CLEAR KEEP Bo Bo CLEAR KEEP CLEAR KEEP CLEAR KEEP CLEAR KEEP For continuation of route see Consultation Drawing No. 1 For continuation of route see Consultation Drawing No. 3 Road to be widened to retain 3 traffic lanes Widened cycle lane to be provided, and early start facility for cycles New cycle lane to tie-in to Bus Lane Road to be widened to enable continuous cycle lane to be provided Cycle lanes to continue though junction Island to be amended New cycle lane to be provided with 'buffer zone' between parking. Low level cycle signals with early start for cycles to be provided Cycle lane to be widened Cycle early start to be provided via low level cycle signal aspect, to allow cyclists to clear junction in advance of traffic Island to be amended to enable cycle lanes to continue through junction and pedestrian facilities improved to single stage crossing Signal stop line positions to be amended to increase traffic flow Mandatory cycle lanes to be installed with flexible bollard segregation from traffic. Bollards to be spaced to still enable on street parking and access to premises, as existing Mandatory cycle lanes to be installed with flexible bollard segregation from traffic. Bollards to be spaced to still enable on street parking and access to premises, as existing Cycle lane to be widened New advisory cycle lanes Cyclist to utilise recently installed wide cycle lanes within existing bus lanes leader Cyclist to utilise recently installed wide cycle lanes within existing bus lanes Existing cycle lane to be widened Cyclist to utilise recently installed wide cycle lanes within existing bus lanes Cyclist to utilise recently installed wide cycle lanes within existing bus lanes Cyclist to utilise recently installed wide cycle lanes within existing bus lanes Cyclist to utilise recently installed wide cycle lanes within existing bus lanes Cyclist to utilise recently installed wide cycle lanes within existing bus lanes Beverley Road Corridor Cycle Facilities - Ryde Street to Riversdale Road Consultation Drawing No. 2 Existing road markings. Proposed new cycle lane markings. Proposed new kerb line. Proposed flush dropped kerb. Proposed wand style bollard. Proposed bollard. Proposed green surfacing in bus lanes and at junctions to highlight presence of cyclists. Cycle track adjacent to carriageway. Bo Key: