2
CONFIGURATION SPECIFICATIONS Fire Exnguisher, First-Aid & Eye Wash Kit Mounted on Telco Board Fluorescent or LED lighng as Required Passive Hydrogen Venng White Powder Coat Finish Standard - Custom Colors Available Concealment Soluons Available Opons/Add-ons: Pneumac or Hydraulic Masts as Required 20 - 36 Kw 1-Phase, 3-Wire, 120/240 Volt Generator Extended Run Fuel Cell - 24 Hour, 48 hour or As Required Provisions for Mounng Remote Mounted Radio Heads 3802 E. Broadway Rd. Phoenix, AZ 85040 Tel (602) 275-0662 Toll Free (800) 635-3658 www.sunwesteng.com Heavy Gauge Aluminum or Steel as Required Powder Coat or Epoxy Finishes Stainless Steel and Grade-8 Fasteners Throughout Hot-Dipped Galvanized Steel Base Frame R4 Rated Double-Sided Foil Insulaon Stainless Steel Handles and Hardware Custom Designed Equipment & Baery Racks as Required Modular Construcon Outriggers and Jacks as Required Linex® Floor Coang Standing Rib Roof Design CONSTRUCTION SPECIFICATIONS COP (Cell On Platform) 3/16 Custom Designed UL® Listed NEMA 3R Wireless Communicaons Cabinet 150 MPH Wind Load, 150-lb/sq. ſt. Snow Load, 500-lb/sq. ſt. Floor Load, Zone-4 Rated R56 Ground Ring, Main Ground Bar (Exterior) Equipment Ground Bar (Interior) Internal & External GFI Service Receptacles 200 AMP 42-Posion 1-Phase 3-Wire Distribuon Panel Flexible Equipment Mounng Opons with Ceiling Mounted Ladder Rack Lightweight Modular Design Provides For On-Site Assembly in Access Restricted Areas Like; Roof Tops, Parking Garages, and Under Power line Towers McLean® HVAC Units with Lead-Lag Controller High & Low Temperature Alarms, Intrusion, Smoke, Surge, & Ulity Power Fail Alarms as Required ** PROPRIETARY AND CONFIDENTIAL ** Copyright © 2014 & Present Sun West Engineering, Inc. THIS PROPOSAL CONTAINS TRADE SECRETS AND OTHER PROPRIETARY AND CONFIDENTIAL INFORMATION OF SUN WEST ENGINEERING, INC. THIS DOCUMENT AND ITS CONTENTS, INCLUDING WITH- OUT LIMITATION THE DRAWINGS AND OTHER INFOR- MATION HEREIN, ARE THE SOLE AND EXCLUSIVE PROP- ERTY OF SUN WEST ENGINEERING, INC. ANY DUPLICATION, DISCLOSURE, OR USE OF ANY POR- TION OF THIS DOCUMENT REQUIRES THE PRIOR WRIT- TEN CONSENT OF SUN WEST ENGINEERING, INC.

Transcript of COP (Cell On Platform) · 2016-03-07 · COP (Cell On Platform) 3/16 ustom Designed UL® Listed...

Page 1: COP (Cell On Platform) · 2016-03-07 · COP (Cell On Platform) 3/16 ustom Designed UL® Listed NEMA 3R Wireless ommunications abinet -lb/sq. ft. Snow Load, 500lb/sq. ft. Floor Load,

C O N F I G U R AT I O N S P E C I F I C AT I O N S

Fire Extinguisher, First-Aid & Eye Wash Kit Mounted on Telco Board Fluorescent or LED lighting as Required

Passive Hydrogen Venting

White Powder Coat Finish Standard - Custom Colors Available Concealment Solutions Available

Options/Add-ons:

Pneumatic or Hydraulic Masts as Required

20 - 36 Kw 1-Phase, 3-Wire, 120/240 Volt Generator

Extended Run Fuel Cell - 24 Hour, 48 hour or As Required

Provisions for Mounting Remote Mounted Radio Heads

3802 E. Broadway Rd. Phoenix, AZ 85040 Tel (602) 275-0662 Toll Free (800) 635-3658 www.sunwesteng.com

Heavy Gauge Aluminum or Steel as Required

Powder Coat or Epoxy Finishes

Stainless Steel and Grade-8 Fasteners Throughout

Hot-Dipped Galvanized Steel Base Frame

R4 Rated Double-Sided Foil Insulation

Stainless Steel Handles and Hardware

Custom Designed Equipment & Battery Racks as

Required

Modular Construction

Outriggers and Jacks as Required

Linex® Floor Coating

Standing Rib Roof Design

C O N S T R U C T I O N S P E C I F I C AT I O N S

COP (Cell On Platform)

3/16

Custom Designed UL® Listed NEMA 3R Wireless Communications Cabinet

150 MPH Wind Load, 150-lb/sq. ft. Snow Load, 500-lb/sq. ft. Floor Load, Zone-4 Rated

R56 Ground Ring, Main Ground Bar (Exterior) Equipment Ground Bar (Interior)

Internal & External GFI Service Receptacles

200 AMP 42-Position 1-Phase 3-Wire Distribution Panel

Flexible Equipment Mounting Options with Ceiling Mounted Ladder Rack Lightweight Modular Design Provides For On-Site Assembly in Access Restricted Areas

Like; Roof Tops, Parking Garages, and Under Power line Towers McLean® HVAC Units with Lead-Lag Controller

High & Low Temperature Alarms, Intrusion, Smoke, Surge, & Utility Power Fail Alarms as Required

** PROPRIETARY AND CONFIDENTIAL ** Copyright © 2014 & Present Sun West Engineering, Inc.

THIS PROPOSAL CONTAINS TRADE SECRETS AND OTHER

PROPRIETARY AND CONFIDENTIAL INFORMATION OF SUN WEST ENGINEERING, INC.

THIS DOCUMENT AND ITS CONTENTS, INCLUDING WITH-

OUT LIMITATION THE DRAWINGS AND OTHER INFOR-MATION HEREIN, ARE THE SOLE AND EXCLUSIVE PROP-

ERTY OF SUN WEST ENGINEERING, INC.

ANY DUPLICATION, DISCLOSURE, OR USE OF ANY POR-TION OF THIS DOCUMENT REQUIRES THE PRIOR WRIT-

TEN CONSENT OF SUN WEST ENGINEERING, INC.

Page 2: COP (Cell On Platform) · 2016-03-07 · COP (Cell On Platform) 3/16 ustom Designed UL® Listed NEMA 3R Wireless ommunications abinet -lb/sq. ft. Snow Load, 500lb/sq. ft. Floor Load,

SAMPLE

CONFIGURATIO

N