Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

25
Slide Show of Construction Progress at TechTown - Detroit TechTown 1st Floor Renovation May 1 - May 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com

description

Photos of this SlideShare are of the 1st Floor Renovation Project my firm designed for TechTown –Detroit. TechTown is a small business incubator and resource hub for start up, small and medium size businesses. TechTown will unveil this premier Co-Working Office Space in the fall of 2013. The photos posted are tracking the construction progress. Come back next month and see how far along we are. Thanks for viewing.

Transcript of Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Page 1: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Slide Show of Construction Progress at TechTown - Detroit TechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 2: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Breaking Down Existing ItemsTechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 3: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Cleaning Up for DemolitionTechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 4: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Temporary Mailbox WallTechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 5: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Temporary Mail Box LocationTechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 6: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Demolition - Breaking Through Cafe Wall - 1TechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 7: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Demolition - Breaking Through Cafe Wall - 2TechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 8: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Demolition - Partition RemovalTechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 9: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Demolition In Full SwingTechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 10: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Demolition - Removal of Existing Walls CompleteTechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 11: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Opening Up The 1st Floor - 1TechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 12: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Opening Up The 1st Floor - 2TechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 13: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Opening Up The 1st Floor - 3TechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 14: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Future Co-Working Space LocationTechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 15: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Floor Saw Cuts for Electrical - 1TechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 16: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Floor Saw Cuts for Electrical - 2TechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 17: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Future Co-working Community Kitchen AreaTechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 18: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Construction - Wall Framing BeginsTechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 19: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Director’s Office & TechTown Conf. Rm.TechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 20: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

More Stud WallsTechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 21: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Stud Walls Go Up for Event SpaceTechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 22: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Wall Framing + Mechanical DuctworkTechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 23: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Stud Walls for Conf. Rooms 3 - 4TechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 24: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

Stud Walls Along CorridorTechTown 1st Floor Renovation

May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 25: Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31

More Construction Progress Photos Will Be Posted Next Month

TechTown 1st Floor Renovation May 1 - May 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com