EASTCUSTOMS STREET WEST
QUEENSTREET
COMMERCESTREET
CANOPY ABOVE
CANOPY ABOVE
ALBERTSTREET
C
A
B
N
PREPARED FORJOB No.
SCALE @ A1 1:
SCALE @ A3 1 :
1 : 500
City Rail Link - Indicative Britomart Station Concept
Auckland Transport SITE PLAN212005
Plan
SITE PLAN
1000
REVIS01.06.12 Concept Design Submission
20.06.12 Concept Design Submission
17.07.12 Concept Design Submission
-
7/29/2019 CRL Technical Concept Design Report - Appendix B and C
5/14
0 5m10m 20m 50m
N
PREPARED FORJOB No.
SCALE @ A1 1:
SCALE @ A3 1 :
1 : 1250
City Rail Link - Indicative Aotea Station Concept
Auckland Transport LOCATION PLAN212005
Plan
LOCATION PLAN
2500
REVIS01.06.12 Concept Design Submission
20.06.12 Concept Design Submission
17.07.12 Concept Design Submission
-
7/29/2019 CRL Technical Concept Design Report - Appendix B and C
6/14
ALBERT STREET
WELLESLEYWEST
CANDASHE
CANOPIESDASHED ABOVE
FIRE EGRESS TO LANEAT LEVEL BELOW
FIRE EGRESS TO LANEAT LEVEL BELOW
ENTRY
ENTRY
ENT
0 5m 10m 20m
N
PREPARED FORJOB No.
SCALE @ A1 1:
SCALE @ A3 1 :
1 : 500
City Rail Link - Indicative Aotea Station Concept
Auckland Transport CADASTRAL SITE PLAN212005
Plan
CADASTRAL SITE PLAN
1000
CADASTRAL BOUNDARIES
ROAD EXTENTS
REVIS01.06.12 Concept Design Submission
20.06.12 Concept Design Submission
17.07.12 Concept Design Submission
13.08.12 Concept Design Submission
-
7/29/2019 CRL Technical Concept Design Report - Appendix B and C
7/14
DAYS
TREET
SAMOA
HOUSE
LANE
0 5m10m 20m 50m
N
PREPARED FORJOB No.
SCALE @ A1 1:
SCALE @ A3 1 :
1 : 1250
City Rail Link - Indicative Karangahape Station Concept
Auckland Transport LOCATION PLAN212005
Plan
LOCATION PLAN
2500
REVIS01.06.12 Design Concept Submission
08.06.12 Design Concept Submission - R
20.06.12 Design Concept Submission
17.07.12 Design Concept Submission
-
7/29/2019 CRL Technical Concept Design Report - Appendix B and C
8/14
C
A
B
1 2 3
TICKETING
FIREEGRESS
ENTRY
PITTSTREE
KARANGAHAPE
ROAD
SAMOAHOUSELANE
ENTRY
KAR
ANGAHAPE
ROAD
MERCURYLANE
FIRE EGRESS
EAST
STREE
T
SOUTHSTR
EET
GALATOSSTREET
CRO
SSSTREET
0 5m 10m 20m
N
PREPARED FORJOB No.
SCALE @ A1 1:
SCALE @ A3 1 :
1 : 500
City Rail Link - Indicative Karangahape Station Concept
Auckland Transport CADASTRAL SITE PLAN212005
Plan
CADASTRAL SITE PLAN
1000
REVIS01.06.12 Design Concept Submission
08.06.12 Design Concept Submission - R
20.06.12 Design Concept Submission
17.07.12 Design Concept Submission
-
7/29/2019 CRL Technical Concept Design Report - Appendix B and C
9/14
0 5m10m 20m 50m
N
PREPARED FORJOB No.
SCALE @ A1 1:
SCALE @ A3 1 :
1 : 1250
City Rail Link - Indicative Newton Station Concept
Auckland Transport LOCATION PLAN212005
Plan
LOCATION PLAN
2500
REVIS01.06.12 Concept Design Submission
20.06.12 Concept Design Submission
17.07.12 Concept Design Submission
-
7/29/2019 CRL Technical Concept Design Report - Appendix B and C
10/14
2
1 3
C
A SYMONDS STREET
KHYBER
PASSROAD
MOUNTEDEN
ROAD
NEW
NORTHRO
AD BASQUEROAD
DUNDONALD STREET
FLOW
ERSTR
EET
ENTRY
FIRE EGRESS ATLEVEL BELOW
B
2
CANOPYABOVESHOWNDASHED
3
FIRE EGRESS
1
LEAN-TO
0 5m 10m 20m
N
PREPARED FORJOB No.
SCALE @ A1 1:
SCALE @ A3 1 :
1 : 500
City Rail Link - Indicative Newton Station Concept
Auckland Transport CADASTRAL SITE PLAN212005
Plan
CADASTRAL SITE PLAN
1000
REVIS01.06.12 Concept Design Submission
20.06.12 Concept Design Submission
17.07.12 Concept Design Submission
13.08.12 Concept Design Submission
-
7/29/2019 CRL Technical Concept Design Report - Appendix B and C
11/14
Appendix CProject Delivery Diagram
-
7/29/2019 CRL Technical Concept Design Report - Appendix B and C
12/14
Appendix CProject Delivery Diagram
-
7/29/2019 CRL Technical Concept Design Report - Appendix B and C
13/14
INVESTIGATIONWORK
PRELIMINARY SITE
INVESTIGATIONS ANY FURTHER
SITE INVESTIGATIONS
REQUIRED
ANY FINAL
SITE INVESTIGATIONS
CONCEPT DESIGN
ENGINEERING AND
ARCHITECTURAL
DESIGN
PRELIMINARY
DESIGN DETAILED
DESIGN CONSTRUCTION
DESIGN CITY RAIL LINK
OPERATIONAL
NOTICE OF REQUIREMENT
FOR DESIGNATION
ASSESSMENT OF EFFECTS
FOR LAND USE ACTIVITIES
PLANNING
APPLICATIONS
RESOURCE CONSENTS FOR GROUNDWATER TAKE/DIVERSIONS, CONTAMINATION,
LAND DISTURBANCE, AIR DISCHARGE.
NB: REQUIRES PRELIMINARY DESIGN AS A MINIMUM
& MAY HAPPEN AT PRELIMINARY DESIGN PHASE OR
DURING DETAILED DESIGN
ANCILLARY / LOCALISED
RESOURCE CONSENTS AS
REQUIRED
+ OUTLINE PLAN [WHICH
PROVIDES THE INFORMATION
REQUIRED BY THE
DESIGNATION]
DEVELOP ENVIRONMENTAL
MANAGEMENT FRAMEWORK
FOR MANAGING FUTURE
CONSTRUCTION AND
OPERATIONAL EFFECTS
ENVIRONMENTAL
MANAGEMENT
ENVIRONMENTAL MANAGEMENT PLAN (EMP) AT PRELIMINARY DESIGN STAGE
DELIVERY WORK PLANS (DWPs) ETC AS REQUIRED FOR RESOURCE CONSENT
APPLICATIONS
EMP AND DWPs UNDER
DESIGNATION/NoR ARE
COMPLETED
EMP AND DWPs FOR
RESOURCE CONSENTS ARE
REFINED AND UPDATED
OPERATIONAL
MANAGEMENT
PLANS
IWI
DIRECTLY AFFECTED
LANDOWNERS
STAKEHOLDERS
AFFECTED BY PROXIMITY
LANDOWNERS
COMMUNITY
PUBLIC SUBMISSION
PERIOD FOR
DESIGNATION
CONSULTATION
IWI
DIRECTLY AFFECTED LANDOWNERS
STAKEHOLDERS
AFFECTED BY PROXIMITY LANDOWNERS
COMMUNITY
LOCALISED RESOURCE CONSENTS: AS REQUIRED WITH LANDOWNERS
IWI
DIRECTLYAFFECTEDLANDOWNERS
STAKEHOLDERS
AFFECTEDBY PROXIMITY
LANDOWNERS
COMMUNITY
LOCALISEDRESOURCECONSENTS:
AS REQUIREDWITHLANDOWNERS
ONGOING CUSTOMER
SUPPORT VIA HELPLINES
ETC
AS REQUIRED BY ANY
OPERATIONAL
MANAGEMENT PLANS
DESIGNATION CONDITIONS
THE MECHANISM TO
REQUIRE ENVIRONMENTAL
MANAGEMENT PLANS AT
CONSTRUCTION AND
OPERATIONAL PHASES
(EMP + DWPs)
CONDITIONS
RESOURCE CONSENT CONDITIONS
E.G. MONITORING REQUIREMENTS AND
THE MECHANISM TO REQUIRE
ENVIRONMENTAL MANAGEMENT PLANS AT
CONSTRUCTION AND OPERATIONAL PHASES (EMP + DWPs)
IMPLEMENTATION OF
CONDITIONS + CONDITION
MONITORING
CURRENT PHASE PHASE 2 PHASE 3 PHASE 4 PHASE 5
DESKTOP ANALYSIS &
INITIAL SITEINVESTIGATIONS (CAN
INCLUDE SURVEY, BOREHOLES
AND UTILITY POT HOLING)
CITY RAIL LINK ANTICIPATED PROJECT DELIVERY
ONGOING MONITORING
OF CONDITIONS
AS REQUIRED
(OPERATIONAL CONDITIONS)
-
7/29/2019 CRL Technical Concept Design Report - Appendix B and C
14/14