1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING Moussa A. Issa, PhD, PE, SE Chief Structural Engineer 2018 National AAAEA Technical Conference Richardson, Texas NOVEMBER 09, 2018

Transcript of CREATIVE SOLUTIONS FOR CHALLANGING...

Page 1: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

1

CREATIVE SOLUTIONS FOR CHALLANGINGPROBLEMS IN STRUCTURAL ENGINEERING

Moussa A. Issa, PhD, PE, SEChief Structural Engineer

2018 National AAAEA Technical ConferenceRichardson, Texas

NOVEMBER 09, 2018

Page 2: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

•Chicago Department of Transportation•Illinois Department of Transportation•Illinois Tollway•Florida Department of Transportation•PB/WSP•AECOM•UIC (Professor Mohsen A. Issa)•HBM Engineering Group

Thanks are due to:

ACKNOWLEDGEMENT

Page 3: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

3

Presentation Outline

1. Field Inspection, Rating and Testing of In-Service Bridges

2. Strengthening of In-Service Bridges by using CFRP

3. Approach Structures for 41st and 43rd Pedestrian Bridges

4. Demmolition of IL-89 Truss Bridge over the Illinois River

5. Field Investigation and Testing of Sign Structures for VMS/CMS System

Page 4: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

4

BRIDGE LOAD TESTING AND RATING

Page 5: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

PLATE GIRDER

5

SLAB BRIDGE

TRUSS SUSPENSION

Page 6: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

6

Page 7: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

7

Page 8: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

8

Page 9: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

9

Page 10: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

WHAT IS BRIDGE LOAD RATING?

10

The safe live load carrying capacity of a highway structure is called its load rating.

It is usually expressed as a (rating) factor (RF) of a defined vehicle OR as a gross tonnage for a defined vehicle axle configuration

Page 11: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

BASIC EQUATION FOR CALCULATING THE RATING FACTOR (RF)

RF = Rating factor for live load C = Capacity of member D = Dead load effect L = Live load effect I = Impact factor A1 = Factor for dead load

A1=1.0 for AS A1=1.3 for LF

A2 = Factor for live load A2=1.0 for AS A2=2.17 for LF (Inventory Rating) A2=1.3 for LF (Operating Rating)

11

RF = C – A1 * D

A2 * L*(1 + I)

How to calculate the Rating Factor (RF)

Page 12: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

AASHTO HS 20-44 TRUCK

12

14’Varies(14’-30’)

8k32k

32k

(HS 20-44)

Page 13: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

13

ILLINOIS LEGAL LOADS (TYPE 3-S1)

58,500#16

k

8.5k

10’

16k

18k

4’ 14’

Page 14: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

14

Page 15: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

15

Page 16: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

16

Page 17: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

17

Page 18: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

18

Page 19: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

19

Page 20: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

20

Page 21: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

21

Page 22: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

22

Page 23: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

23

Page 24: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

24

Page 25: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

25

Page 26: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

26

Page 27: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

27

Page 28: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

CARBON FIBER REINFORCED POLYMER (CFRP)

28

Unwrapped 1-Layer Fully Wrapped

Rupture of CFRP

Page 29: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

29

Mechanical properties of CFRP CF130 fromMaster Builders Inc.

Property

Ultimate strength 620 ksi (4275 MPa)

Design strength 550 ksi (3790 MPa)

Yielding modulus 33,000 ksi(228 GPa)

Ultimate strain 0.017 mm/mm

Mbrace CF 130

Amount

Page 30: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

30

Modes of Failure

Page 31: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

31Deflection, mm

0 20 40 60 80 100

Load

, kip

s

0

8

16

24

32

40

48

Deflection, in0.00 0.75 1.50 2.25 3.00 3.75

Load

, kN

0

50

100

150

200

Control

3-strips 3-layers (Master Builder Inc.)

2 sheets layers (Master Builder Inc.)3 strips (Sika)

4strips (Sika)

3-strips 6-layers (Master Builder Inc.)5 strips (Sika)

Load vs. Deflection Curves for all SlabsMaster Builders and Sika CFRP

Page 32: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

32

Deflection, mm0 15 30 45 60 75 90

0

5

10

15

20

25

30

Deflection, in0.0 0.6 1.2 1.8 2.4 3.0

Load

, kN

0

20

40

60

80

100

120

control 1-layer (w=6")

2-layers (w=12")

1-layer U-shape

Load

,kip

s

Load vs. Deflection Curves for 8 ft RC Beams Cured at Room Temperature

Design Load/unit width = 0.0065” x 550 ksi= 3.575 Kips/in.

Page 33: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

33

Deflection (mm)0 5 10 15 20 25 30 35 40 45

Loa

d (k

ips)

0

5

10

15

20

25

Deflection (in)0.0 0.3 0.6 0.9 1.2 1.5

Loa

d (K

N)

0

20

40

60

80

100

Static loadingAfter 0.5 million cycles (40-60%)After 1.0 million cycles (40-60%)After 2 million cycles (40-60%)After 0.523 million cycles (60-80%)After 1.085 million cycles (60-80%)After 1.588 million cycles (60-80%)After 2 million cycles (60-80%)Static loading to Failure

Load vs. Deflection Curves for Beam (B8F1L40-60, 60-80)Strengthened with 1-Layer of CFRP under Cyclic Loading

Page 34: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

34

Mode of Failure of RC Column (Control)

Page 35: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

35

Mode of Failure of RC Column confined with CFRP

C30L2T

Page 36: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

36

Note: ( )* represents the ultimate load for the 30" long columns** with respect to control specimens

Specimen Type of strengthening Ultimate loadkips % Increase**

C36C0 Control (unconfined) 263(264)* ---

C36S1 1- layer 4" strips @ 1" spacing

332(334)* 26

C361T 1- layer in lateral direction 353(347)* 34

C362T 2-layers in lateral direction 444(422)* 69

Test Results of all Circular 36 in. Long RC Columns

Page 37: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

37

FIELD APPLICATION

Page 38: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

18”X48” VOIDED PRESTRESSED CONCRETE SLAB BRIDGE.THE BRIDGE CONSISTS OF FIFTEEN 39 FT. SPANS.

38

Page 39: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

CORROSION OF PRESTRESSING STRANDSAND SPALLING OF CONCRETE

39

Page 40: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

RESTORATION OF CONCRETE SECTION

40

Page 41: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

APPLICATION OF CFRP

41

Page 42: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

DAMAGED AASHTO TYPE II GIRDERS

42

Page 43: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

FORMING AND RESTORING OF CONCRETE SECTIONS

43

Page 44: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

APPLICATION OF CFRP

44

Page 45: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

45

I90 Toll Highway Bridge OverBurr Oak Ridge Road, Village of Roscoe

Page 46: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

46

I90 Toll Highway Bridge OverBurr Oak Ridge Road, Village of Roscoe

Damaged Prestressed Concrete Beams

Page 47: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

47

The existing plan for bridge No. 711

Beam # 9Beam #10Beam #11

Page 48: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

48

Damaged Precast Prestressed Concrete Beam # 9(Rectangular Section)

Bridge Condition:Bridge hit and severelydamaged, one strand cut,Two strands fully exposedwith some damage.

Action:Beam needs concrete repair and CFRP strengthening to counterbalance for the prestress force lost due to the damage. Beam also needs CFRP wrap to confine the beam at the damaged location.

Page 49: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

49

Location of CFRP lamination and prestressing steel for beam #11

Page 50: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

50

Damaged and repaired details of Beam #11

Page 51: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

51

Application of CFRP to Fully RestoredDamaged Girder

Page 52: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

52

InstrumentationVibrating Wire Strain Gages

Page 53: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

53

Repaired Damaged Areas and Installing the Monitoring System

Page 54: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

54

Monitoring SystemHoused in Aluminum Box

Page 55: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

55

Solar Panel

Page 56: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

56

Damaged AASHTO Beams on I88Illinois Tollway Bridge

Page 57: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

CFRP BEAM REPAIR NW TOLLWAY(I-90) OVER IL 173

57

Page 58: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

58

Page 59: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

59

CFRP BEAM REPAIR NW TOLLWAY(I-90) OVER IL 173

Page 60: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

60

CFRP BEAM REPAIR NW TOLLWAY(I-90) OVER IL 173

Page 61: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

61

CFRP BEAM REPAIR NW TOLLWAY(I-90) OVER IL 173

Page 62: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

62

CFRP BEAM REPAIR NW TOLLWAY(I-90) OVER IL 173

Page 63: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

63

CFRP BEAM REPAIR NW TOLLWAY(I-90) OVER IL 173

Page 64: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

64

CFRP BEAM REPAIR NW TOLLWAY(I-90) OVER IL 173

Page 65: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

65

CFRP BEAM REPAIR NW TOLLWAY(I-90) OVER IL 173

Page 66: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

66

CFRP BEAM REPAIR NW TOLLWAY(I-90) OVER IL 173

Page 67: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

CFRP PIER REPAIR 18TH STREET – EAST OF THE RIVER

Page 68: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

CFRP PIER REPAIR 18TH STREET – EAST OF THE RIVER

Page 69: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

CFRP PIER REPAIR 18TH STREET – EAST OF THE RIVER

Typical Pier Repairs

Page 70: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

CFRP PIER REPAIR 18TH STREET – EAST OF THE RIVER

Application of Primer Material on Pier 1 Surface

Page 71: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

CFRP PIER REPAIR 18TH STREET – EAST OF THE RIVER

Application of First Horizontal Layer of CFRP on Pier 1

Page 72: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

CFRP PIER REPAIR 18TH STREET – EAST OF THE RIVER

Pier 4 with two coats of FRL in gray color

Page 73: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

Pull out Testing at Pier 4

Location # Pullout Strength (PSI)

Pier 1 475Pier 4 520

Average = 497.5

CFRP PIER REPAIR 18TH STREET – EAST OF THE RIVER

Page 74: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

41ST & 43RD ST. PEDESTRIAN BRIDGES OVER IC/CN RAILROAD AND LSD,

CHICAGO IL

APPROACH STRUCTURES

Page 75: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

41ST & 43RD STREET PEDESTRIAN BRIDGESDESIGN TEAM AND HISTORY

HistoryDouble-curved, tilted arch mono tube concept was Winner of Chicago International Design Competition for updating and revitalizing Chicago’s south side neighborhoods providing pedestrian access to Lake Shore Drive Lake Front Trail.

Original TS&L completed in 2007 by Earthtech(AECOM). Revisions made and resubmitted in 2014.

Design Team Cordogan Clark & Associates, Inc

(Architect) AECOM (Structural, main spans, Civil and

Construction Administrator). HBM Engineering Group, LLC (Structural, East

and West Approaches). Singh and Associates (Lighting aesthetics). Ground Engineering Consultants, Inc

(Geotechnical) RWDI (Wind tunnel and dynamic modeling) F.H Paschen (Contractor)

Page 76: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

41ST & 43RD STREET PEDESTRIAN BRIDGESPROJECT LOCATION AND OVERVIEW

41st St PedestrianBridge

43rd St PedestrianBridge

Page 77: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

41ST & 43RD STREET PEDESTRIAN BRIDGESARCHICTURAL CONCEPT RENDERING

IC and CN Railroad

Lake Shore Drive

Page 78: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

41ST & 43RD STREET PEDESTRIAN BRIDGE

Complex Geometry Fabrication/Erection/Camber

3-Dimensional Camber Structural Stability

Fully welded saddle bearings for torsional restraint Redundancy

Single circular carrier rib

• Tight Radius of Curvature 120’-0” radius with 5% vertical profile (41st St. Approaches) 60’-0” Radius with 8% vertical profile (43rd St. Approaches)

• Uplift• Thermal movements

3-Dimensional modeling considering foundation flexibility to determine location of thermal neutrality.

• High Torsion• Agency Coordination

Design Challenges:

Page 79: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

41ST STREET PEDESTRIAN BRIDGERAMP APPROACH SECTION

Page 80: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

41ST & 43RD STREET PEDESTRIAN BRIDGEVERTICAL AND HORIZONTAL PROFILE41st St. Bridge

43rd St. Bridge

Page 81: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

41ST STREET PEDESTRIAN BRIDGEWEST APPROACH ELEVATION VIEW

Page 82: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

41ST STREET PEDESTRIAN BRIDGEEAST APPROACH ELEVATION VIEW

Page 83: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

41ST STREET PEDESTRIAN BRIDGERAMP WEST APPROACH

Page 84: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

41ST STREET PEDESTRIAN BRIDGERAMP WEST APPROACH STAIRS

Page 85: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

41ST STREET PEDESTRIAN BRIDGERAMP WEST APPROACH SHARED PIER

Page 86: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

41ST STREET PEDESTRIAN BRIDGERAMP WEST APPROACH

Page 87: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

DEMOLITION OF IL 89 TRUSS BRIDGEOVER THE ILLINOIS RIVER

Page 88: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

BACKGROUND19-span bridge over the Illinois River in

Spring Valley, ILBuilt in 193414 approach spans consisting of concrete

slab on rolled steel stringers5 truss spans (200 ft – 362 ft length)

Page 89: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

BRIDGE REMOVALAfter the construction of the new

bridge:Approach spans were wrecked to

the groundModeled in CSI Bridge with

equipment loads for deck removal (including 50% impact)

Page 90: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

TRUSS SPANS

Deck sawcut and removed Stringers removed Top and bottom lateral bracing

members cut or removed Weakened to prepare for

demolition by explosives, while still withstanding the wind load prior to blasting

Shorter truss spans (200 ft) were weakened at the 4 corners to drop into the river

Longer truss span (362 ft) was weakened at every truss panel (truss top chord, bottom chord & diagonal members)

Page 91: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

2 MODELS IN CSI BRIDGE FOR EACH TRUSS SPAN:

Full truss model with equipment loads for deck removal (including 50% impact)

Weakened truss without the deck: dead load and 50% wind

Page 92: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

WEAKEN TRUSS MEMBERS

Red areas removed by torch cutting: Top & Bottom Chords

Diagonals & Lateral Bracing

Page 93: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

DESIGN CHALLENGES & CONCLUSIONS Performance ratios slightly exceeding 1.0

Obtained conservatively using 50% impact for construction live load

Temporary condition (few days): not scheduled during weather of maximum design-force winds

Specified load permitted to be carried by construction equipment & allowable travel lanes

• Determined cuts for truss & lateral bracing members

• Project concluded with safe & successful demolition in August 2018

Page 94: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

https://youtu.be/cLf9xhpwriI

Page 95: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

95

Field Investigation & Testing of Sign Structures for VMS/CMS System

Page 96: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

96

Page 97: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

97

Page 98: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

98

Page 99: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

99

Page 100: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

100

Page 101: CREATIVE SOLUTIONS FOR CHALLANGING …box2046.temp.domains/~natioqq5/wp-content/uploads/2019/...2019/06/04  · 1 CREATIVE SOLUTIONS FOR CHALLANGING PROBLEMS IN STRUCTURAL ENGINEERING

THANK YOU

QUESTIONS?