Integrated River-Basin Management Model for a Target River Basin (Selenga River)

7
Integrated River-Basin Management Model for a Target River Basin (Selenga River) KOREA ENVIRONMENT INSTITUTE First Draft

description

First Draft. Integrated River-Basin Management Model for a Target River Basin (Selenga River) KOREA ENVIRONMENT INSTITUTE. Background. √ Jeju NISD Meeting (2005, Korea) - Build Institute Network for Sustainable Development - Organize Four Thematic Groups - PowerPoint PPT Presentation

Transcript of Integrated River-Basin Management Model for a Target River Basin (Selenga River)

Page 1: Integrated River-Basin Management Model for a Target River Basin (Selenga River)

Integrated River-Basin Management Model for a Target River Basin

(Selenga River)

KOREA ENVIRONMENT INSTITUTE

First Draft

Page 2: Integrated River-Basin Management Model for a Target River Basin (Selenga River)

Background Background

√ Jeju NISD Meeting (2005, Korea) - Build Institute Network for Sustainable Development

- Organize Four Thematic Groups

(Water, Transportation, National Park, Trade)

√ Delft NISD Meeting(2005, Netherlands) - Reconfirm the dedications of NISD Network

- Discussion on the Organizing Thematic Groups

• Proposal: Development of Integrated River-Basin Management Model for a Target River Basin• Support UNEP/DTIE/ETB’s Efforts for Design & Implementation of Integrated Sustainable Development Policies

Page 3: Integrated River-Basin Management Model for a Target River Basin (Selenga River)

STUDY SITE (Tentative)STUDY SITE (Tentative)

√ trans-boundary Issues √ Water Quality & Water Development Issues

√ Capacity Building Requirement

√ Cooperative Networks

Page 4: Integrated River-Basin Management Model for a Target River Basin (Selenga River)

WORK FLOWWORK FLOW

START

Ad Hoc WorkingGroup Meeting (3M)

Year IMOU betweenParticipatingInstitutes(2M)

Selection ofDemo Site(6~7M)

Compile IWMExperiences

Networking & Preparation

Refine Derailed Work Plan (2M)

Basic Survey of Water Issues & Socio-Economic Condition(6M)

Test Applicability of IWM Approaches (4M)

Year II

Year III

Evaluate Applicability of Korean Schemes to PH

Development IWM Model

Capacity Building –Integrated Thematic Group Meeting (4M)

Local Assessment

Formulate IWM Model (8M)

Page 5: Integrated River-Basin Management Model for a Target River Basin (Selenga River)

TASKS & EXPECTED OUTPUTSTASKS & EXPECTED OUTPUTS

Task 2: Assessment of IWM -Regulatory-Market-based-Define Successful Components

Task 1: Research Network

-Share information-Share Experience-Capacity Building Activities

Task 4 : Model Formulation-Test Applicability-Suggest IWM Framework-Capacity Building

Task 3: Gap Analysis-Water Resource Development-Water Quality Management-Water Supply

-IWM Model Framework-Policy Recommendation Report-Capacity Building

-Cooperative Network-Capacity Building Ad Hoc Meeting

-Technical Tools -Regulatory Tools -Market-Based Tools of IWM

-IWM Guiding Principles-Review Report of IWM

Main Objectives Expected Results &Output

Page 6: Integrated River-Basin Management Model for a Target River Basin (Selenga River)

COOPERATIVE FRAMEWORK (Tentative)COOPERATIVE FRAMEWORK (Tentative)

UNEP(Supports & Coordination)

Institute of Geoecology Mongolian Academy of Science

(watershed issues)

Other Institutes in Developing Countries (Capacity Building)

Institute for Sustainable Futures(water development issues)

Korea Environment Institute(water quality issues)

All-Russian Research Institute For Nature Protection

(watershed issues)

Other Thematic Groups (Capacity Building)

Page 7: Integrated River-Basin Management Model for a Target River Basin (Selenga River)

Thank you !

Discussion