CORUH RIVER DEVELOPMENT PLAN - UNECE · U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS...

17
U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS (DSI), TURKEY 1/17 Ubeyd Sezer Geological Engineer International Workshop on Transboundary Water Resources Management Tbilisi, Georgia 8-10 December 2009 CORUH RIVER DEVELOPMENT PLAN

Transcript of CORUH RIVER DEVELOPMENT PLAN - UNECE · U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS...

Page 1: CORUH RIVER DEVELOPMENT PLAN - UNECE · U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS (DSI), TURKEY 2/17 CORUH RIVER BASIN The Coruh (or Chorokhi in Georgian) River Basin

U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WOR KS (DSI), TURKEY 1/17

Ubeyd SezerGeological Engineer

International Workshop on Transboundary Water Resources Management

Tbilisi, Georgia8-10 December 2009

CORUH RIVER DEVELOPMENT PLAN

Page 2: CORUH RIVER DEVELOPMENT PLAN - UNECE · U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS (DSI), TURKEY 2/17 CORUH RIVER BASIN The Coruh (or Chorokhi in Georgian) River Basin

U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WOR KS (DSI), TURKEY 2/17

CORUH RIVER BASIN

The Coruh (or Chorokhi in Georgian) River Basin loc ated in the NE part ofTurkey, near the boundary between Turkey and Georgi a

It rises from the Mescit Mountain Range (highest peak 3255 m) in Turkey and flows into the Black Sea in Batumi, Georgia

Page 3: CORUH RIVER DEVELOPMENT PLAN - UNECE · U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS (DSI), TURKEY 2/17 CORUH RIVER BASIN The Coruh (or Chorokhi in Georgian) River Basin

U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WOR KS (DSI), TURKEY 3/17

Catchment's Area (approximately)

In Turkey 19 872 km2

In Georgia 2,090 km2

Mean Annual Water Potential 6,824 hm3

Annual Sediment Load 5,8 million m³

Total length of the river 431 kmIn Turkey 410 kmIn Georgia 21km

Çoruh Basin

Page 4: CORUH RIVER DEVELOPMENT PLAN - UNECE · U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS (DSI), TURKEY 2/17 CORUH RIVER BASIN The Coruh (or Chorokhi in Georgian) River Basin

U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WOR KS (DSI), TURKEY 4/17

CORUH RIVER BASIN

CLIMATE

• The Climate of the Coruh River Basin is continental and Black Sea climatic conditions

• Climate varies greatly due to;• high mean elevation of the land (1 132 m)

and• the influence of the mountainous areas

running parallel to the coast line • Mean annual rainfalls varies between 250 mm-

2650 mm

Page 5: CORUH RIVER DEVELOPMENT PLAN - UNECE · U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS (DSI), TURKEY 2/17 CORUH RIVER BASIN The Coruh (or Chorokhi in Georgian) River Basin

U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WOR KS (DSI), TURKEY 5/17

Tortu

m Ç

ayı

Çoruh Nehri

Bar

hal

Çay

ı

Oltu Çayı

Bulanık Çayı

Berta Çayı Meydancık

Deresi

Şavşat Deresi

Murgul Çayı

İçkale Deresi

Deviskel DeresiK

apis

tre

Der

esi

Sundura Deresi

İİspirspir

Çoruh N

ehri

Çoruh N

ehri

2600mm -2650 mm

685mm-700 mm

250mm-300 mm

PRECIPITATION

Page 6: CORUH RIVER DEVELOPMENT PLAN - UNECE · U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS (DSI), TURKEY 2/17 CORUH RIVER BASIN The Coruh (or Chorokhi in Georgian) River Basin

U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WOR KS (DSI), TURKEY 6/17

CORUH RIVER

HYDROLOGYDrainage area in Turkey :19 872 km 2

Mean annual run-off : 6,824 hm 3

Mean, maximum and minimum flows (at Kar şıköy flow gauging station near Muratlı Dam)Mean : 200 m 3/sMaximum : 2,431 m 3/s Minimum : 38 m 3/s

About About 85%85% of the total annual of the total annual flowflow in Coruh in Coruh RRiveriverconcentrated in concentrated in three monthsthree months period from period from May to JulyMay to July

Page 7: CORUH RIVER DEVELOPMENT PLAN - UNECE · U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS (DSI), TURKEY 2/17 CORUH RIVER BASIN The Coruh (or Chorokhi in Georgian) River Basin

U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WOR KS (DSI), TURKEY 7/17

Tortu

m Ç

ayı

Çoruh Nehri

Bar

hal

Çay

ı

Oltu Çayı

Bulanık Çayı

Berta Çayı

Şavşat Deresi

Murgul Çayı

Deviskel DeresiK

apis

tre

Der

esi

İİspirspir

Çoruh N

ehri

Çoruh N

ehri

Barhal ÇayıOrt. 16 m3/s

Mean discharges of Coruh River and its tributaries

Tortum ÇayıOrt. 15 m3/s

Oltu ÇayıOrt. 20 m3/s

Bulanık ÇayıOrt. 7 m3/s

Berta ÇayıOrt. 27 m3/s

Deviskel DeresiOrt. 14 m3/s

Đçkale DeresiOrt. 7 m3/s

Murgul DeresiOrt. 12 m3/s

Coruh RiverMean 200 m3/sn

Barhal ÇayıOrt. 16 m3/s

Kapistre DeresiÇoruh NehriOrt. 25 m3/s

Tortum ÇayıOrt. 15 m3/s

Oltu ÇayıOrt. 20 m3/s

Bulanık ÇayıOrt. 7 m3/s

Berta ÇayıOrt. 27 m3/s

Deviskel DeresiOrt. 14 m3/s

Murgul DeresiOrt. 12 m3/s

Đçkale DeresiOrt. 7 m3/s

Kapistre DeresiOrt. 15 m3/s

Page 8: CORUH RIVER DEVELOPMENT PLAN - UNECE · U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS (DSI), TURKEY 2/17 CORUH RIVER BASIN The Coruh (or Chorokhi in Georgian) River Basin

U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WOR KS (DSI), TURKEY 8/17

CORUH RIVER

WATER QUALITY

• Water quality in the main course and tributaries of the Coruh River measured and analyzed regularly from existing stations

• According to Turkish Inland Water Quality Standards (derived from Water Pollution Control Regulation) Water Quality of Coruh River generally Class I and Class II (Unpolluted and Less polluted water body)

• General Pollution Sources:�Households, municipal wastewaters and dump sites

Page 9: CORUH RIVER DEVELOPMENT PLAN - UNECE · U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS (DSI), TURKEY 2/17 CORUH RIVER BASIN The Coruh (or Chorokhi in Georgian) River Basin

U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WOR KS (DSI), TURKEY 9/17

CORUH RIVER BASIN

ÇORUH BASIN DEVELOPMENT PLAN

• Çoruh River is one of the significant water resources of Turkey, especially in terms of hydropower potential

• The preliminary study for development plan started in 1962 by General Directorate of Electrical Power Resources Survey and Development Administration (EIA),

• The Master plan for hydropower development of Çoruh River was prepared in 1982

• In the master plan and subsequent studies various options were considered for the Coruh River Development Plan and as a result 10 hydropower projects in series along the main river in a cascade style were proposed on the main course of Coruh River

Page 10: CORUH RIVER DEVELOPMENT PLAN - UNECE · U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS (DSI), TURKEY 2/17 CORUH RIVER BASIN The Coruh (or Chorokhi in Georgian) River Basin

U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WOR KS (DSI), TURKEY 10/17

LALELĐ HEPP245 GWh99 MW

ĐSPĐR HEPP327 GWh54 MW

GÜLLÜBAĞ HEPP285 GWh84 MW

AKSU HEPP344 GWh120 MW

ARKUN HEPP788 GWh222 MW

*YUSUFELĐ HEPP1 705 GWh540 MW

* ARTVĐN HEPP1 026 GWh332 MW

DERĐNER HEPP2 118 GWh670 MW

BORÇKA HEPP1 039 GWh300 MW

MURATLI HEPP444 GWh115 MW

LONGITUDINAL PROFILE OF THE CORUH RIVER DEVELOPMENT PLAN

1 420 m

*BAĞLIK HEPP238 GWh67 MW

* BAYRAM HEPP265 GWh81 MW

Upper Çoruh Middle Çoruh Lower Çoruh

2 130 million m3

167million m3

1 969million m3

419million m3

75million m3

7,3millon m3

133millon m3

969million m3

367million m3

20million m3

184million m3

283million m3

410 km

In operation

Under Investment program

Planning Stage

Laleli Dam Max. water level : 1,480 mMuratlı Dam Thalweg level: 60 mTotal volume of reservoirs: 6,72 billion m3

Installed Capacity : 2, 236 MW(for dams on main course)Energy generation : 8,320 GWh/year

AYVALI HES336 GWh125 MW

OLUR HEPP170 GWh60 MW

ALTIPARMAK HEPP200 GWh50 MW

Barhal Kolu

Oltu Kolu

Berta Kolu

Page 11: CORUH RIVER DEVELOPMENT PLAN - UNECE · U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS (DSI), TURKEY 2/17 CORUH RIVER BASIN The Coruh (or Chorokhi in Georgian) River Basin

U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WOR KS (DSI), TURKEY 11/17

CORUH RIVER DEVELOPMENT PLAN

Page 12: CORUH RIVER DEVELOPMENT PLAN - UNECE · U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS (DSI), TURKEY 2/17 CORUH RIVER BASIN The Coruh (or Chorokhi in Georgian) River Basin

U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WOR KS (DSI), TURKEY 12/17

Type of dam : Rock fill

Height oh the damPurpose of the dam

: 49 mEnergy

Mean annual flow :

:

6 billion m³

:

Reservoir Volume : 75 million m³

Dead Volume : 55 million m³

Active Volume : 20 million m³

MURATLI DAM AND HYDROPOWER PLANT

It is located 100 metre upstream from the border

UNDER OPERATION SINCE 2005

Installed Capacity 115 MW

Total Energy 444 GWh/Annual

Page 13: CORUH RIVER DEVELOPMENT PLAN - UNECE · U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS (DSI), TURKEY 2/17 CORUH RIVER BASIN The Coruh (or Chorokhi in Georgian) River Basin

U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WOR KS (DSI), TURKEY 13/17

Installed capacity 300 MW

Total energy 1 039 GWh/annual

Reservoir volume 419 million m3

In operation 2007

BORÇKA DAM AND HYDROPOWER PLANT

Page 14: CORUH RIVER DEVELOPMENT PLAN - UNECE · U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS (DSI), TURKEY 2/17 CORUH RIVER BASIN The Coruh (or Chorokhi in Georgian) River Basin

U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WOR KS (DSI), TURKEY 14/17

D E R İ N E R DAM AND HYDROPWER INSTALLATIONS

April 2009

Page 15: CORUH RIVER DEVELOPMENT PLAN - UNECE · U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS (DSI), TURKEY 2/17 CORUH RIVER BASIN The Coruh (or Chorokhi in Georgian) River Basin

U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WOR KS (DSI), TURKEY 15/17

CORUH RIVER BASIN

ENVIRONMENTAL IMPACT ASSESSMENT (EIA)

• Environmental Impact Assessment Report (EIA) for Yusufeli Dam was prepared by ENCON in 2006 to fulfil the requirements of international standards,

• The EIA Report Assess in detail:� The effects of the project on the natural and socio-economic environment,� The respective mitigation measures including resettlement action plan

Page 16: CORUH RIVER DEVELOPMENT PLAN - UNECE · U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS (DSI), TURKEY 2/17 CORUH RIVER BASIN The Coruh (or Chorokhi in Georgian) River Basin

U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WOR KS (DSI), TURKEY 16/17

CORUH RIVER BASIN

• Consultation between Turkey and Georgia regarding the hydropower development on Coruh River were started in 1996 with construction preparations for Deriner Dam.

• Since then Turkish and Georgian experts have been conducting joint studies that will serve to identif y, monitor and evaluate changes, which may occur over time in the downstream of Coruh projects on the Georgian section of the river, including the mouth of the river and the Black Sea Coastline

CONSULTATION AND COOPERATION BETWEEN TURKEY AND GEORGIA

Page 17: CORUH RIVER DEVELOPMENT PLAN - UNECE · U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WORKS (DSI), TURKEY 2/17 CORUH RIVER BASIN The Coruh (or Chorokhi in Georgian) River Basin

U. Sezer GENERAL DIRECTORATE OF STATE HYDRAULIC WOR KS (DSI), TURKEY 17/17

THANK YOU