THE USE OF PULSED DC HOLIDAY DETECTORS FOR FIELD TESTING PIPELINE COATINGS
Author:
John Fletcher FICORR
Technical Support Manager
Elcometer Limited
© Elcometer Limited 2011
![Page 2: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/2.jpg)
60 years of excellence
www.elcometer.com
inspection equipment
THE USE OF PULSED DC HOLIDAY DETECTORS FOR FIELD TESTING PIPELINE COATINGS
Presented by Craig Woolhouse
Regional Sales Manager
Elcometer Limited
© Elcometer Limited 2011
![Page 3: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/3.jpg)
Introduction
The Problem - Flaws & Defects
Standards for Porosity Detection
Continuous DC High Voltage Testing
Pulsed DC High Voltage Testing
Conclusions
Content
![Page 4: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/4.jpg)
Introduction
High Voltage Holiday Detection is used on cured coatings to ensure there are no flaws
Two main high voltage equipment types
Continuous DC
Pulsed DC
![Page 5: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/5.jpg)
Introduction
Continuous AC High Voltage Testers are also available but these are often mains operated, which is inconvenient for site work
Surface contamination & moisture cause AC sparks
High AC voltage is more hazardous than DC
![Page 6: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/6.jpg)
The Problem
Flaws in cured coatings reduce service life:
Pipeline – internal and external coatings
Tank linings
Immersion Service
![Page 7: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/7.jpg)
The Problem
Some Examples of Coating Flaws
Runs & Sags
Pinholes
Cratering
Cissing
Incorrect Coating Thickness
![Page 8: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/8.jpg)
The Problem
Runs & Sags
Caused by excessive local thickness prior to cure
![Page 9: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/9.jpg)
The Problem
Pinholes
Caused by air or blast media inclusion in the coating
![Page 10: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/10.jpg)
The Problem
Cratering
Caused by air release from the partially cured coating
![Page 11: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/11.jpg)
The Problem
Cissing
Caused by contamination of substrate by oil or grease
(also known as crawling or fisheyes)
![Page 12: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/12.jpg)
The Problem
Incorrect Coating Thickness
Profile peaks through thin coatings
Cracking due to excess coating thickness
![Page 13: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/13.jpg)
Test Standards
NACE
SP0188:2006
“Discontinuity (Holiday) Testing of New Protective Coatings on Conductive Substrates”
Test Voltage Table
![Page 14: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/14.jpg)
Test Standards
NACE
RP0274:2004
“High Voltage Electrical Inspection of Pipeline Coatings”
Voltage Formula or Table
Where: V = test voltage
and T is the thickness in
mm
TV 900,7
TV 250,1Where: V = test voltage
and T is the thickness in
mil
![Page 15: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/15.jpg)
Test Standards
NACE
SP0490:2007
“Holiday Detection of Fusion-Bonded Epoxy External Coatings of 250 to 760 µm (10 to 30 mil) ”
Voltage Formula or Table
Where: V = test voltage
and T is the thickness in
µm
Where: V = test voltage
and T is the thickness in
mil
TV 104
TV 525
![Page 16: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/16.jpg)
Test Standards
ASTM
D5162:2008
“Practice for Discontinuity (Holiday) Testing of Nonconductive Protective Coating on Metallic Substrates ”
Voltage Formula or Table
Where: V = test voltage,
Tc is the thickness in
mm or mil and M is a
constant dependant on
the range of the
thickness
TcMV
![Page 17: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/17.jpg)
Test Standards
ASTM
D4787:2008
“Continuity verification for liquid or sheet linings applied to concrete substrates ”
Voltage Formula or Table
Where: V = test voltage,
Tc is the thickness in
mm or mil and M is a
constant dependant on
the range of the
thickness
TcMV
![Page 18: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/18.jpg)
Test Standards
ISO
BS EN ISO29601:2011
“Paints and varnishes – Corrosion protection by protective paint systems – Assessment of porosity in a dry film”
Test Voltage Table
![Page 19: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/19.jpg)
Test Standards
Test Voltage Comparisons
Standard Test Voltage for 500 µm (20
mil) Coating
NACE SP0188 2.5 kV
NACE RP0274 6.0 kV
NACE SP0490 2.3 kV
ASTM D4787 (Formula) 2.3 kV
ASTM D4787 (Table) 2.7 kV
BS EN ISO 29601 2.9 kV
![Page 20: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/20.jpg)
Test Set-up
Signal return connected to
substrate
DC Voltage from 0.5 to 30 kV
Conductive Electrodes
Continuous DC Testing
![Page 21: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/21.jpg)
Test Electrodes
Insulated Handle
Rolling Spring
Internal Pipe Brush
Metal or Conductive Rubber
Brush Electrodes
Extension rods
Continuous DC Testing
![Page 22: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/22.jpg)
Test Set-up
Capacitive Signal Return Cable
Pulsed DC Testing
![Page 23: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/23.jpg)
Test Set-up
35 kV Test Voltage
Range
Menu operated standards
Voltage calculator
Pulsed DC Testing
![Page 24: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/24.jpg)
Full Set of Electrodes
Band brushes
Wire brushes up to 1 m wide
Internal pipe brushes
Conductive Rubber Strip
Electrode adaptors
Steel rolling springs
Phosphor-Bronze Rolling Springs
Pulsed DC Testing
![Page 25: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/25.jpg)
Signal Return Conductive Mat
Pulsed DC Testing
![Page 26: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/26.jpg)
.
CONCLUSIONS
THE USE OF PULSED DC HOLIDAY DETECTORS FOR
FIELD TESTING PIPELINE COATINGS
![Page 27: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/27.jpg)
The key to successful high voltage holiday detection
is the selection of the correct test voltage:
Too low a voltage and
flaws will be missed
Too high a voltage and
the coating will be burnt
.
Conclusions
![Page 28: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/28.jpg)
Care must be taken with low dielectric strength coating:
Thin sections may not resist the high voltage if the dielectric strength is low
Breakdown voltage of air is:
4 kV/mm
Some coatings have a dielectric strength of 6 kV/mm
.
Conclusions
![Page 29: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/29.jpg)
Continuous DC vs. Pulsed DC
Testing
Determined by practical issues
Pulsed DC when direct connection
to substrate is not possible
Pulsed DC when coating is damp or
dirty
.
Conclusions
![Page 30: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/30.jpg)
Continuous DC vs. Pulsed DC
Testing
Continuous DC recommended when
accurate voltage setting required –
low dielectric strength coatings
.
Conclusions
![Page 31: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/31.jpg)
Care when referencing a standard
The different standards produce different test voltages for
the same thickness
.
Conclusions
![Page 32: Craig Woolhouse - The Use of Pulsed DC Holiday Detectors for Field Testing Pipeline Coatings](https://reader034.fdocuments.in/reader034/viewer/2022052315/5470a802b4af9fae0a8b482b/html5/thumbnails/32.jpg)
THANK YOU
FOR YOUR ATTENTION
Any Questions?
.
THE USE OF PULSED DC HOLIDAY DETECTORS
FOR FIELD TESTING PIPELINE COATINGS