Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31
-
Upload
damon-thomas -
Category
Design
-
view
193 -
download
3
description
Transcript of Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31
Slide Show of Construction Progress at TechTown - Detroit TechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Breaking Down Existing ItemsTechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Cleaning Up for DemolitionTechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Temporary Mailbox WallTechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Temporary Mail Box LocationTechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Demolition - Breaking Through Cafe Wall - 1TechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Demolition - Breaking Through Cafe Wall - 2TechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Demolition - Partition RemovalTechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Demolition In Full SwingTechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Demolition - Removal of Existing Walls CompleteTechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Opening Up The 1st Floor - 1TechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Opening Up The 1st Floor - 2TechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Opening Up The 1st Floor - 3TechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Future Co-Working Space LocationTechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Floor Saw Cuts for Electrical - 1TechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Floor Saw Cuts for Electrical - 2TechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Future Co-working Community Kitchen AreaTechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Construction - Wall Framing BeginsTechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Director’s Office & TechTown Conf. Rm.TechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
More Stud WallsTechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Stud Walls Go Up for Event SpaceTechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Wall Framing + Mechanical DuctworkTechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Stud Walls for Conf. Rooms 3 - 4TechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Stud Walls Along CorridorTechTown 1st Floor Renovation
May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
More Construction Progress Photos Will Be Posted Next Month
TechTown 1st Floor Renovation May 1 - May 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com