    Appendix BStation Location Drawings

  • 7/29/2019 CRL Technical Concept Design Report - Appendix B and C

    2/14

    Appendix BStation Location Drawings

  • 7/29/2019 CRL Technical Concept Design Report - Appendix B and C

    3/14

    0 5m10m 20m 50m

    N

    PREPARED FORJOB No.

    SCALE @ A1 1:

    SCALE @ A3 1 :

    1 : 1250

    City Rail Link - Indicative Britomart Station Concept

    Auckland Transport LOCATION PLAN212005

    Plan

    LOCATION PLAN

    2500

    REVIS01.06.12 Concept Design Submission

    20.06.12 Concept Design Submission

    17.07.12 Concept Design Submission

  • 7/29/2019 CRL Technical Concept Design Report - Appendix B and C

    4/14

    0 5m 10m 20m

    3

    5

    24 1

    1

    TYLER STREET

    GALWAY STREET

    CPO/ TICKET HALL

    BRIDGE OVER CONCOURSE LEVELCONCOURSEWESTERN EXIT

    TV

    3900

    4375

    5225

    VOID

    VOID

    CANOPY ABOVE

    CANOPY ABOVE

    CANOPY ABOVE

    EXTENT OF STATIONBELOW

    TBC

    QUAY STREET

    CUSTOMS STREET EASTCUSTOMS STREET WEST

    QUEENSTREET

    COMMERCESTREET

    CANOPY ABOVE

    CANOPY ABOVE

    ALBERTSTREET

    C

    A

    B

    N

    PREPARED FORJOB No.

    SCALE @ A1 1:

    SCALE @ A3 1 :

    1 : 500

    City Rail Link - Indicative Britomart Station Concept

    Auckland Transport SITE PLAN212005

    Plan

    SITE PLAN

    1000

    REVIS01.06.12 Concept Design Submission

    20.06.12 Concept Design Submission

    17.07.12 Concept Design Submission

  • 7/29/2019 CRL Technical Concept Design Report - Appendix B and C

    5/14

    0 5m10m 20m 50m

    N

    PREPARED FORJOB No.

    SCALE @ A1 1:

    SCALE @ A3 1 :

    1 : 1250

    City Rail Link - Indicative Aotea Station Concept

    Auckland Transport LOCATION PLAN212005

    Plan

    LOCATION PLAN

    2500

    REVIS01.06.12 Concept Design Submission

    20.06.12 Concept Design Submission

    17.07.12 Concept Design Submission

  • 7/29/2019 CRL Technical Concept Design Report - Appendix B and C

    6/14

    ALBERT STREET

    WELLESLEYWEST

    CANDASHE

    CANOPIESDASHED ABOVE

    FIRE EGRESS TO LANEAT LEVEL BELOW

    FIRE EGRESS TO LANEAT LEVEL BELOW

    ENTRY

    ENTRY

    ENT

    0 5m 10m 20m

    N

    PREPARED FORJOB No.

    SCALE @ A1 1:

    SCALE @ A3 1 :

    1 : 500

    City Rail Link - Indicative Aotea Station Concept

    Auckland Transport CADASTRAL SITE PLAN212005

    Plan

    CADASTRAL SITE PLAN

    1000

    CADASTRAL BOUNDARIES

    ROAD EXTENTS

    REVIS01.06.12 Concept Design Submission

    20.06.12 Concept Design Submission

    17.07.12 Concept Design Submission

    13.08.12 Concept Design Submission

  • 7/29/2019 CRL Technical Concept Design Report - Appendix B and C

    7/14

    DAYS

    TREET

    SAMOA

    HOUSE

    LANE

    0 5m10m 20m 50m

    N

    PREPARED FORJOB No.

    SCALE @ A1 1:

    SCALE @ A3 1 :

    1 : 1250

    City Rail Link - Indicative Karangahape Station Concept

    Auckland Transport LOCATION PLAN212005

    Plan

    LOCATION PLAN

    2500

    REVIS01.06.12 Design Concept Submission

    08.06.12 Design Concept Submission - R

    20.06.12 Design Concept Submission

    17.07.12 Design Concept Submission

  • 7/29/2019 CRL Technical Concept Design Report - Appendix B and C

    8/14

    C

    A

    B

    1 2 3

    TICKETING

    FIREEGRESS

    ENTRY

    PITTSTREE

    KARANGAHAPE

    ROAD

    SAMOAHOUSELANE

    ENTRY

    KAR

    ANGAHAPE

    ROAD

    MERCURYLANE

    FIRE EGRESS

    EAST

    STREE

    T

    SOUTHSTR

    EET

    GALATOSSTREET

    CRO

    SSSTREET

    0 5m 10m 20m

    N

    PREPARED FORJOB No.

    SCALE @ A1 1:

    SCALE @ A3 1 :

    1 : 500

    City Rail Link - Indicative Karangahape Station Concept

    Auckland Transport CADASTRAL SITE PLAN212005

    Plan

    CADASTRAL SITE PLAN

    1000

    REVIS01.06.12 Design Concept Submission

    08.06.12 Design Concept Submission - R

    20.06.12 Design Concept Submission

    17.07.12 Design Concept Submission

  • 7/29/2019 CRL Technical Concept Design Report - Appendix B and C

    9/14

    0 5m10m 20m 50m

    N

    PREPARED FORJOB No.

    SCALE @ A1 1:

    SCALE @ A3 1 :

    1 : 1250

    City Rail Link - Indicative Newton Station Concept

    Auckland Transport LOCATION PLAN212005

    Plan

    LOCATION PLAN

    2500

    REVIS01.06.12 Concept Design Submission

    20.06.12 Concept Design Submission

    17.07.12 Concept Design Submission

  • 7/29/2019 CRL Technical Concept Design Report - Appendix B and C

    10/14

    2

    1 3

    C

    A SYMONDS STREET

    KHYBER

    PASSROAD

    MOUNTEDEN

    ROAD

    NEW

    NORTHRO

    AD BASQUEROAD

    DUNDONALD STREET

    FLOW

    ERSTR

    EET

    ENTRY

    FIRE EGRESS ATLEVEL BELOW

    B

    2

    CANOPYABOVESHOWNDASHED

    3

    FIRE EGRESS

    1

    LEAN-TO

    0 5m 10m 20m

    N

    PREPARED FORJOB No.

    SCALE @ A1 1:

    SCALE @ A3 1 :

    1 : 500

    City Rail Link - Indicative Newton Station Concept

    Auckland Transport CADASTRAL SITE PLAN212005

    Plan

    CADASTRAL SITE PLAN

    1000

    REVIS01.06.12 Concept Design Submission

    20.06.12 Concept Design Submission

    17.07.12 Concept Design Submission

    13.08.12 Concept Design Submission

  • 7/29/2019 CRL Technical Concept Design Report - Appendix B and C

    11/14

    Appendix CProject Delivery Diagram

  • 7/29/2019 CRL Technical Concept Design Report - Appendix B and C

    12/14

    Appendix CProject Delivery Diagram

  • 7/29/2019 CRL Technical Concept Design Report - Appendix B and C

    13/14

    INVESTIGATIONWORK

    PRELIMINARY SITE

    INVESTIGATIONS ANY FURTHER

    SITE INVESTIGATIONS

    REQUIRED

    ANY FINAL

    SITE INVESTIGATIONS

    CONCEPT DESIGN

    ENGINEERING AND

    ARCHITECTURAL

    DESIGN

    PRELIMINARY

    DESIGN DETAILED

    DESIGN CONSTRUCTION

    DESIGN CITY RAIL LINK

    OPERATIONAL

    NOTICE OF REQUIREMENT

    FOR DESIGNATION

    ASSESSMENT OF EFFECTS

    FOR LAND USE ACTIVITIES

    PLANNING

    APPLICATIONS

    RESOURCE CONSENTS FOR GROUNDWATER TAKE/DIVERSIONS, CONTAMINATION,

    LAND DISTURBANCE, AIR DISCHARGE.

    NB: REQUIRES PRELIMINARY DESIGN AS A MINIMUM

    & MAY HAPPEN AT PRELIMINARY DESIGN PHASE OR

    DURING DETAILED DESIGN

    ANCILLARY / LOCALISED

    RESOURCE CONSENTS AS

    REQUIRED

    + OUTLINE PLAN [WHICH

    PROVIDES THE INFORMATION

    REQUIRED BY THE

    DESIGNATION]

    DEVELOP ENVIRONMENTAL

    MANAGEMENT FRAMEWORK

    FOR MANAGING FUTURE

    CONSTRUCTION AND

    OPERATIONAL EFFECTS

    ENVIRONMENTAL

    MANAGEMENT

    ENVIRONMENTAL MANAGEMENT PLAN (EMP) AT PRELIMINARY DESIGN STAGE

    DELIVERY WORK PLANS (DWPs) ETC AS REQUIRED FOR RESOURCE CONSENT

    APPLICATIONS

    EMP AND DWPs UNDER

    DESIGNATION/NoR ARE

    COMPLETED

    EMP AND DWPs FOR

    RESOURCE CONSENTS ARE

    REFINED AND UPDATED

    OPERATIONAL

    MANAGEMENT

    PLANS

    IWI

    DIRECTLY AFFECTED

    LANDOWNERS

    STAKEHOLDERS

    AFFECTED BY PROXIMITY

    LANDOWNERS

    COMMUNITY

    PUBLIC SUBMISSION

    PERIOD FOR

    DESIGNATION

    CONSULTATION

    IWI

    DIRECTLY AFFECTED LANDOWNERS

    STAKEHOLDERS

    AFFECTED BY PROXIMITY LANDOWNERS

    COMMUNITY

    LOCALISED RESOURCE CONSENTS: AS REQUIRED WITH LANDOWNERS

    IWI

    DIRECTLYAFFECTEDLANDOWNERS

    STAKEHOLDERS

    AFFECTEDBY PROXIMITY

    LANDOWNERS

    COMMUNITY

    LOCALISEDRESOURCECONSENTS:

    AS REQUIREDWITHLANDOWNERS

    ONGOING CUSTOMER

    SUPPORT VIA HELPLINES

    ETC

    AS REQUIRED BY ANY

    OPERATIONAL

    MANAGEMENT PLANS

    DESIGNATION CONDITIONS

    THE MECHANISM TO

    REQUIRE ENVIRONMENTAL

    MANAGEMENT PLANS AT

    CONSTRUCTION AND

    OPERATIONAL PHASES

    (EMP + DWPs)

    CONDITIONS

    RESOURCE CONSENT CONDITIONS

    E.G. MONITORING REQUIREMENTS AND

    THE MECHANISM TO REQUIRE

    ENVIRONMENTAL MANAGEMENT PLANS AT

    CONSTRUCTION AND OPERATIONAL PHASES (EMP + DWPs)

    IMPLEMENTATION OF

    CONDITIONS + CONDITION

    MONITORING

    CURRENT PHASE PHASE 2 PHASE 3 PHASE 4 PHASE 5

    DESKTOP ANALYSIS &

    INITIAL SITEINVESTIGATIONS (CAN

    INCLUDE SURVEY, BOREHOLES

    AND UTILITY POT HOLING)

    CITY RAIL LINK ANTICIPATED PROJECT DELIVERY

    ONGOING MONITORING

    OF CONDITIONS

    AS REQUIRED