CPM-100: Principles of Earned Value Management Lesson A: Principles of Performance Management
description
Transcript of CPM-100: Principles of Earned Value Management Lesson A: Principles of Performance Management
CPM-100: Principles of Earned Value ManagementLesson A: Principles of Performance Management
Eleanor Haupt Susan WoodEarned Value Associates LLC Earned Value Associates [email protected]/937-572-2586 [email protected]/850-585-4830Date: May 30, 2012
IPM 2014 Workshop
Presentation Template
• The following general rules apply:– Company logos can be displayed on the title page but not in
subsequent slides– Font: Arial, No smaller than 16pt (18pt minimum is
recommended)• Test print your slides (3 per page), gray scale, for readability
– Target content briefing to 25-35 slides– Include TLOs on separate slide– Mark each slide as appropriate with TLO # in box at top right
corner• Used by test team and by dean to verify content
2
Slide Title
• Instructions– Can change background to all white or leave grids
• Right mouse click on chart, select Format Background. Select white fill.
– If using PowerPoint 2010, paste your charts into this template. Right mouse click and select Use Destination Theme (first option).
– May still need to adjust font size and boxes of color fill.– Can change background to all white or leave grids
• Right mouse click on chart, select Format Background. Select white fill.
3
TLO #1
Learning Objectives
• List TLOs by number
4