    Non-conformance Reporting

    Jim Kirk FCQI CQP

    Quality Manager

  • 8/10/2019 CQI NCR Training Presentation

    2/34

    2

    Annex 24

  • 8/10/2019 CQI NCR Training Presentation

    3/34

    HA Network Map

    3

  • 8/10/2019 CQI NCR Training Presentation

    4/34

    HA Area 4 Map

    4

  • 8/10/2019 CQI NCR Training Presentation

    5/34

    What is an NCR?

    5

    What isnt an NCR?

    TriviaA tool to get your own back

    Somebodys opinion as to

    something going wrong when it is

    not actually a requirement

    A report issued when a product, process or

    procedure does not comply with the set standards

    for a product, process or procedure under

    inspection

    An NCR is any significant deficiency

    A means of tracking actions

    A tool to put right things that are going wrong

    A means of stopping repeated errors

    NCRs are used to record findings from internal

    and external audits that require addressing

    NCRs are usually raised from within a process

    team relating to their inputs received as outputs

    Accumulating data from across the organisation

    and reporting in a consistent way will enable you to

    identify non-conformance trends before they

    seriously affect the business.

  • 8/10/2019 CQI NCR Training Presentation

    6/34

    6

    There is a Procedure

    For Non-conformance!

    Area 4> Area 4 Document Centre

    > Procedure Documents

    http://portal.bbmmjv.com/http://portal.bbmmjv.com/A4Documentshttp://portal.bbmmjv.com/A4Documents/Procedures/Forms/AllItems.aspx?View={EE28A527-FE80-47BE-A5D0-879D1E8EBF76}&FilterField1=ReportOwner&FilterValue1=Barry%20Tophamhttp://portal.bbmmjv.com/A4Documents/Procedures/Forms/AllItems.aspx?View={EE28A527-FE80-47BE-A5D0-879D1E8EBF76}&FilterField1=ReportOwner&FilterValue1=Barry%20Tophamhttp://portal.bbmmjv.com/A4Documentshttp://portal.bbmmjv.com/
  • 8/10/2019 CQI NCR Training Presentation

    7/34

    On-line NCR System

    7

  • 8/10/2019 CQI NCR Training Presentation

    8/34

    Raising NCRs

    Copy from one of these

    1. Copy from the process,

    procedure, form, template orother document, the instruction

    as to what needs to be done

    2. State what is wrong and how it

    doesnt match what is required

    3. If you cannot find the written

    requirement, ask yourself if this isreally a non-conformance?

    Activity:

    To the Activity box on the NCR form

  • 8/10/2019 CQI NCR Training Presentation

    9/34

    Parts 2 & 3

    9

    Fix the problemComplete the form

    correctlySign the form

    Re-draw the As-built

    Close the scheme

    Provide the missing

    document

    Ask the 5 why questions

    Why didnt he do it?

    Why didnt he know he

    was supposed to do it

    Why wasnt he trained

    Why wasnt therequirement specified

    Why wasnt there

    enough resource to do the

    work

    Enter the root cause after answering all these questions

    Having worked out the root cause, the action to prevent recurrence is obvious

    Enter a realistic date

    Enter a realistic date

    Decide who the correct person is and speak to him/her

    Decide who the correct person is and speak to him/her

    N.B. Quality Management Points awarded

    if the working day 7 deadline missed - from

    observation date not NCR raised date

    N.B. The Action Owner should have

    discussed with the actionee before

    approval. It is difficult to change afterwards

  • 8/10/2019 CQI NCR Training Presentation

    10/34

    BS EN ISO 9001:2008

    Records of the audits and their results shall be maintained (see 4.2.4).

    The management responsible for the area being audited shall ensure that

    any necessary corrections and corrective actions are taken without undue

    delay to eliminate detected nonconformities and their causes.

    10

  • 8/10/2019 CQI NCR Training Presentation

    11/34

    BS EN ISO 9001:2008

    8.5.2 Corrective action

    The organization shall take action to eliminate the causes of nonconformities in order toprevent recurrence.

    Corrective actions shall be appropriate to the effects of the nonconformities encountered.

    A documented procedure shall be established to define requirements for

    a) reviewing nonconformities (including customer complaints),

    b) determining the causes of nonconformities,

    c) evaluating the need for action to ensure that nonconformities do not recur,

    d) determining and implementing action needed,

    e) records of the results of action taken (see 4.2.4), and

    f) reviewing the effectiveness of the corrective action taken.

    11

  • 8/10/2019 CQI NCR Training Presentation

    12/34

  • 8/10/2019 CQI NCR Training Presentation

    13/34

    There is a Procedure for

    Corrective Action!

    13

    Area 4> Area 4 Document Centre

    > Procedure Documents

    http://portal.bbmmjv.com/http://portal.bbmmjv.com/A4Documentshttp://portal.bbmmjv.com/A4Documents/Procedures/Forms/AllItems.aspx?View={EE28A527-FE80-47BE-A5D0-879D1E8EBF76}&FilterField1=ReportOwner&FilterValue1=Barry%20Tophamhttp://portal.bbmmjv.com/A4Documents/Procedures/Forms/AllItems.aspx?View={EE28A527-FE80-47BE-A5D0-879D1E8EBF76}&FilterField1=ReportOwner&FilterValue1=Barry%20Tophamhttp://portal.bbmmjv.com/A4Documentshttp://portal.bbmmjv.com/
  • 8/10/2019 CQI NCR Training Presentation

    14/34

    Benjamin Franklin's 5-Why Analysis

    For want of a nail a shoe was lost,

    for want of a shoe a horse was lost,

    for want of a horse a rider was lost,

    for want of a rider an army was lost,

    for want of an army a battle was lost,

    for want of a battle the war was lost,

    for want of the war the kingdom was lost,

    And all for the want of a little horseshoe nail.

  • 8/10/2019 CQI NCR Training Presentation

    15/34

    5 Why Questions

    1. Why was the Kingdom lost?

    Because the war was lost.2. Why was the war lost?

    Because the battle was lost.

    3. Why was the battle lost?

    Because the army was lost.

    4. Why was the army lost?

    Because the rider was lost.5. Why was the rider lost?

    Because the horse was lost.

    6. Why was the horse lost?

    Because the shoe was lost.

    7. Why was the shoe lost?

    Because the nail was lost8. Why was the nail of the shoe lost?

    .............................?

    15

  • 8/10/2019 CQI NCR Training Presentation

    16/34

    Notes on Root Cause Analysis

    Difficulties in tracking down the root causesWhere do you draw the line?

    At the Joint Venture?

    At the Parent Company?

    At the Client?

    At the Regulator?At the Big Bangcreation of the universe?

    What are the stop rules?

    There are no natural break-points, only artificially imposed ones.

    The goal is to establish what happened and how to stop it happening again.

    The logical stop point would seem to be where managers might reasonably be expected to exercisecontrol

    A sad story will help to illustrate this point

    16

  • 8/10/2019 CQI NCR Training Presentation

    17/34

    Chernobyl

    Academician Valeri Legasov was the principle investigator of the Chernobylreactor disaster. He was also the Soviet Unions chief spokesman at the

    international conference on this accident. At this meeting Legasov put theblame for the disaster squarely on the errors and violations of the operators.Later he confided to friends, I told the truth at the conference, but not the

    whole truth. Two years later he hanged himself after recording his innermost

    feelings about the accident to a tape recorder.1

    After being at Chernobyl, I drew the unequivocal conclusionthat the accident was ... the summit of all the incorrectrunning of the economy which had been going on in ourcountry for many years.2

    1 Managing the Risks of Organisational AccidentsJames Reason, Ashgate Publishing ISBN 978-1-84014-105-4

    2 This quotation is taken from the Legasov Tapes, a transcript prepared by the US Department of Energy in 1988. The original material appeared inPravda shortly after Legasovsdeath.

    17

  • 8/10/2019 CQI NCR Training Presentation

    18/34

    An alternative method of root cause analysis

    18

    What was supposed to happen?________________________

    ________________________

    ________________________

    ________________________

    ________________________

    ________________________

    Why was there a difference?________________________

    ________________________

    ________________________

    ________________________

    ________________________

    ________________________

    What actually happened?

    (and did we get hurt?)

    ________________________

    ________________________

    ________________________________________________

    ________________________

    ________________________

    What have we learnt?

    Plus actions

    ________________________

    ________________________

    ________________________________________________

    ________________________

    ________________________

  • 8/10/2019 CQI NCR Training Presentation

    19/34

    Fish-bone analysis to find root cause

    19

    Problem

    Main Factor 1 Main Factor 2 Main Factor 3

    Main Factor 4 Main Factor 5 Main Factor 6

    Probable cause 1.2

    Probable cause 1.3Probable cause 1.1

    Probable cause 2.1

    Probable cause 2.2

    Probable cause 3.1

    Probable cause 3.2

    Probable cause 4.1 Probable cause 4.2

    Probable cause 5.1

    Probable cause 5.2

    Probable cause 6.1

    Probable cause 6.2Underlying cause 4.1.1 Underlying cause 4.2.1

    Underlying cause 6.2.1

  • 8/10/2019 CQI NCR Training Presentation

    20/34

    Worked example of fishbone analysis

    20

    Employees

    rude tocustomer

    Procedures People

    Equipment Policies

    Employees expected

    to perform tasks that

    reduce time spent on

    customer service

    Low pay

    Employees not motivated

    Provide quick service to customers

    Customer is always right

    Inadequate training

    Lack of recognition

    Supervisor assigns

    unrealistic workload

    Management not

    sensitive to

    employee concerns

    Bend the rules to satisfy customer

    Etc.

    Etc. Etc.

  • 8/10/2019 CQI NCR Training Presentation

    21/34

    Acceptance

    21

    I will not accept

    inadequately

    completed forms,

    missing information etc

    If I think 2 & 3 are

    reasonably ok, I willput further guidelines

    in the comments box

    Rejected forms will

    return to Parts 2

    and 3.

    At that point thenames of the

    actionees can be

    changed if needed

  • 8/10/2019 CQI NCR Training Presentation

    22/34

    Closure

    22

    The Closure must be completed in full

    all the evidence must be uploaded to the

    three sections

    Include hyperlinks as a last resort (theymay move or be deleted)

    Highlight the word for example Click Here

    Press Ctrl K

    Paste the web address into the pop-up

    menu

    http://localhost/var/www/apps/conversion/tmp/scratch_2/Root%20Cause%20Analysis.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_2/Root%20Cause%20Analysis.pptx
  • 8/10/2019 CQI NCR Training Presentation

    23/34

    Closure Approval

    23

    I will not close out the NCR

    if the evidence is not

    provided or the action to

    prevent recurrence is not

    adequate

    The Local Process Owner

    is required to sign off the

    NCR to indicate that he /

    she is satisfied that the

    actions are suitable and to

    understand that the NCR

    may need to be included inthe process review input

  • 8/10/2019 CQI NCR Training Presentation

    24/34

    Further Training Available - 1

    24

  • 8/10/2019 CQI NCR Training Presentation

    25/34

    Further Training Available - 2

    25

  • 8/10/2019 CQI NCR Training Presentation

    26/34

    Any Questions?

    Comments?

    Other Concerns?

    26

  • 8/10/2019 CQI NCR Training Presentation

    27/34

    27

  • 8/10/2019 CQI NCR Training Presentation

    28/34

    28

  • 8/10/2019 CQI NCR Training Presentation

    29/34

    29

  • 8/10/2019 CQI NCR Training Presentation

    30/34

    30

  • 8/10/2019 CQI NCR Training Presentation

    31/34

    31

  • 8/10/2019 CQI NCR Training Presentation

    32/34

    32

  • 8/10/2019 CQI NCR Training Presentation

    33/34

    33

  • 8/10/2019 CQI NCR Training Presentation

    34/34

    34