COOLIDGE HOUSE Comprehensive Program Review February 28, 2014.

21
COOLIDGE HOUSE Comprehensive Program Review February 28, 2014

Transcript of COOLIDGE HOUSE Comprehensive Program Review February 28, 2014.

COOLIDGE HOUSE

Comprehensive Program ReviewFebruary 28, 2014

Cool Cats - staff working group Coolidge newsletter Community Inclusion – resident holiday party New Generator Outside - In Magazine, December 2013

HIGHLIGHTS

18 PASSION FOR THE JOBCitizens’ Kurt Hanson brings personalpassion to a role that has a long-termimpact on his local community

Resident Holiday Party

Staff Retention

Training

Walk-aways: Probation

Overdue Performance Evaluations

STAFFING

Staff Turnover RatesPerformance Evaluations

Staff Training

STAFF TURNOVER RATES

(1/1/13 to 12/31/13)

Data obtained from HR Personnel Summary

Last CPR, CH staff turnover was 46.9% compared to SJS at 33.9% Last CPR, Overdue Performance Evaluations = 6 FT and 2 PT as of 1/31/13.

OVERDUE PERFORMANCE EVALUATIONS

as of 12/31/13

FT PT

Coolidge House 9 0

Data obtained from HR Retention and Turnover Report

STAFF RETENTION RATES

Data obtained from MMRs and HR Training Reports

Total of 862.75 training hours over six months; an average of 24 hours per staff over six months or 4 hours per month. (This is a 29% decrease in training hours from previous CPR)Last CPR: a total of 1219.5 training hours over six months and an average of 42 hours per staff/over six months or 7 hours per month/per staff

PROGRAMMING

• Utilization• Successful Completions• Completion with:o Employmento Permanent Housing

Current utilization rate is 89.6 %; last CPR the utilization rate was 83.3%. This is an increase of 7.5 % Coolidge House had an average of 107.5 clients; last CPR, an average of 100 clients. This is a 7.5% increase.

Data obtained from Monthly Utilization Reports

Average of 37% of clients completed with employment. Last CPR = 41% (This is a 9.7% decrease)Average of 46.5 % of clients completed with housing. Last CPR = 100% (This is a 53.5% decrease) Average of 82.3 % of clients successfully completed the program. Last CPR = 72% (This is a 14% increase) Average of 17.7 % of clients were terminated before completing the program. Last CPR = 28% (This is a 36% decrease)

Data obtained from MMRs

CLIENT RELATED

• Clinical Hours• Walk-Aways• Medication

Total Hours: 3,949; last CPR = 1,564 (This is a 152% increase) Total Life Skills Hours: 2,585; last CPR =184 Total Cognitive-Behavioral Hours: 1,364; last CPR = 1,380

Data obtained from MMRs

Average Total Hours per client/over six months = 4.3; last CPR = 2.6 Average Life Skills per client/over six months = 2.8; last CPR = 0.3 Average Cognitive-Behavioral per client/six months = 1.48; last CPR = 2.3

CLIENT WALK-AWAYS

7/13-12/13 8/12 - 1/13

Coolidge House 12 6

MEDICATION INCIDENTS

7/13-12/13 8/12 - 1/13

Coolidge House 1 1

Client Walkaways increased by 100% during this time period compared to the last CPR Medication Incidents: one client medication refusal

Client Walk-Aways and Medication Incidents data obtained from MMRs

QUALITY ASSURANCE

Key MMR Results

Satisfaction Surveys

KEY MMR RESULTS

During this reporting time period:• 828 Community Service Hours reported; last CPR =

100. Community Service placements include: Tobin Community Center; Salvation Army; Galvin Foundation; Step Rox; BMC; Inner City Weight Lifting

• A total of 18 incidents involving contraband were reported; last CPR = 43 (this is a 58% decrease)

• 100% of staff are certified in First Aid/CPR/AED and Fire Safety

Data obtained from MMRs

Answered Aways and Most Times If there was a fire = 52/61 or 85% Observe UA = 52/61 or 85% Things working in my room = 44/61 or 72% Know how to file complaint = 43/61 or 70%Program rules are clear = 39/61 or 64%

Answered Aways and Most Times Know about contraband items = 38/61 or 63% Overall program is clean = 38/61 or 63% Receive medical care = 31/61 or 51% Food is good = 14/61 or 23% Receive Emergency Assistance = 12/61 or 20%

ISSUE: Retention of residents COMMENTS: Last CPR, successful completion rate = 72% IMPROVEMENTS MADE: Currently, 82.3% of clients successfully completed the program. (14.3% increase in successful completion rates from last CPR)

ISSUE: Increase Employment Completion Rate COMMENTS: Last CPR, the clients completing with employment was 41%IMPROVEMENTS MADE: The current employment rate = 37% - a decrease of 10.8%

ISSUE: Decrease staff turnoverCOMMENTS: Last CPR, the turnover rate was 46.9%IMPROVEMENTS MADE: Currently, 38.6 % staff turnover rate (21.5% decrease from last CPR)

ISSUE: Improve on the Overdue Performance Evaluation Completion COMMENTS: Last CPR, 6 FT and 2 PT evaluations were overdue IMPROVEMENTS MADE: Currently, 9 FT evaluations are overdue. Working on improving internal

processes to ensure timely completion of evaluations.