Cradle Coast Regional Planning Initiative
c/- PO Box 338
Burnie
Tasmanian 7320
The Executive Commissioner Tasmanian Planning Commission GPO Box 1691 Hobart TAS 7001 9th July 2014 Dear Sir Joint Report in accordance with section 30J land Use Planning and Approvals Act 1993 in relation to the Interim Planning Schemes of the Cradle Coast Region.
The Minister for Planning declared an interim planning scheme for each municipal district within the Cradle Coast Region to commence from 19th October 2013.
Each of the declared interim planning schemes was concurrently notified in accordance with section 30H Land Use Planning and Approvals Act 1993 from 19th October 1993 and a period of two months allowed for community consideration and written comment.
A total of 260 individual representations were received during the notification period.
I am pleased to advise the planning authorities of the Cradle Council Region have each determined to provide to the Tasmanian Planning Commission a report containing the views and opinions of the planning authority in relation to the merits and impacts of the representations made on the notified interim planning scheme for their municipal district.
The views and opinions of each planning authority are combined into a joint report in accordance with LUPAA s30J for planning schemes that were concurrently notified.
The decision of each Council has instructed that the Cradle Coast Regional Planning Initiative Steering Committee compile the s30J Joint Report, and provide it to the Tasmanian Planning Commission.
The s30J Joint Report will be provided in digital format under separate cover to the Tasmanian Planning Commission.
Provision of the s30J Joint Report is a significant milestone in the planning scheme reform program for the Cradle Coast Region.
The Report marks the conclusion of the independent actions required of the planning authorities within the Region under the Memorandum of Understanding.
The final task was to prepare and implement replacement planning schemes that are consistent to the mandatory format and structure provided in Planning Directive No1 and harmonised in relation to the purpose and content of local provisions on matters that do not have to be different between the planning schemes of adjacent municipal districts.
-
The actions and commitment by all of the planning authorities to attain this outcome in a constructive and cooperated manner remains a hallmark of the approach taken within the Region on planning reform.
The views and opinions expressed within the 30J Joint Report continue to evidence a high level of consistency and agreement between planning authorities of the Region.
The Joint Report provides constructive observation and advice to assist the Tasmanian Planning Commission in determining representations and in approving a final form of planning scheme that is strategically and operationally robust.
The Region is aware of the current considerations at State level for further reforms within the land use planning system, including for transition to a single state wide planning scheme.
However, the Region urges that the interim planning scheme process for the Cradle Coast Region not be terminated or unduly delayed in anticipation of a possible replacement model.
The Region and the State have both invested considerable financial, political, and technical capital in preparing and providing the interim planning schemes.
The Region has initiated a statutory process to invite the community to consider and comment on the declared interim planning schemes; and the statutory requirements in LUPAA allow that those who have made representations can anticipate that the subsequent processes will be now be finalised.
It is requested that the Tasmanian Planning Commission receive the Joint Report and advise its requirements for continuing the process for final determination as planning schemes in accordance with LUPAA s30N.
Yours faithfully
Charles Arnold Chair – Cradle Coast Regional Planning Initiative Steering Committee
-
Cradle Coast Region Interim Planning Schemes
Joint Report under s30J Land Use Planning and Approvals Act 1993 on Representations made in relation
to Common Provisions and Local Provisions in the –
Burnie Interim Planning Scheme 2013
Central Coast Interim Planning Scheme 2013
Circular Head Interim Planning Scheme 2013
Devonport Interim Planning Scheme 2013
Kentish Interim Planning Scheme 2013
King Island Interim Planning Scheme 2013
Latrobe Interim Planning Scheme 2013
Waratah Wynyard Interim Planning Scheme 2013
West Coast Interim Planning Scheme 2013
Prepared by –
Burnie City Council
Central Coast Council
Circular Head Council
Devonport City Council
Kentish Council
King Island Council
Latrobe Council
Waratah Wynyard Council
West Coast Council
June 2014
-
30J Joint Report on Representations in relation to the notified Interim Planning Schemes of the Cradle Coast Region – 30th June 2014 Page | 1
Cradle Coast Region Interim Planning Schemes
Joint Report under s30J Land Use Planning and Approvals Act 1993 on Representations made in relation
to Common Provisions and Local Provisions in the –
Burnie Interim Planning Scheme 2013
Central Coast Interim Planning Scheme 2013
Circular Head Interim Planning Scheme 2013
Devonport Interim Planning Scheme 2013
Kentish Interim Planning Scheme 2013
King Island Interim Planning Scheme 2013
Latrobe Interim Planning Scheme 2013
Waratah Wynyard Interim Planning Scheme 2013
West Coast Interim Planning Scheme 2013
Prepared by –
Burnie City Council
Central Coast Council
Circular Head Council
Devonport City Council
Kentish Council
King Island Council
Latrobe Council
Waratah Wynyard Council
West Coast Council
June 2014
-
30J Joint Report on Representations in relation to the notified Interim Planning Schemes of the Cradle Coast Region – 30th June 2014 Page | 2
Table of Contents
Page
Introduction 3
Table 1 – Principles for response on representations 9
Table 2 – Persons making Representations 15
Table 3 – Persons making representations (by municipal district and issues) 16
Representations and response in relation to interim planning schemes
Table 4 –Format and Operation 34
Table 5 - Purpose and Objectives 53
Table 6 - Administration 55
Table 7 - Exemptions 60
Table 8 - Permit Pathways 74
Table 9 Special Provisions 95
Table 10 - General Residential Zone 106
Table 11 - Inner Residential Zone 147
Table 12 - Low Density Residential Zone 148
Table 13 - Rural Living Zone 156
Table 14 - Environmental Living Zone 189
Table 15 - Urban Mixed Use Zone 200
Table 16 - Village Zone 203
Table 17 - Community Purpose Zone 206
Table 18 - Recreation Zone 214
Table 19 - Open Space Zone 217
Table 20 - Local Business Zone 225
Table 21 - General Business Zone 234
Table 22 - Central Business Zone 238
Table 23 – Commercial Zone 242
Table 24 – Light Industrial Zone 251
Table 25 – General industrial Zone 261
Table 26 – Rural Resource Zone 269
Table 27 – Significant Agricultural Zone 370
Table 28 - Utilities Zone 371
Table 29 – Environmental Management Zone 383
Table 30 – Major Tourism Zone 401
Table 31 – Port and Marine Zone 402
Table 32 – Particular Purpose Zone 406
Table 33 – Codes 407
Table 34 – Code E1 Bushfire-prone Areas 408
Table 35 – Code E2 Airport Management 417
Table 36 – Code E4 Change in Ground Level 430
Table 37 – Code E5 Local Heritage Code 434
Table 38 – Code E6 Hazard Management 446
Table 39 – Code E7 Signs 451
Table 40 – Code E8 Telecommunication Infrastructure 454
Table 41 – Code E9 Traffic Generating Use and Parking Code 456
Table 42 – Water and Waterways Code 464
Table 43 – Code E11 (Devonport IPS 2013) 471
Table 44 – Specific Area Plans 473
F4 Turners Beach SAP (central Coast IPS) 473
F3 Stony Rise SAP (Devonport IPS) 475
F1 Cradle Gateway SAP (Kentish IPS) 475
F2 Port Sorell SAP (Latrobe IPS) 475
Boat Harbour and Sisters Beach SAP (Waratah Wynyard IPS) 476
Table 45 - Appendices 478
Table 46 – Additional Matters 479
Proposed Electricity Transmission Infrastructure Protection Code 479
Appendix 1 – Council Motions to provide 30J Joint Report 483
Appendix 2 – Substantive Modifications suggested for the interim planning
scheme Ordinances.
487
-
30J Joint Report on Representations in relation to the notified Interim Planning Schemes of the Cradle Coast Region – 30th June 2014 Page | 3
Introduction
In October 2013 the Tasmanian Minister for Planning declared an Interim Planning
Scheme in accordance with s30F Land Use Planning and Approvals Act 1993 for each
of the nine municipal districts of the Cradle Coast Region of northwest Tasmania.
The Minister’s declaration effectively repealed all former planning schemes applying
for the municipal districts and replaced them with an Interim Planning Scheme.
Each Interim Planning Scheme became the operational and enforceable planning
instrument for the applicable municipal district.
A period for community consideration and comment concurrently commenced with
declaration of the schemes.
The purpose of this report is to identify each of the representations received, and to
set out a joint response by the planning authorities of the Cradle Coast Region on
each issue in each representation, including whether a change to the interim planning
scheme may be justified.
Interim planning schemes
A planning scheme is enforceable regulation prepared and approved under the Land
Use Planning and Approvals Act 1993 for the purpose of prescribing how land in a
municipal district is to be used, developed, protected and conserved.
Toward Consistency – A Guide to the Cradle Coast Interim Planning Schemes October
2013 provides explanation for the statutory requirements and for the strategy and
policy considerations underpinning provisions in the interim planning schemes.
An interim planning scheme is a particular form of planning scheme in accordance
with LUPAA s30E.
The primary purpose of an IPS is to translate a former planning scheme into a
common format and structure, and to align the purpose of regulatory provisions to a
regional land use strategy.
The objective for an IPS is to provide greater consistency and coordination between
the purpose and provisions of the planning schemes applying for adjacent municipal
districts within the Cradle Coast Region.
Each interim planning scheme is required to –
a) Be consistent with and likely to further the objectives and outcomes of the
Cradle Coast Regional Land Use Strategy 2010 - 2030 (CCR LUS)
The purpose and provisions of a planning scheme must be based on sound
strategic planning and must further the objectives and be coordinated with
the strategies and policies applying for land and resource management in
Tasmania.
Each interim planning scheme must be aligned to the regional strategic
perspective for land use planning.
It is not the function of an interim planning scheme to render significant
strategic change, including in the purpose for which land was assigned under
a zone in the former planning scheme.
The IPS for each of the CCR municipal districts generally retain the purpose
for which land was zoned under the applicable former planning scheme.
Change is only made if reasonably required for compliance to the CCR LUS.
The IPS process does not allow a wholesale review of local land use strategy
and a corresponding change in the purpose or nature of the manner in which
land may be utilised.
The IPS process does not allow opportunity for rationalisation and correction
of zone assignment and boundary location under the former planning
scheme.
b) Contain all of the common provisions for issues relating to the use,
development, protection or conservation of land, or for procedural matters
arising from operation of a planning process, as detailed by a Planning
Directive as necessary for consistency between all municipal areas.
Common mandatory provisions are requirements a planning scheme must
contain.
The common mandatory provisions for the interim planning scheme are –
(i) The format and structure of the planning scheme ordinance as
required by Planning Directive No 1.
The common mandatory provisions establish the sequence and
general expression of the provisions in an IPS, and including –
a. Part A – Clauses 1.0, 2.0 and 3.0 for citation and for
identifying purpose of the interim planning scheme;
b. Part B – clauses 4.0, 5.0, 6.0, 7.0 and 8.0 which provide for
definitions, exemptions, operation, and permit
requirements;
c. Part C – clause 9.0 which provide compliance requirements
for change of existing non-conforming use, boundary
adjustments, demolition, and subdivision; and
d. Part D – which the zone purpose statement for each of the
zones described in clauses 10 – 32 inclusive
(ii) The provisions in clause 10.4.3 for development standards for single
dwellings in the General Residential zone of the interim planning
scheme as notified in accordance with Planning Directive No 4; and
from 28th
February 2014, the provisions in 10.4.1 to 10.4.8 inclusive
relating to development standards for single and multiple dwellings
as required by Planning Directive No 4.1;
(iii) The provisions in Code E1 for Bushfire-prone Areas as required by
Planning Directive No 5;
(iv) The provisions in Table E9A to Code E9 – Traffic Generating Use and Parking Code relating to provision of parking for single dwelling and
multiple dwelling development in the General Residential zone as
required by Planning Directive No 4.1
(v) Optional common provisions as requirements a planning scheme is
to contain if the matters addressed by the provision are relevant to
the circumstances and conditions of the municipal district.
There are no optional common provisions applicable for the IPS of
the Cradle Coast Region.
c) Contain local provisions that are overriding local provisions.
Local provisions are requirements that are particular to an interim planning
scheme.
Overriding local provisions are requirements that prevail in the interim
planning scheme against a common mandatory provision if there is a conflict
with a common mandatory provision.
The overriding local provisions in each interim planning scheme are
identified by a Planning Purpose Notice; and are –
(i) with respect to any provision in Code E1 – Bushfire-prone Areas
a. Code E3.0 – Clearing and Conversion of Vegetation;
b. Code E5.0 – Local Heritage; and
c. Code E10.0 Water and Waterways ; and
(ii) with respect to any provision in Clause 10.0 General Residential
zone
a. Clause 10.4.12 Setback of sensitive use development
b. Code E3.0 – Clearing and Conversion of Vegetation;
c. Code E4.0 – Change in Ground Level;
d. Code E5.0 – Local Heritage;
e. Code E6.0 – Hazard Management;
f. Code E10.0 Water and Waterways; and
d) Contain provisions that are conflicting local provisions
A conflicting local provision is a requirement that is not inconsistent with an
overriding local provision unless specified in a Planning Purpose Notice.
There are no conflicting local provisions in any interim planning scheme of
the Cradle Coast Region.
e) Contain local provisions that are not inconsistent with common provisions
and overriding local provisions.
Local provisions form the larger part of the provisions in the interim planning
schemes.
Local provisions may be in two forms –
(i) Ordinance provisions
-
30J Joint Report on Representations in relation to the notified Interim Planning Schemes of the Cradle Coast Region – 30th June 2014 Page | 4
Ordinance provisions are the written instructions for how the
interim planning scheme is to operate; and for the matters for
assessment and decision if the interim planning scheme applies for
a use or development
The local provisions in the IPS of the Cradle Coast Region may be
categorised as –
a. Regional provision
A Cradle Coast Region local provision template has ensured
the form, expression, purpose, and requirements in local
provisions are the same between all of the declared IPS
unless there is a very compelling reason to be different.
Local provisions derived from the Cradle Coast template
planning scheme are identified as common regional
provisions (RP) for the purpose of this Report.
The majority of local provisions in each interim planning
scheme are common with those in each of the other
planning schemes.
b. Local provisions
Several interim planning schemes contain local provisions
that are unique to that planning scheme.
Such provisions are found as Codes (DIPS 2013) and as
Specific Area Plans in the CCIPS 2013, DIPS 2013, and LIPS
2013
Representations relating to provisions that are unique to
an individual interim planning scheme are identified as
local provision (LP) matters for the purpose of this report.
(ii) Planning Scheme maps
Planning scheme maps indicate the land area to which provisions
apply.
There are two main categories of maps –
a. Zone maps
The statutory process for preparation of interim planning
schemes required conversion from the zone applying
under the former planning scheme into the zone with the
most corresponding purpose within the range of zones
provided in the template in Planning Directive No1.
IPS zone maps must match in purpose the zone maps
included with the former planning scheme. There is very
limited opportunity within an IPS to change the purpose
for which land may be used.
b. Particular provision maps
These maps depict factors called in to account by a
particular provision, such as in Code E3.0 for areas of
landscape or scenic value, and by Code E6 for areas of
landslide risk.
Particular purpose maps are introduced into IPS as a
requirement of the CCR LUS to more adequately address
natural hazards.
Notification of Interim Planning Schemes
A statutory opportunity in accordance with LUPAA s30H commenced on 19th
October
2013 for the community to consider and make comment on any aspect of the interim
planning schemes.
The notification commenced on the same date on which each of the IPS became an
operational planning scheme in accordance with the Ministerial declaration under
LUPAA s30F.
The process for notification, including publication notices, was combined in
accordance with LUPAA s30H (7) into a single process because each of the nine
interim planning scheme was declared and notified on the same day.
Written representations on in relation to all or any of the interim planning schemes
were to be received by 20th
December 2013.
A representation is a written statement of facts or reasons in support of or in
opposition to the interim planning scheme.
The particular requirements of LUPAA s30I allow that a representation is to be in
relation to the statutory function and content of an IPS. These are the matters of
common and local provisions, and changes required for consistency to the CCR LUS.
Representations should not extend to matters that more generally discuss the
purpose and practice of the Tasmanian land use planning system; or the adequacy or
otherwise, and the need for change, in the strategic intent and operational provisions
of a former planning scheme, including in the purpose for which land is zoned.
Representations received
The statutory notification period attracted a total of 260 individual representations.
Some representations made the same submissions separately to each planning
authority, and have been identified as individual submissions. The net effect is that in
the total of 260, some 79 contain replica matters.
Each representation has been assigned a unique reference number1.
Table 2 identifies each of the persons making a representation.
Many representations deal with two or more separate matters.
There are 797 separate issues raised within the representations.
Each issue has been assigned a unique reference number.
The majority of representations may be classified as an objection in that there is an
expressed dissatisfaction with the purpose or outcome intended, or a desire that the
IPS be modified.
1 Some references are numeric and some are alpha-numeric. The difference reflects the
sequence of registration and does not imply any distinction in the status or treatment of a
representation
Several the representations may be described as raising matters that are concerned
with the content or outcome of an IPS as a replacement planning scheme; but which
cannot accurately be said to be matters in relation to an IPS as intended by LUPAA
s30I.
The distribution of representations by municipal district is –
Municipal District Representations Received
Burnie City 33
Central Coast 52
Circular Head 37
Devonport City 34
Kentish 31
King Island 13
Latrobe 14
Waratah Wynyard 27
West Coast 17
Total 260
Process for Consideration of Representations
The matters raised in each representation must be considered and taken into account
before a decision to finalise an interim planning scheme is made.
The consideration of representations is made initially by the planning authorities of
the Cradle Coast Region who are to provide the Tasmanian Planning Commission with
advice on the merits of each matter and the impact of that matter on operation of
the IPS; and whether it is appropriate to consider modifying the interim planning
scheme.
The TPC is subsequently required to review the advice from the planning authorities
and to consider each representation before making a decision on whether to
approve, modify or reject the IPS as a final planning scheme.
Views and opinion of planning authorities
LUPAA 30I requires that a planning authority to which a representation has been
made in relation to a provision that is common to all other interim planning schemes
must provide a copy of that representation to each of the other planning authorities
which notified an interim planning scheme on the same day.
LUPAA s 30J requires a planning authority that has notified an interim planning
scheme must provide a report to the Tasmanian Planning Commission within four
months from the date on which the notification period concluded.
The report on each Cradle Coast interim planning scheme is to be provided to the
Commission by 20Th
April 2014 unless a further period is agreed.
The Tasmanian Planning Commission has agreed a further period for provision of the
Report until 30th
June 2014.
LUPAA 30J(9) allows that if two or more interim planning schemes for a region are
declared and publicly notified on the same date, the planning authorities must
-
30J Joint Report on Representations in relation to the notified Interim Planning Schemes of the Cradle Coast Region – 30th June 2014 Page | 5
provide one Joint Report on common provisions and operation of the IPS instead of
each providing a separate report.
A Joint Report must include the views of all of the planning authorities, whether they
are in agreement or not.
The planning authorities of the Cradle Cost Region are to provide a Joint Report.
The Joint Report is to provide –
a) a copy of each representation received by each planning authority, and if no
representations are received, a statement to that effect;
b) a statement indicating the applicable planning authority’s views as to the
merits of each matter contained in each representation made in relation to a
local provision of each interim planning scheme as to –
(i) the need for modification of the interim planning scheme in the
light of that representation; and
(ii) the impact of that representation on the interim planning scheme
as a whole
Each IPS of the CCR contains provisions that are common for all of the IPS.
Such provisions are local provisions in the sense that they are not common
provisions in terms of LUPAA s30B.
The major proportion of each IPS is comprised of the provisions that are
common for the Region. These provisions have been identified for the
purpose of the Joint Report as regional provisions.
It is appropriate the Joint Report provide the views of all the planning
authorities on local provisions that are regional provisions. The approach
allows that such provisions are assessed from a regional perspective, and
that any modification can be considered from the perspective of retaining
regional consistency. That is, if a change is made to a local provision that is a
regional provision in one IPS, the same change is made for all of the other
IPS.
This document is the joint Report and contains the collective views of the
planning authorities of the Cradle Coast Region on the local provisions that
are regional provisions and incorporated into each IPS; and on those aspects
of local provisions that have implication beyond the boundaries of the
applicable municipal district.
Primary content of the Joint Report in respect of local provisions that are
particular to a single municipal district, including for the zoning assigned to
land or for controls on use or development contained in a Specific Area Plan,
is provided by the applicable planning authority for that municipal district.
It is relevant to also include a regional perspective on some local issues to
ensure consistency between IPS on matters of principle and process.
c) a joint statement by all of the planning authorities indicating theirs views as
to the merits of each matter contained in each representation made in
relation to a provision that is a common provision for all interim planning
schemes as to –
(i) the impact of that representation on operation of the interim
planning scheme as a whole if –
a. the relevant planning directive creating a common
mandatory provision or a common optional provision were
to be modified in accordance with the outcome intended
by the representation; or
b. the common provision is an optional provision, and in
accordance with the representation, the provision were to
be –
i. taken out of the interim planning scheme; or
ii. taken out of the interim planning scheme and
replaced by another optional provision
This document is the Joint Report and contains the collective views of the
planning authorities of the Cradle Coast Region on the common provisions
d) a statement of the planning authority’s views and recommendations in
respect of the operation of the interim planning scheme.
This document is the joint Report and contains the collective views and
recommendations of the planning authorities of the Cradle Coast Region in
relation to the impact of representations and modifications on operation of
the IPS.
It is not necessary to identify a single common response on each matter – the Joint
Report may indicate there are two or more options for how to deal with a matter.
It is not necessary the Joint Report provide a single, unanimous or majority view or
opinion on each matter – the Report may indicate more than one option or opinion
on how to address a matter in a representation.
A planning authority is not excluded from holding an independent view. However,
dissenting or alternate views must be expressed in the Report
Cradle Coast Region Section 30J Joint Report
It is the purpose of this document to be the LUPAA s30J Joint Report by the planning
authorities of the Cradle Coast Region on the representations received during the
concurrent notification period for each of the Burnie, Central Coast, Circular Head,
Devonport, Kentish, King Island, Latrobe, Waratah Wynyard, and West Coast interim
planning scheme.
Table 1 categorises the matters in representations and provides an indication for how
the Joint Report views and provides advice in relation to issues in each a category.
The categorises described may be aggregated in terms of three basic process
outcomes –
a) Representations in relation to –
i. planning scheme reform outcomes; and
ii. procedural fairness
(Category 1 and 2)
These matters are not specific to the purpose or content of an IPS; and can
be determined without need for a hearing.
b) Matters in relation to –
i. an error in drafting of the planning scheme ordinance;
ii. an error in translation of a zone from a former planning scheme;
and
iii. opportunity for improvement in the construction or expression of
provisions in the planning scheme ordinance to clarify or improve
operation and compliance without significant change to intended
outcome
(Category 3, 4, and 5)
There is no apparent benefit in conducting a hearing or in delaying
consequential correction or modification of the IPS if these matters are
agreed between the planning authorities and the party making a
representation.
These modifications could be made as consequential amendments under
LUPAA s30IA.
c) Matters requiring modification of the IPS to –
i. change the purpose or outcome of an objective or compliance test in
the planning scheme ordinance;
ii. introduce or delete a provision in the planning scheme ordinance;
iii. adjust the purpose for which land is assigned by zone to reflect a
strategic objective, existing use, or land capability; or
iv. convert the purpose for which land is assigned by zone to provide an
alternate opportunity for use
(Category 6, 7, 8 and 9)
These matters address the substance of IPS provisions and intend significant
change to purpose or operation.
Representations require independent review to ensure consistency to
statutory purpose.
A hearing could be dispensed with if there is agreement between the
planning authority and the party making the representation that the IPS
should be modified.
The TPC may desire to seek future information or to question the parties.
A hearing may be necessary if there is difference between the planning
authorities in relation to regional consistency or disagreement with the party
making a representation.
The TPC should have discretion to dispense with a hearing and determine a
representation if it –
i. is not in relation to an IPS; or
ii. does not contain sufficient information to establish a prima facie
case for consideration in terms of the applicable LUPAA
-
30J Joint Report on Representations in relation to the notified Interim Planning Schemes of the Cradle Coast Region – 30th June 2014 Page | 6
prescriptions for change or departure from the purpose or
provisions of a planning scheme
Table 2 identifies each person making a representation by municipal district; and
describes for each representation the quantum of issues raised in relation to
common, common regional and local provisions.
Table 3 of this Report sets out the nature of each matter in each representation, and
provides a corresponding response in relation to merits of the matter, whether it is
considered there is a need to modify in accordance with the outcome intended by the
representation, and the likely impact of such change on operation of the IPS as a
whole.
The 30J Report does not represent a decision by the planning authorities to finalise
how each matter is to be determined.
The Report is advice to the Tasmanian Planning Commission, and the Commission is
required to take the advice into consideration when determining how to resolve each
representation.
The TPC may not agree with a position in response to a representation as articulated
in the Joint Report.
Hearing
After receiving a Joint Report, the Commission –
a) Is to hold a hearing in relation to each of the representations provided in the
Joint Report.
The Commission is to appoint an independent Panel to conduct hearings.
Hearings are open to the public.
The Panel may determine whether a representation is in relation to an
interim planning scheme or whether it is concerned with a matter that deals
with other aspects of the land use planning system or could be more
correctly dealt with through a process other than as required for reviewing
and finalising an IPS.
It follows that not all persons making a representation will be invited to
appear at a hearing.
Each party making a representation in relation to an interim planning
scheme is to be invited to attend and speak to the matters identified, and
may be questioned by the Panel and by other parties, including a planning
authority, in order to clarify the matters in the representation.
The Panel may seek further information, including from the person making
the representation or from the planning authority, to assist its
understanding and to inform its decision; and may call witnesses if required.
However, the hearing process should not allow a person opportunity to
expand the scope of an issue or to substantially embellish the standard of
material provided in a representation so as to provide further and better
particulars in support of the outcome advocated.
b) If there are several representations on the same issue, the Commission may
consolidate such representations, and hold a hearing in relation to
consolidated representations; and
c) May hold hearings in relation to other matters that it thinks fit
However, LUPAA does not anticipate a hearing to be a forum in which to advance an
alternate philosophy for purpose of the land use planning system, or to make
commentary and suggestion on the adequacy or fairness of any prescribed process.
A hearing is particular to an interim planning scheme, and to the matters that are
relevant to the function, construction, purpose, and content of each IPS.
A hearing should not entertain submissions nor engage in deliberation on any matter
that is extraneous to the statutory purpose of an IPS.
Determination of an interim planning scheme
The hearing and review process conducted by the Commission is intended to provide
a foundation on which to make a decision on whether the interim planning scheme
can be approved; or for whether the interim planning scheme, in whole or party,
should be redone.
After receiving a Joint Report under s30J, and having completed any hearings, the
Commission is to consider the following matters in relation to the IPS –
a) the interim planning scheme itself;
b) any document in relation to the interim planning scheme provided to the
Commission in the Joint Report;
c) matters raised at hearings in relation to the interim planning scheme;
d) the Cradle Coast Regional Land Use Strategy; and
e) any applicable State Policy
As a result of such a consideration the Commission is to –
In relation to common provisions
Prepare a report to the Minister for Planning in relation to common provisions of the
interim planning scheme to include –
a) a copy of each interim planning scheme;
b) a copy of the Joint Report;
c) having regard to the Joint Report, provided to it by the planning authorities,
a statement by the Commission in relation to each common provision to
specify whether the Commission is of the opinion that –
(i) a planning directive containing the provision ought be modified to
take account of the representation made in respect of the
provision; and
(ii) the interim planning schemes ought be modified accordingly
On receipt of the Commission’s report the Minister may direct the Commission to
prepare a draft planning directive to modify a planning directive containing a
common provision for which a change is require.
The Cradle Coast Region expects that the TPC will independently consider and report
on representations and LUPAA s30J advice on common provisions regardless of any
submission or decision that may have been made in relation to the same common
provision under a LUPAA 30K process applying for an IPS in a municipal district
outside the Region.
In relation to local provisions
At the completion of its hearings and after considering all applicable matters, the
Commission may in relation to a local provision (including for how land is assigned to
a zone) –
a) direct the planning authority for a specific interim planning scheme to
prepare a modification –
(i) to correct an error in a local provision of that interim planning
scheme;
(ii) in relation to a local provision; or
(iii) in relation to a common provision if -
a. to modify a common provision in that interim planning
scheme to comply with a planning directive;
b. to modify a common provision for the purpose of consistency
to an urgent amendment made to that interim planning
scheme in accordance with LUPAA s 30IA(3);
c. to take an optional common provision out of that interim
planning scheme; or
d. to take an optional common provision out of that interim
planning scheme and replace it with another optional
common provision; or
b) prepare such a modification itself
The planning authority must prepare and submit the required modifications to the
Commission within the timeframe specified in the direction. If the Commission
instructs an interim planning scheme must be modified, the Commission may also
instruct that the modified interim planning scheme must be notified again.
If the Commission instructs a modified interim planning scheme must be notified, all
of the requirements of LUPAA with respect to the process and period for notification,
the responsibilities on a planning authority to prepare a report to the Commission,
and for the Commission to conduct a hearing and either report to the Minister or
again require modification, must be fully observed.
The Cradle Coast Region expects that any decision to require a modification to a local
provision that is a regional provision must apply for each of the IPS. The approach is
critical for ensuring consistency is retained between the provisions of each IPS.
Finalising the Cradle Coast planning schemes
If the Commission is satisfied that an interim planning scheme, including any
modification required to an interim planning scheme, is in order having regard to all
statutory requirements, it must obtain the approval of the Minister to make the
interim planning scheme into a planning scheme if such planning scheme –
a) complies with LUPAA s20 in terms of its purpose and provisions;
-
30J Joint Report on Representations in relation to the notified Interim Planning Schemes of the Cradle Coast Region – 30th June 2014 Page | 7
b) complies with LUPAA s21 in terms of consistency and co-ordination to the
planning schemes applying for adjacent municipal areas and with regard to
the use and development of the Cradle Coast Region as a whole in social,
economic and environmental terms
c) complies with LUPAA s30E in that –
(i) it contains common mandatory provisions;
(ii) it contains applicable common optional provisions;
(iii) it contains local provisions that are not directly or indirectly
inconsistent with common provisions or an over-riding local
provision or a conflicting local provision; and
(iv) it is consistent with and likely to further the objectives and
outcomes of the Cradle Coast Regional Land Use Strategy
The Commission’s decision to make a planning scheme must be published in the
Government Gazette.
The decision to make a planning scheme revokes the interim planning scheme, and
the final scheme becomes the enforceable planning scheme for the municipal district
from the date notified in the Government Gazette.
The Commission is required to take all reasonable steps to ensure that all of the final
planning schemes for the Cradle Coast Region are to come into operation on the
same day.
Joint Report on Views and Opinions on Representations
This Joint Report sets out the views and options of the planning authorities of the
Cradle Coast Region in response to each of the matters raised in each representation.
The Joint Report addresses the matters required in the Report to be provided to the
Commission in accordance with LUPAA s30J.
The interim planning schemes to which this report refers are –
Burnie Interim Planning Scheme 2013
Central Coast Interim Planning Scheme 2013
Circular Head Interim Planning Scheme 2013
Devonport Interim Planning Scheme 2013
Kentish Interim Planning Scheme 2013
King Island Interim Planning Scheme 2013
Latrobe Interim Planning Scheme 2013
Waratah Wynyard Interim Planning Scheme 2013
West Coast Interim Planning Scheme 2013
It is assumed that the version of each interim planning scheme to which
representations relate is as contained in the Content Management System module of
Planning Schemes Online as administered by the Tasmanian Planning Commission at
the date on which each interim planning scheme was declared and notified.
The planning scheme maps referenced in the Joint Report are those as declared and
notified, and were then held in hard copy or as PDF files on the respective planning
authority website.
Hard copies of each IPS, including maps, are not included with the Joint Report.
It is noted that each interim planning scheme has been subsequently modified to
correct or introduce additional common mandatory provisions, specifically in relation
to –
a) clause 8.1 on information requirements from January 2014;
b) Clause 9.1.1 and 9.2; and
c) the standards on single and multiple dwelling development on land in the
General Residential zone as directed by PD 4.1 from 28th
February 2014
Representations were not made on the modified mandatory provisions. However,
the Joint Report makes observation on the modified common mandatory provision in
association with a response on a representation in relation to the form of provision at
the date of notification.
It is noted the planning scheme maps for each of the IPS are now held on the
Tasmanian Land Information System and linked to the IPS ordinance through the
Content Management System.
The format of the Report is -
Volume 1
a) An introductory statement
b) A schedule indicating by municipal district the persons making
representation and the nature of the provisions addressed in the
representation.
c) Tables 4 – 46 inclusive to identify the matters in representations and the
planning authorities’ response for each issue.
(i) Each Tableaddresses a particular set of provisions within the interim
planning scheme ordinance.
The Tables are set out in the sequence of the provisions within the
interim planning scheme in accordance with the format and structure
required by Planning Directive No 1.
The approach requires that each of the matters in all of the
representations that relate to a particular provision are identified and
discussed within the same part of the Joint Report.
Each matter is addressed in context of its position within the interim
planning scheme so as to present the full scope of issues and allow
consistency in the content of the advice provided to the TPC.
The approach is consistent with the coordinated approach to local
provisions and the objective for the best possible level of consistency
between planning schemes.
The format of the Joint Report means that the entirety of the matters
in each representation on an interim planning scheme is not treated
individually.
The approach may be criticised in that it creates an apparently
disjointed arrangement in the response provided for each
representation; and does not allow a person to readily establish what
has been said by the planning authorities on each matter in a
representation or on the representation as a whole.
However, the Joint Report format is in accordance with the
instruction in LUPAA s30K for consolidation of representations. LUPAA
s30K instructs that the TPC may disaggregate individual
representations into component matters, and consolidate all like
representations into a combined hearing and review process.
The Joint Report anticipates such an approach and consolidates
representations in accordance with the relative provisions of the IPS.
a. Each issue is allocated an Issue Reference Number (1st column).
Issue Reference Numbers do not relate to the reference number
allocated to the entirety of a representation.
The Representation Reference Number is included in the 4th
column
identifying for each matter the Person making the Representation to
enable cross-reference to the original statement.
(ii) The 2nd
column indicates the matter addressed in the representation
by reference to the applicable citation for the provision of the interim
planning scheme or to the land assigned to a zone.
(iii) The 3rd
column identifies whether the issue relates to a common
provision, a regional provision or a local provision.
Local provisions relating to the zone to which land is assigned are
included at the conclusion of issues for each zone provision under the
heading of Land Assigned to Zone in Column 2.
A colour code is included for ready reference –
The distribution of matters raised in representation is –
Nature of Provision
Common Mandatory Provisions
13%
Regional provisions
58%
Provisions
28%
Other Matters 1%
-
30J Joint Report on Representations in relation to the notified Interim Planning Schemes of the Cradle Coast Region – 30th June 2014 Page | 8
(iv) Column 4 identifies the person making the representation by reference
to the Representation Reference Number and the name and contact
details for the person.
(v) A copy or summary of that part of the representation addressing each
individual interim planning scheme provision is provided in the 5th
Column.
Copy in full of the representation text is included if the statement is
relatively succinct.
Summaries are intended to provide an overview, and may include
direct quotes from part of the representation document.
The original statement should be read in full in order to better grasp
context and expression of the representation.
(vi) The planning authorities’ response on each issue is provided in Column 6.
The response contains a view and opinion on the merits of each issue and
on operation of the interim planning scheme; whether modification is
required; and the impact of the representation or modification on
operation of the interim planning scheme as a whole.
The response is the joint view and opinion of all of the planning authorities
unless otherwise identified.
If one or more planning authority hold an alternate or dissenting view on
the merits or consequence of an issue in a representation, such planning
authority is identified and the view is stated.
If several representations address the same matter, the table is set out to
provide a single statement of response.
Appendix 1 contains the resolutions made by each planning authority to provide its views
and opinions in relation to representations received on the municipal interim planning
scheme; and to include such views and opinions in the Joint Report.
Appendix 2 contains a summary of the substantive modifications proposed by the Joint
Report to the common mandatory provisions and the regionally consistent local provisions
as contained in the interim planning schemes
Volume 2
Contains a full copy of each representation received.
The document is arrangement by representations received for each municipal district; and
each representation is assigned its own reference number.
-
30J Joint Report on Representations in relation to the notified Interim Planning Schemes of the Cradle Coast Region – 30th June 2014 Page | 9
Table 1 – Principles for response on matters raised in Representation
Category
Matters raised
Principle to guide response
1.
Planning scheme reform outcomes
(5 x representations)
Adequacy of the IPS process to deliver on reform objectives for the Tasmanian
planning system
Express concern for whether the IPS simplify and improve the level of certainty in
planning regulation; and for capacity to remove constraint on development and
investment
The IPS of the Cradle Coast Region have each been prepared in accordance with the mandatory common provisions on format and structure, and include the
common provisions for residential development and bushfire prone areas.
The IPS process cannot be responsible for resolving a failing in the expectation of a person that may be based on interpretation of information that did not come
from the regional planning project. Nor does the IPS process invite opportunity for evaluating opinions on how the planning system could be better structured
and operated.
These are not matters in relation to an interim planning scheme.
It is not appropriate that the Joint Report deliberate and provide advice on matters of general policy for how the planning system should operate; or provide a
view on whether the IPS should be modified.
For clarity, the Joint Report provides an explanation for why the issue is not a matter in relation to an IPS.
2.
Procedural Fairness
(9 x representations)
Question adequacy of the process for notification, including prior consultation,
personalised invitations to comment, and denial of natural justice
Notification on the IPS was conducted in accordance with the statutory process prescribed in LUPAA.
Whether or not the notification process was compliant with statutory requirements is a matter of fact ascertainable by examining the actions and documents of
the planning authorities.
For clarity, the Joint Report provides an explanation for why the issue is not a matter in relation to an IPS.
It is not appropriate that the Joint Report deliberate and provide advice on matters regarding the adequacy of the process prescribed by legislation.
A person with a grievance on process may initiate a judicial review through avenues outside the TPC hearing.
3.
Drafting errors in the planning scheme
ordinance
(141 x representations)
Identify errors in the planning scheme ordinance in relation to spelling, punctuation,
formatting, numbering, and omissions.
This category of representation addresses common mandatory provisions, regionally
common provisions and local provisions.
There are matters in relation to drafting errors that do not go to substance of an IPS.
These matters can be treated as consequential amendments arising from a proof reading of the instrument, and do not impact on intent or meaning of provisions.
The Joint Report indicates whether it is agreed a matter is an error or omission in drafting, and includes advice on the nature of any correction required.
The TPC may direct in accordance with LUPAA s30M that modifications be made to correct errors in an IPS.
LUPAA 301A and 37(1) both allow the TPC may dispense with notification of a change to a planning scheme if required to correct an error, remove an anomaly,
clarify or simplify operation, remove any inconsistency against other regulation, make procedural changes, achieve consistency to common mandatory provisions,
or for any other prescribed reason – subject only to a requirement that public interest will not be prejudiced.
The principle to dispense with notification implies it is also not necessary to conduct a hearing.
The principle should apply in relation to representations received on an IPS that identify errors in need of correction.
There is no likelihood of compromising a public interest if spelling, punctuation and citation errors are corrected.
There is little to be gained from hearing a party on such matters. Either the error exists or it does not.
It can be said these are matters agreed between the parties. A decision panel in other jurisdictions is generally not required to hear further submissions on
agreed facts.
The TPC should be able to determine a representation relating to an error or omission in drafting without resort to a hearing.
-
30J Joint Report on Representations in relation to the notified Interim Planning Schemes of the Cradle Coast Region – 30th June 2014 Page | 10
4.
Errors in relation to the translation from
the former planning scheme
(88 x representations)
Express concern for the correctness of translation from a zone under the former
planning scheme into the most corresponding zone provided in the PD1 template.
These matters are really questions of fact for whether there is an error in translating the purpose of a zone under a former planning scheme into the zone with the
most corresponding purpose as provided in the PD1 template.
The Joint Report provides advice on whether –
i. the zone assigned under the former planning scheme has been correctly translated into the zone with the most corresponding purpose as provided under
the PD1 template; or
ii. a change in the purpose of the zone assigned to the land is reasonably required by a State Policy, mandatory directive, or for consistency to the CCR LUS
Modification of an IPS to correct an error in the zone to which land is assigned may be dealt with in the same manner as suggested with respect to correction or
errors and omissions of drafting.
The Joint Report indicates whether an issue in a representation is agreed as a matter requiring modification to correct a mistake in translation of zone purpose or
to deliver greater consistency to the objectives for the CCR LUS.
It can be said these are matters on which there is agreement between the parties. A decision panel in other jurisdictions is generally not required to hear further
submissions on agreed facts.
LUPAA s30IA and 37(1) both allow the TPC may dispense with notification of changes to a planning scheme if required to remove an anomaly or clarify or simplify
operation – subject only to a requirement that public interest will not be prejudiced.
The principle to dispense with notification implies it is also not necessary to conduct a hearing.
The principle should apply in relation to representations received on an IPS that identify opportunity or provide suggestion to improve the construction and
expression of an IPS provision.
There is little to be gained from hearing a party on such matters if the Joint Report supports modification.
5.
Construction of provisions in the planning
scheme ordinance
(208 x representations)
Suggestion for improvement in construction or expression of individual provisions to
improve clarity or certainty in operation and compliance without modification to the
purpose or outcome.
This category of representation addresses common mandatory provisions, regionally
common provisions and local provisions.
These matters are in relation to format and expression or the control content of a provision.
Such matters address opportunity to improve clarity and certainty for operation and compliance, and are not concerned with changing the purpose of a provision.
The Joint Report indicates the majority can be agreed as consequential modifications in the nature of LUPAA s37(1) for which there is no express or unintended
change in purpose, meaning or outcome for each provision.
These matters can be treated as consequential amendments.
There is no likelihood of compromising a public interest if changes are made to expression or construction to improve clarity of individual provisions.
There is little to be gained from hearing a party on such matters if the Joint Report agrees with the representation.
It can be said these are matters agreed between the parties if the Joint Report agrees with the need for change. A decision panel in other jurisdictions is generally
not required to hear further submissions on agreed facts.
The Joint Report indicates whether an issue in a representation is agreed as a matter requiring modification to improve clarity in expression or construction of
individual provisions.
The Joint Report provides explanation for why some suggested changes are not agreed.
LUPAA 301A and 37(1) both allow the TPC may dispense with notification of a change to a planning scheme if required to correct an error, remove an anomaly,
clarify or simplify operation, remove any inconsistency against other regulation, make procedural changes, achieve consistency to common mandatory provisions,
or for any other prescribed reason – subject only to a requirement that public interest will not be prejudiced.
The principle to dispense with notification implies it is also not necessary to conduct a hearing.
The principle should apply in relation to representations received on an IPS that identify improvement in expression or of individual provisions.
There is little to be gained from hearing a party on such matters if the Joint Report supports modification.
The TPC should be able to determine whether a representation offers constructive suggestion or identifies valid reason to make changes that will remove an
anomaly or clarify or simplify operation of an IPS without need for a hearing.
-
30J Joint Report on Representations in relation to the notified Interim Planning Schemes of the Cradle Coast Region – 30th June 2014 Page | 11
6.
Protect or preserve the benefit of
provisions contained in a former planning
scheme ordinance
(14 x representations)
Seek to retain benefit of an unrealised opportunity provided under a former planning
scheme, including for the types of permitted use, applicable standards, and the
quantum in compliance tests.
This category of representation addresses common mandatory provisions, regionally
common provisions and local provisions.
This is a separate category of representation seeking to retain elements of a former planning scheme in a manner with potential to impact on consistency
between planning schemes in terms of how like maters are regulated.
A loss in the individualism of provisions for like use or development as contained in former planning schemes is an unavoidable consequence in harmonising
provisions in order to deliver consistency in the purpose and content of provisions for planning schemes applying between adjacent municipal districts.
The Cradle Coast interim planning scheme process acknowledged it is inevitable that the finer grain of criteria for permitted activity, and for use and development
standards, will change as provisions are harmonised. The outcome may be an increase or reduction in the level of intervention experienced and in the
requirements for compliance relative to the provisions of a former planning scheme.
The Joint Report indicates as a matter of principle that any shift in the nature of an opportunity or compliance test available under a former planning scheme and
the opportunity or compliance test applying under the IPS for the corresponding zone or Code should be accepted if the general intent and outcome remain
consistent.
There is no imperative within the statutory intent for an IPS to protect the exact form of an opportunity that may have been available under a former planning
scheme provided there is a comparable translation in purpose and outcome.
The Joint Report suggests the provisions in an IPS should only be modified to protect or preserve provisions applying under a former planning scheme after having
regard for whether –
i. the common provisions or the regional provisions include opportunity to insert locality specific criteria that are different to the default acceptable solution
for the applicable standard; or
ii. the IPS standard effectively sterilises or unreasonably restrains opportunity to achieve complying use or development of a kind or form previously
available; and
iii. there is no alternate permit pathway provided in the IPS
If modification is required, preference is that the change be effected by modification of the generic provision rather than by a provision that seeks to exclude
operation of the standard and revert to the provision that pre-dates implementation of the IPS.
These matters require exercise of judgement for whether –
a) the IPS effectively sterilises or unreasonably restrains opportunity to achieve complying use or development of a like kind or form regardless of the permit
pathway or criteria in applicable compliance test;
b) the desirable to retain standards that applied under a former planning scheme in order only to avoid what may be perceived as a less certain or more
onerous permit pathway under the IPS which could realise the opportunity provided by the former planning scheme but unsecured through a permit
process prior to declaration of the IPS;
c) it is fair and reasonable to create inequity between use or development on the basis of standards that differ only because of the temporal origin for the
legal identity of a site;
d) it is necessary for effective operation of an IPS to create an inconsistency between planning schemes in relation to standards on the same planning matter
for reason only that the former planning instrument was different if there was and remains no need to be different;
e) it is necessary for effective operation of an IPS to evidence a lack of commitment and consistency to the common standard prescribed in the CCR model IPS;
and
f) it is necessary for effective operation of an IPS to include provisions that by-pass an opportunity to demonstrate compliance to the objective through a
permit pathway relying on performance criteria
The Joint Report indicates for each matter whether protection of a former opportunity may be achieved where appropriate without inclusion of “saving
provisions”.
The Joint Report does not provide a consensus position on whether exception provisions should be introduced to retain former standards for particular use or
development sites or localities.
-
30J Joint Report on Representations in relation to the notified Interim Planning Schemes of the Cradle Coast Region – 30th June 2014 Page | 12
7.
Change to the purpose for which land is
zoned under the IPS
(71 x representations)
Seek to change the purpose for which land may be used by converting the zone
assigned by translation from a former planning scheme zone into an IPS zone that
does not have a corresponding strategic purpose.
Representations typically reflect a desire to enhance opportunity for use or
development.
Representations in relation to zoning may express dissatisfaction that the zone has
not been changed to establish an alternate land use purpose.
In some instances a representation indicates the former and current IPS zone does
not correlate to the established purpose for which the land is utilised.
Representations relating to how land is assigned to a zone are described as local
provision (LP) matters for the purpose of this Report.
These representations seek to change local provisions in an IPS in relation to the zone to which land is assigned.
The majority of representations refer to individual sites or discrete small localities.
These matters are comparable in intended outcome to a scheme amendment or dispensation to change the zoning of land.
The majority may be described as speculative or opportunistic in order to include individual sites as an increment on an adjacent zone; or changes that may
involve a significant land area or facilitate a major departure from the purpose for which land is currently assigned.
There are no representations comparable to LUPAA 40A matters which evidence a commitment to subsequently proceed with a particular kind of use or form of
development in the event a change is made.
There are a small few which describe a speculative use or development outcome if the impediment perceived in the applicable IPS for a specific site were to be
removed.
While representations for a change in zone may be described as being in relation to a local provision, there is a regional interest with regard to consistency in how
land is assigned to a zone from both a strategic and operational perspective.
a) It is debatable whether such representations should be entertained given the statutory purpose for an IPS process to translate and not convert.
An IPS is not a general reform or review instrument.
LUPAA 30I requires a representation must be in relation to an interim planning scheme. A representation may be invalid if it pursues an outcome that is
beyond competence of an IPS.
There is strong desire among government, industry and the community for the planning system to only activate the processes that are necessary to further
a statutory outcome. There is no purpose in continuing and exhausting all stages in a land use planning process if it is clear a submission will fail.
The Joint Report provides advice on whether a representation that seeks to modify the purpose or outcome of an IPS provision, including for the zoning of
land, is valid against the statutory function for an IPS.
Such change could follow a dispensation pathway if there is an urgent need to facilitate an outcome consistent with the CCR LUS but which was not
reasonably contemplated at the time the IPS was declared.
Alternatively, the change could be more appropriately addressed by a subsequent scheme amendment.
The Joint Report suggests a representation for a change in the zone assigned to land in order to facilitate a purpose that was not intended by the former
planning scheme is not a matter within the statutory function of an IPS unless –
i. reasonably required for consistency to the CCR LUS and in accordance with the published municipal land use strategy; or
ii. required to rectify an anomaly in the former planning scheme under which –
a. translation to a corresponding IPS zone perpetuates a purpose that is inconsistent with the reality of the established land use and for which
there is little likelihood of redeeming the land for the assigned purpose; or
b. factors such as land capability, infrastructure provision or availability, natural hazards, or economic or cultural values clearly exclude use or
development for the purpose intended by the zone assigned by direct translation into the IPS format
b) In the event modifying an IPS to change the zone to which land is assigned is appropriate to the IPS process, the representation should not be further
considered unless it adequately addresses the corresponding matters for consideration of any change in zone as provided for in LUPAA s30R and s32.
Both LUPAA s30R and LUPAA s32 prescribe the considerations against which a departure from the current provisions of a planning scheme is to be assessed.
For consistency to the planning processes required under LUPAA, the adequacy of a representation seeking to modify an IPS should be assessed against the
same considerations.
The matters in s30R or s32 should be the default considerations for any significant change in purpose or outcome of the IPS.
A representation should contain sufficient information to demonstrate compliance to the applicable requirements in 30R or 32.
The advice in the Joint Report should turn on the information provided with each representation.
-
30J Joint Report on Representations in relation to the notified Interim Planning Schemes of the Cradle Coast Region – 30th June 2014 Page | 13
There is nothing expressly within the IPS representation process to allow a planning authority to request further information.
There is considerable variation among representations in the scope and standard of supporting information.
The majority of representations either fail to directly address the considerations in s30R or s32; or are very superficial in the nature and veracity of
information provided to demonstrate compliance.
If a representation does not adequately identify and address each of the matters in s30R or s32, it should fail.
No opportunity should be allowed during the hearing process to substantially expand upon and embellish the scope or standard of information and analysis
provided with the representation as made during the notification period.
The Joint Report indicates for each representation whether the information provided is sufficient to establish the change is reasonably required and otherwise
adequate to address each of the considerations that would apply under LUPAA s30R or s32.
c) The Joint Report advises inadequate representations should not be allowed, and should be determined without need for a hearing.
The planning process for an IPS implies expectation of a right to be heard if a representation is made.
However, the right does not appear absolute, and can appropriately be restricted to only exist if a representation is in relation to an interim planning scheme.
The nexus between the right to make a representation and the right to be considered or heard must be clearly understood and observed.
PD1 clause 8.10 illustrates the position with respect to representations on a permit application. A representation is valid only in respect of the provision
invoking discretion. It is not a general invitation to provide comment on any aspect of the permit application.
A similar principle should be applied for representations on a planning scheme. If a representation is not particular to the purpose of an IPS it should be
considered invalid.
8.
Appropriateness or adequacy of planning
scheme ordinance provisions
(199 x representations)
Indicate the objectives and compliance tests may not be appropriate or adequate to
the outcomes intended for the IPS, and that the IPS should be modified to insert or
delete provisions.
The suggested modifications intend a change to the purpose or outcome of a
provision.
This category of representation addresses common mandatory provisions, regionally
common provisions and local provisions.
These matters seek to diminish, embellish, or extend the purpose or outcome of an objective or compliance test.
Such matters are more than corrections or improvement in expression. They address the substance of a provision.
Representations variously argue the adequacy or relevance in purpose or objective, the effectiveness or relevance of an IPS compliance test against its objective;
and a concern for how the IPS may unreasonably or unnecessarily restrict use or develop on a particular site.
Suggested modification cannot be accommodated without risk of departure from purpose or intended outcome.
Each must be reviewed for consistency to underpinning State and regional strategy and policy (including the CCR LUS), any mandatory direction, and for
consistency to other provisions of the IPS; and to determine whether the suggested change has implication for what the provision intends or delivers.
Resolution involves more than a judgement for compliance to standards for drafting.
The Joint Report provides advice on whether a modification should be made for the reason that –
i. The matter is in relation to an IPS;
ii. The suggested change would improve operation of the IPS without significant variation to strategic purpose or for intended outcome of a provision;
and
iii. There is sufficient information provided in the representation to demonstrate compliance to the mandatory matters in LUPAA s30R or s32 for
modification to the provisions of a planning scheme
The Joint Report suggests the principles discussed against Category 7 in relation to acceptance of a representation, adequacy of information, and need for a
hearing, are to apply if a representation requires significant change in the purpose or operation of an ordinance provision.
-
30J Joint Report on Representations in relation to the notified Interim Planning Schemes of the Cradle Coast Region – 30th June 2014 Page | 14
9.
Relevant agency provisions
(18 x representations)
Seek –
a) expansion of exemptions for infrastructure use and development; and
b) inclusion of additional provisions to –
i. protect the operation and security of infrastructure assets; and
ii. minimise likely impact on safety and amenity of use and
development on land in proximity of existing and potential
infrastructure assets
These matters seek to elevate and expand the role of an IPS to facilitate and protect a
particular form of utility use and development.
These matters primarily concern interests of the electricity generating and
transmission entities Hydro and Transend; and the road entity Department of
Infrastructure, Energy and Resources.
This category of representation addresses common mandatory provisions and
regionally common provisions.
This category deals specifically with representations by State agencies or business enterprises seeking to change the purpose or operation of provisions in order to
create an advantage or benefit for the role or responsibilities of the agency or service provider.
The merit or otherwise of the representations turns on –
a) whether it is within the jurisdiction of a planning scheme to facilitate an exemption that provides for operational convenience of the infrastructure entity
and allows use or development of a kind for which there is likely to be more than a low risk to purpose of the IPS; and
b) whether it is within the competence of a planning scheme to assume a statutory responsibility vested in another statutory agency through legislation
other than LUPAA
There is no point in a hearing considering the merits of a representation if the matters are ultra vires the powers for which any planning scheme may make
provisions or are matters for which a planning authority has no jurisdiction to enforce compliance.
The Joint Report indicates it is not within the statutory competence of an IPS –
i. to exempt use or development with potential to have more than a low risk for the statutory purpose of a planning scheme;
ii. to make decisions with respect to the protection of infrastructure assets and to minimise likely risk to the community in circumstances where there is
already a statutory responsibility conferred on an infrastructure entity; and
iii. to extend or embellish exemption or protection provisions already available to an infrastructure entity under its enabling legislation
The Joint Report indicates the representations made by infrastructure agencies to embellish exemptions and to include infrastructure asset protection provisions
should not be allowed as matters consistent with the purpose and powers of an IPS.
There is no need to conduct a hearing into the merit or otherwise of the substantive outcomes intended by the representations.
-
30J Joint Report on Representations in relation to the notified Interim Planning Schemes of the Cradle Coast Region – 30th June 2014 Page | 15
Table 2 – Persons making a representation in relation to a notified Interim Planning Scheme for a municipal district of the Cradle Coast Region
Allen, Geoff
Appleby Hotel Pty Ltd (Dobson, Mitchell Allport)
Atkins, Frank
Atkinson, Justin
Badcock Craig (Oldaker Street)
Badcock, Craig
Bell, Natalie
Bennett, Alysia
Bissett, Kim
Blenkhorn, Rodney
Boat Harbour Progress Association Inc (Wilson, Neville)
Borlini, Pettina (Olivini Pty Ltd)
Boxhall, Patricia
Braid, Greg
Briggs, John (Ecologically Sustainable Design Pty Ltd)
Britton, Hazel & Ellison, Patricia
Brumby, RC & LJ
Burbury, Lonis
Burnie Airport Corporation
Burnie City Council
Campbell, Barry
Cannell, Elisabeth (1)
Cannell, Elisabeth (2)
Carson, Robert and Wendy
Carson, Robert and Wendy (Irishtown Road)
Cash, Greg and McMullen, Tija
Cement Concrete & Aggregates Australia
Central Coast Council
Circular Head Council
Clarke, William
Colledge, Michele & Garth
Collins, Sally
Connelly, Gail (Lester Franks)
Connolly, R
Cooke, Robert
Crawshaw, Christine
Crawshaw, Ray
Critchlow, Phillip & Audrey
Cure, IJ
Curtis, Glynis and Derek
Dalby, Mary
Dart, John
Davis, Geoff and Patricia
De Bomford, W
Denwar Pty Ltd
Department of Communication (Heazlett, Mark)
Department of Infrastructure, Energy & Resources
Devonport Bodyworks (Kerrison, Maurice)
Devonport Central Pty Ltd (Bullock Consulting)
Devonport City Council
Dudley, Simon and Elizabeth
Eberhardt, Adrian
Enright, Mark
EnviroPlan Australia (Wells, Micheal)
Fisher, Glenn & Janet
Fishman, FC & KR and Lambert, L
Flanagan, Rebecca, and O’Rouke, Greg, and Bakker, Jan
Forsyth, Janet
Foster, D & J (Lester Franks)
Freeman, Ron
Fromberg, Bill
Gamble, Richard
Gibson, Jedda
Goodstone Group (Planning Development Services)
Gowan Motors (4 Planning Pty Ltd )
Green Point Tas Pty Ltd (Nicholls, Richard)
Guthrie, Rod
Hall, Lesley
Hamilton, Mary
Hardy, RT & JM
Harrisson, Patricia
Heikkinen, M & A
Heritage Tasmania (Fitzgerald, Liz)
Hiscutt, Benjamin
Hobbs, Rhonda (4 Planning Pty Ltd)
Horne, Peter and Natalie
Hoyle, Ian and Virginia
Hudson, Alan
Hydro Tasmania
IASM Investments Pty Ltd (GHD Pty Ltd)
James Ashworth
Janney, Douglas
Jensen-Schnapper, Lynn
Johns, Jason & Sarah Johnson, Allan
Johnston, David
Jones, Annie & Joseph
Jones, Cliff & Rhonda
Jones, Faye
Kay, KR
Kentish Council
Kentish Council (rural land)
Kernan, J and W (Lester Franks)
Kerr, William
King Island Council
Kossler, Margaret & Peter
Kurrle, Peter & Dianne (Carport Central)
Lange, Aaron
Latrobe Council
Lead Light Investments (Boardman, Evan)
Leary, Mike
Lester Franks
Long, Adam
Long, Shaun
Lynd, Philip & Ann
Martin Gill
McNab, John
Meander Valley Council
Mersey Community Care (Lester Franks)
Michell Hodgetts & Associate - Plunkett, Paul (Myalla)
Michell Hodgetts & Associates - Plunkett, Paul (Elliott)
Michell Hodgetts & Associates - Plunkett, Paul (Preolenna
Road)
Michell Hodgetts & Associates - Plunkett, Paul (Tollymore
Road)
Michell Hodgetts & Associates (Turgah Road)
Milne, RA & JE
Morgan, Kevin
Nettleton, David
New Bounty Pty Ltd (Lester Franks)
Overton, Andrew
Owens, M
Parker, Beverly (Environmental Services & Design Pty Ltd)
Parker, KJ & RA
Parsons, David
Peisker, Joe
Penguin Caravan Park (IreneInc)
Pitt & Sherry (Dion Lester)
Poke, Jonathon & Desmond
Porteus, Timi
Priestley, R
Private Forests (Ravenwood, Ian)
Railpine P/L (Environmental Service and Design Pty Ltd)
Redruth Trading Co (Lester Franks)
Roberts-Thomson, Andrew
Rogers, T & OM
Rynmarc Pty Ltd (Bullock Consulting)
Sadler, Duncan
Sands, Richard
Shields, GM
Simplot (Dazeley, G)
Simplot (West, David)
Southern Cross Care (Tas) Inc (Fabrzio, Nic)
Southern Cross Care (Tas) Inc (Sadek, Richard)
Squeaking Point Properties Pty Ltd (Planning Development
Services)
Stammers, Mrs M
Stewart, Leonie, and Brewster, Kevin
Storay, M and K (Lester and Franks)
Stuart, K
Stuart, R
Stubbs, Brian and Lorraine
Sushames, Renee
Swain, Dale & Dorothy
Sweeney, Michael
Sweetman, Vivienne
Talbot, Mike
Tall Timbers Tasmania Pty Ltd
Tarver, C & K
Tascott Carpet et al (Neil Shephard & Associates)
Tasports (Planning Development Services)
Thomson, Debbie
Thorn, Jennifer
Thorne, Lyndal
Timms, RC & HM
Transend (Goodman, Gina)
Turners Beach Coastcare Inc
University of Tasmania (ireneinc)
Van Der Weide, Robert and Toni
Walker, Geoff
Waratah-Wynyard Council
Ware, Barry
Waterfront Wynyard Motel (Hilliger, Cyndia and McErlain,
Justin)
Webb, Rose
Weitjens, Jed (FJA Solutions)
West Coast Council
West Coast Recreation Association (Giles, Max and
Croswell, Anthony)
White, Jeffery
Whitney, Brian
Wigg, GV and Sons
Williams, Geoff
Wilson, Darren
Woodhouse, Colin (IreneInc)
Worthen, Phillip
-
30J Joint Report on Representations in relation to the notified Interim Planning Schemes of the Cradle Coast Region – 30th June 2014 Page | 16
Table 3 – Persons making a Representation in relation to a notified Interim Planning Scheme for a municipal district of the Cradle Coast Region by municipal district and issue addressed in the Representation
BURNIE CITY COUNCIL
REP
NO. Person making Representation
Mandatory
Provisions
Regional
Provisions
Local
Provisions
Other
Matters
1
Bennett, Alysia
1
Issue 691
1
Issue 703
2
Boxhall, Patricia
1
Issue 705
3
Burbury, Lonis
1
Issue 419
4
Burnie City Council
Earle, Patrick
24
Issue 24, 26, 27, 28, 32, 34, 35, 39, 41, 42, 52, 55, 58, 60,
62, 68, 71, 75, 78, 79, 82, 86, 89, 91, 642, 647, 650, and
657,
124
Issue 20, 21, 100, 102, 106, 112, 118, 119, 130, 131, 144,
168, 169, 171, 173, 174, 188, 191, 211, 217, 219, 220,
230, 232, 235, 236, 254, 259, 260, 264, 268, 277, 280,
285, 293, 295, 296, 297, 299, 305, 306, 307, 310, 314,
315, 316, 318, 324, 325, 326, 335, 340, 342, 343, 344,
346, 348, 357, 358, 360, 362, 363, 364, 365, 367, 368,
369, 372, 373, 384, 390, 397, 398, 401, 413, 414, 415,
416, 433, 437, 438, 441, 448, 455, 465, 470, 482, 573,
578, 582, 588, 593, 594, 601, 602, 605, 608, 611, 630,
633, 635, 658, 659, 669, 677, 683, 684, 694, 715, 718,
720, 724, 725, 729, 731, 740, 747, 748, 749, 765, and
767,
4
Issue 151, 181, 238, and 265
-
5
Campbell, Barry
1
Issue 380
6
Cement Concrete & Aggregates Australia
3
Issue 481, 670, and 761
7
Clarke, William
1
Issue 618
8
Cooke, Robert
BCC & CCC
2
Issue 424, and 446
9
Crawshaw, Christine
1
Issue 707
10
Crawshaw