CRICOS No. 00213J Tracking rail safety: Incident and Accident investigation in Australia Herbert...
-
date post
20-Dec-2015 -
Category
Documents
-
view
216 -
download
1
Transcript of CRICOS No. 00213J Tracking rail safety: Incident and Accident investigation in Australia Herbert...
![Page 1: CRICOS No. 00213J Tracking rail safety: Incident and Accident investigation in Australia Herbert Biggs PhD, Tamara Banks PhD, & Nathan Dovan 10 th National.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d485503460f94a23e8e/html5/thumbnails/1.jpg)
CRICOS No. 00213J
Tracking rail safety: Incident and Accident investigation in Australia
Herbert Biggs PhD, Tamara Banks PhD, & Nathan Dovan10th National Conference on Injury Prevention and Safety Promotion
2- 4 November 2011 Brisbane
![Page 2: CRICOS No. 00213J Tracking rail safety: Incident and Accident investigation in Australia Herbert Biggs PhD, Tamara Banks PhD, & Nathan Dovan 10 th National.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d485503460f94a23e8e/html5/thumbnails/2.jpg)
Acknowledgement
• This research is funded by the CRC Rail Innovation with support from rail operators, rail association groups, and rail and transport regulators across Australia
![Page 3: CRICOS No. 00213J Tracking rail safety: Incident and Accident investigation in Australia Herbert Biggs PhD, Tamara Banks PhD, & Nathan Dovan 10 th National.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d485503460f94a23e8e/html5/thumbnails/3.jpg)
Project Background
• Scoping Project: Currently no national or structured learning framework available in Aus or NZ
• Current Project: Develop a national training program & capability framework for rail incident investigators– Establish the potential market demand – Define the curricula for a multi-level national training program – Explore training providers & delivery options
![Page 4: CRICOS No. 00213J Tracking rail safety: Incident and Accident investigation in Australia Herbert Biggs PhD, Tamara Banks PhD, & Nathan Dovan 10 th National.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d485503460f94a23e8e/html5/thumbnails/4.jpg)
Demand
• Inconsistent T&D of rail incident investigators• Appointment of a national rail safety regulator in
2012• Strong support for a more collaborative
approach
![Page 5: CRICOS No. 00213J Tracking rail safety: Incident and Accident investigation in Australia Herbert Biggs PhD, Tamara Banks PhD, & Nathan Dovan 10 th National.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d485503460f94a23e8e/html5/thumbnails/5.jpg)
Training – Who & What?
Training Framework
SME’s
Current Training
Literature Review
![Page 6: CRICOS No. 00213J Tracking rail safety: Incident and Accident investigation in Australia Herbert Biggs PhD, Tamara Banks PhD, & Nathan Dovan 10 th National.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d485503460f94a23e8e/html5/thumbnails/6.jpg)
Who?
![Page 7: CRICOS No. 00213J Tracking rail safety: Incident and Accident investigation in Australia Herbert Biggs PhD, Tamara Banks PhD, & Nathan Dovan 10 th National.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d485503460f94a23e8e/html5/thumbnails/7.jpg)
What KSAO’s?• Thorough• Objective• Critical/analytical thinking• Managing investigations• Confidentiality• Attention to detail• Site Safety• Problem solving• Personal safety• Compliance
![Page 8: CRICOS No. 00213J Tracking rail safety: Incident and Accident investigation in Australia Herbert Biggs PhD, Tamara Banks PhD, & Nathan Dovan 10 th National.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d485503460f94a23e8e/html5/thumbnails/8.jpg)
Training Delivery• Current Providers:
– ATSB; ARA; Uni of New England; CQ Uni; Cranfield Uni; rail operator driven internal training
• Considerations:– Cost; Access; Accredited v’s Endorsed; Ownership of IP;
Credibility; RPL– Do they really need what they want (experience; fidelity)
![Page 9: CRICOS No. 00213J Tracking rail safety: Incident and Accident investigation in Australia Herbert Biggs PhD, Tamara Banks PhD, & Nathan Dovan 10 th National.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d485503460f94a23e8e/html5/thumbnails/9.jpg)
Project Benefits
• Development of a rail-specific competency framework and curricula for a multi-level national training program will:– Allow industry to share training resources – Increase recruitment pool of qualified
professional investigators– Provide a nationally recognised career
pathway for rail investigators– Enhance quality of both curricula and training
providers
![Page 10: CRICOS No. 00213J Tracking rail safety: Incident and Accident investigation in Australia Herbert Biggs PhD, Tamara Banks PhD, & Nathan Dovan 10 th National.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d485503460f94a23e8e/html5/thumbnails/10.jpg)
Project Timelines
• Commenced 1 Nov 2010• Assess Supply and Demand June 2010• Complete Training Needs Analysis Nov 2010• Develop Competency Framework Mar 2012• Final Report 30 Jun 2012