Page 2: Creating and operating the Riyadh Bus Network

A MAJOR PROJECT FOR THE CAPITAL

OF THE KINGDOM

OF SAUDI ARABIA

2

Page 3: Creating and operating the Riyadh Bus Network

• Create and operate a 100-line network with over 1,000

buses

to offer the capital’s inhabitants a modern public transport service

to dense coverage integrated with the metro network under construction

under the

authority of the ADA (ArRiyadh Development Authority)

• Three-stage deployment from 2017 onwards followed by a

ten-year operation contract

• Patronage forecasts exceed 120 million passengers per year

from 2024 onward

3

Page 4: Creating and operating the Riyadh Bus Network

LEGENDS

Page 5: Creating and operating the Riyadh Bus Network

5

Riyad public transport project

Importations, launching and maintenance of the bus network

buse

s

+than1000 YEARS

Project length

(mobilisation

and operation)

12

Year of launch

2017 Employees

4 500

3 909 stops Kilometers

4 Parkings

MILLIONS

lines

+ than

100

Principal

stations

91,8

5

Page 6: Creating and operating the Riyadh Bus Network
Page 7: Creating and operating the Riyadh Bus Network
Page 8: Creating and operating the Riyadh Bus Network
Page 9: Creating and operating the Riyadh Bus Network
Page 10: Creating and operating the Riyadh Bus Network
Page 11: Creating and operating the Riyadh Bus Network
Page 12: Creating and operating the Riyadh Bus Network
Page 13: Creating and operating the Riyadh Bus Network
Page 14: Creating and operating the Riyadh Bus Network

PROJECT CORE :

EXCELLENCE

14

Page 15: Creating and operating the Riyadh Bus Network

• “World Class” standards

• A hierarchical network with very high levels of service

lines rounded out by feeder lines

• Contribution of experience forged in the top networks

worldwide: Paris, London

• Metro integration targeted in every field

(physical, ticketing, information, etc.)

• Committed service quality at the

highest level (safety,

accessibility, appeal, etc.)

15

Page 16: Creating and operating the Riyadh Bus Network

EXEMPLARY PARTNERSHIP IN

IMPLEMENTATION

16

Page 17: Creating and operating the Riyadh Bus Network

SAPTCO and RATP Group: partners since 2010

A Saudi company set up jointly and fielding experts from both

partners:

• RATP GROUP KNOW-HOW in launching and managing

multi-modal transport networks (Paris, Manchester, Algiers,

Austin, Seoul, Johannesburg, Florence, etc.)

• SAPTCO EXPERTISE of bus transportation in Saudi

Arabia

17

Page 18: Creating and operating the Riyadh Bus Network

SAPTCO and RATP Group: partners since 2010

• TOGETHER, the power of a fleet of over 15,000 buses

worldwide

• OUR OBJECTIVE : to transfer know-how to ensure local

expertise

• OUR AIM : to pursue other transport projects together in

Saudi Arabia (Riyadh metro, Mecca, etc.).

18

Page 19: Creating and operating the Riyadh Bus Network

12 tram networks

19

RATP Group in figures

MILLION Group net income

€304

MILLION

of customers

everyday

12

International group

in public transportation sector

5 th

Employees

59 000

BILLION

revenue

€5.134

12 countries

In

The

19 metro lines

80 bus networks

4 CONTINENTS

And a presence

on

Page 20: Creating and operating the Riyadh Bus Network

20

SAPTCO in figures

4 500 vehicles 35 years

of experience in

public transportation

1 Billion

SAR

Revenue 2013

7 000 Employees

1.25 Billion SAR

Net income between 2009 and 2013

40 000

shareholders

More than 2 Billion

Passengers transported

Saudization

17%

Page 21: Creating and operating the Riyadh Bus Network